ndsu design build - cd drawing set
TRANSCRIPT
CODE SUMMARY
APPLICABLE CODES:
ST. PAUL, MINNESOTA CODE OF ORDINANCES
MEANS OF EGRESS
(1) WEST OPENING, 4'-0"; (1) WEST DOOR, 3'-0"
(1) EAST OPENING, 4'-0"
(1) SOUTH DOOR, 3'-0"
ACCESSIBILITY
(1) WEST RAMP, 4'-0" WIDTH, 1:20 SLOPE
(1) SOUTH RAMP, 4'-0" WIDTH, 1:20 SLOPE
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
T001TITLE
PA-CS
ECO - EXPERIENCE
05/06/11
SHEET LIST
A405 DOOR TO WALL SOUTH
A406 ROUGH OPENING AND PLAN B
A407 SOUTHWEST CORNER
A408 DOOR TO WALL WEST
A409 ROOF TO WALL
A410 LOFT POST TO FOUNDATION
A500 INTERIOR ELEVATION KITCHEN
A501 INTERIOR ELEVATION BATHROOM
A502 INTERIOR ELEVATION EAST & WEST
A503 INTERIOR ELEVATION SOUTH
A504 INTERIOR ELEVATION STAIR EAST
A505 INTERIOR ELEVATION STAIR NORTH
A506 INTERIOR ELEVATION STAIR SOUTH
A507 INTERIOR SECTION STAIR NORTH
A508 INTERIOR SECTION STAIR SOUTH
A600 STAIR AXON NORTH
A601 STAIR AXON SOUTH
A602 LOFT RAILING AXON
E100 ELECTRICAL MAIN LEVEL
E101 ELECTRICAL DETAILS
M100 HVAC MAIN LEVEL
M101 MECHANICAL SECTION
Z100 BACKUP PLAN MAIN FLOOR
Z101 BACK UP FRAMING DIAGRAM
SHEET LIST
T001 TITLE
T002 MATERIALS SCHEDULE
A100 SITE WORK
A101 PLAN MAIN LEVEL
A102 SIGNAGE MAIN LEVEL
A103 FLOOR DIAPHRAGM FRAMING
A104 FLOOR DIAPHRAGM SHEATHING
A105 FLOOR DIAPHRAGM SCHEDULE
A106 FLOOR - LOFT - ROOF FRAMING
A107 ROOF PLAN SIP ASSEMBLY
A200 ELEVATION SHADING
A201 ELEVATION EAST SIP ASSEMBLY AND FINISHED
A202 ELEVATION NORTH SIP ASSEMBLY AND FINISHED
A203 ELEVATION SOUTH SIP ASSEMBLY AND FINISHED
A204 ELEVATION WEST SIP ASSEMBLY AND FINISHED
A300 SITE SECTION WEST
A301 SHADING STRUCTURE SECTIONS
A400 FOUNDATION TO WALL N
A401 FOUNDATION TO WINDOW
A402.1 SHADE STRUCTURE TO FOUNDATION
A402.2 SHADE STRUCTURE TO FOUNDATION ELEVATION
A403 WINDOW TO HEADER
A404 NORTHWEST CORNER
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
T001TITLE
PA-CS
ECO - EXPERIENCE
05/06/11
INTERIOR FINISH SCHEDULE
FLOOR3/4" Plywood
INTERIOR FINISHAlt. #1: 1" x 4" Reclaimed Pine
Alt. #2: 1" x 4" Reclaimed Fir1/2" Concrete Board, Stained at Bathroom and Kitchen
INTERIOR DOORSolid Core Veneer Maple
CEILINGAlt. #1: 1" x 4" Reclaimed Pine
Alt. #2: 1" x 4" Reclaimed Fir
INTERIOR STRUCTUREAlt. #1: 4" x 4" Reclaimed Douglas Fir Heavy Timber Columns
Alt. #2: 4" x 4" Painted Parallam
WINDOWS & DOORSReclaimed Pine At Sill and Head
Reclaimed Pine At Jambs (Cut One Piece to Fit Window Width)
WINDOW TREATMENTBurlap Fabric on Galvanized Conduit Pipe
STAIRS & SHELVINGFixed Burlap Panel Framed with 2" x 2" Maple, Oiled
1/2" Galvanized Welded Wire Black Fabric set in a 2"x2" Maple Frame, Oiled
1" x 3" Maple Battens, Oiled
2" x 12" Maple Removable Shelves, Oiled
COUNTERTOPSEpoxy Sealed Concrete Countertop with Glass Aggregate
18" x 24" (LLV) Metal Bracket (stainless steel)
KITCHENWolf Convection Microwave - model #: MWC24 with 30" trim kit (stainless steel trim)
Wolf 30" Induction Cooktop - model #: CT30IU
Frigidaire Top-Freezer Refrigerator - model #: LGUI1849LF (stainless steel)
Kohler Faucet - model #: K-7505 (polished chrome)
Kohler Sink - model #: K-3936 (stainless steel)
BATHROOMKohler Lavatory - model #: K-14293 (white)
Kohler Faucet - model #: K-T14414-4 (polished chrome)
Kohler Multi-Function Handshower - model #: K-10298 (polished chrome)
Kohler Slider Bar - model #: K-9516 (polished chrome)
Kohler Persuade Dual Flush Toilet - model #: K-3654 (white, polished chrome)
Kohler Brevia™ Elongated Toilet Seat - model #: K-4664 (white)
Freewill One-Piece Barrier-Free Transfer Shower Module - model #: K-12101-P (white)
Freewill Shower Drain - model #: K-9132 (polished chrome)
36" Kohler Contemporary Style Grab Bar - model #: K-14564 (polished stainless steel)
18" Kohler Contemporary Style Grab Bar - model #: K-14561 (polished stainless steel)
LIGHTING & ELECTRICAL ACCESSORIESSee Notes on Electrical Drawings and Specifications
MECHANICAL EQUIPMENT & ACCESSORIESSee notes on Mechanical Drawings and Specifications
EXTERIOR FINISH SPECIFICATIONS
