Dunsmuir Connection NORTHEAST FALSE CREEK Learn more: vancouver.ca/nefc [email protected] 3-1-1 WE ARE HERE Preliminary Dunsmuir Connection Consultation NEFC Plan Approved FEB 2018 SEP 2019 JAN 2020 SPRING 2020 2021 + Concept Options Consultations Preferred Dunsmuir Connection Design NEFC Infrastructure Construction Begins HOW WE MOVE Aerial of the future active transportation connections in the new False Creek neighbourhood Excerpt from the initial Dunmsuir Connection survey, full survey results are available online at: vancouver.ca/files/cov/dunsmuir-connection-survey-summary.pdf ACTIVE TRANSPORTATION During the Northeast False Creek (NEFC) planning process, it was determined that a pedestrian and cycling connection between the Union St and Quebec St cycling routes to the existing Dunsmuir St bi-directional bike facility would be necessary to replace the existing facility on the Dunsmuir Viaduct. The Dunsmuir Connection is a proposed elevated east-west pedestrian pathway and bikeway, connecting the city to the park, allowing for views out to the park space and the mountain and creek horizons beyond. Through preliminary public engagement and discussions with City staff, the consulting team of COWI / Henning Larsen / Dissing + Weitling has developed two concept options for discussion and review. STADIUM - CHINATOWN STATION ROGERS ARENA ANDY LIVINGSTONE PARK CHINATOWN CREEKSIDE PARK EXTENSION UNION - ADANAC BIKEWAY SCIENCE WORLD How do you actively use the Dunsmuir Viaduct currently? What are the most important amenities that the Dunsmuir Connection should have? How would you use the Dunsmuir Connection in the future? 1. The Dunsmuir Connection Survey was conducted on-line from September 4 - 29, 2019. In addition, the project team held two in-person events on September 7 and 11 near the Dunsmuir Viaduct outside Stadium-Chinatown SkyTrain Station. The survey consisted of four multiple choice questions, and one open ended question. In total, 929 survey responses were received. PROJECT TIMING PRELIMINARY SURVEY 28% 41% 1% 1% 16% 13% 44% 42% 3% 3% 3% 5% Walk Cycle Skateboard Rollerblade None All other Walk Cycle Skateboard Rollerblade None All other Ϭ ϭϬϬ ϮϬϬ ϯϬϬ ϰϬϬ sŝĞǁƐ ŽĨ &ĂůƐĞ ƌĞĞŬ ĂŶĚ ƚŚĞ ŵŽƵŶƚĂŝŶƐ ^ĞĂƚŝŶŐ ĂŶĚ ƉůĂĐĞƐ ƚŽ ƌĞƐƚ &ůĞdžŝďůĞ ŽƉĞŶ ƐƉĂĐĞƐ ĨŽƌ ƚĞŵƉŽƌĂƌLJ ĞǀĞŶƚƐ >ĂŶĚƐĐĂƉŝŶŐ >ŝŐŚƚŝŶŐ WƵďůŝĐ ƌƚ sĞƌLJ ŝŵƉŽƌƚĂŶƚ ^ŽŵĞǁŚĂƚ ŝŵƉŽƌƚĂŶƚ EŽƚ ǀĞƌLJ ŝŵƉŽƌƚĂŶƚ EŽƚ Ăƚ Ăůů ŝŵƉŽƌƚĂŶƚ

Upload: others

Post on 03-Feb-2021

3 views

Category:

Documents


0 download

TRANSCRIPT

  • Dunsmuir Connection

    NORTHEAST FALSE CREEK

    Learn more: vancouver.ca/nefc [email protected] 3-1-1

    WEARE

    HEREPreliminary Dunsmuir

    Connection Consultation

    NEFC Plan

    Approved

    FEB 2018

    SEP 2019

    JAN 2020 SPRING

    2020 2021 +

    Concept Options

    Consultations

    Preferred Dunsmuir

    Connection Design

    NEFC Infrastructure

    Construction Begins

    HOW WE MOVE

    Aerial of the future active transportation connections in the new False Creek neighbourhood

    Excerpt from the initial Dunmsuir Connection survey, full survey results are available online at: vancouver.ca/files/cov/dunsmuir-connection-survey-summary.pdf

    ACTIVE TRANSPORTATIONDuring the Northeast False Creek (NEFC) planning process, it was determined that a pedestrian and cycling connection between the Union St and Quebec St cycling routes to the existing Dunsmuir St bi-directional bike facility would be necessary to replace the existing facility on the Dunsmuir Viaduct.

