NDAP & Design Statements for Capital Investment Network
Susan Grant Health Facilities Scotland
& Heather Chapple
Architecture + Design Scotland
2 2
Scottish Capital Investment Manual (SCIM ) Design Assessment Guidance All projects submitted to the SGHSC for approval are now subject to an assessment of design quality and functionality, including technical and sustainability standards. This Design Assessment will take place at the Initial Agreement, Outline Business Case and Full Business Case stages of approval. This requirement is mandated through NHS CEL 19 (2010) Policy on Design Quality for NHSScotland
“
“
4 4
Scottish Capital Investment Manual (SCIM) To assist NHS Boards in utilising good design to achieve the best outcomes from their development projects, Boards are required to develop and produce a Design Statement prior to the submission of their Initial Agreement. The Design Statement is the first control document produced for a project and should be consistent with the Board’s overall vision contained within the strategic Design Action Plan. http://www.pcpd.scot.nhs.uk/Facilities.htm
“ “
5 5
Map the strategic benefits to enabling environments
NHSScotland Design Assessment Process (NDAP)
Shared work & social spaces
Single reception
Location
Green space
BREEAM
Adaptability
6 6
Scottish Capital Investment Manual (SCIM ) BREEAM All new build above £2m are required to obtain a BREEAM Healthcare or equivalent 'Excellent ' rating; all refurbishments above £2m to obtain a 'Very Good ' rating. If the capital costs are less than £2m, projects should undertake a BREEAM pre-assess- ment to establish whether BREEAM is a viable option.
“ “
7 7
BREEAM Transport TRA -01 to TRA -03
Pragmatic Approach – Project on an existing
hospital site, in proximity to existing public transport and cycling facilities, therefore the combined score for TRA-01 to TRA-03 can be ignored from overall BREEAM total.
Therefore ‘Excellent’ for this
project is 70% - 6.6% = 63.4%
8 8
ENE-01 Energy & CO2 - targets
0 10 20 30 40 50 60 70 80 90
100
2010 min Scottish
Regs
BRE 11 ENE01 6credits
BRE 14 ENE01 5credits
2015 min Prop Scot
Regs
2019 'nearly zero' EU
% 2010 Building Regs
9 9
BREEAM Products NEW Construction 2011: Refurb 2014:
&
BRE 2014 encourages: refurb; ‘passive’ design; adaptability
10 10
NDAP
CAPITAL INVESTMENT GROUP (CIG)
Consider IA/ Business Case, including level of support from
NDAP
PROJECT TEAM Develop IA, business case & design proposals / Check & Approve / Submit
IA - Initial Agreement
Submit
Develop IA – clearly set out needs, benefits, objectives, priorities & benchmarks
Supp
ort f
or D
esig
n St
atem
ent
and
St
akeh
olde
r Wor
ksho
ps
OBC - Outline Business Case
Submit
Develop OBC - outline design that supports IA, eg: site, ADB, layouts, risks,AEDET, BREEAM, strategies
Feed
back
pre
OB
C s
ub-
mis
sion
, e.
g. B
REE
AM
, A
EDET
,
FBC – Full Business Case
Submit
Develop FBC - detail design discharges IA, & OBC recommend-ations, eg: Fire, M&E, health promo, derogations
Feed
back
pre
FB
C s
ub-
mis
sion
, e.
g. S
HTM
s &
su
stai
nabl
e d
esig
n
Design Statement Formal Report
agreed Formal Report
NDAP & Design Statements
Heather Chapple Architecture + Design Scotland
& Susan Grant
Health Facilities Scotland
NDAP & Design Statements EXERCISE 1
12 12
embeds consensus, collabora/on, consistency
walk through a ‘day in the life’
capture short statements on key a;ributes
increase ‘bang for the buck’
find views of what success might look like
agree key health & business benefits
Design Statement www.ads.org.uk