SITE3/4" Plywood
EXTERIOR WALLS1/2" x 6" Reclaimed Lap Barn Siding
1" x 12" Cedar Trim Board
16" x 4" x 8" Gabions made from 1/2" Galvanized Welded Wire Fabric,
filled with local rocks 1" to 3" in diameter3/8" Black Skatelite Black (at Exterior Window Jambs)
SHADING STRUCTURE2" x 10" Cedar Wood
2" x 6" Cedar Wood
2" x 4" Cedar Wood
2" x 2" Cedar Wood
1" x 2" Cedar Wood
ROOF1" x 6" x 12'-0" Cedar Roof Lap
Bent Metal, Colored Flashing
1" x 12" Trim Board
Mill Finish Aluminum Plate 1/8" Thick
WINDOWS & DOORS (See Window Sheet For More Details)
Energate 1042 Tilt & Turn, triple glazed
Energate 1042 Fixed, triple glazed
Energate Full Tempered Glazed Main Entrance Swinging Door - model #: 2.001.1
Energate Fully Tempered Glazed Side Entrance Swinging Door - model #: 3.001.3
GLAZINGEnergate Solar Gain 1 Glass .55/.088, R-11.36
Energate Solar Gain 2 Glass .61/.113, R-8.85
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
T002MATERIALS SCHEDULE
HB-CT
ECO - EXPERIENCE
05/06/11
SIGNAGE SCHEDULE
PASSIVE HOUSE INTRO BOARD (36" X 36")
DONOR BOARD
MEASURABLE RESULTS BOARD (36" X 36")
PASSIVE SOLAR BOARD (36" X 36")
BREATHE EASY BOARD (36" X 36")
BREATHE EASY BOX (3'4" X 2'5")
CABIN RENDERINGS AND CONSTRUCTION PHOTOS (5" X 7")
CABIN PROCESS MODELS (ON SHELVING)
EFFICIENT FIXTURES BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'4" X 2'5"
PASSIVE SOLAR BOX (3'4" X 2'5")
EMBODIED ENERGY BOARD (36" X 36")
PASSIVE HOUSE CUT-OUT MURAL
SKIN AND BONES BOARD (36" X 36")
SKIN AND BONES BOX (36" X 36")
SKIN AND BONES BOX (36" X 36")
SKIN AND BONES BOX (36" X 36")
SKIN AND BONES BOX (36" X 36")
SKIN AND BONES BOX (36" X 36")
UNEXPECTED ENERGY BOARD (36" X 36")
UNEXPECTED ENERGY BOX (36" X 36")
EARTH'S ENERGY BOARD (36" X 36")
EARTH'S ENERGY BOX (3'4" X 2'5")
BUFFALO GRASS
VERIFY: THE SOUTHERN BLOCKOF BUFFALO GRASS SHOULD BESIZED TO FIT BETWEEN THE ENDOF THE SHADING PLATFORM ANDTHE ROAD. IF NO SPACE ISAVAILABLE DO NOT PLACE GRASS.
ECO SCALE
GREEN ROOFS TRAILER
SKEEBALL
STORAGE
RESTROOM
STREAM TABLE
GS PARTNERUP
UP
ENTRANCE
11'-73 _ 4"
4'
14'-61 _ 2"
4'-103 _ 4"
20'-515__16" 3' 16'-1
3_4"
7'-73 _ 4"
4'
13'-53 _ 4"
5'-111 _ 2"
5' 23'-111_2"
31'-1"
0' - 0"
0' - 6"
1
12
13
20 21 22 23
24
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
CORNERFINISH
DONOR SPACE
19
16
18
17
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A100SITE WORK
JH - JV
ECO - EXPERIENCE
05/06/11
1/8" = 1'-0"1
SITE WORK
7' 7' 3' 4' 1'-2"
4'-4"
7'-2"
4'
3'
2'
7'
1'-2"
1'-2" 2'-6" 4' 14'-6" 1'-2"
23'-4"
7'-2"
4'
13'-2"
24'-4"
10'
1'
2'-11"
1'
2'-11"
5'-2"
3'-10"
1'-6"
5'-4"
1'-3"
3'-10"
6'-5"
5'-8"
2'-4"4'-2"10'-1"3'-10"
24'-10"
1'-2"
23'-8"
4'-11_2" 4'-1
1_2" 4'-1
1_2" 4'-1
1_2" 4'-1
1_2" 4'-1
1_2" 4'-1
1_2"
3'-10"
1'-11" 1'-9" 1'-10"
2" 2"
2"
4"
2"2"
4"
2"
1'-4"
2'-91 _ 2"
-
LIVING ROOM
KITCHEN
BATH
ENTRY
CORRIDOR
MEC.
N KITCHEN FL1
W KITCHEN FL1
W LIVING ROOM FL1
S LIVING ROOM FL1 A S LIVING ROOM FL1 B S DOOR
W DOOR
BUILT-IN TABLE
BUILT-IN SHELVINGBUILT-IN SHELVING
BUILT-IN SHELVING
BUILT-IN WORK SURFACE
SHELVESSHELVES
BUILT-IN COUCH
DESK
BENCH
STUDY
1/4" = 1'-0"1
MAIN LEVEL PLANNorth Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A101PLAN MAIN LEVEL
PA
ECO - EXPERIENCE
05/06/11
SIGNAGE SCHEDULE
PASSIVE HOUSE INTRO BOARD (36" X 36")
DONOR BOARD
MEASURABLE RESULTS BOARD (36" X 36")
PASSIVE SOLAR BOARD (36" X 36")
BREATHE EASY BOARD (36" X 36")
BREATHE EASY BOX (3'4" X 2'5")
CABIN RENDERINGS AND CONSTRUCTION PHOTOS (5" X 7")
CABIN PROCESS MODELS (ON SHELVING)
EFFICIENT FIXTURES BOARD (36" X 36")
EXITEXIT
MEASURABLE RESULTS BOX (3'4" X 2'5"
PASSIVE SOLAR BOX (3'4" X 2'5")
EMBODIED ENERGY BOARD (36" X 36")
PASSIVE HOUSE CUT-OUT MURAL
SKIN AND BONES BOARD (36" X 36")
SKIN AND BONES BOX (36" X 36")
SKIN AND BONES BOX (36" X 36")
SKIN AND BONES BOX (36" X 36")
SKIN AND BONES BOX (36" X 36")
SKIN AND BONES BOX (36" X 36")
UNEXPECTED ENERGY BOARD (36" X 36")
UNEXPECTED ENERGY BOX (36" X 36")
EARTH'S ENERGY BOARD (36" X 36")
