natural gas engineering hand book (2005) appendix f
TRANSCRIPT
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
1/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
jOil Make, bbl/day
IO il Make, bbl/day
Depth (ft)Figure E-50 Critical gas production rate for condensate removal in 3.5-intubing against 900 psia wellhead pressure, S.G. 0.70 gas.
Depth (ft)Figure E-49 Critical gas production rate for condensate removal in 3.5-intubing against 700 psia wellhead pressure, S.G. 0.70 gas.3.5-in. Tubing, 0.70-S.G. Gas, 900-psia Wellhead Pressure
3.5-in. Tubing, 0.70-S.G. Gas, 700-psia Wellhead PressurePrevious Page
http://11339_appe.pdf/http://11339_appe.pdf/ -
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
2/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
[Oil Make, bb/day
O il Make, bbl/day
1.66-in. Tubing, 0.80-S.G. Gas, 100-psia Wellhead Pressure
Depth (ft)Figure E-51 Critical gas production rate for condensate removal in 1.66-intubing against 100 psia wellhead pressure, S.G. 0.80 gas.1.66-in. Tubing, 0.80-S.G. Gas, 300-psia Wellhead Pressure
Depth (ft)Figure E-52 Critical gas production rate for condensate removal in 1.66-intubing against 300 psia wellhead pressure, S.G. 0.80 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
3/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb/day
O il Make, bb/day
Depth (ft)Figure E-54 Critical gas production rate for condensate removal in 1.66-intubing against 700 psia wellhead pressure, S.G. 0.80 gas.
Depth (ft)Figure E-53 Critical gas production rate for condensate removal in 1.66-intubing against 500 psia wellhead pressure, S.G. 0.80 gas.1.66-in. Tubing, 0.80-S.G. Gas, 700-psia Wellhead Pressure
1.66-in. Tubing, 0.80-S.G. Gas, 500-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
4/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb/day
O il Make, bb /day
1.66-in. Tubing, 0.80-S.G. Gas, 900-psia Wellhead Pressure
Depth (ft)Figure E-55 Critical gas production rate for condensate removal in 1.66-intubing against 900 psia wellhead pressure, S.G. 0.80 gas.1.995-in. Tubing, 0.80-S.G. Gas, 100-psia Wellhead Pressure
Depth (ft)Figure E-56 Critical gas production rate for condensate removal in 1.995-intubing against 100 psia wellhead pressure, S.G. 0.80 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
5/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bbl/day L
O il Make, bb/day
Depth (ft)Figure E-57 Critical gas production rate for condensate removal in 1.995-intubing against 300 psia wellhead pressure, S.G. 0.80 gas.1.995-in. Tubing, 0.80-S.G. Gas, 500-psia Wellhead Pressure
Depth (ft)Figure E-58 Critical gas production rate for condensate removal in 1.995-intubing against 500 psia wellhead pressure, S.G. 0.80 gas.
1.995-in. Tubing, 0.80-S.G. Gas, 300-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
6/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb /day
O il Make bb/day
Depth (ft)Figure E-60 Critical gas production rate for condensate removal in 1.995-intubing against 900 psia wellhead pressure, S.G. 0.80 gas.
Depth (ft)Figure E-59 Critical gas production rate for condensate removal in 1.995-intubing against 700 psia wellhead pressure, S.G. 0.80 gas.1.995-in. Tubing, 0.80-S.G. Gas, 900-psia Wellhead Pressure
1.995-in. Tubing, 0.80-S.G. Gas, 700-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
7/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
[Oil Make, bb/day
O il Make, bb /day
2.375-in. Tubing, 0.80-S.G. Gas, 100-psia Wellhead Pressure
Depth (ft)Figure E-61 Critical gas production rate for condensate removal in 2.375-intubing against 100 psia wellhead pressure, S.G. 0.80 gas.2.375-in. Tubing, 0.80-S.G. Gas, 300-psia Wellhead Pressure
Depth (ft)Figure E-62 Critical gas production rate for condensate removal in 2.375-intubing against 300 psia wellhead pressure, S.G. 0.80 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
8/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb/day
[Oil Make bbl/day
Depth (ft)Figure E-64 Critical gas production rate for condensate removal in 2.375-intubing against 700 psia wellhead pressure, S.G. 0.80 gas.
