ENGINEER’S REPORT
10. Engineer’s Report, including:
a. Commercial Reviews:
1. Beamer Villas – No new updates.
2. El Dorado Tracts:
i. Allora Apartments (9.13 Acre Multi Family Tract): Construction plan letters of no
objection were issued on 10/14/20. SPHL has prepared the front-end documents for the
necessary water line and water meter easements to serve the development. The documents
have been forwarded to the developer for execution.
ii. 123 Unit Assisted Living Facility (6.77 Acres El Dorado Blvd and Beacons View): Plans
were reviewed by the District and WGA has resubmitted construction documents for
review.
3. ACES AC Warehouse (4021 Ellis Road) – Plans have been submitted for review.
4. Rodzina Office Warehouse Phase II (4406 Rex Road) – Plans have been submitted for review.
5. Speedy Carwash (2813 W. El Dorado Blvd) – Plans have been reviewed and a plan review
letter was issued on 10/12/20.
b. Capacity Requests:
i. ACES AC Warehouse Capacity Request: Venturi Engineering, Inc. on behalf of ACES
A/C Supply, Inc., have submitted a capacity reservation for 1,000 gallons per day water
and sewer capacity (4 ESFCs) to serve a 2.0645-acre tract (see page 3). The 2.0645 acre
tract was purchased from Ellis Business park which was originally reserved 8,000 gpd
water and 5,000 gpd sewer service.
Action Item: Grant capacity reservation to ACES A/C warehouse for 4 ESFC and revise
Ellis Business Park capacity reservation to reflect a reduction of 4 ESFC.
Date: October 20, 2020
To: Harris County MUD No. 55
From: Nelson Gaez
Nelson Gaez, PE
District Engineer
Engineer’s Report
Harris County MUD No. 55
October 20, 2020
Page 2
c. BGE authorized projects:
i. 2020 Bond Issue Report – BGE has addressed consultant comments.
d. COH / County Projects:
i. COH South-East Transmission Line (surface water line) – LAN has created a portal for
coparticipant to collaborate in the review of contract D of the alignment (see page 4 – 5).
ii. Blackhawk Treatment Plant:
The next coparticipant meeting will be scheduled for November 5th. The GCA sent an
reminder to the coparticipants that solid disposal fees are expected to increase significantly
within the next 5 years. GCA is proposing to conduct a study to analyze options to
maintain the lowest disposal cost possible. The study is estimated to cost $21,500. The
GCA is proposing to reallocate a portion of unspent funds in the operating expense budget
surplus.
A summary of flows for the month of August is attached (see page 6).
September 11, 2020 Harris County MUD55 c/o Mr. Nelson Gaez P.E. 10777 Westheimer Road, Suite 400 Houston, Texas, 77042 RE: Proposed Aces A/C Supply, Inc. Office/Warehouse
± 2.00-Acre Tract located at 4021 Ellis Road, Friendswood, TX 77546 VE Project# 20-009
Dear Mr. Gaez, On behalf of Aces A/C Supply, Inc. we hereby request reservation of four (4) Equivalent Single-Family Connections (ESFC) for the 2.0645-acre tract located 4021 Ellis Road in Friendswood, Tx based on the enclosed letter from Ellis Properties, LLC. We appreciate your time. If you have any questions, please feel free to contact us. Sincerely, VENTURI ENGINEERS LLC
Jeremiah D. Kamerer, P.E.,
Attachments:
- Aerial Exhibit - Service Unit Equivalent Table - “Letter to Harris County MUD 55 – Water and Sewer Capacity” Allocation
3
F.
Ex
hib
it C
on
tra
ct
Ma
p
4
Co
ntr
ac
t A
(G
un
da
)W
BS
No. S
-000900-0
143-3
30
% S
ub
mitta
l –1
/29
/21
SE
TL
HW
Y 3
DL
(Cit
y O
nly
)
Co
ntr
ac
t B
(B
i nkle
y &
Ba
rfie
ld)
WB
S N
o. S
-000900-0
144-3
30
% S
ub
mitta
l –1
0/1
6/2
0 (
TB
D)
Co
ntr
ac
t C
(N
AK
)W
BS
No. S
-000900-0
145-3
30
% S
ub
mitta
l –1
2/4
/20
Co
ntr
ac
t D
(T
exa
s A
me
rica
n)
WB
S N
o. S
-000900-0
146-3
30
% S
ub
mitta
l –9
/30
/20
Co
ntr
ac
t E
(G
un
da
)W
BS
No. S
-000900-0
147-3
90
% S
ub
mitta
l –1
1/9
/20
Co
ntr
ac
t F
(C
oste
llo)
WB
S N
o. S
-000900-0
148-3
De
sig
n O
n-H
old
AT
TA
CH
ME
NT
NO
. 1
4
WB
S #
Co
ntr
ac
tD
es
ign
E
ng
ine
er
Mile
sto
ne
s
30
%6
0%
90
%B
id S
et
Ad
ve
rtis
em
en
t
S-0
00
90
0-0
14
3-3
AG
un
da
1/2
9/2
19
/24
/21
5/1
2/2
21
1/8
/22
TB
D
S-0
00
90
0-0
14
4-3
BB
inkle
y &
B
arf
ield
10/1
6/2
0*
2/8
/21
6/2
1/2
18/2
/21
TB
D
S-0
00
90
0-0
14
5-3
CN
AK
12
/4/2
05
/18
/21
9/9
/21
1/7
/22
TB
D
S-0
00
90
0-0
14
6-3
DT
AE
9/3
0/2
01
/21
/21
5/6
/21
9/2
/21
TB
D
S-0
00
90
0-0
14
7-3
EG
un
da
4/3
0/1
91
0/2
1/1
91
1/9
/20
TB
DT
BD
S-0
00
90
0-0
14
8-3
FC
oste
lloT
o b
e d
ete
rmin
ed
, a
wa
itin
g w
ate
r lin
e r
e-e
valu
atio
n
Cu
rren
t S
ch
ed
ule
*Pe
nd
ing
sch
ed
ule
up
da
te
AT
TA
CH
ME
NT
NO
. 1
5
City of Friendswood 64.53% 117.0603 MG
MUD #55 22.93% 41.5888 MG
City of Houston 6.05% 10.9831 MG
MUD #1 6.49% 11.7687 MG
Total 100.00% 181.4010 MG
Year to Date
Flow Contribution
Per Cent Contribution
Gulf Coast AuthorityFlow Data
September 2020
0.0000
50.0000
100.0000
150.0000
200.0000
JAN FEB MAR APR MAY JUN JULY AUG SEPT OCT NOV DEC
City of Friendswood Mud #55 City of Houston MUD #1
JAN FEB MAR APR MAY JUN JULY AUG SEPT OCT NOV DEC
City of Friendswood 64.54% 63.34% 64.90% 65.80% 66.20% 65.52% 64.39% 63.45% 64.53% 0.00% 0.00% 0.00%
Mud #55 22.75% 23.10% 23.64% 23.98% 22.00% 20.72% 21.78% 22.07% 22.93% 0.00% 0.00% 0.00%
City of Houston 7.01% 7.86% 6.39% 4.16% 5.03% 5.73% 6.45% 6.50% 6.05% 0.00% 0.00% 0.00%
MUD #1 5.70% 5.70% 5.07% 6.06% 6.78% 8.03% 7.38% 7.98% 6.49% 0.00% 0.00% 0.00%
0.00%
10.00%
20.00%
30.00%
40.00%
50.00%
60.00%
70.00%
6