ndsu design build - cd drawing set

47
CODE SUMMARY APPLICABLE CODES: ST. PAUL, MINNESOTA CODE OF ORDINANCES MEANS OF EGRESS (1) WEST OPENING, 4'-0"; (1) WEST DOOR, 3'-0" (1) EAST OPENING, 4'-0" (1) SOUTH DOOR, 3'-0" ACCESSIBILITY (1) WEST RAMP, 4'-0" WIDTH, 1:20 SLOPE (1) SOUTH RAMP, 4'-0" WIDTH, 1:20 SLOPE North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011 Design Development Drawn by: Date: NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice. T001 TITLE PA-CS ECO - EXPERIENCE 05/06/11 SHEET LIST A405 DOOR TO WALL SOUTH A406 ROUGH OPENING AND PLAN B A407 SOUTHWEST CORNER A408 DOOR TO WALL WEST A409 ROOF TO WALL A410 LOFT POST TO FOUNDATION A500 INTERIOR ELEVATION KITCHEN A501 INTERIOR ELEVATION BATHROOM A502 INTERIOR ELEVATION EAST & WEST A503 INTERIOR ELEVATION SOUTH A504 INTERIOR ELEVATION STAIR EAST A505 INTERIOR ELEVATION STAIR NORTH A506 INTERIOR ELEVATION STAIR SOUTH A507 INTERIOR SECTION STAIR NORTH A508 INTERIOR SECTION STAIR SOUTH A600 STAIR AXON NORTH A601 STAIR AXON SOUTH A602 LOFT RAILING AXON E100 ELECTRICAL MAIN LEVEL E101 ELECTRICAL DETAILS M100 HVAC MAIN LEVEL M101 MECHANICAL SECTION Z100 BACKUP PLAN MAIN FLOOR Z101 BACK UP FRAMING DIAGRAM SHEET LIST T001 TITLE T002 MATERIALS SCHEDULE A100 SITE WORK A101 PLAN MAIN LEVEL A102 SIGNAGE MAIN LEVEL A103 FLOOR DIAPHRAGM FRAMING A104 FLOOR DIAPHRAGM SHEATHING A105 FLOOR DIAPHRAGM SCHEDULE A106 FLOOR - LOFT - ROOF FRAMING A107 ROOF PLAN SIP ASSEMBLY A200 ELEVATION SHADING A201 ELEVATION EAST SIP ASSEMBLY AND FINISHED A202 ELEVATION NORTH SIP ASSEMBLY AND FINISHED A203 ELEVATION SOUTH SIP ASSEMBLY AND FINISHED A204 ELEVATION WEST SIP ASSEMBLY AND FINISHED A300 SITE SECTION WEST A301 SHADING STRUCTURE SECTIONS A400 FOUNDATION TO WALL N A401 FOUNDATION TO WINDOW A402.1 SHADE STRUCTURE TO FOUNDATION A402.2 SHADE STRUCTURE TO FOUNDATION ELEVATION A403 WINDOW TO HEADER A404 NORTHWEST CORNER North Dakota State University DESIGN BUILD STUDIO ARCH 472 Spring 2011 Design Development Drawn by: Date: NOT FOR CONSTRUCTION These documents are the work of students of the Design Build studio at the North Dakota State University. These do not constitute professional advice. T001 TITLE PA-CS ECO - EXPERIENCE 05/06/11

Upload: ndsudesignbuild

Post on 29-Nov-2014

164 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: NDSU Design Build - CD Drawing Set

CODE SUMMARY

APPLICABLE CODES:

ST. PAUL, MINNESOTA CODE OF ORDINANCES

MEANS OF EGRESS

(1) WEST OPENING, 4'-0"; (1) WEST DOOR, 3'-0"

(1) EAST OPENING, 4'-0"

(1) SOUTH DOOR, 3'-0"

ACCESSIBILITY

(1) WEST RAMP, 4'-0" WIDTH, 1:20 SLOPE

(1) SOUTH RAMP, 4'-0" WIDTH, 1:20 SLOPE

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

T001TITLE

PA-CS

ECO - EXPERIENCE

05/06/11

SHEET LIST

A405 DOOR TO WALL SOUTH

A406 ROUGH OPENING AND PLAN B

A407 SOUTHWEST CORNER

A408 DOOR TO WALL WEST

A409 ROOF TO WALL

A410 LOFT POST TO FOUNDATION

A500 INTERIOR ELEVATION KITCHEN

A501 INTERIOR ELEVATION BATHROOM

A502 INTERIOR ELEVATION EAST & WEST

A503 INTERIOR ELEVATION SOUTH

A504 INTERIOR ELEVATION STAIR EAST

A505 INTERIOR ELEVATION STAIR NORTH

A506 INTERIOR ELEVATION STAIR SOUTH

A507 INTERIOR SECTION STAIR NORTH

A508 INTERIOR SECTION STAIR SOUTH

A600 STAIR AXON NORTH

A601 STAIR AXON SOUTH

A602 LOFT RAILING AXON

E100 ELECTRICAL MAIN LEVEL

E101 ELECTRICAL DETAILS

M100 HVAC MAIN LEVEL

M101 MECHANICAL SECTION

Z100 BACKUP PLAN MAIN FLOOR

Z101 BACK UP FRAMING DIAGRAM

SHEET LIST

T001 TITLE

T002 MATERIALS SCHEDULE

A100 SITE WORK

A101 PLAN MAIN LEVEL

A102 SIGNAGE MAIN LEVEL

A103 FLOOR DIAPHRAGM FRAMING

A104 FLOOR DIAPHRAGM SHEATHING

A105 FLOOR DIAPHRAGM SCHEDULE

A106 FLOOR - LOFT - ROOF FRAMING

A107 ROOF PLAN SIP ASSEMBLY

A200 ELEVATION SHADING

A201 ELEVATION EAST SIP ASSEMBLY AND FINISHED

A202 ELEVATION NORTH SIP ASSEMBLY AND FINISHED

A203 ELEVATION SOUTH SIP ASSEMBLY AND FINISHED

A204 ELEVATION WEST SIP ASSEMBLY AND FINISHED

A300 SITE SECTION WEST

A301 SHADING STRUCTURE SECTIONS

A400 FOUNDATION TO WALL N

A401 FOUNDATION TO WINDOW

A402.1 SHADE STRUCTURE TO FOUNDATION

A402.2 SHADE STRUCTURE TO FOUNDATION ELEVATION

A403 WINDOW TO HEADER

A404 NORTHWEST CORNER

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

T001TITLE

PA-CS

ECO - EXPERIENCE

05/06/11

Page 2: NDSU Design Build - CD Drawing Set

INTERIOR FINISH SCHEDULE

FLOOR3/4" Plywood

INTERIOR FINISHAlt. #1: 1" x 4" Reclaimed Pine

Alt. #2: 1" x 4" Reclaimed Fir1/2" Concrete Board, Stained at Bathroom and Kitchen

INTERIOR DOORSolid Core Veneer Maple

CEILINGAlt. #1: 1" x 4" Reclaimed Pine

Alt. #2: 1" x 4" Reclaimed Fir

INTERIOR STRUCTUREAlt. #1: 4" x 4" Reclaimed Douglas Fir Heavy Timber Columns

Alt. #2: 4" x 4" Painted Parallam

WINDOWS & DOORSReclaimed Pine At Sill and Head

Reclaimed Pine At Jambs (Cut One Piece to Fit Window Width)