    The Dunsmuir Connection is a proposed elevated east-west pedestrian pathway and bikeway, connecting the city to the park, allowing for views out to the park space and the mountain and creek horizons beyond.

    Through preliminary public engagement and discussions with City staff, the consulting team of COWI / Henning Larsen / Dissing + Weitling has developed two concept options for discussion and review.

    STADIUM - CHINATOWN

    STATIONROGERS ARENA

    ANDY LIVINGSTONE PARK

    CHINATOWN

    CREEKSIDE PARK EXTENSION

    UNION - ADANAC BIKEWAY

    SCIENCE WORLD

    How do you actively use the Dunsmuir Viaduct currently?

    What are the most important amenities that the Dunsmuir Connection should have?

    How would you use the Dunsmuir Connection in the future?

    1.

    The Dunsmuir Connection Survey was conducted on-line from September 4 - 29, 2019. In addition, the project team held two in-person events on September 7 and 11 near the Dunsmuir Viaduct outside Stadium-Chinatown SkyTrain Station.

    The survey consisted of four multiple choice questions, and one open ended question. In total, 929 survey responses were received.

    PROJECT TIMING

    PRELIMINARY SURVEY

    28%41%

    1% 1%

    16%

    13%

    44%42%

    3%3%3%5%

    Walk

    Cycle

    Skateboard

    Rollerblade

    None

    All other

    Walk

    Cycle

    Skateboard

    Rollerblade

    None

    All other

  • Dunsmuir Connection

    NORTHEAST FALSE CREEK

    Learn more: vancouver.ca/nefc [email protected] 3-1-1

    Bea

    tty

    Stre

    et

    Pacif

    ic Bo

    ulev

    ard

    SkyTrain

    Georgia Street

    Qu

    eb

    ec S

    tre

    et

    Ab

    bo

    tt S

    tre

    et

    Main

    Str

    ee

    t

    Carr

    all G

    reenw

    ay

    Prior Street

    Union Street

    Keefer Street

    Rogers Arena

    BC Place

    Andy Livingstone

    Park

    Creekside Park

    DOWNTOWNAND BRIDGE

    SkyTrain

    PARK LANDING

    FFFFFFFFFFFFUUUUUUUUUUUUTTTTTTTTTTUURRRRRREEEEDDDDDDDDDDUUUUUUUUUUUUUUUUUUUNNNNNNNNNNNNNNSSMMMMMUUUUUIIIIRRR

    CCCCCCCCCCCCCCOOOOOOOOONNNNNNNNNNNNNEEEEEEEEEEEEEECCCCCCCCCCCCCTTTTTTTTTTTIIIIIIIOOOOOOOOOOOOONNNNNNNNNN

    DOWNTOWN AND BRIDGE PARK LANDING

    “We are connected”

    The Downtown and Bridge segment is a flexible area that facilitates walking and cycling through and within the area. This segment provides access for everyday trips while providing a large open space for special events. It includes:

    » A new entry plaza to Stadium-Chinatown Station and a small urban space at Citadel Parade

    » A connection to Rogers Arena, including access to the existing elevator and stairs

    » Views to the streets and surrounding landscape

    » Landscaping to enhance the walking and cycling experience

    » Bridging opportunities to connect to future development

    “You have arrived”

    The Park Landing transitions people travelling on the Dunsmuir Connection into the future park and connects people to neighbourhoods in and adjacent to NEFC. The Park Landing segment facilitates walking and cycling in combination with experience of the park landscape. Whether by foot or on wheels, this segment brings people to the heart of NEFC, the future park and beyond. This segment includes:

    » A programmed plaza space with a stair connection to the park below

    » A pedestrian and bike path that is integrated with the landscape and the park

    The Dunsmuir Connection is divided into two segments, each of these segments speaking to different elements and contexts. The Downtown segment incorporates everyday cycling and walking trips as well as special events, including gatherings and celebrations. The Park Landing segment marks the arrival point to the NEFC neighbourhood and acts as an entry and exit point to the Dunsmuir Connection.

