national mission for clean ganga (nmcg) ministry of water … · 2019. 10. 4. · namami gange...

209
National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River Development & Ganga Rejuvenation, Govt. of India The Development of Sewage Treatment Plant and Associated Infrastructure under Hybrid Annuity based On PPP Mode at Mathura in the State of Uttar Pradesh (LoA File Number: Pc/11011/1/2018-PPP/NMCG) Monthly Progress Report of Project Engineer September - 2019 Executing Agency Funding Agency Project Engineer Concessionaire Uttar Pradesh Jal Nigam, Mathura - National Mission for Clean Ganga MoWR, River Development & Ganga Rejuvenation, New Delhi - 110002 Mahindra Consulting Engineers Limited Mahindra Towers, No. 17/18, Pattullous Road, Chennai - 600 002, Tamil Nadu, India Mathura Wastewater Management Private Limited A-44,Hosiery Complex,Phase-II,Noida, Uttar Pradesh - 201 305

Upload: others

Post on 31-Aug-2020

4 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

National Mission for Clean Ganga (NMCG) Ministry of Water Resources, River

Development & Ganga Rejuvenation, Govt. of India

The Development of Sewage Treatment

Plant and Associated Infrastructure under Hybrid Annuity based On PPP Mode at Mathura in the State of Uttar Pradesh

(LoA File Number: Pc/11011/1/2018-PPP/NMCG)

Monthly Progress Report

of Project Engineer

September - 2019

Executing Agency Funding Agency Project Engineer Concessionaire

Uttar Pradesh Jal

Nigam, Mathura -

National Mission for Clean Ganga MoWR, River

Development & Ganga Rejuvenation,

New Delhi - 110002

Mahindra Consulting Engineers Limited

Mahindra Towers, No. 17/18, Pattullous Road,

Chennai - 600 002, Tamil Nadu, India

Mathura Wastewater Management Private

Limited A-44,Hosiery

Complex,Phase-II,Noida, Uttar Pradesh - 201 305

Page 2: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page i Monthly Progress Report – September 2019

TABLE OF CONTENTS

1 Introduction .................................................................................................................. 1 1.1. Project components ....................................................................................... 3 1.2. Executing agency ........................................................................................... 4 1.3. Implementation agency .................................................................................. 4 1.4. Consulting services ........................................................................................ 4 1.5. Concessionaire .............................................................................................. 4

2. Status of project................................................................................................... 43. Financial status for construction work ................................................................ 64. The issues, the action taken, and status are provided after obtaining the views

from UPJN .................................................................................................................... 8 5. Status of pending Condition precedent ............................................................. 116. Status of interim availability and Operation and Maintenance of existing

facilities .......................................................................................................................12 7. Status of Non-Conformance Report ................................................................... 138. EHS Non-Compliance ......................................................................................... 149. Physical status ................................................................................................... 14

9.1. Pre-Construction activities ............................................................................ 19 9.2. Masani Zone ................................................................................................ 19

9.2.1. 30 MLD STP in Masani Zone: ........................................................ 19 9.2.1.1. Basic Engineering Package and Design Detail Engineering of 30 MLD

STP .............................................................................................. 20 9.2.1.2. Civil Works of 30MLD STP ............................................................ 21 9.2.1.3. Mechanical Works of 30MLD STP .................................................. 22 9.2.1.4. Electrical works of 30MLD STP ...................................................... 23 9.2.1.5. Instrumentation works of 30MLD STP ............................................ 24

9.2.2. Jaisinghpura MPS: ........................................................................ 24 9.2.2.1. Basic Engineering Package & Design Detail Engineering of

Jaisinghpura MPS ......................................................................... 25 9.2.2.2. Civil Works of Jaisinghpura MPS ................................................... 26 9.2.2.3. Mechanical works of Jaisinghpura MPS ......................................... 27 9.2.2.4. Electrical works of Jaisinghpura MPS ............................................. 28 9.2.2.5. Instrumentation works of Jaisinghpura MPS ................................... 28

9.2.3. Masani MPS ................................................................................. 29 9.2.3.1. Basic Engineering Package & Design Detail Engineering of Masani

MPS ............................................................................................. 29 9.2.3.2. Civil works of Masani MPS ............................................................ 30 9.2.3.3. Mechanical Works of Masani MPS ................................................. 30 9.2.3.4. Electrical Works of Masani MPS .................................................... 31 9.2.3.5. Instrumentation Works of Masani MPS ........................................... 32

9.2.4. Vrindavan Gate IPS ....................................................................... 33

Page 3: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page ii Monthly Progress Report – September 2019

9.2.4.1. Basic Engineering Package & Design Detail Engineering of Vrindavan Gate IPS ....................................................................................... 33

9.2.4.2. Civil Works of Vrindavan gate IPS ................................................. 34 9.2.4.3. Mechanical Works of Vrindavan IPS .............................................. 35 9.2.4.4. Electrical Works of Vrindavan IPS .................................................. 36 9.2.4.5. Instrumentation Works of Vrindavan IPS ........................................ 37

9.2.5. Krishnaganga IPS ......................................................................... 38 9.2.5.1. Basic Engineering Package & Design Detail Engineering of

Krishnaganga IPS ......................................................................... 38 9.2.5.2. Civil Works of Krishnaganga IPS ................................................... 39 9.2.5.3. Mechanical Works of Krishnaganga IPS ......................................... 40 9.2.5.4. Electrical Works of Krishnaganga IPS ............................................ 40 9.2.5.5. Instrumentation Works of Krishnaganga IPS .................................. 41

9.2.6. I&D Structures .............................................................................. 42 9.2.6.1. Basic Engineering Package & Design Detail Engineering of I&D

Structures ..................................................................................... 43 9.2.6.2. Construction Works of I&D Structures ............................................ 44 9.2.6.3. Mechanical works of I&D Structures ............................................... 45 9.2.6.4. Electrical Works of I&D Structures ................................................. 46 9.2.6.5. Instrumentation Works of I&D Structures ........................................ 46

9.2.7. Pipeline Works in Masani Zone ...................................................... 46 9.2.7.1. Basic Engineering Package & Design Detail Engineering of Pipeline

Works in Masani Zone ................................................................... 46 9.2.7.2. Construction Works of Pipeline Works in Masani Zone ................... 47

9.2.8. 6.8 MLD WSP ............................................................................... 49 9.2.8.1. Basic Engineering Package & Detail Design of 6.8 MLD WSP ........ 49 9.2.8.2. Construction works of 6.8 MLD WSP.............................................. 50

9.3. Trans Yamuna Zone .................................................................................... 50 9.3.1. Trans-Yamuna TTP: ...................................................................... 50 9.3.1.1. Basic Engineering Package and Detail Design of 20MLD TTRO ..... 51 9.3.1.2. Civil Works of 20MLD TTRO .......................................................... 52 9.3.1.3. Mechanical Works of 20MLD TTRO ............................................... 53 9.3.1.4. Electrical Works of 20MLD TTRO .................................................. 56 9.3.1.5. Instrumentation works of 20MLD TTRO .......................................... 57

9.3.2. Chintaharan IPS ............................................................................ 57 9.3.2.1. Basic Engineering package & Design Detail Engineering of

Chintaharan IPS ............................................................................ 57 9.3.2.2. Civil Works of Chintaharan IPS ...................................................... 58 9.3.2.3. Mechanical Works of Chintaharan IPS ........................................... 59 9.3.2.4. Electrical Works of Chintaharan IPS .............................................. 60 9.3.2.5. Instrumentation works of Chintaharan IPS ...................................... 61

9.3.3. Swamighat IPS ............................................................................. 61 9.3.3.1. Basic Engineering package & Detail Design of Swami Ghat IPS ..... 62 9.3.3.2. Civil Works of Swami Ghat IPS ...................................................... 63

Page 4: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page iii Monthly Progress Report – September 2019

9.3.3.3. Mechanical Works of Swami Ghat IPS ........................................... 63 9.3.3.4. Electrical Works of Swami Ghat IPS............................................... 64 9.3.3.5. Instrumentation Works of Swami Ghat IPS ..................................... 65

9.3.4. Bengali Ghat MPS ......................................................................... 65 9.3.4.1. Basic Engineering package & Design Detail Engineering of Bengali

Ghat MPS ..................................................................................... 66 9.3.4.2. Civil Works of Bengali Ghat MPS ................................................... 67 9.3.4.3. Mechanical Works of Bengali Ghat MPS ........................................ 68 9.3.4.4. Electrical Works of Bengali Ghat MPS ........................................... 69 9.3.4.5. Instrumentation Works of Bengali Ghat MPS .................................. 69

9.3.5. Cant IPS ....................................................................................... 70 9.3.5.1. Basic Engineering package & Detail Design of Cant IPS ................. 70 9.3.5.2. Civil Works of Cant IPS ................................................................. 71 9.3.5.3. Mechanical Works of Cant IPS ....................................................... 72 9.3.5.4. Electrical Works of Cant IPS .......................................................... 73 9.3.5.5. Instrumentation Works of Cant IPS ................................................ 73

9.3.6. Dairy Farm MPS ............................................................................ 74 9.3.6.1. Basic Engineering package & Design Detail Engineering of Dairy Farm

MPS ............................................................................................. 74 9.3.6.2. Civil Works of Dairy Farm MPS ...................................................... 75 9.3.6.3. Mechanical Works of Dairy Farm MPS ........................................... 76 9.3.6.4. Electrical Works of Dairy Farm MPS .............................................. 77 9.3.6.5. Instrumentation Works of Dairy Farm MPS ..................................... 78

9.3.7. I&D of Trans Yamuna Zone ........................................................... 78 9.3.7.1. Basic Engineering package & Design Detail Engineering of I&D of

Trans Yamuna Zone ...................................................................... 78 9.3.7.2. Civil works of I&D of Trans Yamuna Zone ...................................... 81 9.3.7.3. Mechanical works of I&D Structures ............................................... 81 9.3.7.4. Electrical Works of I&D Structures ................................................. 81 9.3.7.5. Instrumentation Works of I&D Structures ........................................ 82

9.3.8. Trans Yamuna 1 Facilities (14.5MLD WSP) .................................... 82 9.3.8.1. Basic Engineering package & Design Detail Engineering of Trans

Yamuna 1 Facilities (14.5MLD WSP) ............................................. 82 9.3.8.2. Construction works - Trans Yamuna 1 Facilities (14.5MLD WSP) .... 83 9.3.8.3. Mechanical works of Trans Yamuna 1 Facilities (14.5MLD WSP) .... 84 9.3.8.4. Electrical Works of Trans Yamuna 1 Facilities (14.5MLD WSP) ...... 84 9.3.8.5. Instrumentation Works of Trans Yamuna 1 Facilities (14.5MLD WSP)

..................................................................................................... 84 9.3.9. Trans Yamuna 2 Facilities (16 MLD UASB) .................................... 84 9.3.9.1. Basic & Design Detail engineering of Trans Yamuna 2 Facilities

(16MLD UASB) ............................................................................. 84 9.3.9.2. Civil Works of Trans Yamuna 2 Facilities (16MLD UASB) ............... 85 9.3.9.3. Mechanical works of Trans Yamuna 2 Facilities (16MLD UASB) ..... 86 9.3.9.4. Electrical Works of Trans Yamuna 2 Facilities (16MLD UASB) ........ 86

Page 5: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page iv Monthly Progress Report – September 2019

9.3.9.5. Instrumentation Works of Trans Yamuna 2 Facilities (16MLD UASB) ..................................................................................................... 86

9.3.10. Pipeline works - Trans Yamuna Zone ............................................. 86 9.3.10.1.BEP & Detail design of Pipeline works of Trans Yamuna Zone

..................................................................................................... 86 9.3.10.2.Construction of Pipeline works at Trans Yamuna Zone

..................................................................................................... 88 10. The issues, the action taken, and status for the observations made in Site order

book .............................................................................................................................89 11. Meetings ........................................................................................................... 11712. Staff deployment .............................................................................................. 118

ANNEX – 1 ............................................................................................................................. 120 Quality assurance / Quality control .............................................................................. 120

ANNEX 2 ................................................................................................................................ 128 Photographs ................................................................................................................ 128

ANNEX - 3 .............................................................................................................................. 138 Outward correspondence list of September 2019 ........................................................ 138

ANNEX - 4 .............................................................................................................................. 171 Inward correspondence list of September 2019 ........................................................... 171

ANNEX - 5 .............................................................................................................................. 197 EHS target & achievement .......................................................................................... 197

Page 6: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 1 Monthly Progress Report – September 2019

Monthly Progress Report 1 Introduction

The GoI, recognizing that long-term rejuvenation of the river Ganga will have significant social and economic benefits on the lives of the 500 million people living along its basin, has identified cleaning of the river Ganga as one of its priorities. For this purpose, in May 2015, the GoI approved the flagship Namami Gange programme for cleaning, rejuvenation, and protection of the river Ganga. In January 2016, the GoI approved a hybrid annuity model to implement STP projects under the Namami Gange programme on a PPP basis. Subsequently, the MoWR issued the River Ganga (Rejuvenation, Protection and Management) Authorities Order, 2016 (Ganga 2016 Order) to constitute various authorities to assist the GoI in achieving its aim of effective abatement of pollution in the river Ganga. The Ganga 2016 Order applies to all states in the catchment of the river Ganga basin, including Uttar Pradesh. The Ganga 2016 Order revised the legal status of NMCG (which was initially constituted as a registered society under the Societies Registration Act, 1860) to an authority constituted under the Environment (Protection) Act, 1986 and designated NMCG as the nodal agency for the implementation of the Ganga 2016 Order. Rapidly increasing population, rising standards of living and exponential growth of industrialisation and urbanisation have exposed water resources, in general, and rivers to various forms of degradation. The mighty Ganga is no exception. The deterioration in the water quality impacts the people immediately. Ganga, in some stretches, particularly during lean seasons has become unfit even for bathing. The threat of global climate change, the effect of glacial melt on Ganga flow and the impacts of infrastructural projects in the upper reaches of the river, raise issues that need a comprehensive response. In the Ganga basin approximately 12,000 million litres per day (MLD) sewage is generated, for which presently there is a treatment capacity of only around 4,000 MLD. Approximately 3000 MLD of sewage is discharged into the mainstream of the river Ganga from the Class I & II towns located along the banks, against which treatment capacity of about 1000 MLD has been created till date. The Uttar Pradesh Jal Nigam (Jal Nigam) is a statutory body constituted under the Uttar Pradesh Water Supply and Sewerage Act, 1975, and has the power to develop, maintain and regulate water supply and sewerage works in Uttar Pradesh. With a view to implement the Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has decided to undertake the development of STPs and TTP Projects along with associated infrastructure as detailed below in Mathura under Hybrid Annuity based PPP mode, in the State of Uttar Pradesh. While the Jal Nigam will be the principal executing agency

Page 7: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 2 Monthly Progress Report – September 2019

and bidding authority for the Project, NMCG will be responsible for making payments to the Concessionaire and Project Engineer. The objectives that NMCG and the UP Jal Nigam wish to achieve through the Project is mentioned in Figure 1.

