ncat pavement test track · 2015-05-21 · apai – 12/2/08 2012 track • green group (gg) study...
TRANSCRIPT
Preservation Update
NCAT Pavement Test Track
10 million ESALs
Washington
Oregon
California
Nevada
Idaho
Montana
Wyoming
Colorado Utah
New Mexico Arizona
Texas
Oklahoma
Kansas
Nebraska
South Dakota
North Dakota Minnesota
Wisconsin
Illinois
Iowa
Missouri
Arkansas
Louisiana
Alabama (DOT & DEM)
Tennessee
Michigan
Pennsylvania
New York
Vermont
Georgia
Florida
Mississippi
Kentucky
South Carolina
North Carolina
Maryland Ohio Delaware
Indiana West Virginia
New Jersey
Connecticut
Massachusetts
Maine
Rhode Island
Virginia
New Hampshire Michigan (upper pennisula)
Private Sector Sponsors Cargill Deicing Technology FP2 Kraton Polymers Modified Asphalt Solutions Oldcastle Materials Polycon Manufacturing Seneca Petroleum Shell Sulfur Solutions Trinidad Lake Asphalt
FHWA
Pre-2012, 2012, 2015
Track Research Sponsors
3
Content
• NCAT Pavement Test Track • Lee Road 159 • 2015 research cycle (US-280)
APAI – 12/2/08
2012 Track
• Green Group (GG) study • 100% RAP CCPR base mix (+FDR) • Surface crack prevention • Crack and rut resistant thin overlays • Perpetual pavement design • HiMA for new/rehab pavements • Preservation Group (PG) study.
4
APAI – 12/2/08
2012 Track
• Green Group (GG) study • 100% RAP CCPR base mix (+FDR) • Surface crack prevention • Crack and rut resistant thin overlays • Perpetual pavement design • HiMA for new/rehab pavements • Preservation Group (PG) study.
5
2012 Track
2012 Track
2012 Track
2012 Track
2012 Track
2012 Track
Pavement Preservation on Lee Road 159
•12
Asphalt Plant
Martin Marietta Quarry
• Low ADT roadway • Very high % trucks • 14-year old 5½” pavement • Diverse pavement condition • Load data provided by quarry and asphalt plant
Lee Road 159
1. Rejuvenating Fog Seal 2. Fibermat 3. Control 4. Control 5. Crack Seal (CS) 6. Single Layer Chip Seal 7. CS + Single Layer Chip Seal 8. Triple Layer Chip Seal 9. Double Layer Chip Seal 10. Microsurfacing + Single Chip (Cape) 11. Microsurfacing 12. CS + Microsurfacing 13. Double Layer Microsurfacing
14. Fibermat + Microsurfacing (Cape) 15. Scrub Seal + Microsurfacing (Cape) 16. Scrub Seal 17. Distress Demo Section 18. Fibermat + HMA thinlay (HMA Cape) 19. HMA Thinlay (PG 67-22) 20. HMA + 100% Foamed Recycle Inlay 21. HMA Thinlay (PG 76-22) 22. Ultra Thin Bonded Wearing Course 23. HMA Thinlay (50% RAP) 24. HMA Thinlay (5% PCRAS) 25. HMA Thinlay (High Polymer)
Pavement Preservation on Lee Road 159
14
Quality
• Good material supply • Designs with actual stockpiles • Contractor quality commitment • Equipment setup and calibration • Test section preparation • Good execution.
15
Emulsion Calibrated Prior to Placement
16
Emulsion Calibrated Prior to Placement
17
18
19
Chip Rate Checked Prior to Placement
20
Plastic for Startup VariabilityL1
21
Plastic for Overrun with Sample PansL1
22
23
Plastic for Overrun with Sample PansS8B
24
Tack & Chip Rate QC Measurements
Alternative to Plastic
25
26
Sample Treated Section on Lee Road 159 Pretreatment (July, 2012)
Outside Wheelpath Driving Towards Quarry
Inside Wheelpath Driving Towards Quarry
Sample Treated Section on Lee Road 159 August, 2012
Outside Wheelpath Driving Towards Quarry
Inside Wheelpath Driving Towards Quarry
Sample Treated Section on Lee Road 159 July 2, 2013
Sample Treated Section on Lee Road 159 September 12, 2013
Sample Treated Section on Lee Road 159 October 29, 2013
Sample Treated Section on Lee Road 159 December 17, 2013
Sample Treated Section on Lee Road 159 January 31, 2014
Sample Treated Section on Lee Road 159 February 26, 2014
Sample Treated Section on Lee Road 159 March 25, 2014
Sample Treated Section on Lee Road 159 April 22, 2014
Sample Treated Section on Lee Road 159 May 27, 2014
Sample Treated Section on Lee Road 159 June 19, 2014
Sample Treated Section on Lee Road 159 July 24, 2014
Sample Treated Section on Lee Road 159 August 12, 2014
Sample Treated Section on Lee Road 159 October 7, 2014
Sample Treated Section on Lee Road 159 October 7, 2014
Sample Treated Section on Lee Road 159 October 7, 2014
Sample Treated Section on Lee Road 159 October 7, 2014
Sample Treated Section on Lee Road 159 October 7, 2014
Sample Treated Section on Lee Road 159 October 7, 2014
Pavement Preservation on Lee Road 159
Pavement Preservation on Lee Road 159
Condition Improving Benefit
Life Extending Benefit
Pavement Preservation on Lee Road 159
Pavement Preservation on Lee Road 159
51
Pavement Preservation on Lee Road 159
52
Pavement Preservation on Lee Road 159
• Crack sealing appears to be beneficial in all cases • Differences between route/seal and blow/band • Scrub seal appears to exhibit crack seal benefit • Preservation treatments reduce subgrade moisture, but… • Durability of micro surface in accelerated traffic • Objective life extending benefit curves developing • Interim results presented at 2015 Track Conference.
Pavement Preservation on Lee Road 159
55
Options in the 2015 Research Cycle
• Traffic continuation • Mill/inlay sections • Structural sections • Pavement preservation
56
Preservation Group (PG15) Study
• Continue monitoring ‘12 sections (Track & 159) • Capture life extending benefit curve data • Partnership with MnROAD for nationwide scope • Build new sections on higher ADT roadway.
57
Preservation Group (PG15) Study
• Continue monitoring ‘12 sections (Track & 159) • Capture life extending benefit curve data • Partnership with MnROAD for nationwide scope • Build new sections on higher ADT roadway.
NCAT+MnROAD Preservation Partnership
To facilitate high value pavement research that addresses national needs using full-scale pavement testing facilities in both warm and cold climates on flexible, rigid, and composite pavement structures.
NCAT+MnROAD Preservation Partnership
To facilitate high value pavement research that addresses national needs using full-scale pavement testing facilities in both warm and cold climates on flexible, rigid, and composite pavement structures.
Higher ADT Off-Track Preservation
Higher ADT Off-Track Preservation • US-280 3 miles to east of Track • 17,000 ADT, ≈9 year old surface • Westbound outside lane • ≥ MP 128.0 to MP 132.6 • Tenth mile sections • Repeat Lee Road 159 (±) • Add CCPRF,E, CIRF,E, HIR, etc. • High ABR thin overlays • Connection to Cracking Group.
NCAT Track
7¾” Asphalt Pavement 10” Aggregate Base
62
www.pavetrack.com
63
Dr. R. Buzz Powell, PE Assistant Director & Test Track Manager 277 Technology Parkway Auburn, AL 36830 Phone: (334) 844-6857 Cell: (334) 750-6293
Email: [email protected] Web: www.pavetrack.com Twitter: www.twitter.com/pavetrack