    THE PEAK AND THE VALLEY

    Bridge:'The Landscape of the Peak'

    Landings:'The Landscape of the Forest and Valley'

    2.

    SEGMENTS

  • Dunsmuir Connection

    NORTHEAST FALSE CREEK

    Learn more: vancouver.ca/nefc [email protected] 3-1-1

    Base ScenarioThis option provides a simple straightforward connection with the potential for programmable plazas, flexible connections and ease of wayfinding.

    Dynamic ScenarioThis option provides a continuous cycling experience by reducing conflict and removing one pedestrian crossing.

    t

    Pacif

    icBo

    ulev

    ard

    SkyTrain

    Georgrgia Street

    Qu

    eb

    ec

    Str

    ee

    t

    Ab

    bo

    tt S

    tre

    et

    Carr

    all G

    reenw

    ay

    Keefer Street

    Rogers Arena

    Andy Livingstone

    Park

    CreeksidePark

    t

    Pacif

    ic Bo

    ulev

    ard

    SkyTrain

    Georrggia Street

    Qu

    eb

    ec S

    tre

    et

    Ab

    bo

    tt S

    tre

    et

    Carr

    all G

    reenw

    ay

    Keefer Street

    Rogers Arena

    Andy Livingstone

    Park

    Creekside Park

    kyTT

    $80M $90M

    OPTIONS OVERVIEWAs per Council direction in 2015, staff are continuing to pursue a self-funding implementation strategy, through on-going public benefits negotiations with NEFC landowners and community partners. It is anticipated that these developments will provide the funding for public benefits including the required City infrastructure, housing, parks and open spaces and civic facilities.

    In order to meet the objectives of the NEFC Plan and meet the transportation needs of the city, two concepts were explored. These two concepts have many cross over points and, depending on the feedback we receive, elements from both could be included in the final design.

    3.

    THE OPTIONS

    Pacific

    Blvd NEFC PLAN

    FUTURE NEIGHBOURHOOD

    FUTURE STREET NETWORK

    PARKS AND OPENSPACES

    OPTION A OPTION B

    The NEFC Plan will act as a framework for guiding new growth, development and public investment within NEFC. The Plan will be implemented over the next 20 years through development, partnerships and City initiatives.

  • Dunsmuir Connection

    NORTHEAST FALSE CREEK

    Learn more: vancouver.ca/nefc [email protected] 3-1-1

    DN

    RAMP

    MAX 5%

    SLOPE

    Dunsm

    uir Street

    Beat

    ty S

    tree

    t

    Rogers Arena

    Stadium-Chinatown SkyTrain Station

    Dunsm

    uir Street

    Beat

    ty S

    tree

    t

    Rogers Arena

    Stadium-Chinatown SkyTrain Station

    DN

    ONE LEVEL SEPARATED PEDESTRIAN AND CYCLING

    DO

    WN

    TO

    WN

    AN

    D B

    RID

    GE

    Bea

    tty

    Stre

    et

    Pacif

    ic Bo

    ulev

    ard

    SkyTrain

    Georgia Street

    Qu

    eb

    ec S

    tre

    et

    Ab

    bo

    tt S

    tre

    et

    Main

    Str

    ee

    t

    Carr

    all G

    reenw

    ay

    Prior Street

    Union Street

    Keefer Street

    Rogers Arena

    BC Place

    Andy Livingstone

    Park

    Creekside Park

    DOWNTOWNAND BRIDGE

    SkyTrain

    FFFFFUUUUUUUTTTTURRREEEEEDDDDDUUUUUUUUUUUNNNNNNNNNSSSMMUUUIRR

    CCCCCCCCCOOOOOONNNNNNNNEEEEEEEEEECCCCCCCCCCTTTTIIIIIOOOOOOONNNNN

    Advantages: » Simple structure » Flexible open spaces » Adaptable to varying needs » Less maintenance required

    Challenges: » Pedestrian/cycling crossings: » Beatty St » Citadel Parade » Increased pedestrian and cyclist conflict

    4.