Depth (ft)Figure E-63 Critical gas production rate for condensate removal in 2.375-intubing against 500 psia wellhead pressure, S.G. 0.80 gas.2.375-in. Tubing, 0.80-S.G. Gas, 700-psia Wellhead Pressure
2.375-in. Tubing, 0.80-S.G. Gas, 500-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
9/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bbl/day
O il Make, bb /day
2.375-in. Tubing, 0.80-S.G. Gas, 900-psia Wellhead Pressure
Depth (ft)Figure E-65 Critical gas production rate for condensate removal in 2.375-intubing against 900 psia wellhead pressure, S.G. 0.80 gas.2.875-in. Tubing, 0.80-S.G. Gas, 100-psia Wellhead Pressure
Depth (ft)Figure E-66 Critical gas production rate for condensate removal in 2.875-intubing against 100 psia wellhead pressure, S.G. 0.80 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
10/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bbl/day
[Oil Make, bbl/day
Depth (ft)Figure E-68 Critical gas production rate for condensate removal in 2.875-intubing against 500 psia wellhead pressure, S.G. 0.80 gas.
Depth (ft)Figure E-67 Critical gas production rate for condensate removal in 2.875-intubing against 300 psia wellhead pressure, S.G. 0.80 gas.2.875-in. Tubing, 0.80-S.G. Gas, 500-psia Wellhead Pressure
2.875-in. Tubing, 0.80-S.G. Gas, 300-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
11/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
[Oil Make, bb /day
O il Make, bbl/day
2.875-in. Tubing, 0.80-S.G. Gas, 700-psia Wellhead Pressure
Depth (ft)Figure E-69 Critical gas production rate for condensate removal in 2.875-intubing against 700 psia wellhead pressure, S.G. 0.80 gas.2.875-in. Tubing, 0.80-S.G. Gas, 900-psia Wellhead Pressure
Depth (ft)Figure E-70 Critical gas production rate for condensate removal in 2.875-intubing against 900 psia wellhead pressure, S.G. 0.80 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
12/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O Make, bbl day
O il Make, bbl/day
3.5-in. Tubing, 0.80-S.G. Gas, 100-psia Wellhead Pressure
Depth (ft)Figure E-71 Critical gas production rate for condensate removal in 3.5-intubing against 100 psia wellhead pressure, S.G. 0.80 gas.
3.5-in. Tubing, 0.80-S.G. Gas, 300-psia Wellhead Pressure
Depth (ft)Figure E-72 Critical gas production rate for condensate removal in 3.5-intubing against 300 psia wellhead pressure, S.G. 0.80 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
13/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bbl/day
O il Make, bb /day
3.5-in. Tubing, 0.80-S.G. Gas, 500-psia Wellhead Pressure
Depth (ft)Figure E-73 Critical gas production rate for condensate removal in 3.5-intubing against 500 psia wellhead pressure, S.G. 0.80 gas.3.5-in. Tubing, 0.80-S.G. Gas, 700-psia Wellhead Pressure
Depth (ft)Figure E-74 Critical gas production rate for condensate removal in 3.5-intubing against 700 psia wellhead pressure, S.G. 0.80 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
14/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb/day
O il Make, bbl/day
Depth (ft)Figure E-76 Critical gas production rate for condensate removal in 1.66-intubing against 100 psia wellhead pressure, S.G. 0.90 gas.
Depth (ft)Figure E-75 Critical gas production rate for condensate removal in 3.5-irtubing against 900 psia wellhead pressure, S.G. 0.80 gas.1.66-in. Tubing, 0.90-S.G. Gas, 100-psia Wellhead Pressure
3.5-in. Tubing, 0.80-S.G. Gas, 900-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
15/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb /day
O il Make, bb/day
Depth (ft)Figure E-78 Critical gas production rate for condensate removal in 1.66-intubing against 500 psia wellhead pressure, S.G. 0.90 gas.
1.66-in. Tubing, 0.90-S.G. Gas, 300-psia Wellhead Pressure
Depth (ft)Figure E-77 Critical gas production rate for condensate removal in 1.66-intubing against 300 psia wellhead pressure, S.G. 0.90 gas.1.66-in. Tubing, 0.90-S.G. Gas, 500-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
16/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
lOil Make, bb /day
O il Make, bb /day
1.66-in. Tubing, 0.90-S.G. Gas, 700-psia Wellhead Pressure
Depth (ft)igure E-79 Critical gas production rate for condensate removal in 1.66-intubing against 700 psia wellhead pressure, S.G. 0.90 gas.1.66-in. Tubing, 0.90-S.G. Gas, 900-psia Wellhead Pressure
Depth (ft)Figure E-80 Critical gas production rate for condensate removal in 1.66-intubing against 900 psia wellhead pressure, S.G. 0.90 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
17/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bbl/day
O il Make, bbl/day
Depth (ft)Figure E-82 Critical gas production rate for condensate removal in 1.995-intubing against 300 psia wellhead pressure, S.G. 0.90 gas.