WINDOW TREATMENTBurlap Fabric on Galvanized Conduit Pipe

STAIRS & SHELVINGFixed Burlap Panel Framed with 2" x 2" Maple, Oiled

1/2" Galvanized Welded Wire Black Fabric set in a 2"x2" Maple Frame, Oiled

1" x 3" Maple Battens, Oiled

2" x 12" Maple Removable Shelves, Oiled

COUNTERTOPSEpoxy Sealed Concrete Countertop with Glass Aggregate

18" x 24" (LLV) Metal Bracket (stainless steel)

KITCHENWolf Convection Microwave - model #: MWC24 with 30" trim kit (stainless steel trim)

Wolf 30" Induction Cooktop - model #: CT30IU

Frigidaire Top-Freezer Refrigerator - model #: LGUI1849LF (stainless steel)

Kohler Faucet - model #: K-7505 (polished chrome)

Kohler Sink - model #: K-3936 (stainless steel)

BATHROOMKohler Lavatory - model #: K-14293 (white)

Kohler Faucet - model #: K-T14414-4 (polished chrome)

Kohler Multi-Function Handshower - model #: K-10298 (polished chrome)

Kohler Slider Bar - model #: K-9516 (polished chrome)

Kohler Persuade Dual Flush Toilet - model #: K-3654 (white, polished chrome)

Kohler Brevia™ Elongated Toilet Seat - model #: K-4664 (white)

Freewill One-Piece Barrier-Free Transfer Shower Module - model #: K-12101-P (white)

Freewill Shower Drain - model #: K-9132 (polished chrome)

36" Kohler Contemporary Style Grab Bar - model #: K-14564 (polished stainless steel)

18" Kohler Contemporary Style Grab Bar - model #: K-14561 (polished stainless steel)

LIGHTING & ELECTRICAL ACCESSORIESSee Notes on Electrical Drawings and Specifications

MECHANICAL EQUIPMENT & ACCESSORIESSee notes on Mechanical Drawings and Specifications

EXTERIOR FINISH SPECIFICATIONS

SITE3/4" Plywood

EXTERIOR WALLS1/2" x 6" Reclaimed Lap Barn Siding

1" x 12" Cedar Trim Board

16" x 4" x 8" Gabions made from 1/2" Galvanized Welded Wire Fabric,

filled with local rocks 1" to 3" in diameter3/8" Black Skatelite Black (at Exterior Window Jambs)

SHADING STRUCTURE2" x 10" Cedar Wood

2" x 6" Cedar Wood

2" x 4" Cedar Wood

2" x 2" Cedar Wood

1" x 2" Cedar Wood

ROOF1" x 6" x 12'-0" Cedar Roof Lap

Bent Metal, Colored Flashing

1" x 12" Trim Board

Mill Finish Aluminum Plate 1/8" Thick

WINDOWS & DOORS (See Window Sheet For More Details)

Energate 1042 Tilt & Turn, triple glazed

Energate 1042 Fixed, triple glazed

Energate Full Tempered Glazed Main Entrance Swinging Door - model #: 2.001.1

Energate Fully Tempered Glazed Side Entrance Swinging Door - model #: 3.001.3

GLAZINGEnergate Solar Gain 1 Glass .55/.088, R-11.36

Energate Solar Gain 2 Glass .61/.113, R-8.85

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

T002MATERIALS SCHEDULE

HB-CT

ECO - EXPERIENCE

05/06/11

Page 3: NDSU Design Build - CD Drawing Set

SIGNAGE SCHEDULE

PASSIVE HOUSE INTRO BOARD (36" X 36")

DONOR BOARD

MEASURABLE RESULTS BOARD (36" X 36")

PASSIVE SOLAR BOARD (36" X 36")

BREATHE EASY BOARD (36" X 36")

BREATHE EASY BOX (3'4" X 2'5")

CABIN RENDERINGS AND CONSTRUCTION PHOTOS (5" X 7")

CABIN PROCESS MODELS (ON SHELVING)

EFFICIENT FIXTURES BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'4" X 2'5"

PASSIVE SOLAR BOX (3'4" X 2'5")

EMBODIED ENERGY BOARD (36" X 36")

PASSIVE HOUSE CUT-OUT MURAL

SKIN AND BONES BOARD (36" X 36")

SKIN AND BONES BOX (36" X 36")

SKIN AND BONES BOX (36" X 36")

SKIN AND BONES BOX (36" X 36")

SKIN AND BONES BOX (36" X 36")

SKIN AND BONES BOX (36" X 36")

UNEXPECTED ENERGY BOARD (36" X 36")

UNEXPECTED ENERGY BOX (36" X 36")

EARTH'S ENERGY BOARD (36" X 36")

EARTH'S ENERGY BOX (3'4" X 2'5")

BUFFALO GRASS

VERIFY: THE SOUTHERN BLOCKOF BUFFALO GRASS SHOULD BESIZED TO FIT BETWEEN THE ENDOF THE SHADING PLATFORM ANDTHE ROAD. IF NO SPACE ISAVAILABLE DO NOT PLACE GRASS.

ECO SCALE

GREEN ROOFS TRAILER

SKEEBALL

STORAGE

RESTROOM

STREAM TABLE

GS PARTNERUP

UP

ENTRANCE

11'-73 _ 4"

4'

14'-61 _ 2"

4'-103 _ 4"

20'-515__16" 3' 16'-1

3_4"

7'-73 _ 4"

4'

13'-53 _ 4"

5'-111 _ 2"

5' 23'-111_2"

31'-1"

0' - 0"

0' - 6"

1

12

13

20 21 22 23

24

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

CORNERFINISH

DONOR SPACE

19

16

18

17

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A100SITE WORK

JH - JV

ECO - EXPERIENCE

05/06/11

1/8" = 1'-0"1

SITE WORK

Page 4: NDSU Design Build - CD Drawing Set

7' 7' 3' 4' 1'-2"

4'-4"

7'-2"

4'

3'

2'

7'

1'-2"

1'-2" 2'-6" 4' 14'-6" 1'-2"

23'-4"

7'-2"

4'

13'-2"

24'-4"

10'

1'

2'-11"

1'

2'-11"

5'-2"

3'-10"

1'-6"

5'-4"

1'-3"

3'-10"

6'-5"

5'-8"

2'-4"4'-2"10'-1"3'-10"

24'-10"

1'-2"

23'-8"

4'-11_2" 4'-1

1_2" 4'-1

1_2" 4'-1

1_2" 4'-1

1_2" 4'-1

1_2" 4'-1

1_2"

3'-10"

1'-11" 1'-9" 1'-10"

2" 2"

2"

4"

2"2"

4"

2"

1'-4"

2'-91 _ 2"

-

LIVING ROOM

KITCHEN

BATH

ENTRY

CORRIDOR

MEC.