Figure 1: Objectives of NMCG and UP JAL NIGAM

Government of India has approved the Namami Gange program as an integrated approach for effective abatement of pollution in river Ganga and Yamuna. As part of this and to ensure that no untreated domestic sewage flow into the river Ganga and Yamuna, various interventions are planned such as Interception & Diversion works and development & operation of Sewage Treatment Plants (STPs). Considering various development models in practice for the construction, operation and maintenance of Sewage Treatment Plants, Government of India has approved the Hybrid Annuity based Public Private Partnership (PPP) mode as one of the options for the development & operation of STPs. Under this model, private investor/developer will design, build, finance, construct, rehabilitate, renovate, operate and maintain the asset (STPs, IPS, MPS, TTP) to the Project Executing Agency/Jal Nigam/ at the end of the Concession Period (say 15 years). 40% of the Capital cost will be paid to the developer during construction of the STP. Balance 60% along with Operation & Maintenance (O&M) cost will be paid over the Concession Period on achievement of key performance indicators as per the contract. Entire cost of development and operation of the

Intercept raw sewage flowing into the river Yamuna and divert the raw sewageto the Mathura STPs;

Treatment of the raw sewage at the Mathura STPs;

Treatment of STP effluent for usage at IOCL premises

Implement viable technologies and international best practices fordevelopment, operation and maintenance of the Mathura STPs, TTPs andother facilities and

Demonstrate large scale private sector participation and mobilisation of privatesector investment to further the national aim of rejuvenation of the river Gangaand its tributaries.

Page 8: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 3 Monthly Progress Report – September 2019

STPs will be 100% funded by the Government of India as central sector scheme. It is also envisaged to discharge 20 MLD of the treated wastewater to IOCL near Gokul Barrage.

NMCG & UPJN appointed M/s. Mahindra Consulting Engineers Limited, Chennai as Project Engineer for this project through tendering process. Letter of Award is issued dated 11th October 2018 and agreement signed between the parties on 3rd December 2018.

1.1. Project components Sl. No. Description Capacity / Length

A Masani Zone 1 Newly proposed STP at Masani 30 MLD Average flow 2 Rehabilitation and restoration of existing WSP STP at

Masani 6.8 MLD Average flow

3 Construction of new MPS at Jaisinghpura and Jaisinghpura drain I&D works

2.5 MLD (peak flow)

4 Rising main from Jaisinghpura MPS to Masani STP 2.5 Km 5 Rehabilitation and restoration of Masani MPS 6 Rising main from Masani MPS to Masani STP 3.0 Km 7 Vrindavan Gate IPS, Shahganj I&D works, Chakra Tirth

I&D works & Octroi post I&D works 10 MLD (peak flow)

8 Rising main from Vrindavan Gate IPS to Masani MPS 3.35 Km 9 Rehabilitation and restoration of Krishna Ganga IPS &

Krishna Ganga Nallah I&D works

B Trans Yamuna Zone 1 Newly proposed TTP at Lakshmi Nagar based on Reverse

Osmosis 20 MLD

2 Treated Water Disposal Pipeline 10 Km 3 Rehabilitation and restoration of existing WSP STP at

Lakshmi Nagar 14.5 MLD Average flow

4 Rehabilitation and restoration of existing UASB STP at Lakshmi Nagar

16 MLD Average flow

5 Construction of Bengali Ghat MPS, Dhruv Ghat drain I&D works, Ashkunda Ghat Nala I&D works, Vishram Ghat Nala I&D works, Bengali Ghat Nala I&D woks

32.7 MLD

6 Rising main from Bengali Ghat MPS 1.16 kM 7 Rehabilitation and restoration of Chintaharan IPS,

Chintaharan Nala I&D works, Gaughat Nala I&D works, Daula Maula I&D works

8 Gravity Sewer from Chintaharan IPS to Bengali ghat MPS 0.5 KM

Page 9: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 4 Monthly Progress Report – September 2019

Sl. No. Description Capacity / Length 9 Rehabilitation and restoration of Swamighat IPS, Ranighat

Nala, Swami Ghat Nala

10 Rising main from Swamighat IPS to Bengalighat MPS 0.5 km 11 Rehabilitation and restoration of Dairy Farm MPS,

Ambakhar Nalla I&D works, Dairy Farm Nalla I&D works, Mahadev Ghat drain I&D works, Satrangi Nalla I&D works

12 Rising main from Dairy Farm MPS 1.62 kM 13 Rising main from Cant IPS to Dairy farm MPS 1.10 Km 14 Rehabilitation and restoration of Cant Nalla IPS, Cant nalla

I&D works, Dairy farm drain I&D works

15 Gravity main from dairy farm drain to Cant IPS 1.90 Km 1.2. Executing agency

o Uttar Pradesh Jal Nigam (UPJN) 1.3. Implementation agency

o Uttar Pradesh Jal Nigam (UPJN) 1.4. Consulting services

o Project Engineer • Mahindra Consulting Engineers Ltd, Chennai

1.5. Concessionaire o Mathura Wastewater Management Private Limited

2. Status of project

Status : Construction stage Concessionaire Contract : SUBIN-DLDL80840374672746341531P Agreement No. Name of the Concessionaire: Mathura Wastewater Management Pvt. Ltd. Commencement date : 15th January 2019 Completion date (as per contract): 14th January 2021

Overall progress status

Zone Scheduled

completion in %

Previous month completion in

%

Completion during this month in

%

Total completion

in % Masani Zone 31.56% 19.00% 4.40% 23.40% Trans Yamuna Zone

25.54% 12.64% 4.45% 17.10%

Overall 28.34% 15.60% 4.43% 20.03%

Page 10: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 5 Monthly Progress Report – September 2019

1st Milestone of Masani Zone achieved as on 14th July 2019. 1st Milestone of Trans Yamuna Zone achieved as on 18th August 2019.

Description Scheduled completion

in %

Previous month

completion in %

During this month

completion in %

Total completion

in %

Masani facilities 31.56% 19.00% 4.40% 23.40% Basic engineering and detailed engineering

93.53% 72.74% 2.24% 74.98%

Pipe line works in Masani zone 50.71% 53.42% 18.67% 72.09% 30 MLD STP 24.60% 14.56% 2.94% 17.50% 6.8 MLD rehabilitation 49.47% 42.25% 8.25% 50.50% Jaisinghpura MPS 20.28% 2.49% 0.18% 2.68% Vrindavan gate IPS 25.53% 8.59% 8.29% 16.88% Krishna Ganga IPS 6.37% 2.61% 0.25% 2.86% Masani MPS 12.93% 2.46% 0.23% 2.69% Interception and diversion structures

62.66% 12.11% 0.86% 12.98%

Trans Yamuna Facilities 25.54% 12.64% 4.45% 17.10% Trans Yamuna TTP Facilities 26.05% 14.80% 4.11% 18.91% Basic engineering and detailed engineering

96.37% 67.42% 5.15% 72.57%

TTP 19.38% 9.17% 1.12% 10.28% Treated water disposal pipeline to IOCL

41.22% 31.90% 30.40% 62.30%

31.56%

25.54%28.34%

23.40%

17.10%20.03%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Masani Zone Trans Yamuna Zone Overall

Overall Physical Progress

Scheduled completion in % Total completion in %

Page 11: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 6 Monthly Progress Report – September 2019

Description Scheduled completion

in %

Previous month

completion in %

During this month

completion in %

Total completion

in %

Trans Yamuna facilities 1 - 14.5 MLD WSP STP

32.50% 24.70% 0.00% 24.70%

Trans Yamuna facilities 2 - 16 MLD UASB STP

34.21% 7.10% 0.00% 7.10%

Trans Yamuna facilities - associated infrastructure 24.59% 9.47% 5.05% 14.54%

Basic engineering and detailed engineering

95.74% 48.58% 19.53% 68.11%

Chintaharan IPS 23.24% 2.82% 0.25% 3.33% Swamighat IPS 16.28% 2.82% 0.25% 3.07% Bengalighat MPS 24.43% 4.15% 3.81% 7.97% Cant IPS 19.78% 3.46% 1.13% 4.59% Dairy farm MPS 22.88% 24.30% 0.69% 24.99% Interception and diversion structures

21.50% 3.70% 0.00% 3.70%

Pipe line works in Trans Yamuna Zone

14.39% 6.39% 9.29% 15.67%

3. Financial status for construction work

Facility Contract amount Rs.in crore Construction stage O&M stage Masani facilities 116.57 75.36 Trans Yamuna facilities 1 0.10 0.67 Trans Yamuna facilities 2 1.00 9.23 Trans Yamuna associated infrastructure

53.00 19.65

Trans Yamuna TTP 80.00 82.37 Total 250.67 187.28

Overall Financial progress status as on 30th September 2019

Zone Scheduled

completion in %

Previous month completion in

%

Completion during this month in

%

Total completio

n in % Masani Zone 31.56% 19.00% 4.40% 23.40% Trans Yamuna

25.54% 12.64% 4.45% 17.10%

Overall 28.34% 15.60% 4.43% 20.03%

Page 12: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 7 Monthly Progress Report – September 2019

Note: Ratio of 1:1.15 considered for arriving at the overall financial progress

Status of financial expenditure as on 30.09.2019

SI. No

Description

Total expenditure

incurred (NMCG & MWMPL)

Rupees in crore

Expenditure incurred by MWMPL in Rupees in

crore

Expenditure incurred by

NMCG in Rupees in

crore

Expenditure incurred as

per site progress Rupees in

crore

I Overall (Masani zone and Trans Yamuna Zone)

25.067 25.067 50.74

II Masani zone 1 Mobilization advance

(10% of Rs.116.57 Cr) 11.657 11.657

27.82

2 Ist Milestone Invoice under scrutiny and process by

UPJN

Invoice under scrutiny and process by

UPJN 3 IInd milestone NA NA NA 4 IIIrd milestone NA NA NA 5 IVth milestone NA NA NA 6 Vth milestone NA NA NA

31.56%

25.54%28.34%

23.40%

17.10%20.03%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Masani Zone Trans Yamuna Zone Overall

Overall Financial Progress

Scheduled completion in % Total completion in %

Page 13: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 8 Monthly Progress Report – September 2019

SI. No

Description

Total expenditure

incurred (NMCG & MWMPL)

Rupees in crore

Expenditure incurred by MWMPL in Rupees in

crore

Expenditure incurred by

NMCG in Rupees in

crore

Expenditure incurred as

per site progress Rupees in

crore

7 VIth milestone NA NA NA 8 VIIth milestone NA NA NA 9 VIIIth milestone NA NA NA Total for Masani zone 11.657 11.657

II Trans Yamuna zone 1 Mobilization advance

(10% of Rs.134.10 Cr) 13.41 13.41

22.92

2 Ist Milestone Invoice under scrutiny and process by

UPJN

Invoice under scrutiny and process by

UPJN 3 IInd milestone NA NA NA 4 IIIrd milestone NA NA NA 5 IVth milestone NA NA NA 6 Vth milestone NA NA NA 7 VIth milestone NA NA NA 8 VIIth milestone NA NA NA 9 VIIIth milestone NA NA NA

Total for Trans Yamuna zone 13.41 13.41

4. The issues, the action taken, and status are provided after obtaining the views from

UPJN

S. No. Issues identified 1) Hard Barricading/ Shoring to be provided at Vrindavan Gate IPS Sump excavation 2) Hard Barricading/ Shoring to be provided at Bengali ghat MPS Sump excavation 3) Pending activity of second milestone are listed below under heading physical status. 4) Proper curing to be commenced and maintained at all facility 5) Physical progress at Masani Zone and Trans Yamuna Zone is affected due to

inadequate manpower across all facility

Page 14: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 9 Monthly Progress Report – September 2019

S. No.

Issues identified during Previous month

Action Taken Status

1

To concentrate on the Design detail engineering of the facilities which are falls under second and third milestone and the activities become pending as on date as per approved construction plan and ensure to start the work at site at the earliest.

In progress Partially initiated

2 Road restoration along with embankments where pipelines were laid work to be initiated

Road restoration along 300MM RCC pipe is completed.

3

Components of Jaisinghpura works to be expedited to complete as per approved construction plan

Layout has been completed. Major GFC drawings already approved. As per UPJN the depth of sump need to be revised in line with the proposed gravity sewer network

Yet to commence the work

4

Thickened sludge sump, Chlorination building, centrifuge building works to be expedited to complete as per approved construction plan

Thickened sludge sump excavation has been commenced

Partially Complied

5 Vrindavan Gate IPS substation works to be expedited to complete as per approved construction plan

Panel room footing work has been commenced

Partially Complied

6 Rehabilitation of all pumping station works to be expedited to complete as per approved construction plan

Yet to commence the work

7 Pipeline works from Ambhakar nalla to be expedited to complete as per approved construction plan

Yet to commence the work

8 RO feed tanks works in TTRO plant to be expedited to complete as per approved construction plan

Reinforcement work for raft is in progress

Partially complied

9 I&D works to be expedited to complete as per approved construction plan

Yet to commence the work

Page 15: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 10 Monthly Progress Report – September 2019

S. No.

Issues identified during Previous month

Action Taken Status

10) Manufacturing Clearance to be obtained for electro mechanical items across all facilities

Data sheet & QAP are being submitted and approved

Partially complied

11) Non-adherence of safety works as per EHS plan during pipeline activities

Partially Complied

12)

Hydro test of pipelines needs to be initiated with proper safety measures in presence of responsible persons.

600mm dia of length 2.3km are completed. Balance pipe dia works to be expedited to complete as per approved construction plan

Partially Complied

13)

Percentage breakup of Repair and rehabilitation works are to be submitted for monitoring purpose

Submitted on 30th August 2019. New construction activities under rehabilitation works is not included in the submitted breakup.