Depth (ft)Figure E-81 Critical gas production rate for condensate removal in 1.995-intubing against 100 psia wellhead pressure, S.G. 0.90 gas.1.995-in. Tubing, 0.90-S.G. Gas, 300-psia Wellhead Pressure
1.995-in. Tubing, 0.90-S.G. Gas, 100-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
18/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb/day
[Oil Make, bb/day
1.995-in. Tubing, 0.90-S.G. Gas, 500-psia Wellhead Pressure
Depth (ft)Figure E-83 Critical gas production rate for condensate removal in 1.995-intubing against 500 psia wellhead pressure, S.G. 0.90 gas.1.995-in. Tubing, 0.90-S.G. Gas, 700-psia Wellhead Pressure
Depth (ft)Figure E-84 Critical gas production rate for condensate removal in 1.995-intubing against 700 psia wellhead pressure, S.G. 0.90 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
19/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
[Oil Make, bb/day
Oil Make, bb/day
Depth (ft)Figure E-86 Critical gas production rate for condensate removal in 2.375-intubing against 100 psia wellhead pressure, S.G. 0.90 gas.
Depth (ft)Figure E-85 Critical gas production rate for condensate removal in 1.995-intubing against 900 psia wellhead pressure, S.G. 0.90 gas.2.375-in. Tubing, 0.90-S.G. Gas, 100-psia Wellhead Pressure
1.995-in. Tubing, 0.90-S.G. Gas, 900-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
20/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
[Oil Make, bb/day
jOil Make, bb /day
2.375-in. Tubing, 0.90-S.G. Gas, 300-psia Wellhead Pressure
Depth (ft)Figure E-87 Critical gas production rate for condensate removal in 2.375-intubing against 300 psia wellhead pressure, S.G. 0.90 gas.2.375-in. Tubing, 0.90-S.G. Gas, 500-psia Wellhead Pressure
Depth (ft)Figure E-88 Critical gas production rate for condensate removal in 2.375-intubing against 500 psia wellhead pressure, S.G. 0.90 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
21/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
[Oil Make, bb /day
jO il Make, bbl/day
Depth (ft)Figure E-90 Critical gas production rate for condensate removal in 2.375-intubing against 900 psia wellhead pressure, S.G. 0.90 gas.
Depth (ft)Figure E-89 Critical gas production rate for condensate removal in 2.375-intubing against 700 psia wellhead pressure, S.G. 0.90 gas.2.375-in. Tubing, 0.90-S.G. Gas, 900-psia Wellhead Pressure
2.375-in. Tubing, 0.90-S.G. Gas, 700-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
22/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb/day
O il Make, bbl/day
2.875-in. Tubing, 0.90-S.G. Gas, 100-psia Wellhead Pressure
Depth (ft):igure E-91 Critical gas production rate for condensate removal in 2.875-intubing against 100 psia wellhead pressure, S.G. 0.90 gas.2.875-in. Tubing, 0.90-S.G. Gas, 300-psia Wellhead Pressure
Depth (ft)Figure E-92 Critical gas production rate for condensate removal in 2.875-intubing against 300 psia wellhead pressure, S.G. 0.90 gas.
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
23/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bbl/day
O il Make, bbl/day
Depth (ft)Figure E-94 Critical gas production rate for condensate removal in 2.875-intubing against 700 psia wellhead pressure, S.G. 0.90 gas.
Depth (ft)Figure E-93 Critical gas production rate for condensate removal in 2.875-intubing against 500 psia wellhead pressure, S.G. 0.90 gas.2.875-in. Tubing, 0.90-S.G. Gas, 700-psia Wellhead Pressure
2.875-in. Tubing, 0.90-S.G. Gas, 500-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
24/26
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
25/26
CriticalProductionRate(Mscf/d)
CriticalProductionRate(Mscf/d)
O il Make, bb/day
O il Make, bb/day
Depth (ft)Figure E-98 Critical gas production rate for condensate removal in 3.5-intubing against 500 psia wellhead pressure, S.G. 0.90 gas.
Depth (ft)Figure E-97 Critical gas production rate for condensate removal in 3.5-intubing against 300 psia wellhead pressure, S.G. 0.90 gas.3.5-in. Tubing, 0.90-S.G. Gas, 500-psia Wellhead Pressure
3.5-in. Tubing, 0.90-S.G. Gas, 300-psia Wellhead Pressure
-
8/7/2019 Natural Gas Engineering Hand Book (2005) Appendix F
26/26