N KITCHEN FL1

W KITCHEN FL1

W LIVING ROOM FL1

S LIVING ROOM FL1 A S LIVING ROOM FL1 B S DOOR

W DOOR

BUILT-IN TABLE

BUILT-IN SHELVINGBUILT-IN SHELVING

BUILT-IN SHELVING

BUILT-IN WORK SURFACE

SHELVESSHELVES

BUILT-IN COUCH

DESK

BENCH

STUDY

1/4" = 1'-0"1

MAIN LEVEL PLANNorth Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A101PLAN MAIN LEVEL

PA

ECO - EXPERIENCE

05/06/11

Page 5: NDSU Design Build - CD Drawing Set

SIGNAGE SCHEDULE

PASSIVE HOUSE INTRO BOARD (36" X 36")

DONOR BOARD

MEASURABLE RESULTS BOARD (36" X 36")

PASSIVE SOLAR BOARD (36" X 36")

BREATHE EASY BOARD (36" X 36")

BREATHE EASY BOX (3'4" X 2'5")

CABIN RENDERINGS AND CONSTRUCTION PHOTOS (5" X 7")

CABIN PROCESS MODELS (ON SHELVING)

EFFICIENT FIXTURES BOARD (36" X 36")

EXITEXIT

MEASURABLE RESULTS BOX (3'4" X 2'5"

PASSIVE SOLAR BOX (3'4" X 2'5")

EMBODIED ENERGY BOARD (36" X 36")

PASSIVE HOUSE CUT-OUT MURAL

SKIN AND BONES BOARD (36" X 36")

SKIN AND BONES BOX (36" X 36")

SKIN AND BONES BOX (36" X 36")

SKIN AND BONES BOX (36" X 36")

SKIN AND BONES BOX (36" X 36")

SKIN AND BONES BOX (36" X 36")

UNEXPECTED ENERGY BOARD (36" X 36")

UNEXPECTED ENERGY BOX (36" X 36")

EARTH'S ENERGY BOARD (36" X 36")

EARTH'S ENERGY BOX (3'4" X 2'5")

BUFFALO GRASS

UP

UP

1

2

3

4

5

6

7

8

3

4

56 8

9 9

10

10

9

11

EXIT

10'-8"

6'

10'-8"

3'-7"5'-1"

2'

PRESENTER 1

OPEN WALL,STUDS ONLY

4'4'

5'

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

12

PRESENTER 2

8'-11"

PAINTED IN SHOWER

7'-2"

3'-1"

0" 6"

6"

7

A407 A405

A408

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A102SIGNAGE MAIN LEVEL

JH - JV

ECO - EXPERIENCE

05/06/11 1/4" = 1'-0"1

SIGNAGE MAIN LEVEL

Page 6: NDSU Design Build - CD Drawing Set

1 2 3 4 5

A

B

C

D

E

8'-3"

7'-91 _ 2"

6'-101 _ 2"

8' 8' 8' 10'-8"

35'-2"

39'-8"

8'-3"

5'

*NOTE

DASHED LINES INDICATE

DIAPHRAGM MODULAR GRID

- BUILT WITH 2X6 DIM LUMBER

- REFERENCE FLOOR

MEMBRANE MODULAR

SCHEDULE

- SHEATHED WITH 3/4" OSB

6'

4'

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A103FLOOR DIAPHRAGM

FRAMING

JV

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

FLOOR DIAPHRAGM FRAMING

Page 7: NDSU Design Build - CD Drawing Set

*NOTE

DASHED LINES INDICATE

DIAPHRAGM MODULAR GRID

- BUILT WITH 2X6 DIM LUMBER

- REFERENCE FLOOR

MEMBRANE MODULAR

SCHEDULE

- SHEATHED WITH 3/4" OSB-

-ADD 2X6 BLOCKING WHERE

LOFT POSTS MEET

FOUNDATION

1 2 3 4 5

A

B

C

D

E

8'-3"

7'-91 _ 2"

6'-101 _ 2"

8' 8' 8' 10'-8"

35'-2"

39'-8"

8'-3"

5'

6'

4'

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A104FLOOR DIAPHRAGM

SHEATHING

JV

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

FLOOR DIAPHRAGM SHEATHING

Page 8: NDSU Design Build - CD Drawing Set

FLOOR MEMBRANE SPECIFICATIONS:

CONSTRUCTION:

*MODULES ASSEMBLED OFFSITE

- 1A - 5'-0" x 4'-0" *CONTINUATION OF RAMP 1:20

- 2A THROUGH 5A - N/A

- 1B - 5'-0" x 8'-3" *CONTINUATION OF RAMP 1:20

- 2B - 8'-0" x 8'-3"

- 3B - 8'-0" x 8'-3"

- 4B - 8'-0" x 8'-3"

- 5B - N/A

- 1C - 5'-0" x 8'-3"

- 2C - 8'-0" x 8'-3" *WITH WINDOW SUPPORT * REFERENCE WINDOW DETAIL

- 3C - 8-0" x 8'-3" *BUILT IN 2 PIECES TO ACCOMODATE COLUMN

- 4C - 8'-0" x 8'-3"

- 5C - N/A

- 1D - 5'-0" x 7'-9 1/2"

- 2D - 8'-0" x 7'-9 1/2" *WITH WINDOW SUPPORT * REFERENCE WINDOW DETAIL

- 3D - 8'-0" x 7'-9 1/2"

- 4D - 8'-0" x 8'-3"

- 5D - N/A

- 1E - 5'-0" x 6'-10 1/2"

- 2E - 8'-0" x 6'-10 1/2" *WITH WINDOW SUPPORT * REFERENCE WINDOW DETAIL

- 3E - 8'-0" x 6'-10 1/2" *WITH WINDOW SUPPORT * REFERENCE WINDOW DETAIL

- 4E - 8'-0" x 6'-10 1/2"

- 5E - 10'-8" x 6'-0" * RAMP 1:20

*SHEATHED WITH 3/4" OSB ONSITE

*REFERENCE SHEATHING DETAIL

DECONSTRUCTION:

*REMOVE 3/4" OSB SHEATHING

*SEPARATE DIAPHRAGM MODULES

*DISASSEMBLE 2"X6" LUMBER

7"

6'-71 __16"

2'-01_2"

4'-41_4"

1'-51_2"

10'-8"

RAMPS *FOR RAMP 1A-1B ADD 1'-5 1/2" ADDITION TO THE MODULE

WINDOW SUPPORT *ADD EXTRA 2X6 AT SPECIFIED LOCATION

COLUMN MODULE *BUILD MODULE WITH

SPECIFIED DIM. AND CUT TO FIT AROUND COLUMN

1A-1B 6E

2C, 2D

3C

2E, 3E

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A105FLOOR DIAPHRAGM

SCHEDULE

JV

ECO - EXPERIENCE

05/06/11 1/4" = 1'-0"1

FLOOR DIAPHRAGM SCHEDULE

Page 9: NDSU Design Build - CD Drawing Set

3 PLY LVL POST OR MULTI-PLY LVL HEADER MULTI-PLY- 2X AS

2"X8" JOIST 16" O.C.