Discussed and agreed as on 6th and 7th September 2019

14) Construction material lab reports are to be submitted

Reinforcement steel test report yet to be submitted

Partially complied

15)

Work delay in admin building at TTRO Columns upto Plinth beam completed. Other works to be expedited to complete as per approved construction plan

Partially complied

16) Storm water drains to be constructed across STP and TTRO facility to avoid water stagnation

Yet to initiate Pending

17) Monthly progress report is to be submitted before 5th of every month

June & July Monthly report submitted on 3rd September 2019

18) Daily report on interim availability to be submitted without further delay

Yet to submit Pending

19) Recovery plan along with revised schedule for completing the first milestone to be submitted by MWMPL

Instead of submitting recovery plan,

Discussed and agreed as on 6th and 7th September 2019

Page 16: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 11 Monthly Progress Report – September 2019

S. No.

Issues identified during Previous month

Action Taken Status

MWMPL submitted revised plan

20)

Pipe line work backfilling compaction not done properly due to which sudden pit is being formed during raining and creates inconvenience to public and safety issues.

Partially complied

21) Manufacturing Clearance to be obtained for electro mechanical items across all facilities

Data sheet & QAP are being submitted and approved

Partially complied

22) Non-adherence of safety works as per EHS plan during pipeline activities

Partially Complied

23) Construction material lab reports are to be submitted

Complied

24)

As per approved construction plan, Bengali Ghat MPS pump house and receiving chamber excavation to start from 15th March 2019. But no physical progress at site

Excavation work started

Partially complied

25) 25% of 6 I&D works of trans Yamuna to be completed by 14th July 2019 as per construction plan. No progress at site.

Only on 3 I&Ds work has been initiated

Partially complied

26) Scheduled outage period to be submitted

Yet to submit Pending

5. Status of pending Condition precedent

SI. No.

Condition Precedent Present Status

1 Obtain all concessionaire applicable permits that are required for achieving financial closure and for execution

MWMPL was advised to obtain necessary approval from UPPCB towards usage DG at 30MLD STP, Masani. UPJN shall facilitate if requested by MWMPL along with necessary particulars

2 Review and Approve the Phase I design and drawings

In order to facilitate MWMPL, partial approval was accepted by UPJN. The observation / approval of all the submitted drawings are being provided well within the stipulated

Page 17: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 12 Monthly Progress Report – September 2019

SI. No.

Condition Precedent Present Status

timeline as per CA. however it is requested to MWMPL to ensure that all the necessary details are incorporated in the submitted drawings as per applicable standards and good engineering practice and addressing all the observations without any reservation so that approval can be accorded at the earliest. This was very clearly depicted vide NMCG letter dated 18th December 2018

3 NOC for laying of sewer in Cant area Cantonment board informed that the proposed alignment is crossing through A-1 security zone hence should be re-routed. Re-routed documents are submitted to Cantonment. Meeting was held on 24th September 2019. Minutes are yet to be shared.

4 To replace existing rising mains under Railway bridge / crossing in the following locations

1. Raising main from Bengali Ghat MPS to BPT

2. Raising main from Dairy Farm MPS to Manhole near BPT

MWMPL submitted the subcontractor credentials to UPJN as per in principal approval to execute the work

5 To cross rising main from Gokul Barrage MWMPL addressed the query raised from irrigation department. Proposals are under scrutiny by irrigation department.

6. Status of interim availability and Operation and Maintenance of existing facilities

SI. No Facilities

Average Flow in

MLD

Total no of Working

Hours

Cumulative flow in MLD

(September Month)

Major Breakdown during this

month 1 Krishna Ganga

IPS 0.27 166.00 8.13

2 Vrindavan Gate IPS 0.12 38.83 3.49

Page 18: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 13 Monthly Progress Report – September 2019

SI. No Facilities

Average Flow in

MLD

Total no of Working

Hours

Cumulative flow in MLD

(September Month)

Major Breakdown during this

month 3 Masani MPS 6.46 656.83 193.95 4 Chintaharan IPS 1.36 453.98 40.86 5 Swami Ghat IPS 0.70 292.50 21.06 6 Bengali Ghat MPS 4.34 516.38 130.13 7 Cant IPS 1.00 438.92 30.02 8 Dairy Farm MPS 5.11 561.09 153.35 9 16 MLD 9.87 1316.15 296.06

7. Status of Non-Conformance Report

SI. NO

Description Discipline Status Remarks

1 1. Severe non-adherence of EHS observed at 30 MLD STP Premises MWMPL Ignoring repeated instructions by MACE since long.

2. Application of PPE’s, implementation of proper Barrication, proper access to individual structures, proper working platform being ignored repeatedly.

3. Very poor housekeeping observed across the STP premises, MWMPL instructed to improve healthy working conditions repeatedly.

EHS Closed

2 No proper methodology being followed across all facilities at Masani zone and Trans Yamuna zone. The same is not being followed by MWMPL despite repeated instruction by MACE. prior approval of all materials to be used for rehab works to be obtained

Rehabilitation works

Closed

Page 19: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 14 Monthly Progress Report – September 2019

SI. NO

Description Discipline Status Remarks

3 Depth of excavation is more than 8.35m at Bengali Ghat MPS. No shoring is provided. Shoring to be provided

EHS Open

4 Depth of excavation is more than 6m at Vrindavan Gate IPS. No shoring is provided. Shoring to be provided

EHS Open

8. EHS Non-Compliance

Description Upto – Previous Month This Month Total

Non- Compliance Issued 9 6 15 Non- Compliance attended 9 6 15

9. Physical status

MWMPL submitted the financial weightage for each activity considered along with the request for issue of first milestone completion certificate in the month of August 2019. The construction plan and the monitoring programme was revised accordingly. As per the approved construction plan, 1st Milestone of Masani Zone has been completed on 14th July 2019. 1st Milestone of Trans Yamuna Zone has been completed on 18th August 2019. The following activities are still pending on 1st Milestone & 2nd Milestone. As per approved construction plan 2nd milestone to be achieved on or before 14th October 2019.

Description Remarks for completing the target for

secondmilestone MASANI ZONE Pipe line work Rising Main 200 mm DI K9 from Jaisinghpura MPS to Masani STP - 2120m

Around 843m hydro testing to be completed. Around 634m road restoration work to be completed.

Rising Main 700 mm DI K9 from Masani MPS to Masani STP - 2900 m

198m laying completed. Remaining 98 m to be completed. Around 868m hydro testing to be completed. Around 572m road restoration work to be completed

Rising Main 300 mm DI K9 from Vrindavan Gate IPS to Masani MPS - 850 m

Around 338m hydro testing to be completed. Around 254m road restoration work to be completed

Page 20: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 15 Monthly Progress Report – September 2019

Description Remarks for completing the target for

secondmilestone MASANI ZONE Gravity Main 400 mm RCC NP3 from Chakratirth nalla to Vrindavan Gate - 80 m

Around 45m laying and hydro testing to be completed. Around 59m road restoration work to be completed

30 MLD STP – Civil works Inlet & Screen Chamber 100% PCC, 100% of raft, 100% of RCC work upto 50%

Height and 13% of RCC works of 100% height to be completed.

Grit Chamber 100% PCC, 100% of raft, 100% of RCC work upto 50% Height and 48% of RCC works of 100% height to be completed.

Parshall Fume 100% of raft, 100% of RCC work upto 50% Height and 100% of RCC works of 100% height to be completed.

SBR Remaining 2% RCC in raft foundation to be completed to achieve the first milestone

Thickened Sludge Sump 100% PCC, 100% of raft, 100% of RCC work upto 50% Height to be completed.

Chlorination Building 100% PCC, 100% of RCC work upto plinth beam, 100% of RCC work upto slab, 13% of brick work to be completed.

Centrifuge Building 100% PCC, 100% of RCC work upto plinth beam, 100% of RCC work upto slab, 100% of 1st floor slab, 40% of brick work to be completed.

Admin Building 100% of RCC work upto slab, 100% of 1st floor slab, 100% of brick work, 32.50% of columns upto second floor to be completed.

MCC & Transformer 100% of 1st floor slab, 100% of brick work, to be completed.

PMCC & Control Room 82% of columns upto slab, to be completed. HT Panel & Meter Room 100% of columns upto slab, and 100% of brickwork to

be completed. 30 MLD STP – Mechanical works Hoist, Valves, LT Switch Gear, AC drive Data sheet and QAP to be submitted. Manufacturing

clearance to be obtained HT Panel, Chlorine tonner, Grit Mechanism Revised Data sheet to be submitted. Manufacturing

clearance to be obtained to achieve the first milestone Screens, diffuser, Pumps QAP yet to submit. Manufacturing clearance to be

obtained to achieve the first milestone 6.8 MLD STP Rehabilitation - Desludging Completed JAISINGHPURA MPS Civil works

Pump House Receiving Chamber 100% of excavation, 100% PCC, 100% of raft, 68% of RCC work upto 50% Height to be completed

Page 21: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 16 Monthly Progress Report – September 2019

Description Remarks for completing the target for

secondmilestone MASANI ZONE Pump House 100% of excavation, 100% PCC, 100% of raft, 30% of

RCC work upto 50% Height to be completed Panel room 100% of excavation, 100% PCC, 100% of columns upto

plinth level, 54% of columns upto slab to be completed Transformer 100% of excavation, 100% PCC, 18% of raft, to be

completed DG Room 100% of excavation, 100% PCC, 100% of columns upto

plinth level, 23% of columns upto slab to be completed Security Cabin 100% of excavation, 100% PCC, to be completed Boundary wall 85% of boundary wall to be completed Mechanical works Hoist Revised QAP to be submitted. Manufacturing clearance

to be obtained to achieve the first milestone Internal & External electrification, Power Cable, HT Panel, LT panel, VFD starter, Lightning arrestor

Data sheet to be submitted. QAP to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Vrindhavan gate IPS Pump House receiving chamber & screen chamber

100% of excavation 100% PCC, 100% of raft, 49% of RCC work upto 50% Height to be completed

LT Panel Room 100% of columns upto slab, 45% of brickwork to be completed.

DG Room 100% of excavation, 100% PCC, 100% of columns upto plinth level, 100% of columns upto slab, 24% of brickwork to be completed

Boundary wall Remaining 43% of work to be completed. Mechanical works Hoist Revised QAP to be submitted. Manufacturing clearance

to be obtained to achieve the first milestone Electrical works VFD starter, Lightning arrestor Data sheet to be submitted. QAP to be submitted.

Manufacturing clearance to be obtained to achieve the first milestone

Internal & External electrification, Power Cable, HT Panel, LT panel,

Revised Data sheet approved to be submitted. QAP to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Interception and diversion works Shahganj Nalla Not started. Excavation, PCC, RCC and hydro testing to

be completed to achieve the completion of first milestone

Chakratirth Nalla Hydro testing to be completed to achieve the first milestone

Page 22: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 17 Monthly Progress Report – September 2019

Description Remarks for completing the target for

secondmilestone MASANI ZONE Octrai Post Nalla Not started. Excavation, PCC, RCC and hydro testing to

be completed to achieve the completion of first milestone

Masani MPS Hoist Revised QAP to be submitted. Manufacturing clearance

to be obtained to achieve the first milestone VFD starter, Lightning arrestor Data sheet to be submitted. QAP to be submitted.

Manufacturing clearance to be obtained to achieve the first milestone

Internal & External electrification, Power Cable, HT Panel, LT panel,

Revised Data sheet approved to be submitted. QAP to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Krishna ganga IPS Hoist Revised QAP to be submitted. Manufacturing clearance

to be obtained to achieve the first milestone VFD starter, Lightning arrestor Data sheet to be submitted. QAP to be submitted.

Manufacturing clearance to be obtained to achieve the first milestone

Internal & External electrification, Power Cable, HT Panel, LT panel,

Revised Data sheet approved to be submitted. QAP to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Description Remarks for completing the target for second milestone

TRANS-YAMUNA ZONE Pipe line work Rising Main 600 mm DI K9 from TTP to IOCL Discharge point - 10000m

Around 21% of road restoration to be completed

20 MLD TTP Civil works Disc Filter- Platform 100% of excavation, 100% of PCC & 100% of RCC work

to be completed. Waste Water Back wash Sump 100% of excavation, 100% of PCC & 100% of RCC

work, 22.5% of RCC work upto 1st lift to be completed. N- Pit 100% of excavation, 100% of PCC & 41% of RCC work

to be completed. RO Feed Tank 100% RCC in raft foundation, 100% of RCC work of 1st

Lift, 100% of RCC work of 2nd Lift, 100% of RCC work of 3rd Lift, 9% of RCC work of 4th Lift to be completed

Admin Building 100% RCC upto first floor slab, 100% of brick work upto 1st floor, 18% of rcc work in slab to be completed

Ultrafiltration permate pump, N-Pit transfer pump, DG blower with motor, Non-metallic valves, HT panel

Revised data sheet to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Page 23: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 18 Monthly Progress Report – September 2019

Description Remarks for completing the target for second milestone

TRANS-YAMUNA ZONE HT cable Revised Data sheet to be submitted. QAP to be

submitted. Manufacturing clearance to be obtained to achieve the first milestone

Bengali ghat MPS Pump House receiving chamber & screen chamber

100% of excavation 100% of PCC and 100% of RCC in raft, 49% of RCC work upto 50% height to be completed.

Raw sewage Pump House 100% of excavation 100% of PCC and 100% of RCC in raft, 32% of RCC work upto 50% height to be completed.

LT Panel Room 100% of excavation 100% of PCC and 100% of RCC upto plinth level, 100% of columns upto slab, 100% of brick work, 100% of roof slab, 30% of joineries to be completed

DG Room 100% of excavation 100% of PCC and 100% of RCC upto plinth level, 100% of columns upto slab, 100% of brick work, to be completed

Transformer Yard 100% of excavation 100% of PCC and 29% of RCC upto plinth level, to be completed

Boundary wall 60% of boundary wall to be completed. Lifting tackle, Revised QAP to be submitted. Manufacturing clearance

to be obtained to achieve the first milestone Chintaharan IPS Rehabilitation of Existing Civil Structure Schedule for new works to be submitted. 30% of

rehabilitation work to be completed to achieve the first milestone

Lifting tackle, Revised QAP to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Dairy Farm MPS Rehabilitation of existing civil structure Schedule for new works to be submitted. 20% of

rehabilitation work to be completed to achieve the first milestone

Lifting tackle, Revised QAP to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Cant Nalla IPS Rehabilitation of Existing Civil Structure Schedule for new works to be submitted. 10% of

rehabilitation work to be completed to achieve the first milestone

Lifting tackle, Revised QAP to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Swamighat IPS Rehabilitation of Existing Civil Structure Schedule for new works to be submitted. 10% of

rehabilitation work to be completed to achieve the first milestone

Lifting tackle, Revised QAP to be submitted. Manufacturing clearance to be obtained to achieve the first milestone

Interception and Diversion Satrangi nalla 100% of work to be completed Ranighat Nala Remaining 50% to be completed Swami Ghat Nala Remaining 50% to be completed Ashkunda Ghat Nala 100% of work to be completed

Page 24: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 19 Monthly Progress Report – September 2019

Description Remarks for completing the target for second milestone

TRANS-YAMUNA ZONE Vishram Ghat Nala 100% of work to be completed Gau Ghat Nalla 75% of work to completed Chintaharan Nalla 75% of work to completed Dhruv Ghat Nallla 75% of work to completed

9.1. Pre-Construction activities

As per the approved construction for first two months only site mobilization alone is planned by the MWMPL. Site mobilization has been completed at Masani STP and Trans Yamuna STP. Site mobilization for the associated infrastructure need to be carried out. Concessionaire to obtain permit for usage of DG during construction stage prior to the start of construction activities at Masani STP as per the consent to establish received from Pollution Control Board. Concessionaire should dismantle the RMC plant installed within the 30 MLD STP as it is already conveyed to MWMPL.