    OPTION A

    Wide pedestrian realm

    Flexible design

    OVERVIEW

    The Dunsmuir Connection ties into Dunsmuir St at Beatty St facilitating a protected, bi-directional cycling facility on the north side of Dunsmuir St and sidewalks connecting to the Stadium-Chinatown SkyTrain station, Costco and Rogers Arena. Bicycles and pedestrians travel on a single level towards Creekside Park.

  • Dunsmuir Connection

    NORTHEAST FALSE CREEK

    Learn more: vancouver.ca/nefc [email protected] 3-1-1

    DN

    RAMP

    MAX 5%

    SLOPE

    Dunsm

    uir Street

    Beat

    ty S

    tree

    t

    Rogers Arena

    Stadium-Chinatown SkyTrain Station

    DO

    WN

    TO

    WN

    AN

    D B

    RID

    GE

    Bea

    tty

    Stre

    et

    Pacif

    ic Bo

    ulev

    ard

    SkyTrain

    Georgia Street

    Qu

    eb

    ec S

    tre

    et

    Ab

    bo

    tt S

    tre

    et

    Main

    Str

    ee

    t

    Carr

    all G

    reenw

    ay

    Prior Street

    Union Street

    Keefer Street

    Rogers Arena

    BC Place

    Andy Livingstone

    Park

    Creekside Park

    DOWNTOWNAND BRIDGE

    SkyTrain

    FFFFFFUUUUUUUUTTTTUURREEEEDDDDUUUUUUUUUUUNNNNNNNNNSSSMMUUIRR

    CCCCCCCCCCOOOOOONNNNNNNEEEEEEECCCCCCCCCCTTTTTIIIIOOOOOONNNNN

    5.

    OPTION B

    TWO LEVELS SEPARATED PEDESTRIAN WITH CYCLING UNDERPASS

    Advantages: » Direct pedestrian access to SkyTrain from Rogers

    Arena

    Challenges: » Additional cost for structure » Not adaptable to future changes in capacity » Indirect cycling access to Rogers Arena

    Vertical separation of pedestrian and

    cycling

    Uninterrupted circulation from Rogers Arena

    Cyclist stair to Rogers Arena

    OVERVIEW

    Bicycles and pedestrians are separated between Beatty St and Pacific Blvd through a separate structure for cyclists to travel underneath surface level pedestrian space. This creates an uninterrupted pedestrian connection between Rogers Arena and Stadium-Chinatown SkyTrain station. Bicycles and pedestrians travel on a single level between Pacific Blvd and Creekside Park.

  • Dunsmuir Connection

    NORTHEAST FALSE CREEK

    Learn more: vancouver.ca/nefc [email protected] 3-1-1

    PA

    RK

    LA

    ND

    ING

    Bea

    tty

    Stre

    et

    Pacif

    ic Bo

    ulev

    ard

    SkyTrain

    Georgia Street

    Qu

    eb

    ec S

    tre

    et

    Ab

    bo

    tt S

    tre

    et

    Main

    Str

    ee

    t

    Carr

    all G

    reenw

    ay

    Prior Street

    Union Street

    Keefer Street

    Rogers Arena

    BC Place

    Andy Livingstone

    Park

    Creekside Park

    PARK LANDING

    FFFFFFFUUUUUUUTTTTUURRRREEEEDDDDDUUUUUUUUUUUUNNNNNNNNNSSSMMUIIRR

    CCCCCCCCCCCCOOOOOONNNNNNNEEEEEEEEECCCCCCCCCCCCTTTTTIIIIIOOOOOOONNNNN

    Carr

    all G

    ree

    nw

    ay

    Future Creekside

    Park

    Ground Water Treatment

    Plant

    Pacific Boulevard

    Andy Livingstone

    Park

    SkyTrain

    Carr

    all G

    ree

    nw

    ay

    Pacific Boulevard

    Andy Livingstone

    Park

    Future Creekside

    Park

    Ground Water Treatment

    Plant

    SkyTrain

    6.