EARTH'S ENERGY BOX (3'4" X 2'5")
BUFFALO GRASS
UP
UP
1
2
3
4
5
6
7
8
3
4
56 8
9 9
10
10
9
11
EXIT
10'-8"
6'
10'-8"
3'-7"5'-1"
2'
PRESENTER 1
OPEN WALL,STUDS ONLY
4'4'
5'
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
12
PRESENTER 2
8'-11"
PAINTED IN SHOWER
7'-2"
3'-1"
0" 6"
6"
7
A407 A405
A408
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A102SIGNAGE MAIN LEVEL
JH - JV
ECO - EXPERIENCE
05/06/11 1/4" = 1'-0"1
SIGNAGE MAIN LEVEL
1 2 3 4 5
A
B
C
D
E
8'-3"
7'-91 _ 2"
6'-101 _ 2"
8' 8' 8' 10'-8"
35'-2"
39'-8"
8'-3"
5'
*NOTE
DASHED LINES INDICATE
DIAPHRAGM MODULAR GRID
- BUILT WITH 2X6 DIM LUMBER
- REFERENCE FLOOR
MEMBRANE MODULAR
SCHEDULE
- SHEATHED WITH 3/4" OSB
6'
4'
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A103FLOOR DIAPHRAGM
FRAMING
JV
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
FLOOR DIAPHRAGM FRAMING
*NOTE
DASHED LINES INDICATE
DIAPHRAGM MODULAR GRID
- BUILT WITH 2X6 DIM LUMBER
- REFERENCE FLOOR
MEMBRANE MODULAR
SCHEDULE
- SHEATHED WITH 3/4" OSB-
-ADD 2X6 BLOCKING WHERE
LOFT POSTS MEET
FOUNDATION
1 2 3 4 5
A
B
C
D
E
8'-3"
7'-91 _ 2"
6'-101 _ 2"
8' 8' 8' 10'-8"
35'-2"
39'-8"
8'-3"
5'
6'
4'
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A104FLOOR DIAPHRAGM
SHEATHING
JV
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
FLOOR DIAPHRAGM SHEATHING
FLOOR MEMBRANE SPECIFICATIONS:
CONSTRUCTION:
*MODULES ASSEMBLED OFFSITE
- 1A - 5'-0" x 4'-0" *CONTINUATION OF RAMP 1:20
- 2A THROUGH 5A - N/A
- 1B - 5'-0" x 8'-3" *CONTINUATION OF RAMP 1:20
- 2B - 8'-0" x 8'-3"
- 3B - 8'-0" x 8'-3"
- 4B - 8'-0" x 8'-3"
- 5B - N/A
- 1C - 5'-0" x 8'-3"
- 2C - 8'-0" x 8'-3" *WITH WINDOW SUPPORT * REFERENCE WINDOW DETAIL
- 3C - 8-0" x 8'-3" *BUILT IN 2 PIECES TO ACCOMODATE COLUMN
- 4C - 8'-0" x 8'-3"
- 5C - N/A
- 1D - 5'-0" x 7'-9 1/2"
- 2D - 8'-0" x 7'-9 1/2" *WITH WINDOW SUPPORT * REFERENCE WINDOW DETAIL
- 3D - 8'-0" x 7'-9 1/2"
- 4D - 8'-0" x 8'-3"
- 5D - N/A
- 1E - 5'-0" x 6'-10 1/2"
- 2E - 8'-0" x 6'-10 1/2" *WITH WINDOW SUPPORT * REFERENCE WINDOW DETAIL
- 3E - 8'-0" x 6'-10 1/2" *WITH WINDOW SUPPORT * REFERENCE WINDOW DETAIL
- 4E - 8'-0" x 6'-10 1/2"
- 5E - 10'-8" x 6'-0" * RAMP 1:20
*SHEATHED WITH 3/4" OSB ONSITE
*REFERENCE SHEATHING DETAIL
DECONSTRUCTION:
*REMOVE 3/4" OSB SHEATHING
*SEPARATE DIAPHRAGM MODULES
*DISASSEMBLE 2"X6" LUMBER
7"
6'-71 __16"
2'-01_2"
4'-41_4"
1'-51_2"
10'-8"
RAMPS *FOR RAMP 1A-1B ADD 1'-5 1/2" ADDITION TO THE MODULE
WINDOW SUPPORT *ADD EXTRA 2X6 AT SPECIFIED LOCATION
COLUMN MODULE *BUILD MODULE WITH
SPECIFIED DIM. AND CUT TO FIT AROUND COLUMN
1A-1B 6E
2C, 2D
3C
2E, 3E
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A105FLOOR DIAPHRAGM
SCHEDULE
JV
ECO - EXPERIENCE
05/06/11 1/4" = 1'-0"1
FLOOR DIAPHRAGM SCHEDULE
3 PLY LVL POST OR MULTI-PLY LVL HEADER MULTI-PLY- 2X AS
2"X8" JOIST 16" O.C.
3 PLY 2"X8"
2 PLY 2"X8"
2"X8" LEDGER, BLOCKING
4"X4" POST
2 PLY 2"x12"
SPECIFIED BY SIP MFR AS SPECIFIED BY SIP MFR SPECIFIED BY SIP MFR
IN SIP AS SPECIFIED BY MFR
3 PLY 2"X8"
3X12" GLULAM TIMBER
3 PLY LVL POST OR AS SPECIFIED BY SIP MFR
MULTI-PLY LVL HEADER MULTI-PLY- 2X ASSPECIFIED BY SIP MFR SPECIFIED BY SIP MFR
FOUNDATION FRAMING
FOUNDATION SHEATHING
LOFT FRAMING
ROOF FRAMING
6'
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A106FLOOR - LOFT - ROOF
FRAMING
JV
ECO - EXPERIENCE
05/06/11
R1 R2 R3 R4 R5 R6
14" SIP PANEL SCHEDULE AND
CONSTRUCTION:
*MODULES MANUFACTURED
OFFSITE
*LAYOUT ACCOMODATES OFFSET
FOR GABION DRAIN DETAILS
*PANELS ARE THEN BROUGHT IN
AND INSTALLED WITH MACHINE
ASSISTANCE
4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 3'-4"
11'-8"
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A107ROOF PLAN SIPASSEMBLY
JV
ECO - EXPERIENCE
05/06/11 1/4" = 1'-0"1
ROOF PLAN SIP ASSEMBLY
1
2
3
4
5
7
8
STRUCTURAL ENGINEERINGREVIEW OF SHADESTRUCTURE AND FOUNDATIONHAVE NOT BEEN CONDUCTEDFOR SITE LOCATION AND AREIMPERATIVE PRIOR TOCONSTRUCTION
SIMPSON STRONGTIE POST BASE
(2) - 2" X 8" TREATED POSTS
1" X 4" CEDAR LOUVERS COMPOSED
AS SHADING PANELS SPACED 4" O.C.