9.2. Masani Zone 9.2.1. 30 MLD STP in Masani Zone:

Overall physical progress of 30 MLD STP

28.62%21.03%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall progress - 30MLD STP

Scheduled Actual completion till this month

Page 25: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 20 Monthly Progress Report – September 2019

9.2.1.1. Basic Engineering Package and Design Detail Engineering of 30 MLD STP

Item of work

As per schedule Physical status

Start Date Finish Date Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/18/2018 11/17/2018 100.00% 96.00% 0.00% 96.00%

Design Detail Engineering

12/2/2019 6/14/2019 83.41% 52.17% 4.58% 56.74%

100.00%96.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - 30MLD STP

Scheduled Actual completion till this month

83.41%56.74%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%90.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Design Detail Engineering Progress - 30MLD STP

Scheduled Actual completion till this month

Page 26: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 21 Monthly Progress Report – September 2019

9.2.1.2. Civil Works of 30 MLD STP

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 3/15/2019 10/14/2020 39.76% 23.50% 5.13% 28.64% Inlet & Screen Chamber 5/15/2019 1/14/2020 57.60% 9.00% 1.00% 10.00% Grit Chamber 4/15/2019 12/14/2019 68.75% 9.00% 1.00% 10.00% Parshall flume 5/15/2019 11/14/2019 81.39% 15.00% 15.00% SBR 3/15/2019 6/14/2020 56.20% 46.55% 10.44% 56.99% CCT 4/15/2019 11/14/2019 87.76% 79.85% 14.40% 94.25% Sludge Thickener 6/15/2019 3/14/2020 51.43% 37.50% 37.50% Thickened Sludge Sump 6/15/2019 3/14/2020 51.43% 10.00% 10.00% Supernatant Tank 6/15/2019 3/14/2020 51.43% 10.00% 10.00% Chlorination Building 7/15/2019 4/13/2020 40.05% 4.00% 4.00% Centrifuge Building 7/15/2019 4/14/2020 35.72% Blower Building 8/15/2019 6/14/2020 19.25% 18.50% 18.50% Admin, Site office, Lab, SCADA cum workshop & store and Overhead tank

5/15/2019 4/14/2020 48.05% 16.20% 0.20% 16.40%

MCC Room & Transformer Yard

6/15/2019 3/14/2020 50.20% 23.05% 7.25% 30.30%

PMCC & Control room 7/15/2019 5/14/2020 34.55% 23.05% 7.25% 30.30% HT room 6/15/2019 2/14/2020 50.20% 23.05% 7.25% 30.30% DG room 10/15/2019 5/14/2020 Transformer yard 10/15/2019 5/14/2020 Security Cabin 10/15/2019 5/14/2020 Sludge drying bed 10/15/2019 5/14/2020 Boundary wall 10/15/2019 11/14/2019 External Road 7/15/2020 7/21/2020 Internal Road 7/15/2020 7/21/2020 Paver blocks 7/15/2020 8/8/2020 Storm drain 5/15/2020 6/14/2020 Site grading 3/15/2020 10/14/2020 PLC room 3/15/2020 4/14/2020 Staff quarters 3/15/2020 4/14/2020 Tube well 3/15/2019 10/14/2020

Page 27: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 22 Monthly Progress Report – September 2019

9.2.1.3. Mechanical Works of 30 MLD STP

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Mechanical works 4/15/2019 9/14/2020 10.97% 5.80% 0.36% 6.16% Screens 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Grit Mechanism 4/15/2019 9/14/2020 10.00% 6.00% 6.00% Gates 6/15/2019 9/14/2020 10.00% 8.00% 8.00% SBR decanter 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Thickener 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Blowers 5/15/2019 9/14/2020 10.00% 8.00% 8.00% Diffusers 6/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00% Excess sludge and return sludge pumps

4/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00%

Chlorination 9/15/2019 9/14/2020 5.17% Chlorine tonners 6/15/2019 9/14/2020 10.00% 8.00% 0.00% 8.00% Centrifuge feed pumps 5/15/2019 9/14/2020 46.21% 6.00% 2.00% 8.00% Centrifuge 7/15/2019 9/14/2020 10.00% Agitators 10/15/2019 9/14/2020 4.00% 4.00% PE dosing system 10/15/2019 9/14/2020 Hoist / EOT 7/15/2019 9/14/2020 10.00% 2.00% 2.00% Lab equipments 10/15/2019 9/14/2020 Valves 6/15/2019 9/14/2020 10.00% Piping 8/15/2019 9/14/2020 10.00% Pumps 5/15/2019 9/14/2020 10.00%

39.76%

28.64%

0.00%5.00%

10.00%15.00%20.00%25.00%30.00%35.00%40.00%45.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil works Progress - 30MLD STP

Scheduled Actual completion till this month

Page 28: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 23 Monthly Progress Report – September 2019

9.2.1.4. Electrical works of 30 MLD STP

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Electrical works 9/15/2019 10/14/2020 2.07% 2.60% 0.30% 2.90% HT Panel 9/15/2019 10/14/2020 5.17% 6.00% 0.00% 6.00%

Transformer 9/15/2019 10/14/2020 5.17% 6.00% 2.00% 8.00% LT Switch gear 9/15/2019 10/14/2020 5.17%

AC Drive 10/14/2019 10/14/2020 Cables and accessories 11/15/2019 10/14/2020

Cable Trays 11/15/2019 10/14/2020 Lighting 11/15/2019 10/14/2020

Earthing and Lightning 11/15/2019 10/14/2020 DG set 11/15/2019 10/14/2020 8.00% 8.00%

DC system 11/15/2019 10/14/2020 Motors 11/15/2019 10/14/2020

10.97%

6.16%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical works Progress - 30MLD STP

Scheduled Actual completion till this month

Page 29: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 24 Monthly Progress Report – September 2019

9.2.1.5. Instrumentation works of 30MLD STP Not scheduled until this month

9.2.2. Jaisinghpura MPS:

Overall physical progress Jaisinghpura MPS

10.97%6.16%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical works Progress - 30MLD STP

Scheduled Actual completion till this month

24.91%

6.76%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall progress - Jainsingpura MPS

Scheduled Actual completion till this month

Page 30: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 25 Monthly Progress Report – September 2019

9.2.2.1. Basic Engineering Package & Design Detail Engineering of Jaisinghpura MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

11/15/2018 1/28/2019 100.00% 87.00% 0.00% 87.00%

Design Detail Engineering

10/18/2018 6/14/2019 95.00% 41.73% 12.92% 54.65%

100.00%87.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - Jainsingpura MPS

Scheduled Actual completion till this month

95.00%54.65%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Design Detail Engineering Progress - Jainsingpura MPS

Scheduled Actual completion till this month

Page 31: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 26 Monthly Progress Report – September 2019

9.2.2.2. Civil Works of Jaisinghpura MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 4/15/2019 4/14/2020 32.73% Pump House receiving chamber & screen chamber & I&D

4/15/2019 2/14/2020 43.85%

Raw sewage pump house

5/15/2019 3/14/2020 30.00%

LT panel room 7/15/2019 2/14/2020 32.50% Transformer yard 7/15/2019 4/14/2020 27.00% DG room 7/15/2019 4/14/2020 28.42% Security Cabin 9/15/2019 4/14/2020 7.89% Site grading 1/15/2020 3/14/2020 Boundary wall 4/15/2019 11/14/2019 78.02% Paver blocks 2/15/2020 4/14/2020

32.73%

0.00%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil works Progress - Jainsingpura MPS

Scheduled Actual completion till this month

Page 32: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 27 Monthly Progress Report – September 2019

9.2.2.3. Mechanical works of Jaisinghpura MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Mechanical works 5/15/2019 10/14/2020 9.91% 6.40% 0.65% 7.05% Pumps 5/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings 6/15/2019 10/14/2020 10.00% 4.00% 4.00% Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Safety Equipment’s, Tools & Tackles and Misc. Items

9/15/2019 10/14/2020 5.17%

9.91%7.05%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Mechanical works Progress - Jainsingpura MPS

Scheduled Actual completion till this month

Page 33: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 28 Monthly Progress Report – September 2019

9.2.2.4. Electrical works of Jaisinghpura MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Electrical works 9/15/2019 10/14/2020 5.17% 3.89% 3.89% DG 9/15/2019 10/14/2020 5.17% 8.00% 8.00%

Internal and external electrification

9/15/2019 10/14/2020 5.17%

Power cable 9/15/2019 10/14/2020 5.17% Transformer 9/15/2019 10/14/2020 5.17% 6.00% 6.00%

HT Panel 9/15/2019 10/14/2020 5.17% 6.00% 6.00% LT panel 9/15/2019 10/14/2020 5.17%

VFD starter 9/15/2019 10/14/2020 5.17% Earthing and Lightning 9/15/2019 10/14/2020 5.17%

9.2.2.5. Instrumentation works of Jaisinghpura MPS

Not scheduled until this month

5.17%3.89%

0.00%

1.00%

2.00%

3.00%

4.00%

5.00%

6.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Progress - Electrical works Jainsingpura MPS

Scheduled Actual completion till this month

Page 34: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 29 Monthly Progress Report – September 2019

9.2.3. Masani MPS

Overall physical progress - Masani MPS

9.2.3.1. Basic Engineering Package & Design Detail Engineering of Masani MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/15/2018 2/15/2019 100.00% 86.50% 0.50% 87.00%

Design Detail Engineering

11/5/2018 10/14/2020 73.77% 33.06% 4.99% 38.05%

17.36%

6.28%

0.00%

5.00%

10.00%

15.00%

20.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall progress - Masani MPS

Scheduled Actual completion till this month

100.00%87.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - - Masani MPS

Scheduled Actual completion till this month

Page 35: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 30 Monthly Progress Report – September 2019

9.2.3.2. Civil works of Masani MPS

Not scheduled until this month

9.2.3.3. Mechanical Works of Masani MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Mechanical works 5/15/2019 10/14/2020 9.91% 6.40% 0.65% 7.05% Pumps 5/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings 6/15/2019 10/14/2020 10.00% 4.00% 4.00% Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Safety Equipment’s, Tools & Tackles and Misc. Items

9/15/2019 10/14/2020 5.17%

73.77%38.05%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Design Detail EngineeringProgress - - Masani MPS

Scheduled Actual completion till this month

Page 36: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 31 Monthly Progress Report – September 2019

9.2.3.4. Electrical Works of Masani MPS

As per schedule Physical status

Item of work Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical items

3/15/2019 10/14/2020 10.00% 3.89% 0.28% 4.17%

DG 6/15/2019 10/14/2020 10.00% 8.00% 0.00% 8.00%

Internal and external electrification

6/15/2019 10/14/2020 10.00% 0.00% 0.00% 0.00%

Power cable 6/15/2019 10/14/2020 10.00% 0.00% 0.00% 0.00%

Transformer 6/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00%

HT Panel 6/15/2019 10/14/2020 10.00% 6.00% 0.00% 6.00%

LT panel 6/15/2019 10/14/2020 10.00% 0.00% 0.00% 0.00%

VFD starter 6/15/2019 10/14/2020 10.00% 0.00% 0.00% 0.00%

Earthing and Lightning

6/15/2019 10/14/2020 10.00% 0.00% 0.00% 0.00%

9.91%7.05%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical Works Progress - Masani MPS

Scheduled Actual completion till this month

Page 37: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 32 Monthly Progress Report – September 2019

9.2.3.5. Instrumentation Works of Masani MPS

Item of work As per schedule

Physical status

Item of work

As per schedule

Physical status

Item of

work Automation and Instrumentation items

6/15/2019 10/14/2020 10.00%

10.00%4.17%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Electrical works Progress - Masani MPS

Scheduled Actual completion till this month

10.00%0.00%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Instrumentation worksProgress - Masani MPS

Scheduled Actual completion till this month

Page 38: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 33 Monthly Progress Report – September 2019

9.2.4. Vrindavan Gate IPS

Overall physical progress - Vrindavan Gate IPS

9.2.4.1. Basic Engineering Package & Design Detail Engineering of Vrindavan Gate IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/15/2018 2/15/2019 100.00% 94.00% 0.00% 94.00%

Design Detail Engineering

10/21/2018 10/14/2020 94.50% 67.68% 0.00% 67.68%

29.83%20.72%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall progress - - Vrindavan Gate IPS

Scheduled Actual completion till this month

Page 39: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 34 Monthly Progress Report – September 2019

9.2.4.2. Civil Works of Vrindavan gate IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 4/15/2019 6/14/2020 41.21% 12.26% 16.12% 28.38% Pump House receiving chamber & screen chamber

4/15/2019 4/14/2020 40.00%

Raw sewage pump house

5/15/2019 5/14/2020 35.00% 9.00% 31.50% 40.50%

94.00%100.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - Vrindavan Gate IPS

Scheduled Actual completion till this month

94.50%67.68%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Design Detail Engineering Progress - Vrindavan Gate IPS

Scheduled Actual completion till this month

Page 40: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 35 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

LT panel room 6/15/2019 3/14/2020 46.00% 1.00% 11.25% 12.25%

Transformer yard 11/15/2019 1/14/2020 42.50% 42.50% DG room 6/15/2019 1/14/2020 40.40%

Security Cabin 6/15/2019 1/14/2020 40.40% 48.10% 36.90% 85.00% Site grading Boundary wall 4/15/2019 11/14/2019 82.00% 44.00% 44.00% Paver blocks 4/15/2020 6/14/2020

