NECEPT Plant Technician Proficiency Certification NECEPT Bituminous Plant Technician Proficiency Certification requires that all candidates successfully complete both the NECEPT written and performance examinations This Proficiency Certification will be required in addition to the current NECEPT Bituminous Level 1 and 2 Plant Technician Certification Program NECEPT Bituminous Plant Technician Proficiency Certification provides recognition of your skills to conduct sampling and testing of asphalt mixtures

Upload: others

Post on 01-Aug-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NECEPT Plant Technician Proficiency Certification

• NECEPT Bituminous Plant Technician Proficiency Certification requires that all candidates successfully complete both the NECEPT written and performance examinations

• This Proficiency Certification will be required in addition to the current NECEPT Bituminous Level 1 and 2 Plant Technician Certification Program

• NECEPT Bituminous Plant Technician Proficiency Certification provides recognition of your skills to conduct sampling and testing of asphalt mixtures

Page 2: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

• Why is this needed?• Asphalt mixtures tested by Certified Technicians improves

the reliability of test results • This aids in assuring that the test results are truly

representing the asphalt mixture being placed. Proper testing therefore assures accurate identification of good quality asphalt mixtures and sub-standard mixes

• Records of these test results by a Certified Technician are essential for payment purposes and any potential disputes

• Proficiency in the required sampling and test methods becomes extremely important as PennDOT Projects migrate towards Local Acceptance (LA) and Hands-on Local Acceptance (HOLA) specifications where acceptance testing is performed at the producer’s lab and not at PennDOT’sLaboratory Testing Section (LTS)

NECEPT Plant Technician Proficiency Certification

Page 3: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NYSDOT Plant Technician Proficiency Program

• Held at Alfred State College – Alfred, NY• Also (1) at Advance Testing – Campbell Hall, NY

• Class is 1 ½ days • Day 1 – Hands on proficiency / oral exam

• 3 stations in AM• 3 stations in PM

• Day 2 – Written exam (open book)

• 12 students per class• Staff - 1 professor and 2 consultants• 100-200 students per year• No experience required

Page 4: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NYSDOT Plant Technician Proficiency Program

• Day 1 – AM• Demonstrate proficiency and understanding of

procedures/test methods• Three stations – 20 minutes each

• Sampling and splitting • Sieve analysis• Gmb

• Day 1 – PM• Demonstrate proficiency and understanding of

procedures/test methods• Three stations – 20 minutes each

• Gyratory compaction• Gmm• NYSDOT Forms (calculating sample point and QAF)

Page 5: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716
Page 6: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716
Page 7: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716
Page 8: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716
Page 9: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716
Page 10: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

• Day 2 – AM• Written exam• Open book• Re-test is possible

NYSDOT Plant Technician Proficiency Program

Page 11: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NYSDOT Plant Technician Proficiency Program

• Upon successful completion of both proficiency and written exam

• Certification is good for 5 years• Re-certification is required – two methods

• Successfully complete the entire 1 ½ day course againOR

• IAST tests • Two in the past five years with at least one within 24 months of re-

certification date AND• Successfully pass the written exam

• Cost• Full course - $625 NYCMA members ($925 non-members)• Written exam only - $395• http://www.nymaterials.com/Resources/Documents/CMA%202

015%20Brochure.pdf

Page 12: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

• Put on by WVDOT• IAS engineer• Lab technician

• ½ day• Hands-on proficiency

• Sampling / Splitting • Gradation• Marshall compaction• Gyratory compaction• Gmb / Gmm• Marshall stability / flow• Ignition oven

• Written exam?

WVDOT Plant Technician Proficiency Program

Page 13: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

• Currently a one-time requirement• However FHWA pressure going to 5-year renewal• Also developing a proficiency program for those

certified with sample throughout the year (similar to AMRL)

WVDOT Plant Technician Proficiency Program

Page 14: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NECEPT Plant Technician Proficiency Certification

• Manual - Table of Contents• Purpose and Importance• Overview• Administration• Definitions• Technician Manual• Written Examination• Performance Examination• Re-examination• Appeals• Certification• Recertification• Decertification

Page 15: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NECEPT Plant Technician Proficiency Certification

• Study Guide - Each section contains:• Brief description of how to conduct the procedure• Reprint of the AASHTO or PennDOT Standard• Performance Checklist

• Attachment• Question/Answer Study Guide (not to be used on the

written examination)

Page 16: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NECEPT Plant Technician Proficiency Certification

• Included Standards• (1) AASHTO R 47 – Standard Practice for Reducing Samples

of Hot Mix Asphalt (HMA) to Testing Size• (2) PTM 702 - Quantitative Extraction of Bitumen From

Bituminous Paving Mixtures• (3) PTM 739 - Sieve Analysis of Extracted Aggregate (on

written test only)• (4) PTM 757 - Determination of Asphalt Content and

Gradation of Bituminous Mixtures By The Ignition Method• (5) AASHTO T 30 - Standard Method of Test for Mechanical

Analysis of Extracted Aggregate• (6) PTM 703 – Method of Calibration For Volumeter (on

written test only)

Page 17: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NECEPT Plant Technician Proficiency Certification

• Included Standards• (7) PTM 715 - Determination of Bulk Specific Gravity of

Compacted Bituminous Mixtures• (8) PTM 716 - Determination of Bulk Specific Gravity of

Compacted Bituminous Mixtures That Absorb More Than 3.0 Percent Water By Volume (on written test only)

• (9) AASHTO T 209 - Theoretical Maximum Specific Gravity (Gmm) and Density of Hot Mix Asphalt (HMA)

• (10) AASHTO T 312 - Standard Method of Test for Preparing and Determining the Density of Asphalt Mixture Specimens by Means of the Superpave Gyratory Compactor

Page 18: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NECEPT Plant Technician Proficiency Certification

• To be held at various locations across the state

• TBD• Class is 1 ½ days

• Day 1 – Hands on proficiency / oral exam

• 3 stations in AM• 3 stations in PM

• Day 2 – Written exam (open book)• 12 students per class ???• Staff - 1 lead examiner and 2

assistant examiners• 100-200 students per year ???• Approved experience required

Page 19: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NECEPT Plant Technician Proficiency Certification

• Day 1 – AM• Demonstrate proficiency and understanding of

procedures/test methods• Three stations – 20 minutes each

• Reducing HMA to Testing Size (AASHTO R 47)• Determination of Asphalt Content (PTM 702 or 757)• Sieve Analysis (AASHTO T 30)

• Day 1 – PM• Demonstrate proficiency and understanding of

procedures/test methods• Three stations – 20 minutes each

• Gmb Determination (PTM 715)• Gmm and HMA Density Determination (AASHTO T 209)• Gyratory Compaction (AASHTO T 312)

Page 20: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

NECEPT Plant Technician Proficiency Certification

• Day 2 – AM• Written exam ???• Open book ???• Re-test is possible ???

Page 21: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

What’s Next?

• Completion of manual/class structure• Identification of examiners and locations• Secure equipment / materials• Pilot in 2017• Implementation beginning in 2018????• Phased in approach???

Page 22: NECEPT Plant Technician Proficiency Certification · • Included Standards • (7) PTM 715 - Determination of Bulk Specific Gravity of Compacted Bituminous Mixtures • (8) PTM 716

Questions?

Gregory A. Harder, P.E.Asphalt InstituteRegional Engineer5791 Route 80Tully, NY 13159

Ph: [email protected]