1" X 6" CEDAR LOUVERS COMPOSED
AS SHADING PANELS SPACED 6" O.C.
11 GAUGE STEEL CABLE
2" x 8" TREATED WOOD AS BENCH
24'-9"
4'-11_2"
14'-51 _ 2"
12'-1"
11'-10"
9'-51 _ 2"
6'-11"
1'-3"
1
2
4
7
3
5
16" X 4" X 8" GABIONS
8
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A200ELEVATION SHADING
PA - MD
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
200 - SOUTH ELEVATION SHADING
5" RECLAIMED T&G BARN SIDING OVER2"X4" DIM. LUMBER 24" O.C.
1"X6" RECLAIMED CEDAR TRIM
16"X4"X8" GABIONS MADE FROM 1/2"GALVANIZED WELDED WIRE FABRIC
W/ LOCAL ROCKS 1"-3" IN DIAMETER
8" CEDAR SHIPLAP OVER 2"X2" BATTENS& COUNTER-BATTENS 24" O.C.
W/ LOCAL ROCKS 1"-3" IN DIAMETER
SIMPSON STRONGTIE FLAT-PLATECONNECTOR
PASSIVE HOUSE CERTIFIEDWINDOWS/DOORS
2-2"X8" TREATED CEDAR POSTS
SIMPSON STRONGTIE POST BASE
MANUFACTURED SCREEN PANELS
1"X4" CEDAR LOUVERS COMPOSED ASSHADING PANELS SPACED 4" O.C.
3/8" RICHLITE
1
2
3
4
5
6
7
8
9
10
11
E2 E5 E7E1 E3 E4 E8
E9 E10
10
1
2
4
11
3
7
14" SIP PANEL SCHEDULE AND
CONSTRUCTION:
*MODULES MANUFACTURED OFFSITE
*HEADERS DETAILED BY SIP
MANUFACTURER
*PANELS ARE THEN BROUGHT IN WITH
MACHINE ASSISTANCE, PLACED
ONTOP OF DIM LUMBER PLATES
RUNNING THE PERIMETER OF THE
DIAPHRAGM AND SCREWED INTO
PLACE*REFERENCE FOUNDATION
DETAIL
4'-0" 4'-0"3'-7
1_4"
1'-3"
3'-431__32"
1'-29 __32"
12'-81 _ 8"
18'-613__32"
12'-217__32"
3'-63_4"
1'-6" 1'-6"2'-11
7_8"3'-2
1__16"
24'-315__16"
14'12'
4'-11"
2'-8"
20'-3 13/16"
8'-0"
3'-6"
OPEN OPEN
OPEN
OPEN OPEN
OPEN
10'-15 _ 8"
7'
1'- 4"
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A201ELEVATION EAST SIP
ASSEMBLY ANDFINISHED
JV
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
201 - EAST ELEVATION SIP ASSEMBLYAND FINISHED
5" RECLAIMED T&G BARN SIDING OVER2"X4" DIM. LUMBER 24" O.C.
1"X6" RECLAIMED CEDAR TRIM
16"X4"X8" GABIONS MADE FROM 1/2"GALVANIZED WELDED WIRE FABRIC
W/ LOCAL ROCKS 1"-3" IN DIAMETER
8" CEDAR SHIPLAP OVER 2"X2" BATTENS& COUNTER-BATTENS 24" O.C.
W/ LOCAL ROCKS 1"-3" IN DIAMETER
SIMPSON STRONGTIE FLAT-PLATECONNECTOR
PASSIVE HOUSE CERTIFIEDWINDOWS/DOORS
2-2"X8" TREATED CEDAR POSTS
SIMPSON STRONGTIE POST BASE
MANUFACTURED SCREEN PANELS
1"X4" CEDAR LOUVERS COMPOSED ASSHADING PANELS SPACED 4" O.C.
3/8" RICHLITE
1
2
3
4
5
6
7
8
9
10
11
42.0000
3'-513__16"
4'-0" 3'-6" 3'-6" 4'-0" 2'-6"
9'-0"
5'-35 __32"
1'-3"
1'-01 _ 4"
18'-613__32"
42.0000
3'-513__16"
2'-03 __16"
6'-61 _ 4"
23'-4"
1'-23__16"
1'-2"
12'-01 _ 4"
2'-0"
N1 N3 N4 N5 N6 N8
N7
N2
4
1
11
3
6
14" SIP PANEL SCHEDULE AND
CONSTRUCTION:
*MODULES MANUFACTURED OFFSITE
*HEADERS DETAILED BY SIP
MANUFACTURER
*PANELS ARE THEN BROUGHT IN WITH
MACHINE ASSISTANCE, PLACED
ONTOP OF DIM LUMBER PLATES
RUNNING THE PERIMETER OF THE
DIAPHRAGM AND SCREWED INTO
PLACE*REFERENCE FOUNDATION
DETAIL
12.6250
116.6014
2'-2"
19'-5 3/16"
OPEN
OPEN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A202ELEVATION NORTH SIP
ASSEMBLY ANDFINISHED
JV
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
202 - NORTH ELEVATION SIP ASSEMBLYAND FINISHED
5" RECLAIMED T&G BARN SIDING OVER2"X4" DIM. LUMBER 24" O.C.
1"X6" RECLAIMED CEDAR TRIM
16"X4"X8" GABIONS MADE FROM 1/2"GALVANIZED WELDED WIRE FABRIC
W/ LOCAL ROCKS 1"-3" IN DIAMETER
8" CEDAR SHIPLAP OVER 2"X2" BATTENS& COUNTER-BATTENS 24" O.C.
W/ LOCAL ROCKS 1"-3" IN DIAMETER
SIMPSON STRONGTIE FLAT-PLATECONNECTOR
PASSIVE HOUSE CERTIFIEDWINDOWS/DOORS
2-2"X8" TREATED CEDAR POSTS
SIMPSON STRONGTIE POST BASE
MANUFACTURED SCREEN PANELS
1"X4" CEDAR LOUVERS COMPOSED ASSHADING PANELS SPACED 4" O.C.