3 PLY 2"X8"

2 PLY 2"X8"

2"X8" LEDGER, BLOCKING

4"X4" POST

2 PLY 2"x12"

SPECIFIED BY SIP MFR AS SPECIFIED BY SIP MFR SPECIFIED BY SIP MFR

IN SIP AS SPECIFIED BY MFR

3 PLY 2"X8"

3X12" GLULAM TIMBER

3 PLY LVL POST OR AS SPECIFIED BY SIP MFR

MULTI-PLY LVL HEADER MULTI-PLY- 2X ASSPECIFIED BY SIP MFR SPECIFIED BY SIP MFR

FOUNDATION FRAMING

FOUNDATION SHEATHING

LOFT FRAMING

ROOF FRAMING

6'

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A106FLOOR - LOFT - ROOF

FRAMING

JV

ECO - EXPERIENCE

05/06/11

Page 10: NDSU Design Build - CD Drawing Set

R1 R2 R3 R4 R5 R6

14" SIP PANEL SCHEDULE AND

CONSTRUCTION:

*MODULES MANUFACTURED

OFFSITE

*LAYOUT ACCOMODATES OFFSET

FOR GABION DRAIN DETAILS

*PANELS ARE THEN BROUGHT IN

AND INSTALLED WITH MACHINE

ASSISTANCE

4'-0" 4'-0" 4'-0" 4'-0" 4'-0" 3'-4"

11'-8"

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A107ROOF PLAN SIPASSEMBLY

JV

ECO - EXPERIENCE

05/06/11 1/4" = 1'-0"1

ROOF PLAN SIP ASSEMBLY

Page 11: NDSU Design Build - CD Drawing Set

1

2

3

4

5

7

8

STRUCTURAL ENGINEERINGREVIEW OF SHADESTRUCTURE AND FOUNDATIONHAVE NOT BEEN CONDUCTEDFOR SITE LOCATION AND AREIMPERATIVE PRIOR TOCONSTRUCTION

SIMPSON STRONGTIE POST BASE

(2) - 2" X 8" TREATED POSTS

1" X 4" CEDAR LOUVERS COMPOSED

AS SHADING PANELS SPACED 4" O.C.

1" X 6" CEDAR LOUVERS COMPOSED

AS SHADING PANELS SPACED 6" O.C.

11 GAUGE STEEL CABLE

2" x 8" TREATED WOOD AS BENCH

24'-9"

4'-11_2"

14'-51 _ 2"

12'-1"

11'-10"

9'-51 _ 2"

6'-11"

1'-3"

1

2

4

7

3

5

16" X 4" X 8" GABIONS

8

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A200ELEVATION SHADING

PA - MD

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

200 - SOUTH ELEVATION SHADING

Page 12: NDSU Design Build - CD Drawing Set

5" RECLAIMED T&G BARN SIDING OVER2"X4" DIM. LUMBER 24" O.C.

1"X6" RECLAIMED CEDAR TRIM

16"X4"X8" GABIONS MADE FROM 1/2"GALVANIZED WELDED WIRE FABRIC

W/ LOCAL ROCKS 1"-3" IN DIAMETER

8" CEDAR SHIPLAP OVER 2"X2" BATTENS& COUNTER-BATTENS 24" O.C.

W/ LOCAL ROCKS 1"-3" IN DIAMETER

SIMPSON STRONGTIE FLAT-PLATECONNECTOR

PASSIVE HOUSE CERTIFIEDWINDOWS/DOORS

2-2"X8" TREATED CEDAR POSTS

SIMPSON STRONGTIE POST BASE

MANUFACTURED SCREEN PANELS

1"X4" CEDAR LOUVERS COMPOSED ASSHADING PANELS SPACED 4" O.C.

3/8" RICHLITE

1

2

3

4

5

6

7

8

9

10

11

E2 E5 E7E1 E3 E4 E8

E9 E10

10

1

2

4

11

3

7

14" SIP PANEL SCHEDULE AND

CONSTRUCTION:

*MODULES MANUFACTURED OFFSITE

*HEADERS DETAILED BY SIP

MANUFACTURER

*PANELS ARE THEN BROUGHT IN WITH

MACHINE ASSISTANCE, PLACED

ONTOP OF DIM LUMBER PLATES

RUNNING THE PERIMETER OF THE

DIAPHRAGM AND SCREWED INTO

PLACE*REFERENCE FOUNDATION

DETAIL

4'-0" 4'-0"3'-7

1_4"

1'-3"

3'-431__32"

1'-29 __32"

12'-81 _ 8"

18'-613__32"

12'-217__32"

3'-63_4"

1'-6" 1'-6"2'-11

7_8"3'-2

1__16"

24'-315__16"

14'12'

4'-11"

2'-8"

20'-3 13/16"

8'-0"

3'-6"

OPEN OPEN

OPEN

OPEN OPEN

OPEN

10'-15 _ 8"

7'

1'- 4"

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A201ELEVATION EAST SIP

ASSEMBLY ANDFINISHED

JV

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

201 - EAST ELEVATION SIP ASSEMBLYAND FINISHED

Page 13: NDSU Design Build - CD Drawing Set

5" RECLAIMED T&G BARN SIDING OVER2"X4" DIM. LUMBER 24" O.C.

1"X6" RECLAIMED CEDAR TRIM

16"X4"X8" GABIONS MADE FROM 1/2"GALVANIZED WELDED WIRE FABRIC

W/ LOCAL ROCKS 1"-3" IN DIAMETER

8" CEDAR SHIPLAP OVER 2"X2" BATTENS& COUNTER-BATTENS 24" O.C.

W/ LOCAL ROCKS 1"-3" IN DIAMETER

SIMPSON STRONGTIE FLAT-PLATECONNECTOR

PASSIVE HOUSE CERTIFIEDWINDOWS/DOORS

2-2"X8" TREATED CEDAR POSTS

SIMPSON STRONGTIE POST BASE

MANUFACTURED SCREEN PANELS

1"X4" CEDAR LOUVERS COMPOSED ASSHADING PANELS SPACED 4" O.C.

3/8" RICHLITE

1

2

3

4

5

6

7

8

9

10

11

42.0000

3'-513__16"

4'-0" 3'-6" 3'-6" 4'-0" 2'-6"

9'-0"

5'-35 __32"

1'-3"

1'-01 _ 4"

18'-613__32"

42.0000

3'-513__16"

2'-03 __16"

6'-61 _ 4"

23'-4"

1'-23__16"

1'-2"

12'-01 _ 4"

2'-0"

N1 N3 N4 N5 N6 N8

N7

N2

4

1

11

3

6

14" SIP PANEL SCHEDULE AND

CONSTRUCTION:

*MODULES MANUFACTURED OFFSITE

*HEADERS DETAILED BY SIP

MANUFACTURER

*PANELS ARE THEN BROUGHT IN WITH

MACHINE ASSISTANCE, PLACED

ONTOP OF DIM LUMBER PLATES

RUNNING THE PERIMETER OF THE

DIAPHRAGM AND SCREWED INTO

PLACE*REFERENCE FOUNDATION

DETAIL

12.6250

116.6014

2'-2"

19'-5 3/16"

OPEN

OPEN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A202ELEVATION NORTH SIP

ASSEMBLY ANDFINISHED

JV

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

202 - NORTH ELEVATION SIP ASSEMBLYAND FINISHED

Page 14: NDSU Design Build - CD Drawing Set

5" RECLAIMED T&G BARN SIDING OVER2"X4" DIM. LUMBER 24" O.C.

1"X6" RECLAIMED CEDAR TRIM

16"X4"X8" GABIONS MADE FROM 1/2"GALVANIZED WELDED WIRE FABRIC

W/ LOCAL ROCKS 1"-3" IN DIAMETER

8" CEDAR SHIPLAP OVER 2"X2" BATTENS& COUNTER-BATTENS 24" O.C.