9.2.4.3. Mechanical Works of Vrindavan IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Mechanical works 5/15/2019 10/14/2020 9.91% 6.40% 0.65% 7.05% Pumps 5/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings 6/15/2019 10/14/2020 10.00% 4.00% 4.00%

41.21%

28.38%

0.00%5.00%

10.00%15.00%20.00%25.00%30.00%35.00%40.00%45.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil works Progress - Vrindavan Gate IPS

Scheduled Actual completion till this month

Page 41: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 36 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Safety Equipment’s, Tools & Tackles and Misc. Items

9/15/2019 10/14/2020 5.17%

9.2.4.4. Electrical Works of Vrindavan IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical items 3/15/2019 10/14/2020 10.00% 3.89% 0.28% 4.17% DG 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Internal and external electrification

6/15/2019 10/14/2020 10.00%

Power cable 6/15/2019 10/14/2020 10.00% Transformer 6/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00% HT Panel 6/15/2019 10/14/2020 10.00% 6.00% 6.00% LT panel 6/15/2019 10/14/2020 10.00%

9.91%7.05%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical works Progress - Vrindavan Gate IPS

Scheduled Actual completion till this month

Page 42: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 37 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % VFD starter 6/15/2019 10/14/2020 10.00%

Earthing and Lightning

6/15/2019 10/14/2020 10.00%

9.2.4.5. Instrumentation Works of Vrindavan IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Automation and Instrumentation items

6/15/2019 10/14/2020 10.00%

10.00%4.17%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Electrical works Progress - Vrindavan Gate IPS

Scheduled Actual completion till this month

Page 43: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 38 Monthly Progress Report – September 2019

9.2.5. Krishnaganga IPS

Overall physical progress - Krishnaganga IPS

9.2.5.1. Basic Engineering Package & Design Detail Engineering of Krishnaganga IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/15/2018 2/15/2019 100.00% 85.00% 0.00% 85.00%

10.00%0.00%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Instrumentation works Progress - Vrindavan Gate IPS

Scheduled Actual completion till this month

10.92%6.50%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Overall progress - KrishnagangaIPS

Scheduled Actual completion till this month

Page 44: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 39 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Design Detail Engineering

4/1/2019 6/14/2019 64.35% 41.65% 0.42% 42.06%

9.2.5.2. Civil Works of Krishnaganga IPS

Not scheduled until this month

100.00%85.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - Krishnaganga IPS

Scheduled Actual completion till this month

64.35%42.06%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Design Detail Engineering Progress -Krishnaganga IPS

Scheduled Actual completion till this month

Page 45: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 40 Monthly Progress Report – September 2019

9.2.5.3. Mechanical Works of Krishnaganga IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Mechanical works 5/15/2019 10/14/2020 9.82% 6.30% 0.76% 7.07% Pumps 5/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings 6/15/2019 10/14/2020 10.00% 4.00% 4.00% Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Safety Equipment’s, Tools & Tackles and Misc. Items

9/15/2019 10/14/2020 5.17%

9.2.5.4. Electrical Works of Krishnaganga IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical items 6/15/2019 7/14/2019 10.00% 2.50% 2.50% DG 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Internal and external electrification

6/15/2019 10/14/2020 10.00%

9.82%7.07%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical Works Progress - Krishnaganga IPS

Scheduled Actual completion till this month

Page 46: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 41 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Power cable 6/15/2019 10/14/2020 10.00%

LT panel 6/15/2019 10/14/2020 VFD starter 6/15/2019 10/14/2020 Earthing and Lightning 6/15/2019 10/14/2020 10.00%

9.2.5.5. Instrumentation Works of Krishnaganga IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Automation and Instrumentation items

6/15/2019 10/14/2020 10.00%

10.00%2.50%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Electrical works Progress - Krishnaganga IPS

Scheduled Actual completion till this month

Page 47: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 42 Monthly Progress Report – September 2019

9.2.6. I&D Structures

Overall physical progress of I&D Structures

10.00%

0.00%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Instrumentation works Progress - Krishnaganga IPS

Scheduled Actual completion till this month

64.86%16.01%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Overall progress - I&D

Scheduled Actual completion till this month

Page 48: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 43 Monthly Progress Report – September 2019

9.2.6.1. Basic Engineering Package & Design Detail Engineering of I&D Structures

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Interception and diversion structures

9/23/2018 10/14/2020 99.42% 60.00% 3.57% 63.57%

Shahganj Nalla 9/23/2018 6/14/2019 100.00% 68.50% 1.20% 69.70% Basic Engineering Package

9/23/2018 2/15/2019 100.00% 98.60% 0.00% 98.60%

Design Detail Engineering

9/23/2018 6/14/2019 100.00% 38.40% 2.40% 40.80%

Chakra Tirth Nalla

9/23/2018 6/14/2019 100.00% 74.20% 1.80% 76.00%

Basic Engineering Package

9/23/2018 2/15/2019 100.00% 98.60% 0.00% 98.60%

Design Detail Engineering

9/23/2018 6/14/2019 100.00% 49.80% 3.60% 53.40%

Octroi Post Nalla 9/23/2018 6/14/2019 100.00% 68.30% 1.80% 70.10% Basic Engineering Package

9/23/2018 2/15/2019 100.00% 94.60% 0.00% 94.60%

Design Detail Engineering

9/23/2018 6/14/2019 100.00% 42.00% 3.60% 45.60%

Krishnaganga Nalla

9/23/2018 6/14/2019 100.00% 42.00% 4.80% 46.80%

Basic Engineering Package

9/23/2018 2/15/2019 100.00% 84.00% 0.00% 84.00%

Design Detail Engineering

9/23/2018 6/14/2019 100.00% 0.00% 9.60% 9.60%

Masani Nalla 9/23/2018 6/14/2019 96.25% 32.00% 11.10% 43.10% Basic Engineering Package

9/23/2018 2/15/2019 100.00% 64.00% 0.00% 64.00%

Design Detail Engineering

4/1/2019 6/14/2019 92.50% 0.00% 22.20% 22.20%

Page 49: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 44 Monthly Progress Report – September 2019

9.2.6.2. Construction Works of I&D Structures

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 3/15/2019 7/14/2019 89.09% 20.19% 20.19% Shahganj Nalla 3/15/2019 6/14/2019 100.00% 4.50% 4.50% Chakra Tirth Nalla

4/15/2019 7/14/2019 100.00% 76.25% 76.25%

Octroi post Nalla 4/15/2019 7/14/2019 100.00% Krishnaganga Nalla

7/15/2019 11/14/2019 75.22%

Masani Nalla 8/15/2019 12/14/2019 37.50%

99.42%63.57%

0.00%20.00%40.00%60.00%80.00%

100.00%120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering & Detail Design Progress -I&D

Scheduled Actual completion till this month

89.09%20.19%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil worksProgress - I&D

Scheduled Actual completion till this month

Page 50: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 45 Monthly Progress Report – September 2019

9.2.6.3. Mechanical works of I&D Structures

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Shahganj nalla Screen

7/15/2019 10/14/2020 70.00% 0.00% 8.00% 8.00%

Shahganj nalla Gates 11/15/2019 10/14/2020 0.00% 0.00% 0.00% 0.00% Chakratirth nalla

Screen 8/15/2019 10/14/2020 75.17% 0.00% 8.00% 8.00%

Chakratirth nalla Gates

8/15/2019 10/14/2020 75.17% 0.00% 0.00% 0.00%

Octori post nalla Screen

9/15/2019 10/14/2020 36.21% 0.00% 8.00% 8.00%

Octori post nalla Gates

9/15/2019 10/14/2020 36.21% 0.00% 0.00% 0.00%

Krishna ganga nalla Screen

10/15/2019 10/14/2020 0.00% 0.00% 0.00% 0.00%

Krishna ganga nalla Gates

10/15/2019 10/14/2020 0.00% 0.00% 0.00% 0.00%

Masani nalla Screen 11/15/2019 10/14/2020 0.00% 0.00% 0.00% 0.00% Masani Nalla Gates 11/15/2019 10/14/2020 0.00% 0.00% 0.00% 0.00%

30.68%

2.88%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Progress - Mechanical works - I&D

Scheduled Actual completion till this month

Page 51: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 46 Monthly Progress Report – September 2019

9.2.6.4. Electrical Works of I&D Structures

Not scheduled until this month

9.2.6.5. Instrumentation Works of I&D Structures

Not scheduled until this month

9.2.7. Pipeline Works in Masani Zone

Overall physical progress of Pipeline Works in Masani Zone

9.2.7.1. Basic Engineering Package & Design Detail Engineering of Pipeline Works in Masani Zone

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Rising Main 200 mm DI K9 from Jaisinghpura MPS to Masani STP

11/16/2018 1/28/2019 100.00% 80.00% 0.00% 80.00%

Rising Main 700 mm DI K9 from Masani MPS to Masani STP

11/16/2018 12/24/2018 100.00% 80.00% 0.00% 80.00%

72.78%

53.67%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Overall progress - Masani Pipeline Works

Scheduled Actual completion till this month

Page 52: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 47 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Rising Main 300 mm DI K9 from Vrindavan Gate IPS to Masani MPS

11/16/2018 12/28/2018 100.00% 100.00% 0.00% 100.00%

Gravity Main 300 mm RCC NP3 from Shahganj Nalla

11/16/2018 12/18/2018 100.00% 100.00% 0.00% 100.00%

Gravity Main 400 mm RCC NP3 from Chakra Tirth nalla to Vrindavan Gate

11/16/2018 12/18/2018 100.00% 100.00% 0.00% 100.00%

9.2.7.2. Construction Works of Pipeline Works in Masani Zone

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Rising Main 200 mm DI K9 from Jaisinghpura MPS to Masani STP

1/29/2019 5/14/2020 100.00% 80.00% 0.00% 80.00%

83.43%100.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering & Detail DesignProgress -Masani Pipeline Works

Scheduled Actual completion till this month

Page 53: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 48 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Rising Main 700 mm DI K9 from Masani MPS to Masani STP

12/25/2018 6/14/2020 100.00% 80.00% 0.00% 80.00%

Rising Main 300 mm DI K9 from Vrindavan Gate IPS to Masani MPS

2/15/2019 5/14/2020 100.00% 100.00% 0.00% 100.00%

Gravity Main 300 mm RCC NP3 from Shahganj Nalla

2/15/2019 11/14/2019 100.00% 100.00% 0.00% 100.00%

Gravity Main 400 mm RCC NP3 from Chakra Tirth nalla to Vrindavan Gate

2/15/2019 11/14/2019 100.00% 100.00% 0.00% 100.00%

50.71%

72.09%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Progress - Construction works - Masani Pipeline Works

Scheduled Actual completion till this month

Page 54: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 49 Monthly Progress Report – September 2019

9.2.8. 6.8 MLD WSP

Overall physical progress of 6.8 MLD WSP

9.2.8.1. Basic Engineering Package & Detail Design of 6.8 MLD WSP

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

6.8 MLD STP Rehabilitation

9/23/2018 10/14/2020 96.61% 40.00% 0.00% 40.00%

52.30%49.87%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Overall progress - 6.8 MLD WSP

Scheduled Actual completion till this month

96.61%40.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Progress - Basic Engineering & Detail Design Package - 6.8 MLD WSP

Scheduled Actual completion till this month

Page 55: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 50 Monthly Progress Report – September 2019

9.2.8.2. Construction works of 6.8 MLD WSP

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Civil works 6/15/2019 4/14/2020 82.45% 70.42% 13.75% 84.17%

9.3. Trans Yamuna Zone 9.3.1. Trans-Yamuna TTP:

Overall physical progress of 20MLD TTRO

82.45%84.17%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Progress - Civil works - 6.8 MLD WSP

Scheduled Actual completion till this month

11.58%23.97%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Overall Progress - -TTRO

Scheduled Actual completion till this month

Page 56: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 51 Monthly Progress Report – September 2019

9.3.1.1. Basic Engineering Package and Detail Design of 20MLD TTRO

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

9/28/2018 10/28/2018 100.00% 82.80% 0.40% 83.20%

Design Detail Engineering

11/5/2018 10/14/2020 91.92% 52.35% 11.04% 63.39%

100.00%83.20%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - TTRO

Scheduled Actual completion till this month

91.92%63.39%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%90.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Detail Design Progress - TTRO

Scheduled Actual completion till this month

Page 57: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 52 Monthly Progress Report – September 2019

9.3.1.2. Civil Works of 20MLD TTRO

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 3/15/2019 10/14/2020 36.45% 16.00% 2.08% 18.08% Blending Tank/Treated Effluent Tank

7/15/2019 6/14/2020 15.78% 25.00% 25.00%

Disc filter platform 3/15/2019 8/14/2019 100.00% Wastewater backwash sump

5/15/2019 3/27/2020 33.40% 10.00% 10.00%

Ro Feed tank 4/15/2019 12/14/2019 75.15% 25.00% 25.60% Treated water tank 5/15/2019 3/14/2020 40.33% 25.00% 25.00% N Pit 7/15/2019 5/14/2020 19.29%

Admin, Building 4/15/2019 3/14/2020 47.69% 25.00% 12.00% 37.00% UF RO building 7/15/2019 6/14/2020 21.15% 25.00% 25.00% MCC Building , HT Room & PLC Room

9/15/2019 9/14/2020 2.50% 10.00% 16.05% 26.05%

Transformer yard 1/15/2020 7/14/2020 DG Room 1/15/2020 7/14/2020 Security cabin 1/15/2020 7/14/2020 Internal Road 4/15/2020 8/25/2020 Site grading 4/15/2020 10/14/2020 Boundary wall 4/15/2020 10/14/2020 Storm drain 4/15/2020 10/14/2020 Filtered water tank / UF feed tank

7/15/2019 6/14/2020

18.08%

36.45%

0.00%5.00%

10.00%15.00%20.00%25.00%30.00%35.00%40.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Civil Works Progress - TTRO

Scheduled Actual completion till this month

Page 58: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 53 Monthly Progress Report – September 2019

9.3.1.3. Mechanical Works of 20MLD TTRO

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Mechanical works

6/15/2019 9/14/2020 9.50% 6.47% 0.40% 6.87%

Filter Feed Pump With Motor

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Waste Water Transfer Pump With Motor

6/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00%

Ultrafiltration permeate pump

6/15/2019 9/14/2020 10.00% 6.00% 6.00%

RO Cleaning Pumps

6/15/2019 9/14/2020 10.00% 6.00% 6.00%

RO Feed Pump 6/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00% High Pressure Pump