3/8" RICHLITE
1
2
3
4
5
6
7
8
9
10
11
S2
S3
S4
S1 S5
42.0000
12.0000
15'-13__32" 4'-0
29__32"
4'-915__32"
1'-33 __32"
18'-613__32"
1'-527__32"
3'-0"
1'-0"
7'-0"
3'-0"
14" SIP PANEL SCHEDULE AND
CONSTRUCTION:
*MODULES MANUFACTURED OFFSITE
*HEADERS DETAILED BY SIP
MANUFACTURER
*PANELS ARE THEN BROUGHT IN WITH
MACHINE ASSISTANCE, PLACED
ONTOP OF DIM LUMBER PLATES
RUNNING THE PERIMETER OF THE
DIAPHRAGM AND SCREWED INTO
PLACE*REFERENCE FOUNDATION
DETAIL
23'-4"
1'-2"
6 3
11
1
6 6
2'-2"
7'-0"
OPEN
OPEN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A203ELEVATION SOUTH SIP
ASSEMBLY ANDFINISHED
JV
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
203 - SOUTH ELEVATION SIP ASSEMBLYAND FINISHED
5" RECLAIMED T&G BARN SIDING OVER2"X4" DIM. LUMBER 24" O.C.
1"X6" RECLAIMED CEDAR TRIM
16"X4"X8" GABIONS MADE FROM 1/2"GALVANIZED WELDED WIRE FABRIC
W/ LOCAL ROCKS 1"-3" IN DIAMETER
8" CEDAR SHIPLAP OVER 2"X2" BATTENS& COUNTER-BATTENS 24" O.C.
W/ LOCAL ROCKS 1"-3" IN DIAMETER
SIMPSON STRONGTIE FLAT-PLATECONNECTOR
PASSIVE HOUSE CERTIFIEDWINDOWS/DOORS
2-2"X8" TREATED CEDAR POSTS
SIMPSON STRONGTIE POST BASE
MANUFACTURED SCREEN PANELS
1"X4" CEDAR LOUVERS COMPOSED ASSHADING PANELS SPACED 4" O.C.
3/8" RICHLITE
1
2
3
4
5
6
7
8
9
10
11
W2 W3 W4 W5
W7
W9
W1
11
2
4
3'-915__32"
5'-6" 7'-0"
7'-0"
8'-0"
2'-213__32"1'-33 __32"
18'-613__32"
2'-0"
1'-0"
14" SIP PANEL SCHEDULE AND
CONSTRUCTION:
*MODULES MANUFACTURED OFFSITE
*HEADERS DETAILED BY SIP
MANUFACTURER
*PANELS ARE THEN BROUGHT IN WITH
MACHINE ASSISTANCE, PLACED
ONTOP OF DIM LUMBER PLATES
RUNNING THE PERIMETER OF THE
DIAPHRAGM AND SCREWED INTO
PLACE*REFERENCE FOUNDATION
DETAIL
3'-0"
1'-79 __32"
12'-79 __32"
22'-113_4"
3'-41_2"
1'-67 __32"1'-43 __16"
0'-521__32"2'-919__32"0'-919__32"
6
16. 0000
6
2'-8"
OPEN
OPEN
OPEN
OPEN
4'-217__32"
1'-6"
8
10
7
1
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A204ELEVATION WEST SIP
ASSEMBLY ANDFINISHED
JV
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
204 - WEST ELEVATION SIP ASSEMBLYAND FINISHED
RAMP 20:1 OPEN
SCREEN STRUCTURE
GS PARTNER
OPEN ROOF
ALT LIGHT 1: SWITCH OFF LIGHTS IF ADDITIONAL LIGHT IS NOT NEEDEDALT LIGHT 2: TETHER LIGHTS TOGETHER. KEEP ON
13
1
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A300SITE SECTION WEST
JH - JV
ECO - EXPERIENCE
05/06/11
3/16" = 1'-0"1
300 - SITE SECTION WEST
2'-111_2"
1
2
3
3
4
5
7'-51 _ 2"
61 _ 2"
5'-5"
1
2
5
6
14'
2'-8"
2'-3"
2'
1'1'-61 _ 2"
1'-91 _ 2"
1'-51 _ 2"
1'-1"
12'
1'-3" 1'-51 _ 2"
2'-3"
2'-3"
2'-41 _ 2"
4'-11"
6'
4'-41_2"
2'-111_2"
8"
1
2
3
3
4
2'-3"
3
4
7
7
5
8
8
SIMPSON STRONGTIE POST BASE
(2) - 2" X 8" TREATED POSTS
11 GAUGE STEEL CABLE
12' SONOTUBE (5') DEPTH
WITH (2) #5 BARS
1" X 4" CEDAR LOUVERS COMPOSED
AS SHADING PANELS SPACED 4" O.C.
1" X 6" CEDAR LOUVERS COMPOSED
AS SHADING PANELS SPACED 6" O.C.