W/ LOCAL ROCKS 1"-3" IN DIAMETER

SIMPSON STRONGTIE FLAT-PLATECONNECTOR

PASSIVE HOUSE CERTIFIEDWINDOWS/DOORS

2-2"X8" TREATED CEDAR POSTS

SIMPSON STRONGTIE POST BASE

MANUFACTURED SCREEN PANELS

1"X4" CEDAR LOUVERS COMPOSED ASSHADING PANELS SPACED 4" O.C.

3/8" RICHLITE

1

2

3

4

5

6

7

8

9

10

11

S2

S3

S4

S1 S5

42.0000

12.0000

15'-13__32" 4'-0

29__32"

4'-915__32"

1'-33 __32"

18'-613__32"

1'-527__32"

3'-0"

1'-0"

7'-0"

3'-0"

14" SIP PANEL SCHEDULE AND

CONSTRUCTION:

*MODULES MANUFACTURED OFFSITE

*HEADERS DETAILED BY SIP

MANUFACTURER

*PANELS ARE THEN BROUGHT IN WITH

MACHINE ASSISTANCE, PLACED

ONTOP OF DIM LUMBER PLATES

RUNNING THE PERIMETER OF THE

DIAPHRAGM AND SCREWED INTO

PLACE*REFERENCE FOUNDATION

DETAIL

23'-4"

1'-2"

6 3

11

1

6 6

2'-2"

7'-0"

OPEN

OPEN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A203ELEVATION SOUTH SIP

ASSEMBLY ANDFINISHED

JV

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

203 - SOUTH ELEVATION SIP ASSEMBLYAND FINISHED

Page 15: NDSU Design Build - CD Drawing Set

5" RECLAIMED T&G BARN SIDING OVER2"X4" DIM. LUMBER 24" O.C.

1"X6" RECLAIMED CEDAR TRIM

16"X4"X8" GABIONS MADE FROM 1/2"GALVANIZED WELDED WIRE FABRIC

W/ LOCAL ROCKS 1"-3" IN DIAMETER

8" CEDAR SHIPLAP OVER 2"X2" BATTENS& COUNTER-BATTENS 24" O.C.

W/ LOCAL ROCKS 1"-3" IN DIAMETER

SIMPSON STRONGTIE FLAT-PLATECONNECTOR

PASSIVE HOUSE CERTIFIEDWINDOWS/DOORS

2-2"X8" TREATED CEDAR POSTS

SIMPSON STRONGTIE POST BASE

MANUFACTURED SCREEN PANELS

1"X4" CEDAR LOUVERS COMPOSED ASSHADING PANELS SPACED 4" O.C.

3/8" RICHLITE

1

2

3

4

5

6

7

8

9

10

11

W2 W3 W4 W5

W7

W9

W1

11

2

4

3'-915__32"

5'-6" 7'-0"

7'-0"

8'-0"

2'-213__32"1'-33 __32"

18'-613__32"

2'-0"

1'-0"

14" SIP PANEL SCHEDULE AND

CONSTRUCTION:

*MODULES MANUFACTURED OFFSITE

*HEADERS DETAILED BY SIP

MANUFACTURER

*PANELS ARE THEN BROUGHT IN WITH

MACHINE ASSISTANCE, PLACED

ONTOP OF DIM LUMBER PLATES

RUNNING THE PERIMETER OF THE

DIAPHRAGM AND SCREWED INTO

PLACE*REFERENCE FOUNDATION

DETAIL

3'-0"

1'-79 __32"

12'-79 __32"

22'-113_4"

3'-41_2"

1'-67 __32"1'-43 __16"

0'-521__32"2'-919__32"0'-919__32"

6

16. 0000

6

2'-8"

OPEN

OPEN

OPEN

OPEN

4'-217__32"

1'-6"

8

10

7

1

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A204ELEVATION WEST SIP

ASSEMBLY ANDFINISHED

JV

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

204 - WEST ELEVATION SIP ASSEMBLYAND FINISHED

Page 16: NDSU Design Build - CD Drawing Set

RAMP 20:1 OPEN

SCREEN STRUCTURE

GS PARTNER

OPEN ROOF

ALT LIGHT 1: SWITCH OFF LIGHTS IF ADDITIONAL LIGHT IS NOT NEEDEDALT LIGHT 2: TETHER LIGHTS TOGETHER. KEEP ON

13

1

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A300SITE SECTION WEST

JH - JV

ECO - EXPERIENCE

05/06/11

3/16" = 1'-0"1

300 - SITE SECTION WEST

Page 17: NDSU Design Build - CD Drawing Set

2'-111_2"

1

2

3

3

4

5

7'-51 _ 2"

61 _ 2"

5'-5"

1

2

5

6

14'

2'-8"

2'-3"

2'

1'1'-61 _ 2"

1'-91 _ 2"

1'-51 _ 2"

1'-1"

12'

1'-3" 1'-51 _ 2"

2'-3"

2'-3"

2'-41 _ 2"

4'-11"

6'

4'-41_2"

2'-111_2"

8"

1

2

3

3

4

2'-3"

3

4

7

7

5

8

8

SIMPSON STRONGTIE POST BASE

(2) - 2" X 8" TREATED POSTS

11 GAUGE STEEL CABLE

12' SONOTUBE (5') DEPTH

WITH (2) #5 BARS

1" X 4" CEDAR LOUVERS COMPOSED

AS SHADING PANELS SPACED 4" O.C.

1" X 6" CEDAR LOUVERS COMPOSED

AS SHADING PANELS SPACED 6" O.C.

2" x 8" TREATED WOOD AS BENCH

16" X 4" X 8" GABIONS

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A301SHADING STRUCTURE

SECTIONS

PA - MD

ECO - EXPERIENCE

05/06/11

3/8" = 1'-0"1

SHADING STRUCTURE AT DOOR

3/8" = 1'-0"2

A301 - SHADING AT WINDOW

Page 18: NDSU Design Build - CD Drawing Set

*NOTE

-FLOORING DIAPHRAGM FRAMED AND SHEATHED FIRST-2X4 AND 2X10 DIM LUMBER THEN SCREWED INTO PLACE ONTO DIAPHRAGM 16"OC WITHAN INSET OF 3-7/16" FROM OUTER EDGE-14" SIP PANEL THEN PLACED ONTO DIM LUMBER PLATE AND SCREWED IN PLACE-NO EPS INSULATION ATTACHED TO THE EXTERIOR AT ECO-EXPERIENCE-NO VAPOR BARRIER ATTACHED TO THE EXTERIOR AT ECO-EXPERIENCE

8

6

7

1

18

117

10

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A400FOUNDATION TO WALL

N

JV

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

FOUNDATION TO WALL N+E

Page 19: NDSU Design Build - CD Drawing Set

*NOTE

-FLOORING DIAPHRAGM FRAMED AND SHEATHED FIRST-2X4 AND 2X10 DIM LUMBER THEN SCREWED INTO PLACE ONTO DIAPHRAGM 16"OC WITHAN INSET OF 3-7/16" FROM OUTER EDGE-14" SIP PANEL THEN PLACED ONTO DIM LUMBER PLATE AND SCREWED IN PLACE-NO EPS INSULATION ATTACHED TO THE EXTERIOR AT ECO-EXPERIENCE-NO VAPOR BARRIER ATTACHED TO THE EXTERIOR AT ECO-EXPERIENCE