6/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00%

UF Backwash Pump

6/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00%

Treated Water Transfer Pump

6/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00%

N-Pit Transfer Pump

6/15/2019 9/14/2020 10.00% 4.00% 4.00% 8.00%

Sulphuric Acid Dosing Pump With Motor

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Hypo Dosing Pump With Motor

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Citric Acid Dosing Pump With Motor

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

HCL Dosing Pump With Motor

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

SMBS Dosing Pump With Motor

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Antiscalent Dosing Pump With Motor

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

pH Dosing Pump With Motor

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Ultrafiltration Blower

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

DG Blower with motor

6/15/2019 9/14/2020 10.00% 6.00% 6.00%

Mixer For Citric Acid Dosing Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Page 59: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 54 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Mixer For SMBS Dosing Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Mixer For Antiscalent Dosing

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Mixer For pH Dosing Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

DI Pipes & Fittings

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

CPVC/UPVC Pipes & Fittings

6/15/2019 9/14/2020 10.00%

SS Pipes & Fittings

6/15/2019 9/14/2020 10.00%

HDPE Pipes & Fittings

6/15/2019 9/14/2020 10.00%

GI Pipes & Fittings

6/15/2019 9/14/2020 10.00%

Butterfly Valves 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Ball Valve 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Non-return Valve 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Globe Valve 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Sluice Gate 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Nonmetallic Valves

6/15/2019 9/14/2020 10.00% 6.00% 6.00%

Auto Valves 10/15/2019 9/14/2020 Fume Absorber 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Media for DG Tower

6/15/2019 9/14/2020 10.00% 8.00% 0.00% 8.00%

Chemicals 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Cartridges for RO 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Cartridges for RO CIP

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Compressor 10/15/2019 9/14/2020 Electric Hoist 10/15/2019 9/14/2020 Disc filter 6/15/2019 9/14/2020 10.00% 4.00% 2.00% 6.00% Ultrafiltration System (skid)

6/15/2019 9/14/2020 10.00%

Sulphuric Acid Dosing Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Hypo Dosing Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Citric Acid Dosing Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

HCL Dosing Tank 6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Page 60: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 55 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % SMBS Dosing Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Antiscalent Dosing Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

pH Dosing Tank 6/15/2019 9/14/2020 10.00% 8.00% 8.00% RO Cleaning Tank

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Cartridge Filter For RO CIP

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Cartridge Filter For RO

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

RO Skids 6/15/2019 9/14/2020 10.00% 8.00% 8.00% RO Pressure Tube

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

RO Membrane 6/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00% UF Membrane 6/15/2019 9/14/2020 10.00% 8.00% 8.00% DG Tower 6/15/2019 9/14/2020 10.00% 8.00% 8.00%

9.50%6.87%

0.00%1.00%2.00%3.00%4.00%5.00%6.00%7.00%8.00%9.00%

10.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical Works Progress - TTRO

Scheduled Actual completion till this month

Page 61: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 56 Monthly Progress Report – September 2019

9.3.1.4. Electrical Works of 20MLD TTRO

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical works

9/18/2018 10/14/2020 10.00% 1.80% 1.24% 3.04%

HT cable 8/15/2019 9/14/2020 10.00% HT Panel, VFD panel

8/15/2019 9/14/2020 10.00% 4.00% 4.00%

DG set 6/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00% PMCC cum AMF Panel.

8/15/2019 9/14/2020 10.00%

APFC Panel 8/15/2019 9/14/2020 10.00% Transformer 8/15/2019 9/14/2020 10.00% 6.00% 2.00% 8.00% LT Cable 8/15/2019 9/14/2020 10.00% LT motors 8/15/2019 9/14/2020 10.00% VFD Panel 8/15/2019 9/14/2020 10.00% Control Cables 6/15/2019 9/14/2020 10.00% Lighting fixtures

6/15/2019 9/14/2020 10.00% 8.00% 8.00%

Cable Trays 6/15/2019 9/14/2020 10.00% 8.00% 8.00% Earthing Material

6/15/2019 9/14/2020 10.00%

3.04%

10.00%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Electrical Works Progress - TTRO

Scheduled Actual completion till this month

Page 62: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 57 Monthly Progress Report – September 2019

9.3.1.5. Instrumentation works of 20MLD TTRO

Not scheduled until this month

9.3.2. Chintaharan IPS

Overall physical progress of Chintaharan IPS

9.3.2.1. Basic Engineering package & Design Detail Engineering of Chintaharan IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/16/2018 3/10/2019 100.00% 85.10% 0.00% 85.10%

Design Detail Engineering

1/1/2019 3/16/2019 94.74% 37.35% 11.52% 48.87%

64.43% 97.37%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Progress - Overall-Chintaharan IPS

Scheduled Actual completion till this month

Page 63: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 58 Monthly Progress Report – September 2019

9.3.2.2. Civil Works of Chintaharan IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 4/15/2019 2/14/2020 55.08% 0.00% 0.75% 0.75%

Rehabilitation of existing structure

4/15/2019 2/14/2020 55.08% 0.00% 0.75% 0.75%

85.10% 100.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - Chintaharan IPS

Scheduled Actual completion till this month

48.87%94.74%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%90.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Detail DesignProgress - Chintaharan IPS

Scheduled Actual completion till this month

Page 64: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 59 Monthly Progress Report – September 2019

9.3.2.3. Mechanical Works of Chintaharan IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Mechanical works 6/15/2019 10/14/2020 10.00% 6.93% 0.76% 7.70% Pumps 6/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Safety Equipment’s, Tools & Tackles and Misc. Items

6/15/2019 10/14/2020 10.00%

55.08%0.75%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil Works Progress - Chintaharan IPS

Scheduled Actual completion till this month

Page 65: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 60 Monthly Progress Report – September 2019

9.3.2.4. Electrical Works of Chintaharan IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical items 6/15/2019 7/14/2019 3.13% 2.50% 0.00% 2.50% DG 6/15/2019 10/14/2020 10.00% 8.00% 0.00% 8.00% Internal and external electrification

10/15/2019 10/14/2020

Power cable 10/15/2019 10/14/2020 LT panel 10/15/2019 10/14/2020 VFD starter 10/15/2019 10/14/2020 Earthing and Lightning

10/15/2019 10/14/2020

7.70% 10.00%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical Works Progress - Chintaharan IPS

Scheduled Actual completion till this month

Page 66: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 61 Monthly Progress Report – September 2019

9.3.2.5. Instrumentation works of Chintaharan IPS

Not scheduled until this month

9.3.3. Swamighat IPS

Overall physical progress of Swamighat IPS

2.50% 3.13%

0.00%

0.50%

1.00%

1.50%

2.00%

2.50%

3.00%

3.50%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Electrical Works Progress - Chintaharan IPS

Scheduled Actual completion till this month

63.46% 97.49%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall Progress - Swamighat IPS

Scheduled Actual completion till this month

Page 67: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 62 Monthly Progress Report – September 2019

9.3.3.1. Basic Engineering package & Detail Design of Swami Ghat IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/16/2018 3/10/2019 100.00% 83.40% 0.60% 84.00%

Design Detail Engineering

2/24/2019 5/14/2019 94.98% 36.65% 11.28% 47.93%

100.00%84.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - Swamighat IPS

Scheduled Actual completion till this month

47.93%94.98%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%90.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Detail Design Progress - Swamighat IPS

Scheduled Actual completion till this month

Page 68: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 63 Monthly Progress Report – September 2019

9.3.3.2. Civil Works of Swami Ghat IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 6/15/2019 4/14/2020 35.20% Rehabilitation of existing structure

6/15/2019 4/14/2020 35.20%

9.3.3.3. Mechanical Works of Swami Ghat IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Mechanical works

6/15/2019 10/14/2020 10.00% 6.93% 0.76% 7.70%

Pumps 6/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00%

0.00%

35.20%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil Works Progress - Swamighat IPS

Scheduled Actual completion till this month

Page 69: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 64 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Safety Equipment’s, Tools & Tackles and Misc. Items

6/15/2019 10/14/2020 10.00%

9.3.3.4. Electrical Works of Swami Ghat IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical items 6/15/2019 7/14/2019 3.13% 2.50% 2.50% DG 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Internal and external electrification

10/15/2019 10/14/2020

Power cable 10/15/2019 10/14/2020 LT panel 10/15/2019 10/14/2020 VFD starter 10/15/2019 10/14/2020 Earthing and Lightning

10/15/2019 10/14/2020

10.00%7.70%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical Works Progress - Swamighat IPS

Scheduled Actual completion till this month

Page 70: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 65 Monthly Progress Report – September 2019

9.3.3.5. Instrumentation Works of Swami Ghat IPS Not scheduled until this month

9.3.4. Bengali Ghat MPS

Overall physical Progress – Bengali Ghat MPS

2.50% 3.13%

0.00%

0.50%

1.00%

1.50%

2.00%

2.50%

3.00%

3.50%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Electrical Works Progress - Swamighat IPS

Scheduled Actual completion till this month

28.56%9.22%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall Progress - BengaliGhat MPS

Scheduled Actual completion till this month

Page 71: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 66 Monthly Progress Report – September 2019

9.3.4.1. Basic Engineering package & Design Detail Engineering of Bengali Ghat MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/27/2018 4/17/2019 100.00% 94.40% 0.00% 94.40%

Design Detail Engineering

12/14/2018 10/14/2020 86.40% 53.57% 4.10% 57.66%

100.00%94.40%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - BengaliGhat MPS

Scheduled Actual completion till this month

86.40%57.66%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%90.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Detail Design Engineering Progress -BengaliGhat MPS

Scheduled Actual completion till this month

Page 72: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 67 Monthly Progress Report – September 2019

9.3.4.2. Civil Works of Bengali Ghat MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 3/15/2019 8/14/2020 42.37% 2.89% 7.62% 10.51% Pump House receiving chamber & screen chamber & I&D

3/15/2019 4/14/2020 40.00%

Raw sewage pump house

4/15/2019 5/14/2020 35.00% 7.00% 7.00%

LT panel room 4/15/2019 12/14/2019 75.86%

Transformer yard 7/15/2019 2/14/2020 32.43%

DG room 5/15/2019 1/14/2020 52.74%

Security Cabin 5/15/2019 1/14/2020 52.74% 27.75% 49.45% 77.20% Boundary wall 5/15/2019 1/4/2020 52.77% 27.00% 27.00% Paver blocks 6/15/2020 8/14/2020 Staff quarters 12/15/2019 8/14/2020 Storm drain 6/15/2020 8/8/2020 Demolition of RCC structure

7/15/2019 8/14/2019 100.00% 50.00% 50.00%

Rehabilitation works 7/15/2019 3/14/2020 31.69%

42.37%7.62%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

45.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil Works Progress - BengaliGhat MPS

Scheduled Actual completion till this month

Page 73: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 68 Monthly Progress Report – September 2019

9.3.4.3. Mechanical Works of Bengali Ghat MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Mechanical works

6/15/2019 10/14/2020 10.00% 7.85% 7.85%

Pumps 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Safety Equipment’s, Tools & Tackles and Misc. Items

6/15/2019 10/14/2020 10.00%

7.85% 10.00%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Mechanical Works Progress - BengaliGhat MPS

Scheduled Actual completion till this month

Page 74: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 69 Monthly Progress Report – September 2019

9.3.4.4. Electrical Works of Bengali Ghat MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical items 6/15/2019 10/14/2020 2.78% 3.06% 3.06% DG 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Internal and external electrification

11/15/2019 10/14/2020

Power cable 11/15/2019 10/14/2020 LT panel 11/15/2019 10/14/2020 VFD starter 11/15/2019 10/14/2020 Earthing and Lightning

11/15/2019 10/14/2020

9.3.4.5. Instrumentation Works of Bengali Ghat MPS Not scheduled until this month

3.06%2.78%

0.00%

0.50%

1.00%

1.50%

2.00%

2.50%

3.00%

3.50%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Electrical Works Progress - BengaliGhat MPS

Scheduled Actual completion till this month

Page 75: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 70 Monthly Progress Report – September 2019

9.3.5. Cant IPS Overall physical progress of Cant IPS

9.3.5.1. Basic Engineering package & Detail Design of Cant IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

9/18/2018 3/10/2019 100.00% 85.00% 0.00% 85.00%

Design Detail Engineering

2/4/2019 4/24/2019 95.02% 35.85% 2.68% 38.52%

97.51%59.21%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall Progress - CantIPS

Scheduled Actual completion till this month

100.00%85.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Progress - CantIPS

Scheduled Actual completion till this month

Page 76: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 71 Monthly Progress Report – September 2019

9.3.5.2. Civil Works of Cant IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completio

n in %

Civil works 5/15/2019 3/14/2020 45.39% 2.00% 2.50% 4.50% Rehabilitation of existing structure

5/15/2019 3/14/2020 45.39% 2.00% 2.50% 4.50%

38.52%95.02%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%90.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Detail Design Progress - CantIPS

Scheduled Actual completion till this month

45.39%2.50%

0.00%5.00%

10.00%15.00%20.00%25.00%30.00%35.00%40.00%45.00%50.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil Works Progress - CantIPS

Scheduled Actual completion till this month

Page 77: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 72 Monthly Progress Report – September 2019

9.3.5.3. Mechanical Works of Cant IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Mechanical works

6/15/2019 10/14/2020 10.00% 6.93% 0.76% 7.70%

Pumps 6/15/2019 10/14/2020 10.00% 6.00% 2.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Safety Equipments, Tools & Tackles and Misc. Items

6/15/2019 10/14/2020 10.00%

10.00%7.70%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Mechanical Works Progress - CantIPS

Scheduled Actual completion till this month

Page 78: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 73 Monthly Progress Report – September 2019

9.3.5.4. Electrical Works of Cant IPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical items 6/15/2019 7/14/2019 2.78% 2.22% 2.22%

DG 6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Internal and external electrification

10/15/2019 10/14/2020

Power cable 10/15/2019 10/14/2020

LT panel 10/15/2019 10/14/2020

VFD starter 10/15/2019 10/14/2020

Earthing and Lightning

10/15/2019 10/14/2020

9.3.5.5. Instrumentation Works of Cant IPS

Not scheduled until this month

2.22% 2.78%

0.00%

0.50%

1.00%

1.50%

2.00%

2.50%

3.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Electrical Works Progress - CantIPS

Scheduled Actual completion till this month

Page 79: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 74 Monthly Progress Report – September 2019