2" x 8" TREATED WOOD AS BENCH
16" X 4" X 8" GABIONS
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A301SHADING STRUCTURE
SECTIONS
PA - MD
ECO - EXPERIENCE
05/06/11
3/8" = 1'-0"1
SHADING STRUCTURE AT DOOR
3/8" = 1'-0"2
A301 - SHADING AT WINDOW
*NOTE
-FLOORING DIAPHRAGM FRAMED AND SHEATHED FIRST-2X4 AND 2X10 DIM LUMBER THEN SCREWED INTO PLACE ONTO DIAPHRAGM 16"OC WITHAN INSET OF 3-7/16" FROM OUTER EDGE-14" SIP PANEL THEN PLACED ONTO DIM LUMBER PLATE AND SCREWED IN PLACE-NO EPS INSULATION ATTACHED TO THE EXTERIOR AT ECO-EXPERIENCE-NO VAPOR BARRIER ATTACHED TO THE EXTERIOR AT ECO-EXPERIENCE
8
6
7
1
18
117
10
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A400FOUNDATION TO WALL
N
JV
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
FOUNDATION TO WALL N+E
*NOTE
-FLOORING DIAPHRAGM FRAMED AND SHEATHED FIRST-2X4 AND 2X10 DIM LUMBER THEN SCREWED INTO PLACE ONTO DIAPHRAGM 16"OC WITHAN INSET OF 3-7/16" FROM OUTER EDGE-14" SIP PANEL THEN PLACED ONTO DIM LUMBER PLATE AND SCREWED IN PLACE-NO EPS INSULATION ATTACHED TO THE EXTERIOR AT ECO-EXPERIENCE-NO VAPOR BARRIER ATTACHED TO THE EXTERIOR AT ECO-EXPERIENCE
5
7
11
8
3
1815
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A401FOUNDATION TO
WINDOW
JV
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
FOUNDATION TO WINDOW SOUTH
8
11
1'-4"
8
9
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A402.1SHADE STRUCTURE TO
FOUNDATION
DC
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
402.1 - SHADE STRUCTURE TOFOUNDATION
8
11
9
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A402.2SHADE STRUCTURE TO
FOUNDATIONELEVATION
DC
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
SHADE STRUCTURE TO FOUNDATIONELEVATION
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
1
14
12
17
14
19
3
15
LED LIGHTING
LED LIGHTING
ROUGH OPENING
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A403WINDOW TO HEADER
DC
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
WINDOW TO HEADER
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" FLOOR JOISTS AT 16" O.C
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
15
7
1
5
14
14
155
3
19
718
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A404NORTHWEST CORNER
DC
ECO - EXPERIENCE
05/06/11
1 1/2" = 1'-0"1
NORTHWESTCORNER
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
7
1
5
15
17
223
19 17
18
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A405DOOR TO WALL SOUTH
DC
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
DOOR TO WALL SOUTH
1
12
14
14
12
1
15
3
17
19
7
12
14
14
12
12
15
3
17
19
ROUGH OPENING
7
11
11
12
ROUGH OPENING
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A406ROUGH OPENING AND
PLAN B
DC
ECO - EXPERIENCE
05/06/11 3" = 1'-0"
1
ROUGH OPENING AND ALTERNATIVEPLAN B
17
19
3
15
7
13
5
15
14
1
14
3
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A407SOUTHWEST CORNER
DC
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
SOUTHWEST CORNER
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
7
1
5
15
17
22
19 17
18
8
ROUGH OPENING
PAINT FINISH
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A408DOOR TO WALL WEST
DC
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
DOOR TO WALL WEST
14
21
11
23
1
14
14
1'-2"
16
1'-4"
7 1/4"
1'-2"
14
21
11
23
1
14
14
1'-2"
16
1'-4"
7 1/4"
1'-2"
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A409ROOF TO WALL
JK
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
ROOF TO WALL
1 14" SIP (W/ 7/16" OSB)
2 PASSIVE HOUSE CERTIFIED DOOR
3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW
4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW
5 6" PINE LAP SIDING
6 16" X 4" X 8" GABIONS
7 2" X 4" DIM LUMBER
8 2" X 6" DIM LUMBER
9 2" X 8" DIM LUMBER
10 2" X 10" DIM LUMBER
11 3/4" OSB
12 HEADER SPECIFIED BYMANUFACTURER
13 COLUMN SPECIFIED BYMANUFACTURER
14 LVL SPECIFIED BYMANUFACTURER
15 3/8" RICHLITE
16 2" X 8" LUMBER AT 16" O.C.
17 1" X 2" FURRING STRIPS
18 1" X 4" RECLAIMED PINE, OIL FINISH
19 1" X 12" RECLAIMED PINE BOARD
20 1" X 12" CEDAR TRIM BOARD
21 1" X 6" X 12' CEDAR ROOF LAP
22 2" X 12" DIM LUMBER
23 16" SIP (W/ 7/16" OSB)
24 4X4 POST
*NOTE
-END FASTENING OF BLOCKING THROUGH FLOOR DIAPHRAGM-SEE A104
FLOOR DIAPHRAGM 16" O.C.
SIMPSON STRONG-TIEABU44 POST BASE
8
11
24
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A410LOFT POST TOFOUNDATION
DC
ECO - EXPERIENCE
05/06/11
3" = 1'-0"1
SOUTH FIXED WINDOW
OPEN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
20
21
19
418
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A500INTERIOR ELEVATION
KITCHEN
MF
ECO - EXPERIENCE
05/06/11
1/2" = 1'-0"1
INTERIOR ELEVATION KITCHEN
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
18
7
1'-21_4"
7'3'-2"
26
5'-4"
423
24
25
26
2'-10"
3'-6"
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
18
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A501INTERIOR ELEVATION
BATHROOM
MF
ECO - EXPERIENCE
05/06/11 1/2" = 1'-0"1
INTERIOR ELEVATION BATHROOM
19
1
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
R.O
R.O
4' 5'-7" 2'-41_2"
6
1
2
7
5
18
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A502INTERIOR ELEVATION
EAST & WEST
MF
ECO - EXPERIENCE
05/06/11
1/2" = 1'-0"1
INTERIOR ELEVATION EAST & WEST
R.O R.O
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
8
1010
6" 3'-6"
5
6 12
11
7
9
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A503INTERIOR ELEVATION
SOUTH
MF
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
INTERIOR ELEVATION SOUTH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
27
14
14
16
4'
2'-101_2" 11
1_4"
22
7'-8 1/4"
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A504INTERIOR ELEVATION
STAIR EAST
MF
ECO - EXPERIENCE
05/06/11 1/2" = 1'-0"
1INTERIOR ELEVATION STAIR EAST
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
14
27
22
3'10"
7'-8 1/4"
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A505INTERIOR ELEVATION
STAIR NORTH
MF
ECO - EXPERIENCE
05/06/11
1/2" = 1'-0"1
INTERIOR ELEVATION STAIR NORTH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
22
13
14
3'10"
3'-31_2" 6'-7
1_2"
4' 2"
8'
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
4'
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A506INTERIOR ELEVATION
STAIR SOUTH
MF
ECO - EXPERIENCE
05/06/11 1/2" = 1'-0"1
INTERIOR ELEVATION STAIR SOUTH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
27
14
22
4'
3'-9"
6'-101_2" 3'-7"
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A507INTERIOR SECTION
STAIR NORTH
MF
ECO - EXPERIENCE
05/06/11 1/2" = 1'-0"
1INTERIOR SECTION STAIR NORTH
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
27
22
14
10'-2"
7'-8 1/2"
4'
WALL
4' WALL OPENING
MECHANICAL ROOM
2"X4" STUD WALL
BREATHE EASY BOARD (36"X36")
BREATHE EASY BOX(3'4"X2'5")
1X4 PINE, UNFINISHED
SRUCTURAL INSULATED PANELS
DOOR
WINDOW
PASSIVE SOLAR BOARD (36"X36")
PASSIVE SOLAR BOX (3'4"X2'5")
2X4 MAPLE FRAMING
1X3 MAPLE BATTENS
2X2 MAPLE GUARDRAIL
1X8 16" O.C FLOOR JOIST
BUILT IN SHELVING
CEMENT BOARD, STAINED
EXPOSED SIP WALL
MEASURABLE RESULTS BOARD (36" X 36")
MEASURABLE RESULTS BOX (3'6"X2'5")
2X12 MAPLE FRAMING
2X6 STUD
OPEN WALL WITH STUDS ONLY
EFFICIENT FIXTURES BOARD (36"X36")
PAINTED IN SHOWER
4X4 TIMBER COLUMN
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A508INTERIOR SECTION
STAIR SOUTH
MF
ECO - EXPERIENCE
05/06/11
1/2" = 1'-0"1
INTERIOR SECTION STAIR SOUTH
1
2
3
4
5
6
20
7
11
8
10
12
9
13
14
15
16
17
18
19
21
22
23
24
1
1
1
1
1
1
1
1
1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH)
MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS
BUILT-IN MAPLE VENEER WORK DESK
BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED
EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE
4 X 3 1/2" MAPLE TAPERED SQUARE LEGS
SHOWER SYSTEM
1"X3" MAPLE BATTENS UNFINISHED
3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH
FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE
2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH
2X8 16" O.C. FLOOR JOIST
2" X 12" MAPLE SHELVES UNFINISHED.