5

7

11

8

3

1815

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A401FOUNDATION TO

WINDOW

JV

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

FOUNDATION TO WINDOW SOUTH

Page 20: NDSU Design Build - CD Drawing Set

8

11

1'-4"

8

9

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A402.1SHADE STRUCTURE TO

FOUNDATION

DC

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

402.1 - SHADE STRUCTURE TOFOUNDATION

Page 21: NDSU Design Build - CD Drawing Set

8

11

9

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A402.2SHADE STRUCTURE TO

FOUNDATIONELEVATION

DC

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

SHADE STRUCTURE TO FOUNDATIONELEVATION

Page 22: NDSU Design Build - CD Drawing Set

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

1

14

12

17

14

19

3

15

LED LIGHTING

LED LIGHTING

ROUGH OPENING

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A403WINDOW TO HEADER

DC

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

WINDOW TO HEADER

Page 23: NDSU Design Build - CD Drawing Set

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" FLOOR JOISTS AT 16" O.C

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

15

7

1

5

14

14

155

3

19

718

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A404NORTHWEST CORNER

DC

ECO - EXPERIENCE

05/06/11

1 1/2" = 1'-0"1

NORTHWESTCORNER

Page 24: NDSU Design Build - CD Drawing Set

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

7

1

5

15

17

223

19 17

18

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A405DOOR TO WALL SOUTH

DC

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

DOOR TO WALL SOUTH

Page 25: NDSU Design Build - CD Drawing Set

1

12

14

14

12

1

15

3

17

19

7

12

14

14

12

12

15

3

17

19

ROUGH OPENING

7

11

11

12

ROUGH OPENING

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A406ROUGH OPENING AND

PLAN B

DC

ECO - EXPERIENCE

05/06/11 3" = 1'-0"

1

ROUGH OPENING AND ALTERNATIVEPLAN B

Page 26: NDSU Design Build - CD Drawing Set

17

19

3

15

7

13

5

15

14

1

14

3

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A407SOUTHWEST CORNER

DC

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

SOUTHWEST CORNER

Page 27: NDSU Design Build - CD Drawing Set

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

7

1

5

15

17

22

19 17

18

8

ROUGH OPENING

PAINT FINISH

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A408DOOR TO WALL WEST

DC

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

DOOR TO WALL WEST

Page 28: NDSU Design Build - CD Drawing Set

14

21

11

23

1

14

14

1'-2"

16

1'-4"

7 1/4"

1'-2"

14

21

11

23

1

14

14

1'-2"

16

1'-4"

7 1/4"

1'-2"

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A409ROOF TO WALL

JK

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

ROOF TO WALL

Page 29: NDSU Design Build - CD Drawing Set

1 14" SIP (W/ 7/16" OSB)

2 PASSIVE HOUSE CERTIFIED DOOR

3 PASSIVE HOUSE CERTIFIEDFIXED PROFILE WINDOW

4 PASSIVE HOUSE CERTIFIEDTILT AND TURN WINDOW

5 6" PINE LAP SIDING

6 16" X 4" X 8" GABIONS

7 2" X 4" DIM LUMBER

8 2" X 6" DIM LUMBER

9 2" X 8" DIM LUMBER

10 2" X 10" DIM LUMBER

11 3/4" OSB

12 HEADER SPECIFIED BYMANUFACTURER

13 COLUMN SPECIFIED BYMANUFACTURER

14 LVL SPECIFIED BYMANUFACTURER

15 3/8" RICHLITE

16 2" X 8" LUMBER AT 16" O.C.

17 1" X 2" FURRING STRIPS

18 1" X 4" RECLAIMED PINE, OIL FINISH

19 1" X 12" RECLAIMED PINE BOARD

20 1" X 12" CEDAR TRIM BOARD

21 1" X 6" X 12' CEDAR ROOF LAP

22 2" X 12" DIM LUMBER

23 16" SIP (W/ 7/16" OSB)

24 4X4 POST

*NOTE

-END FASTENING OF BLOCKING THROUGH FLOOR DIAPHRAGM-SEE A104

FLOOR DIAPHRAGM 16" O.C.

SIMPSON STRONG-TIEABU44 POST BASE

8

11

24

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A410LOFT POST TOFOUNDATION

DC

ECO - EXPERIENCE

05/06/11

3" = 1'-0"1

SOUTH FIXED WINDOW

Page 30: NDSU Design Build - CD Drawing Set

OPEN

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

20

21

19

418

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A500INTERIOR ELEVATION

KITCHEN

MF

ECO - EXPERIENCE

05/06/11

1/2" = 1'-0"1

INTERIOR ELEVATION KITCHEN

Page 31: NDSU Design Build - CD Drawing Set

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

18

7

1'-21_4"

7'3'-2"

26

5'-4"

423

24

25

26

2'-10"

3'-6"

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

18

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A501INTERIOR ELEVATION

BATHROOM

MF

ECO - EXPERIENCE

05/06/11 1/2" = 1'-0"1

INTERIOR ELEVATION BATHROOM

Page 32: NDSU Design Build - CD Drawing Set

19

1

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

R.O

R.O

4' 5'-7" 2'-41_2"

6

1

2

7

5

18

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A502INTERIOR ELEVATION

EAST & WEST

MF

ECO - EXPERIENCE

05/06/11

1/2" = 1'-0"1

INTERIOR ELEVATION EAST & WEST

Page 33: NDSU Design Build - CD Drawing Set

R.O R.O

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

8

1010

6" 3'-6"

5

6 12

11

7

9

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A503INTERIOR ELEVATION

SOUTH

MF

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

INTERIOR ELEVATION SOUTH

Page 34: NDSU Design Build - CD Drawing Set

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

27

14

14

16

4'

2'-101_2" 11

1_4"

22

7'-8 1/4"

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A504INTERIOR ELEVATION

STAIR EAST

MF

ECO - EXPERIENCE

05/06/11 1/2" = 1'-0"

1INTERIOR ELEVATION STAIR EAST

Page 35: NDSU Design Build - CD Drawing Set

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

14

27

22

3'10"

7'-8 1/4"

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A505INTERIOR ELEVATION

STAIR NORTH

MF

ECO - EXPERIENCE

05/06/11

1/2" = 1'-0"1

INTERIOR ELEVATION STAIR NORTH

Page 36: NDSU Design Build - CD Drawing Set

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

22

13

14

3'10"

3'-31_2" 6'-7

1_2"

4' 2"

8'

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

4'

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A506INTERIOR ELEVATION

STAIR SOUTH

MF

ECO - EXPERIENCE

05/06/11 1/2" = 1'-0"1

INTERIOR ELEVATION STAIR SOUTH

Page 37: NDSU Design Build - CD Drawing Set

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

27

14

22

4'

3'-9"

6'-101_2" 3'-7"

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A507INTERIOR SECTION

STAIR NORTH

MF

ECO - EXPERIENCE

05/06/11 1/2" = 1'-0"