9.3.6. Dairy Farm MPS

Overall physical progress of Dairy Farm MPS

9.3.6.1. Basic Engineering package & Design Detail Engineering of Dairy Farm MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/16/2018 3/10/2019 100.00% 80.60% 4.00% 84.60%

Design Detail Engineering

11/28/2018 3/14/2019 94.78% 33.57% 6.38% 39.96%

24.81% 27.35%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall Progress -DairyFarm MPS

Scheduled Actual completion till this month

Page 80: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 75 Monthly Progress Report – September 2019

9.3.6.2. Civil Works of Dairy Farm MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completio

n in %

Civil works 5/15/2019 3/15/2020 54.25% 60.00% 1.96% 61.96% Rehabilitation of existing structure

5/15/2019 3/14/2020 47.66% 0.00% 5.60% 5.60%

Boundary wall 5/15/2019 3/15/2020 45.13% 90.00% 0.00% 90.00% Demolition of RCC structure

5/15/2019 7/14/2019 100.00% 100.00% 0.00% 100.00%

84.60% 100.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering Package Progress - DairyFarm MPS

Scheduled Actual completion till this month

39.96%94.78%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%90.00%

100.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Detail DesignProgress - DairyFarm MPS

Scheduled Actual completion till this month

Page 81: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 76 Monthly Progress Report – September 2019

9.3.6.3. Mechanical Works of Dairy Farm MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Mechanical works

6/15/2019 10/14/2020 10.00% 7.70% 7.70%

Pumps 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Valves and Dismantling units

6/15/2019 10/14/2020 10.00% 8.00% 8.00%

Piping and Fittings 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Lifting Tackle 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Screen 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Gates 6/15/2019 10/14/2020 10.00% 8.00% 8.00% Safety Equipment’s, Tools & Tackles and Misc. Items

6/15/2019 10/14/2020 10.00%

61.96%54.25%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Civil Works Progress - DairyFarm MPS

Scheduled Actual completion till this month

Page 82: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 77 Monthly Progress Report – September 2019

9.3.6.4. Electrical Works of Dairy Farm MPS

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Electrical items 6/15/2019 7/14/2019 2.78% 3.61% 0.00% 3.61% DG 6/15/2019 10/14/2020 10.00% 8.00% 0.00% 8.00% Internal and external electrification

10/15/2019 10/14/2020

Power cable 10/15/2019 10/14/2020 LT panel 10/15/2019 10/14/2020 VFD starter 10/15/2019 10/14/2020 Earthing and Lightning

10/15/2019 10/14/2020

7.70% 10.00%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Mechanical Progress - DairyFarm MPS

Scheduled Actual completion till this month

3.61%

2.78%

0.00%0.50%1.00%1.50%2.00%2.50%3.00%3.50%4.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Electrical Works Progress - DairyFarm MPS

Scheduled Actual completion till this month

Page 83: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 78 Monthly Progress Report – September 2019

9.3.6.5. Instrumentation Works of Dairy Farm MPS

Not scheduled until this month

9.3.7. I&D of Trans Yamuna Zone

Overall physical progress of I&D of Trans Yamuna Zone

9.3.7.1. Basic Engineering package & Design Detail Engineering of I&D of Trans Yamuna Zone

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Interception and diversion structures

10/2/2018 6/14/2019 21.50% 3.70% 0.00% 3.70%

Satrangi nalla 10/2/2018 6/14/2019 96.25% 56.20% 4.00% 60.20% Basic Engineering Package

10/2/2018 2/15/2019 100.00% 70.40% 8.00% 78.40%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 42.00% 0.00% 42.00%

Ambakhar nalla 10/2/2018 6/14/2019 77.48% 30.90% 8.30% 39.20% Basic Engineering Package

12/31/2018 4/14/2019 100.00% 61.80% 16.60% 78.40%

25.03%

6.17%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Overall Progress - I&D

Scheduled Actual completion till this month

Page 84: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 79 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Design Detail Engineering

10/2/2018 6/14/2019 54.95% 0.00% 0.00% 0.00%

Dairy Farm nalla 10/2/2018 6/14/2019 51.25% 35.20% 8.20% 43.40% Basic Engineering Package

10/2/2018 2/15/2019 100.00% 70.40% 8.00% 78.40%

Design Detail Engineering

10/2/2018 6/14/2019 2.50% 0.00% 8.40% 8.40%

Cant IPS Nalla

10/2/2018 6/14/2019 25.00% 0.00% 0.00% 0.00%

Basic Engineering Package

10/2/2018 2/15/2019 51.25% 35.20% 10.30% 45.50%

Design Detail Engineering

10/2/2018 6/14/2019 2.50% 0.00% 12.60% 12.60%

Mahadev Ghat drain 10/2/2018 6/14/2019 51.25% 32.90% 10.50% 43.40% Basic Engineering Package

12/31/2018 4/14/2019 100.00% 65.80% 12.60% 78.40%

Design Detail Engineering

10/2/2018 6/14/2019 2.50% 0.00% 8.40% 8.40%

Dhruv Ghat drain 10/2/2018 6/14/2019 96.25% 30.90% 12.40% 43.30% Basic Engineering Package

12/31/2018 4/14/2019 100.00% 61.80% 8.00% 69.80%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 0.00% 16.80% 16.80%

Gaughat Nala 10/2/2018 6/14/2019 96.25% 35.20% 10.30% 45.50% Basic Engineering Package

12/31/2018 4/14/2019 100.00% 70.40% 8.00% 78.40%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 0.00% 12.60% 12.60%

Chintaharan Nala 10/2/2018 6/14/2019 96.25% 33.70% 8.20% 41.90% Basic Engineering Package

12/31/2018 4/14/2019 100.00% 67.40% 8.00% 75.40%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 0.00% 8.40% 8.40%

Daula Maula 10/2/2018 6/14/2019 96.25% 58.00% 4.00% 62.00% Basic Engineering Package

10/2/2018 2/15/2019 100.00% 70.40% 8.00% 78.40%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 45.60% 0.00% 45.60%

Ranighat Nala 10/2/2018 6/14/2019 96.25% 50.80% 4.00% 54.80%

Page 85: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 80 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic Engineering Package

10/2/2018 2/15/2019 100.00% 70.40% 8.00% 78.40%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 31.20% 0.00% 31.20%

Swami Ghat Nala 10/2/2018 6/14/2019 96.25% 50.80% 4.00% 54.80% Basic Engineering Package

10/2/2018 2/15/2019 100.00% 70.40% 8.00% 78.40%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 31.20% 0.00% 31.20%

Ashkunda Ghat Nala 10/2/2018 6/14/2019 96.25% 35.20% 4.00% 39.20% Basic Engineering Package

10/2/2018 2/15/2019 100.00% 70.40% 8.00% 78.40%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 0.00% 0.00% 0.00%

Vishram Ghat Nala 10/2/2018 6/14/2019 25.00% 0.00% 0.00% 0.00% Basic Engineering Package

10/2/2018 2/15/2019 96.25% 35.20% 4.00% 39.20%

Design Detail Engineering

10/2/2018 6/14/2019 92.50% 0.00% 0.00% 0.00%

Bengali Ghat Nala 10/2/2018 6/14/2019 77.48% 24.90% 6.30% 31.20% Basic Engineering Package

10/2/2018 2/15/2019 100.00% 49.80% 12.60% 62.40%

Design Detail Engineering

3/13/2019 6/14/2019 54.95% 0.00% 0.00% 0.00%

80.40%44.87%

0.00%10.00%20.00%30.00%40.00%50.00%60.00%70.00%80.00%90.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Basic Engineering & detail Design Progress - I&D

Scheduled Actual completion till this month

Page 86: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 81 Monthly Progress Report – September 2019

9.3.7.2. Civil works of I&D of Trans Yamuna Zone

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Civil works 6/15/2019 2/14/2020 35.83% 6.16% 6.16% Satrangi nalla 6/15/2019 10/14/2019 88.17% Ambakhar nalla 10/15/2019 2/14/2020 Dairy Farm nalla 1/15/2020 5/14/2020 Cant IPS Nalla 1/15/2020 5/14/2020 Mahadev Ghat drain 1/15/2020 5/14/2020 Dhruv Ghat drain 7/15/2019 11/14/2019 62.50% Gaughat Nala 7/15/2019 11/14/2019 62.50% Chintaharan Nala 7/15/2019 11/14/2019 62.50% Daula Maula 6/15/2019 10/14/2019 88.17% 93.25% 93.25% Ranighat Nala 6/15/2019 10/14/2019 88.17% 15.00% 15.00% Swami Ghat Nala 6/15/2019 10/14/2019 88.17% 15.00% 15.00% Ashkunda Ghat Nala 6/15/2019 10/14/2019 88.17% Vishram Ghat Nala 6/15/2019 10/14/2019 88.17% Bengali Ghat Nala 10/15/2019 2/14/2020

9.3.7.3. Mechanical works of I&D Structures

Not scheduled until this month

9.3.7.4. Electrical Works of I&D Structures

Not scheduled until this month

6.16%

35.83%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Civil Works Progress - I&D

Scheduled Actual completion till this month

Page 87: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 82 Monthly Progress Report – September 2019

9.3.7.5. Instrumentation Works of I&D Structures

Not scheduled until this month

9.3.8. Trans Yamuna 1 Facilities (14.5MLD WSP)

Overall physical progress of Trans Yamuna 1 Facilities (14.5MLD WSP)

9.3.8.1. Basic Engineering package & Design Detail Engineering of Trans Yamuna 1 Facilities (14.5MLD WSP)

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic engineering package and Design detail engineering -Trans Yamuna facilities 1 - 14.5 MLD WSP STP

2/13/2019 6/14/2019 75.88% 20.00% 0.00% 20.00%

32.83%23.22%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall Progress - TransYamuna 1

Scheduled Actual completion till this month

Page 88: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 83 Monthly Progress Report – September 2019

9.3.8.2. Construction works - Trans Yamuna 1 Facilities (14.5MLD WSP)

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 6/15/2019 4/14/2020 59.47% 50.00% 0.00% 50.00% Boundary wall 12/15/2019 4/14/2020 0.00% 0.00% 0.00% 0.00%

75.88%

20.00%

0.00%

10.00%

20.00%

30.00%

40.00%

50.00%

60.00%

70.00%

80.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

BEP & Detail Design Progress - TransYamuna 1

Scheduled Actual completion till this month

29.73%25.00%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Construction Works Progress - TransYamuna 1

Scheduled Actual completion till this month

Page 89: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 84 Monthly Progress Report – September 2019

9.3.8.3. Mechanical works of Trans Yamuna 1 Facilities (14.5MLD WSP)

Not scheduled until this month 9.3.8.4. Electrical Works of Trans Yamuna 1 Facilities (14.5MLD WSP)

Not scheduled until this month 9.3.8.5. Instrumentation Works of Trans Yamuna 1 Facilities (14.5MLD WSP)

Not scheduled until this month

9.3.9. Trans Yamuna 2 Facilities (16 MLD UASB)

Overall physical progress of Trans Yamuna 2 Facilities (16MLD UASB)

9.3.9.1. Basic & Design Detail engineering of Trans Yamuna 2 Facilities (16 MLD UASB)

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Basic engineering package and Design detail engineering - Trans Yamuna

11/16/2018 6/14/2019 100.00% 40.00% 0.00% 40.00%

35.16%6.67%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

40.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall Progress - TransYamuna 2

Scheduled Actual completion till this month

Page 90: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 85 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

facilities 2 - 16 MLD UASB STP

9.3.9.2. Civil Works of Trans Yamuna 2 Facilities (16MLD UASB)

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Civil works 5/15/2019 1/14/2020 50.03% 10.00% 0.00% 10.00% Boundary wall 7/15/2019 1/14/2020 27.89% 0.00% 0.00% 0.00%

100.00%40.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

BEP & Detail Design Progress - TransYamuna 2

Scheduled Actual completion till this month

30.02%5.00%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

30.00%

35.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14th July19

Jul-19 Aug-19 Sep-19

Construction Works Progress -TransYamuna 2

Scheduled Actual completion till this month

Page 91: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 86 Monthly Progress Report – September 2019

9.3.9.3. Mechanical works of Trans Yamuna 2 Facilities (16MLD UASB)

Not scheduled until this month

9.3.9.4. Electrical Works of Trans Yamuna 2 Facilities (16MLD UASB)

Not scheduled until this month 9.3.9.5. Instrumentation Works of Trans Yamuna 2 Facilities (16MLD UASB)

Not scheduled until this month

9.3.10. Pipeline works - Trans Yamuna Zone

Overall physical progress of Pipeline works at Trans Yamuna Zone

9.3.10.1. BEP & Detail design of Pipeline works of Trans Yamuna Zone

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Pipe line in Trans Yamuna Zone

4/2/2019 6/14/2019 100.00% 13.95% 56.25% 70.20%

18.94%

19.52%

0.00%

5.00%

10.00%

15.00%

20.00%

25.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Overall Progress -Pipeline Works

Scheduled Actual completion till this month

Page 92: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 87 Monthly Progress Report – September 2019

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in % Gravity Main 1000 mm RCC NP3 from Ambakhar nalla

4/2/2019 6/14/2019 100.00% 0.00% 80.00% 80.00%

Gravity Main 400 mm RCC NP3 near Dairy Farm MPS

4/2/2019 6/14/2019 100.00% 0.00% 0.00% 0.00%

Rising Main 500 mm DI K9 from Bengali Ghat MPS to Trans-Yamuna 1 STP and Trans-Yamuna 2 STP

4/2/2019 6/14/2019 100.00% 0.00% 80.00% 80.00%

Rising Main 500 mm DI K9 from Dairy farm MPS to the existing manhole of sewer line at Trans Yamuna

4/2/2019 6/14/2019 100.00% 0.00% 80.00% 80.00%

Rising Main 300 mm DI K9 from Cant IPS to collection chamber/sewer manhole near Dairy Farm MPS

4/2/2019 6/14/2019 100.00% 60.00% 0.00% 60.00%

Gravity Main 600 mm RCC from sewer manhole (Mahadevghat) to Dairy Farm MPS

4/2/2019 6/14/2019 100.00% 0.00% 80.00% 80.00%

Gravity/ Rising Main 300-1000 mm from Swamighat IPS to Bengali Ghat MPS

4/2/2019 6/14/2019 100.00% 60.00% 20.00% 80.00%

Gravity/ Rising Main 300-1000 mm from Chintaharan IPS to Bengali Ghat MPS

4/2/2019 6/14/2019 100.00% 60.00% 0.00% 60.00%

Gravity Main 300/500 mm Diversion from Dairy Farm drain

4/2/2019 6/14/2019 100.00% 0.00% 60.00% 60.00%

Page 93: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 88 Monthly Progress Report – September 2019