BUILT-IN SEATING/BED W/ FIRM FOAM AND
2X12 VENEER MAPLE SHELVING, OIL FINISH
BUILT-UP STRINGER
2X2 MAPLE GUARDRAIL W/ FIXED BURLAP PANEL
3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE
2" X 2" MAPLE FRAMING UNIFINISHED
RIDGE BEAM
VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT
1/2" GALVANIZED WELDED WIRE BLACK FABRIC
4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS
1" x 12" MAPLE STAIR TREADS UNFINISHED
OILED MAPLE PLYWOOD
SET IN 2" X 2" UNFINISHED MAPLE FRAME
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A600STAIR AXON NORTH
MF
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
STAIR AXON NORTH
1
2
3
4
5
6
20
7
11
8
10
12
9
13
14
15
16
17
18
19
21
22
23
24
25
1
1
1
1
1
1
1
1
1
1
1
1
1" x 4" OILED, RECLAIMED PINE (UNFINISHED)
MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS
BUILT-IN MAPLE VENEER WORK DESK
BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED
EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE
4 X 3 1/2" MAPLE TAPERED SQUARE LEGS
SHOWER SYSTEM
1"X3" MAPLE BATTENS UNFINISHED
3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH
FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE
2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH
2X8 16" O.C. FLOOR JOIST
2" X 12" MAPLE SHELVES UNFINISHED.
BUILT-IN SEATING/BED W/ FIRM FOAM AND
2X12 VENEER MAPLE SHELVING, OIL FINISH
BUILT-UP STRINGER
2X2 MAPLE GUARDRAIL W/ FIXED BURLAP PANEL
3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE
2" X 2" MAPLE FRAMING UNIFINISHED
RIDGE BEAM
MAPLE VENEER SHELVING W/ METAL BRACKETS
VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT
1/2" GALVANIZED WELDED WIRE BLACK FABRIC
4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS
1" x 12" MAPLE STAIR TREADS UNFINISHED
OILED MAPLE PLYWOOD
SET IN 2" X 2" UNFINISHED MAPLE FRAME
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A601STAIR AXON SOUTH
MF
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
STAIR AXON SOUTH
MAPLE GUARDRAIL W/FIXED BURLAP PANEL DETAIL
1
2
3
4
5
6
20
7
11
8
10
12
9
13
14
15
16
17
18
19
21
22
23
24
4'-8"
4'-0"
3'-6"
8'-81_4"
7
FIXED BURLAP PANEL
2X2 MAPLE GUARDRAIL
U-CLIP, METAL ANCHOR PLATE
16 2X2 MAPLE GUARDRAIL
2X2 MAPLE POST
7
12
1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH)
MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS
BUILT-IN MAPLE VENEER WORK DESK
BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED
EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE
4 X 3 1/2" MAPLE TAPERED SQUARE LEGS
SHOWER SYSTEM
1"X3" MAPLE BATTENS, OILED
3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH
FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED
2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH
2X8 16" O.C. FLOOR JOIST
2" X 12" MAPLE SHELVES, OILED
BUILT-IN SEATING/BED W/ FIRM FOAM AND
2X12 VENEER MAPLE SHELVING, OIL FINISH
BUILT-UP STRINGER
2X2 MAPLE GUARDRAIL W/ FIXED BURLAP PANEL
3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE
2" X 2" MAPLE FRAMING UNIFINISHED
RIDGE BEAM
VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT
1/2" GALVANIZED WELDED WIRE BLACK FABRIC
4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS
1" x 12" MAPLE STAIR TREADS, OILED
OILED MAPLE PLYWOOD
SET IN 2" X 2" UNFINISHED MAPLE FRAME
7
2X2 MAPLE GUARDRAIL
FIXED BURLAP PANEL
U-CLIP, METAL ANCHOR PLATE
16
LOFT FLOOR
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
A602LOFT RAILING AXON
CS
ECO - EXPERIENCE
05/06/11
1/2" = 1'-0"1
STAIR AXON
3
3
1
LED FLEXTIBLE STRIP LIGHT FIXTURE
LED LIGHT BULB FIXTURE
SINGLE POLE/3-WAY
SINGLE POLE/2-WAY
ELECTRICAL PANEL
3
SEE DETAIL (1/E101)
MODEL # DVSCCL-153P-WH (WHITE)
LUTRON DIVA LED DIMMER
FIREX 5000 SMOKE ALARM
WITH BATTERY BACK-UP
LUTRON DIVA LED DIMMER
CARLTON 1/2IN. X 25FT. ELECTRICAL NON-METALLIC TUBINGNOTE:
MODEL # FADC
MODEL # 12005-25
MODEL # DVSCCL-153P-WH (WHITE)
KILL SWITCH ENCLOSED TO TERMINATE
POWER TO ALL LIGHTS AND MECHANICAL
SYSTEMS WITH EXECPTION OF COMFOAIR 200
AND REFRIDGERATOR WHICH WILL HAVE
ELECTRICAL METER
