  • CONTRACT NO : NSPS-C2CONTRACT NAME : Sewerage Scheme ToPhase Out Nee Soon Pumping Station – Contract 2CONTRACTOR : Eng Lee Engineering Pte. Ltd.

    MONTH : February 2016 PHOTOGAPH NO: 000641DESCRIPTION : Fixing Rebar and Casting Permanent Manhole Base Slab at MH-G4

    MONTH : February 2016 PHOTOGRAPH NO: 000642 DESCRIPTION : Installation of 1st and 2ND RC Pipe for Permanent Manhole Construction at MH-G4

  • CONTRACT NO : NSPS-C2CONTRACT NAME : Sewerage Scheme ToPhase Out Nee Soon Pumping Station – Contract 2CONTRACTOR : Eng Lee Engineering Pte. Ltd.

    MONTH : February 2016 PHOTOGAPH NO: 000643DESCRIPTION : Backfilling Works at MH-G4a

    MONTH : February 2016 PHOTOGRAPH NO: 000644 DESCRIPTION : Concrete Casting for Permanent Manhole at MH-G5a

  • CONTRACT NO : NSPS-C2CONTRACT NAME : Sewerage Scheme ToPhase Out Nee Soon Pumping Station – Contract 2CONTRACTOR : Eng Lee Engineering Pte. Ltd.

    MONTH : February 2016 PHOTOGAPH NO: 000645DESCRIPTION : Preparation of Thrust Block and Launching Pad at MH-G5b

    MONTH : February 2016 PHOTOGRAPH NO: 000646 DESCRIPTION : Fixing Rebar and Formwork for Thrust Block and Launching Pad at MH-G5b

  • CONTRACT NO : NSPS-C2CONTRACT NAME : Sewerage Scheme ToPhase Out Nee Soon Pumping Station – Contract 2CONTRACTOR : Eng Lee Engineering Pte. Ltd.

    MONTH : February 2016 PHOTOGAPH NO: 000647DESCRIPTION : Preparation for Pipe Jacking Works at MH-G5b

    MONTH : February 2016 PHOTOGRAPH NO: 000648 DESCRIPTION : HDPE Lining Welding Works at MH-G8 to MH-G9

  • CONTRACT NO : NSPS-C2CONTRACT NAME : Sewerage Scheme ToPhase Out Nee Soon Pumping Station – Contract 2CONTRACTOR : Eng Lee Engineering Pte. Ltd.

    MONTH : February 2016 PHOTOGAPH NO: 000649DESCRIPTION : Set-Up Pipe Jacking Utilities at MH-G11

    MONTH : February 2016 PHOTOGRAPH NO: 000650 DESCRIPTION : Jacked-In of 2400 PJM and Machine Can at MH-G11

  • CONTRACT NO : NSPS-C2CONTRACT NAME : Sewerage Scheme ToPhase Out Nee Soon Pumping Station – Contract 2CONTRACTOR : Eng Lee Engineering Pte. Ltd.

    MONTH : February 2016 PHOTOGAPH NO: 000651DESCRIPTION : Jacked-In 1st to 3rd RC Pipe at MH-G11

    MONTH : February 2016 PHOTOGRAPH NO: 000652 DESCRIPTION : Jacked-In 9th to 19th RC Pipe at MH-G11

  • CONTRACT NO : NSPS-C2CONTRACT NAME : Sewerage Scheme ToPhase Out Nee Soon Pumping Station – Contract 2CONTRACTOR : Eng Lee Engineering Pte. Ltd.

    MONTH : February 2016 PHOTOGAPH NO: 000653DESCRIPTION : Jacked-In 28th to 40th RC Pipe at MH-G11

    MONTH : February 2016 PHOTOGRAPH NO: 000654 DESCRIPTION : Jacked-In 50th to 56th RC Pipe at MH-G11

  • CONTRACT NO : NSPS-C2CONTRACT NAME : Sewerage Scheme ToPhase Out Nee Soon Pumping Station – Contract 2CONTRACTOR : Eng Lee Engineering Pte. Ltd.

    MONTH : February 2016 PHOTOGAPH NO: 000655DESCRIPTION : Preparation of Works for MTBM Breakthrough at MH-G10

    MONTH : February 2016 PHOTOGRAPH NO: 000656 DESCRIPTION : Preparation of Works for MTBM Breakthrough at MH-G10