1INTERIOR SECTION STAIR NORTH

Page 38: NDSU Design Build - CD Drawing Set

1

2

3

4

5

6

7

8

9

10

11

12

13

14

15

16

17

18

19

20

21

22

23

24

25

26

27

27

22

14

10'-2"

7'-8 1/2"

4'

WALL

4' WALL OPENING

MECHANICAL ROOM

2"X4" STUD WALL

BREATHE EASY BOARD (36"X36")

BREATHE EASY BOX(3'4"X2'5")

1X4 PINE, UNFINISHED

SRUCTURAL INSULATED PANELS

DOOR

WINDOW

PASSIVE SOLAR BOARD (36"X36")

PASSIVE SOLAR BOX (3'4"X2'5")

2X4 MAPLE FRAMING

1X3 MAPLE BATTENS

2X2 MAPLE GUARDRAIL

1X8 16" O.C FLOOR JOIST

BUILT IN SHELVING

CEMENT BOARD, STAINED

EXPOSED SIP WALL

MEASURABLE RESULTS BOARD (36" X 36")

MEASURABLE RESULTS BOX (3'6"X2'5")

2X12 MAPLE FRAMING

2X6 STUD

OPEN WALL WITH STUDS ONLY

EFFICIENT FIXTURES BOARD (36"X36")

PAINTED IN SHOWER

4X4 TIMBER COLUMN

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A508INTERIOR SECTION

STAIR SOUTH

MF

ECO - EXPERIENCE

05/06/11

1/2" = 1'-0"1

INTERIOR SECTION STAIR SOUTH

Page 39: NDSU Design Build - CD Drawing Set

1

2

3

4

5

6

20

7

11

8

10

12

9

13

14

15

16

17

18

19

21

22

23

24

1

1

1

1

1

1

1

1

1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH)

MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS

BUILT-IN MAPLE VENEER WORK DESK

BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED

EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE

4 X 3 1/2" MAPLE TAPERED SQUARE LEGS

SHOWER SYSTEM

1"X3" MAPLE BATTENS UNFINISHED

3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH

FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE

2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH

2X8 16" O.C. FLOOR JOIST

2" X 12" MAPLE SHELVES UNFINISHED.

BUILT-IN SEATING/BED W/ FIRM FOAM AND

2X12 VENEER MAPLE SHELVING, OIL FINISH

BUILT-UP STRINGER

2X2 MAPLE GUARDRAIL W/ FIXED BURLAP PANEL

3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE

2" X 2" MAPLE FRAMING UNIFINISHED

RIDGE BEAM

VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT

1/2" GALVANIZED WELDED WIRE BLACK FABRIC

4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS

1" x 12" MAPLE STAIR TREADS UNFINISHED

OILED MAPLE PLYWOOD

SET IN 2" X 2" UNFINISHED MAPLE FRAME

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A600STAIR AXON NORTH

MF

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

STAIR AXON NORTH

Page 40: NDSU Design Build - CD Drawing Set

1

2

3

4

5

6

20

7

11

8

10

12

9

13

14

15

16

17

18

19

21

22

23

24

25

1

1

1

1

1

1

1

1

1

1

1

1

1" x 4" OILED, RECLAIMED PINE (UNFINISHED)

MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS

BUILT-IN MAPLE VENEER WORK DESK

BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED

EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE

4 X 3 1/2" MAPLE TAPERED SQUARE LEGS

SHOWER SYSTEM

1"X3" MAPLE BATTENS UNFINISHED

3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH

FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE

2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH

2X8 16" O.C. FLOOR JOIST

2" X 12" MAPLE SHELVES UNFINISHED.

BUILT-IN SEATING/BED W/ FIRM FOAM AND

2X12 VENEER MAPLE SHELVING, OIL FINISH

BUILT-UP STRINGER

2X2 MAPLE GUARDRAIL W/ FIXED BURLAP PANEL

3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE

2" X 2" MAPLE FRAMING UNIFINISHED

RIDGE BEAM

MAPLE VENEER SHELVING W/ METAL BRACKETS

VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT

1/2" GALVANIZED WELDED WIRE BLACK FABRIC

4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS

1" x 12" MAPLE STAIR TREADS UNFINISHED

OILED MAPLE PLYWOOD

SET IN 2" X 2" UNFINISHED MAPLE FRAME

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A601STAIR AXON SOUTH

MF

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

STAIR AXON SOUTH

Page 41: NDSU Design Build - CD Drawing Set

MAPLE GUARDRAIL W/FIXED BURLAP PANEL DETAIL

1

2

3

4

5

6

20

7

11

8

10

12

9

13

14

15

16

17

18

19

21

22

23

24

4'-8"

4'-0"

3'-6"

8'-81_4"

7

FIXED BURLAP PANEL

2X2 MAPLE GUARDRAIL

U-CLIP, METAL ANCHOR PLATE

16 2X2 MAPLE GUARDRAIL

2X2 MAPLE POST

7

12

1" x 4" OILED, RECLAIMED PINE (POLYURETHANE FINISH)

MAPLE VENEER SHELVING W/ CONCEALED METAL BRACKETS

BUILT-IN MAPLE VENEER WORK DESK

BUILT-IN 2" VENEER MAPLE BENCH, UNFINISHED

EPOXY SEALED CONCRETE COUNTERTOP WITH GLASS AGGREGATE

4 X 3 1/2" MAPLE TAPERED SQUARE LEGS

SHOWER SYSTEM

1"X3" MAPLE BATTENS, OILED

3'-3"X4'-0" MAPLE BUILT-IN TABLE, OIL FINISH

FIXED BURLAP PANEL FRAMED W/ 2" X 2" MAPLE, OILED

2X18 VENEER MAPLE BUILT-IN WORKSURFACE, OIL FINISH

2X8 16" O.C. FLOOR JOIST

2" X 12" MAPLE SHELVES, OILED

BUILT-IN SEATING/BED W/ FIRM FOAM AND

2X12 VENEER MAPLE SHELVING, OIL FINISH

BUILT-UP STRINGER

2X2 MAPLE GUARDRAIL W/ FIXED BURLAP PANEL

3/4 " FINISHED PLYWOOD, 3/8" FINISHED PINE

2" X 2" MAPLE FRAMING UNIFINISHED

RIDGE BEAM

VENEER MAPLE CONSTRUCTION; CUSHIONS TAILOR TO FIT

1/2" GALVANIZED WELDED WIRE BLACK FABRIC

4" X 4" RECLAIMED DOUGLAS FIR HEAVY TIMBER COLUMNS

1" x 12" MAPLE STAIR TREADS, OILED

OILED MAPLE PLYWOOD

SET IN 2" X 2" UNFINISHED MAPLE FRAME

7

2X2 MAPLE GUARDRAIL

FIXED BURLAP PANEL

U-CLIP, METAL ANCHOR PLATE

16

LOFT FLOOR

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

A602LOFT RAILING AXON

CS

ECO - EXPERIENCE

05/06/11

1/2" = 1'-0"1

STAIR AXON

Page 42: NDSU Design Build - CD Drawing Set

3

3

1

LED FLEXTIBLE STRIP LIGHT FIXTURE

LED LIGHT BULB FIXTURE

SINGLE POLE/3-WAY

SINGLE POLE/2-WAY

ELECTRICAL PANEL

3

SEE DETAIL (1/E101)