WATER METER
1
2
3
A SEPARATE KILL SWITCH
SEE DETAIL (2/E101) FOR WINDOWS
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
E100ELECTRICAL MAIN
LEVEL
AM
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
ELECTRICAL MAIN LEVEL
LED LIGHT BULB ( 7 WATT)
1.5" GALVANIZED METAL PIPING
SHELVING STRUCTURE
METAL FASTENERS
LED BULB FIXTURE LED FLEXIBLE STRIP LIGHT FIXTURE
6
1
2
4
3
5
LED FLEXIBLE STRIP LIGHT (0.72 WATTS)
CONDUIT RUNS
1
2
3
4
1 2
5
6
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
E101ELECTRICAL DETAILS
AM
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
ELECTRICAL DETAILS
ZEHNDER AMERICA COMFOAIR 200 SERIES
7 DAY PROGRAMMABLE THERMOSTAT
HONEYWELL MODEL # RTH7500D
6" COMFOSYSTEMS PIPE
ZEHNDER COMFOSYSTEMS
EXTINGUISHER - CLEANGUARD
WITH FILTER F7 MODEL # 400 100 018
EXHAUST AIR PIPING
INTERIOR TO EXTERIOR R-8 PER INCH
INSULATION ZEHNDER COMFOSYSTEMS
OUTSIDE AIR PIPING
INTERIOR TO EXTERIOR R-8 PER INCH
INSULATION ZEHNDER COMFOSYSTEMS
PRE-HEAT AND POST-HEAT COILSREF 705 512 521
ZEHNDER COMFOSYSTEMS
ZEHNDER COMFOSYSTEMS
RETURN DIFFUSER STB-1-125
SUPPLY DIFFUSER KE 125
4
2
7
1
24 CFM
35 CFM
30 CFM
9 CFM
NOTE:
COMFOTUBE 75 VENTILATION TUBE
REF 990 328 007 FOR NON INSULATED
INTERIOR DUCTWORK
REF 990 326 252 (MAIN LEVEL)
FILTER125 MM REF 990 320 032
REGISTER COVER
ROMA (STAINLESS STEEL)
REF 990 320 610 (LOFT)
COMFOWELL SILENCERS CW-S 320
2
3
3
4
5
1
2
FILTER
FILTER
SILENCER
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
M100HVAC MAIN LEVEL
AM
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
HVAC MAIN LEVEL
NOTE: EQUIPMENT IN EXHIBIT
BUT NOT OPERATING OR PLUGGED IN
6
8 9
4 1
3 2
10 5
11
9 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR PUMP
6 SOLAR SKIES 60 GALLON STAINLESS STEEL
5 ZEHNDER AMERICA COMFOAIR 200 SERIES
4 RETURN DIFFUSER STB-1-125
3 OUTSIDE AIR PIPING WITH
2 EXHAUST AIR PIPING WITH
1 SUPPLY DIFFUSER KE 125
10 ELECTRICAL PANEL
HEAT EXCHANGER & ELECTRIC ELEMENT
FILTER125 MM REF 990 320 032
ZEHNDER COMFOSYSTEMS
MODEL # 915-016
SOLAR TANK W/ONE DOUBLE WALL COIL
ELECTRIC TANKLESS WATER HEATER
MODEL # PWSNAE125
5 POWERSTAR AE125 WHOLE HOUSE
WITH 6" COMFOSYSTEMS PIPE
INTERIOR TO EXTERIOR R-8 PER INCH
INSULATION ZEHNDER COMFOSYSTEMS
ZEHNDER COMFOSYSTEMS
INTERIOR TO EXTERIOR R-8 PER INCH
INSULATION ZEHNDER COMFOSYSTEMS
INTERIOR TO EXTERIOR R-8 PER INCH
INSULATION ZEHNDER COMFOSYSTEMS
WITH FILTER F7 MODEL # 400 100 018
CIRCULATING PUMP
KILL SWITCH ENCLOSED WHICH TERMINATES POWER
TO ALL LIGHTS, AND MECHANICAL SYSTEMS
WITH THE EXCEPTION OF COMFOAIR 200
COMFOAIR TO HAVE INDIVIDUAL KILL SWITCH
8 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR
5 GALLON DRAINBACK TANK
7 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR
QUANTITY 1 4' BY 8' PANEL MOUNTED ON ROOF
REF 990 326 252
REF 705 512 521
11 ZEHNDER AMERICA COMFOFOND-L
GEOTHERMAL HEAT EXCHANGER
GLASS FRONT EXHIBIT DISPLAY ONLY
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
M101MECHANICAL SECTION
AM
ECO - EXPERIENCE
05/06/11
1/2" = 1'-0"1
MECHANICAL SECTION
*NOTE
2X4 MOCK UP FRAMING SYSTEM
REPLACES THE SIP PANEL
USING DIM LUMBER AND
PLYWOOD
*2X4 STRAPPING TIES THE TWO
WALLS TOGETHER
UP
UP
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
Z100BACKUP PLAN MAIN
FLOOR
JV
ECO - EXPERIENCE
05/06/11 1/4" = 1'-0"1
Z100 - BACKUP PLAN MAIN FLOOR
*NOTE
2X4 MOCK UP FRAMING SYSTEM
REPLACES THE SIP PANEL
USING DIM LUMBER AND
PLYWOOD
*2X4 STRAPPING TIES THE TWO
WALLS TOGETHER SPACED AT
48" O.C.
2x4 DIM LUMBER SPACED AT 1' 1-1/8"
2X4 DIM LUMBER 24" O.C.
OSB SHEATHING *INTERIOR
2X4 DIM LUMBER 24" O.C.*BUILDS AIR SPACE
OSB SHEATHING *EXTERIOR
1/2" X 6" RECLAIMEDT&G BARN SIDING
North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011
Design Development
Drawn by:
Date:
NOT FOR CONSTRUCTION
These documents are the work of students of the Design Build
studio at the North Dakota State University. These do not constitute
professional advice.
Z101BACK UP FRAMING
DIAGRAM
JV
ECO - EXPERIENCE
05/06/11
1/4" = 1'-0"1
Z101 - BACK UP PLAN DIAGRAM