    OPTION A

    PACIFIC BLVD CONNECTION

    Advantages: » Quebec St intersection » Simple and clear wayfinding » Reduced park space required » Direct pedestrian connection to Carrall Greenway

    Challenges: » Less integration with surrounding park

    infrastructure

    Grand staircase connecting to Carrall

    Greenway

    Direct route to park and new Pacific

    Blvd

    OVERVIEW

    This option provides a simple and direct connection between the Downtown and the new park.

  • Dunsmuir Connection

    NORTHEAST FALSE CREEK

    Learn more: vancouver.ca/nefc [email protected] 3-1-1

    PA

    RK

    LA

    ND

    ING

    Bea

    tty

    Stre

    et

    Pacif

    ic Bo

    ulev

    ard

    SkyTrain

    Georgia Street

    Qu

    eb

    ec S

    tre

    et

    Ab

    bo

    tt S

    tre

    et

    Main

    Str

    ee

    t

    Carr

    all G

    reenw

    ay

    Prior Street

    Union Street

    Keefer Street

    Rogers Arena

    BC Place

    Andy Livingstone

    Park

    Creekside Park

    PARK LANDING

    FFFFFFFUUUUUUUTTTTUURRRREEEEDDDDDUUUUUUUUUUUUNNNNNNNNNSSSMMUIIRR

    CCCCCCCCCCCCOOOOOONNNNNNNEEEEEEEEECCCCCCCCCCCCTTTTTIIIIIOOOOOOONNNNN

    Carr

    all G

    ree

    nw

    ay

    Future Creekside

    Park

    Ground Water Treatment

    Plant

    Pacific Boulevard

    Andy Livingstone

    Park

    SkyTrain

    ee

    nw

    ay

    ee

    nw

    ay

    7.

    OPTION B

    SEASIDE GREENWAY CONNECTION

    Viewpoint location

    Outdoor amphitheater connected to Carrall

    Greenway

    Experiential connection to the

    park

    OVERVIEW

    This option provides the opportunity to integrate walking and cycling with a park like environment.

    Advantages: » Elevated viewpoint adjacent to Carrall Greenway » Amphitheatre style steps to improve public

    space

    » Direct pedestrian connection to Carrall Greenway

    Challenges: » Increased park space required » Increased integration with the new park

  • Dunsmuir Connection

    NORTHEAST FALSE CREEK

    Learn more: vancouver.ca/nefc [email protected] 3-1-1

    NEXT STEPS

    NEFC PLAN TIMELINE

    The NEFC Plan sets out policy for a new mixed-use neighbourhood with $1.7B in public benefits that will be built out over the next 20 years. These benefits include:

    » Viaducts Replacement Project in two constructions phases

    » Phase 1: Street network and infrastructure to support 750 Pacific Blvd (Sub-area 6B, Plaza of Nations)

    » Phase 2: Street network and infrastructure to support 811 Carrall St (Sub-area 6C), removal of the Georgia and Dunsmuir Viaducts, and construction of the new Dunsmuir Connection

    » Affordable Housing

    » On-site benefits

    » Off-site benefits

    Timing of each development site is dependent on the submission by the landowners/developers and cannot be determined by the City. The current status of NEFC developments is as follows:

    » 750 Pacific Blvd (Sub-area 6B, Plaza of Nations) rezoning was approved in-principle at Council in July 2018, the preliminary

    development permit application has been received

    » 777 Pacific Blvd (Sub-area 10C) rezoning was approved in-principle at Council in July 2018

    » 800 Quebec St and 801 Main St and 898 Main St (Sub-area 6D, Main St Blocks) and 811 Carrall St (Sub-area 6C) are currently on

    hold

    8.

    Take the online survey:

    bit.ly/DunsmuirConnect