MODEL # DVSCCL-153P-WH (WHITE)

LUTRON DIVA LED DIMMER

FIREX 5000 SMOKE ALARM

WITH BATTERY BACK-UP

LUTRON DIVA LED DIMMER

CARLTON 1/2IN. X 25FT. ELECTRICAL NON-METALLIC TUBINGNOTE:

MODEL # FADC

MODEL # 12005-25

MODEL # DVSCCL-153P-WH (WHITE)

KILL SWITCH ENCLOSED TO TERMINATE

POWER TO ALL LIGHTS AND MECHANICAL

SYSTEMS WITH EXECPTION OF COMFOAIR 200

AND REFRIDGERATOR WHICH WILL HAVE

ELECTRICAL METER

WATER METER

1

2

3

A SEPARATE KILL SWITCH

SEE DETAIL (2/E101) FOR WINDOWS

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

E100ELECTRICAL MAIN

LEVEL

AM

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

ELECTRICAL MAIN LEVEL

Page 43: NDSU Design Build - CD Drawing Set

LED LIGHT BULB ( 7 WATT)

1.5" GALVANIZED METAL PIPING

SHELVING STRUCTURE

METAL FASTENERS

LED BULB FIXTURE LED FLEXIBLE STRIP LIGHT FIXTURE

6

1

2

4

3

5

LED FLEXIBLE STRIP LIGHT (0.72 WATTS)

CONDUIT RUNS

1

2

3

4

1 2

5

6

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

E101ELECTRICAL DETAILS

AM

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

ELECTRICAL DETAILS

Page 44: NDSU Design Build - CD Drawing Set

ZEHNDER AMERICA COMFOAIR 200 SERIES

7 DAY PROGRAMMABLE THERMOSTAT

HONEYWELL MODEL # RTH7500D

6" COMFOSYSTEMS PIPE

ZEHNDER COMFOSYSTEMS

EXTINGUISHER - CLEANGUARD

WITH FILTER F7 MODEL # 400 100 018

EXHAUST AIR PIPING

INTERIOR TO EXTERIOR R-8 PER INCH

INSULATION ZEHNDER COMFOSYSTEMS

OUTSIDE AIR PIPING

INTERIOR TO EXTERIOR R-8 PER INCH

INSULATION ZEHNDER COMFOSYSTEMS

PRE-HEAT AND POST-HEAT COILSREF 705 512 521

ZEHNDER COMFOSYSTEMS

ZEHNDER COMFOSYSTEMS

RETURN DIFFUSER STB-1-125

SUPPLY DIFFUSER KE 125

4

2

7

1

24 CFM

35 CFM

30 CFM

9 CFM

NOTE:

COMFOTUBE 75 VENTILATION TUBE

REF 990 328 007 FOR NON INSULATED

INTERIOR DUCTWORK

REF 990 326 252 (MAIN LEVEL)

FILTER125 MM REF 990 320 032

REGISTER COVER

ROMA (STAINLESS STEEL)

REF 990 320 610 (LOFT)

COMFOWELL SILENCERS CW-S 320

2

3

3

4

5

1

2

FILTER

FILTER

SILENCER

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

M100HVAC MAIN LEVEL

AM

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

HVAC MAIN LEVEL

Page 45: NDSU Design Build - CD Drawing Set

NOTE: EQUIPMENT IN EXHIBIT

BUT NOT OPERATING OR PLUGGED IN

6

8 9

4 1

3 2

10 5

11

9 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR PUMP

6 SOLAR SKIES 60 GALLON STAINLESS STEEL

5 ZEHNDER AMERICA COMFOAIR 200 SERIES

4 RETURN DIFFUSER STB-1-125

3 OUTSIDE AIR PIPING WITH

2 EXHAUST AIR PIPING WITH

1 SUPPLY DIFFUSER KE 125

10 ELECTRICAL PANEL

HEAT EXCHANGER & ELECTRIC ELEMENT

FILTER125 MM REF 990 320 032

ZEHNDER COMFOSYSTEMS

MODEL # 915-016

SOLAR TANK W/ONE DOUBLE WALL COIL

ELECTRIC TANKLESS WATER HEATER

MODEL # PWSNAE125

5 POWERSTAR AE125 WHOLE HOUSE

WITH 6" COMFOSYSTEMS PIPE

INTERIOR TO EXTERIOR R-8 PER INCH

INSULATION ZEHNDER COMFOSYSTEMS

ZEHNDER COMFOSYSTEMS

INTERIOR TO EXTERIOR R-8 PER INCH

INSULATION ZEHNDER COMFOSYSTEMS

INTERIOR TO EXTERIOR R-8 PER INCH

INSULATION ZEHNDER COMFOSYSTEMS

WITH FILTER F7 MODEL # 400 100 018

CIRCULATING PUMP

KILL SWITCH ENCLOSED WHICH TERMINATES POWER

TO ALL LIGHTS, AND MECHANICAL SYSTEMS

WITH THE EXCEPTION OF COMFOAIR 200

COMFOAIR TO HAVE INDIVIDUAL KILL SWITCH

8 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR

5 GALLON DRAINBACK TANK

7 SS-32 SOLAR SKIES SOLAR THERMAL COLLECTOR

QUANTITY 1 4' BY 8' PANEL MOUNTED ON ROOF

REF 990 326 252

REF 705 512 521

11 ZEHNDER AMERICA COMFOFOND-L

GEOTHERMAL HEAT EXCHANGER

GLASS FRONT EXHIBIT DISPLAY ONLY

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

M101MECHANICAL SECTION

AM

ECO - EXPERIENCE

05/06/11

1/2" = 1'-0"1

MECHANICAL SECTION

Page 46: NDSU Design Build - CD Drawing Set

*NOTE

2X4 MOCK UP FRAMING SYSTEM

REPLACES THE SIP PANEL

USING DIM LUMBER AND

PLYWOOD

*2X4 STRAPPING TIES THE TWO

WALLS TOGETHER

UP

UP

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

Z100BACKUP PLAN MAIN

FLOOR

JV

ECO - EXPERIENCE

05/06/11 1/4" = 1'-0"1

Z100 - BACKUP PLAN MAIN FLOOR

Page 47: NDSU Design Build - CD Drawing Set

*NOTE

2X4 MOCK UP FRAMING SYSTEM

REPLACES THE SIP PANEL

USING DIM LUMBER AND

PLYWOOD

*2X4 STRAPPING TIES THE TWO

WALLS TOGETHER SPACED AT

48" O.C.

2x4 DIM LUMBER SPACED AT 1' 1-1/8"

2X4 DIM LUMBER 24" O.C.

OSB SHEATHING *INTERIOR

2X4 DIM LUMBER 24" O.C.*BUILDS AIR SPACE

OSB SHEATHING *EXTERIOR

1/2" X 6" RECLAIMEDT&G BARN SIDING

North Dakota State UniversityDESIGN BUILD STUDIOARCH 472 Spring 2011

Design Development

Drawn by:

Date:

NOT FOR CONSTRUCTION

These documents are the work of students of the Design Build

studio at the North Dakota State University. These do not constitute

professional advice.

Z101BACK UP FRAMING

DIAGRAM

JV

ECO - EXPERIENCE

05/06/11

1/4" = 1'-0"1

Z101 - BACK UP PLAN DIAGRAM