9.3.10.2. Construction of Pipeline works at Trans Yamuna Zone

Item of work

As per schedule Physical status

Proposed Date

Completed Date

Scheduled completion

in %

Previous month

completion in %

Completion during this month in %

Total completion

in %

Pipe laying in Trans Yamuna zone

6/3/2019 10/14/2020 14.39% 6.39% 9.29% 15.67%

Gravity Main 1000 mm RCC NP3 from Ambakhar nalla

6/3/2019 3/14/2020 44.41% 62.30% 62.30%

Gravity Main 400 mm RCC NP3 near Dairy Farm MPS

11/3/2019 7/14/2020 5.00% 5.00%

Rising Main 500 mm DI K9 from Bengali Ghat MPS to Trans-Yamuna 1 STP and Trans-Yamuna 2 STP

7/4/2019 4/14/2020 29.14% 60.90% 60.90%

Rising Main 500 mm DI K9 from Dairy farm MPS to the existing manhole of sewer line at Trans Yamuna

8/4/2019 5/14/2020 15.92%

Rising Main 300 mm DI K9 from Cant IPS to collection chamber/sewer manhole near Dairy Farm MPS

10/4/2019 7/14/2020

Gravity Main 600 mm RCC from sewer manhole

8/4/2019 10/14/2020 12.97%

70.20% 100.00%

0.00%

20.00%

40.00%

60.00%

80.00%

100.00%

120.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Basic Engineering & Detail Design Progress -Pipeline

Scheduled Actual completion till this month

Page 94: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 89 Monthly Progress Report – September 2019

(Mahadevghat) to Dairy Farm MPS

Gravity/ Rising Main 300-1000 mm from Swamighat IPS to Bengali Ghat MPS

8/4/2019 5/14/2020 15.92%

Gravity/ Rising Main 300-1000 mm from Chintaharan IPS to Bengali Ghat MPS

1/4/2020 10/14/2020

Gravity Main 300/500 mm Diversion from Dairy Farm drain

11/3/2019 8/14/2020

10. The issues, the action taken, and status for the observations made in Site order

book Sl. No

Date of observation

Observation Made by Action taken Remarks

1 05.04.19 Source approval of construction material not obtained from UPJN

MACE Quarry visit has been done. Materials are sent for testing. Official approval letter yet to be provided by UPJN

2 08.04.19 Raw material like 20mm/10mm/ sand quarry needs to inspect

MACE Quarry visit (Rajasthan) has been

Complied

15.67%

14.39%

0.00%

2.00%

4.00%

6.00%

8.00%

10.00%

12.00%

14.00%

16.00%

18.00%

Jan-19 Feb-19 Mar-19 Apr-19 May-19 Jun-19 14thJuly 19

Jul-19 Aug-19 Sep-19

Construction Woks Progress - Pipeline

Scheduled Actual completion till this month

Page 95: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 90 Monthly Progress Report – September 2019

Sl. No

Date of observation

Observation Made by Action taken Remarks

prior to start of construction works (PCC/RCC)

done. Materials are sent for testing

Page 96: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 91 Monthly Progress Report – September 2019

Site layout-30.00MLD STP Masani

Page 97: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 92 Monthly Progress Report – September 2019

Site layout-20.00MLD TTP Trans Yamuna

Page 98: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 93 Monthly Progress Report – September 2019

Project Engineer Activities Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

4.1 (i) Review, analysis and qualifying assessment of field investigations carried out and reported by the Concessionaire in respect of topographical surveys, hydraulic & hydrologic data verification, sub-surface investigation including laboratory testing and reports of geologists wherever applicable, investigation of construction material including lab testing.

Yes Yes Review of construction material testing, Methodology for ensuring interim availability

4.1 (ii) Review, analysis and qualifying assessment of design memorandums, specifications and construction drawings prepared and submitted by the concessionaire.

Yes Yes Review of construction drawings

4.1 (iii) Conduct kick off meetings Yes Yes Monthly review meeting and weekly meetings conducted

4.1 (iv) Review of the submissions of the Concessionaire such as a. Work schedule b. Detailed survey report c. Basic engineering d. Detailed design and

drawings for i) Civil works

1. Geo-tech reports 2. Lab testing reports 3. Third Party

Inspection report ii) Mechanical & Electrical

Works

Yes Yes • Delay analysis • Remaining GA &

structural drawings of civil structures

Page 99: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 94 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

iii) Automation & Instrumentation works

iv) Any other allied works e. QA/QC plans f. Environment Health and

Safety Plan, material safety data and hazardous chemicals if any.

4.1 (v) Review of the drawings and documents

Yes Yes As mentioned above

4.1 (vi) Identification of Construction Milestones & Project progress monitoring and issue of Milestone Construction Certificates, Construction Completion Certificate, monitoring Trail run, recommendations for issuance of COD certificate by Jal Nigam etc..

Regular review and monitoring

Regular review and monitoring and issuance of first

milestone completion certificate

Regular review and monitoring and issue of 2nd

milestone completion certificate

4.1 (vii) To Assist NMCG for getting statutory permissions

NA NA

4.1 (viii) Ensure compliance with statutory provisions under various applicable laws

NA NA

4.1 (ix) Review, inspection, supervision and monitoring of construction works conducting tests on completion of construction and issuing completion / provisional certificate

Yes Yes Yes

4.1 (x) Review, inspection and monitoring of O&M

Yes Yes Yes

4.1 (xi) Determining, as required under the Concession Agreement, the costs of any works or services and/or their reasonableness

NA NA NA

4.1 (xii) Determining, as required under the Concession Agreement, the

NA NA NA

Page 100: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 95 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

period or any extension thereof, for performing any duty or obligation

4.1 (xiii) Determining the events of default and guidance on consequent termination notices and payment as detailed in clauses 16.1 to 16.5 of the Concession Agreement

NA NA NA

4.1 (xiv) Determine deficiencies in the commissioning & trial runs; prepare the final acceptance document for acceptance of commissioning & trial runs. Prepare & Issue Commercial Operation certificate through Uttar Pradesh Jal Nigam

NA NA NA

4.1 (xv) Any other matter which is not specified in ((vi), (vii), or (viii) above and which creates an obligation or liability on the Employer / NMCG beyond the provisions of the Concession Agreement

NA NA NA

Ensuring Interim Availability of the existing Facilities during construction period and certifying Scheduled Outages during Scheduled Maintenance.

Yes Yes Yes

4.1 (xvi) The Project Engineer shall submit regular periodic reports, as specified in the Concession Agreement to Uttar Pradesh Jal Nigam and NMCG, in respect of its duties and functions under the Concession Agreement

Yes Yes Yes

4.1 (xvii)

The Project Engineer shall aid and advise the Employer on any

NA NA NA

Page 101: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 96 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

proposal for variation under Article 20 of the Concession Agreement

4.1 (xviii)

Assisting the Parties in resolution of Disputes

NA NA NA

4.1 (xix) Assisting the employer in the fulfilment of Hand back requirements as detailed in clause 19.3 of the Concession Agreement

NA NA NA

4.1 (xx) Undertaking all other duties and functions in accordance with this agreement

Yes Yes Yes

4.2 The Project Engineer shall discharge its duties in an efficient manner, consistent with the highest standards of professionalism and Good Industry Practice

Yes Yes Yes

4.3(i) The Project Engineer must function in a manner to assist & equip the employer to ascertain that the Concessionaire shall operate and maintain the Facilities and the Associated Infrastructure in a manner that: Is in compliance with the Technical Specifications, Applicable Laws, Applicable Permits and Good Industry Practice.

Yes Yes Yes

4.3 (ii) Results in the Facilities and the Associated Infrastructure achieving the KPIs as detailed in schedule 10 of the Concession Agreement & certify within 7 days the KPI adherence Report as per

NA NA NA

Page 102: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 97 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

clause 8.12 of the Concession Agreement;

4.3(iii) Ensures that the Mathura STP are capable of treating Sewage up to the Design Capacity on a daily basis;

Yes Yes Yes

4.3(iv) Ensures efficient treatment of Sewage and handling and disposal of STP By- Products and the Treated Effluent

Yes Yes Yes

4.3(v) STPs and TTP are safe and reliable, subject to normal wear and tear of the Facilities and the Associated Infrastructure;

Yes Yes Yes

4.3(vi) Is in compliance with the technology license agreement executed by the Concessionaire for the technology, processes, know-how and systems used or incorporated into the Facilities and/or the Associated Infrastructure

Yes NA NA

4.3(vii) Maintains the safety and security of personnel, material and property at the Site, in accordance with the approved EHS Plan, Applicable Laws and Applicable Permits.

Yes Yes Yes

4.3(viii) Ensures that all waste materials and hazardous substances are stored and/or disposed in accordance with the EHS Plan, Applicable Laws and Applicable Permits.

Yes Yes Yes

4.4 Overall, The Project Engineer shall assist the Uttar Pradesh Jal

Yes Yes Yes

Page 103: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 98 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

Nigam in supervising the construction, rehabilitation, operation & maintenance of the Facilities and the Associated Infrastructure and shall work closely with the Uttar Pradesh Jal Nigam and NMCG to monitor compliance with the KPIs.

5.1 During the Development Period, the Project Engineer shall undertake a detailed review of the basic engineering Designs, furnished by the Concessionaire along with supporting data, including the geo-technical and hydrological investigations, characteristics of materials from borrow areas and quarry sites, topographical surveys and Sewage Flow Analysis. The Project Engineer shall complete such review and send its comments / observations to the NMCG / Name of the Employer (i.e. State Institution) and the Concessionaire within 10 (ten) days of receipt of such Drawings. In particular, such comments shall specify the conformity or otherwise of such Drawings with the Scope of the Project and Specifications and Standards

Yes Yes Review of construction

drawings and other engineering

drawings and document to be

submitted by concessionaire

5.2 The Project Engineer shall review and assist the U P J N in approval of the submissions by the concessionaire relating to the “design and Construction Plan” so as to confirm to the

Yes Yes Yes

Page 104: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 99 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

scope as per Schedule 1 of the Concession Agreement.

5.3 The basic engineering drawings in the above case shall mean the designs and documents to be submitted by the Concessionaire & approved by the Uttar Pradesh Jal Nigam as a Condition Precedent & shall include but not limited to: a) Conduct kick off meeting,

scrutiny of contractors submittals

b) Process description, process calculations and hydraulic calculations;

c) List of design codes and standards;

d) Master drawing schedule; e) Drainage design; f) STP Facilities layout; g) Process flow diagram; h) Hydraulic flow diagram; i) Mass balance diagram; j) Process and instrumentation

diagram; k) Single line diagram; l) Electrical load list; and m) Structure design and

drawings n) Pump Characteristics and o) General arrangement

diagrams of all units of Facilities and;

p) Any other information, design, drawings, etc. needed for effective

Yes Yes Yes

Page 105: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 100 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

development/rehabilitation and operation of Facilities.

5.4 The project engineer shall review any modified Drawings or supporting documents sent to it by the Concessionaire and furnish its comments within 10 (ten) days of receiving such drawings or documents.

Yes Yes Yes

5.5 The project engineer shall review the detailed design, construction methodology, quality assurance procedures and the procurement, engineering and construction time schedule sent to it by the Concessionaire and furnish its comments within 10 (ten) days of receipt thereof.

Yes Yes Yes

5.6 Upon reference by the NMCG/Uttar Pradesh Jal Nigam, the Project Engineer shall review and; comment on the EPC Contract or any other contract for construction, operation and maintenance of the Project, and furnish its comments within 10 (ten) days from receipt of such reference from the NMCG/Uttar Pradesh Jal Nigam.

NA NA NA

6.1 In respect of the designs drawing & documents received by the project engineer for its review and comments during the construction period, the provisions of paragraph 4 shall also apply, mutatis mutandis

Yes Yes Yes

Page 106: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 101 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

6.2 The Project Engineer shall review, and assist the Uttar Pradesh Jal Nigam in reviewing the submissions by the concessionaire, the Construction plan as defined in clause 8.3, and 8.4, of the Concession Agreement including Phase 1 and Phase II Design and Drawings, as well as the ‘As Built’ drawings on completion and EHS plans as defined in clause 8.5 of the Concession Agreement.

Yes Yes Yes

6.3 The Project Engineer shall assist the Uttar Pradesh Jal Nigam submit their comments on effectiveness or otherwise of the Work plan submitted for meeting the specified payment milestones and completion of the work on or before the scheduled construction completion date

Yes Yes Yes

6.4 The Project Engineer shall review in particular, the submissions by the Concessionaire as per Schedule 1 of the Concession Agreement, and assist Uttar Pradesh Jal Nigam in assessing the effectiveness them

Yes Yes Yes

6.5 The Project Engineer shall review the monthly progress report furnished by the Concessionaire and send its comments thereon to the NMCG/ Uttar Pradesh Jal Nigam and the Concessionaire within 7 (seven) days of receipt of such report

Yes Yes

Yes

Page 107: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 102 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

6.6 The Project Engineer shall inspect the Construction Works and the Project as and when necessary and submit a report of such inspection (the “Inspection Report”), preferably after receipt of the monthly progress report from the Concessionaire, but before the 20th (twentieth) day of each month in any case. The report shall contain, an overview of the status, progress, quality and safety of construction, including the work methodology adopted, the materials used and their sources, and conformity of Construction Works with the Scope of the Project and the Specifications and Standards. In a separate section of the Inspection Report, the Project Engineer shall describe in reasonable detail the lapses, defects or deficiencies observed by it in the construction of the Project. The Project Engineer shall send a copy of its Inspection Report to the NMCG/ Uttar Pradesh Jal Nigam and the Concessionaire within 3 (three) days of the inspection

Yes Yes Yes

6.7 However serious lapses, defects and/or deficiencies shall be reported to the Uttar Pradesh Jal Nigam/NMCG immediately without waiting for the monthly progress submissions as

Yes Yes Yes

Page 108: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 103 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

mentioned in the previous paragraph

6.8 For determining that the Construction Works conform to Specifications and Standards, the Project Engineer shall require the Concessionaire to carry out, or cause to be carried out, tests on a sample basis, to be specified by the Project Engineer in accordance with approved norms/Good Industry Practice for quality assurance. The Project Engineer shall issue necessary directions to the Concessionaire for ensuring that the tests are conducted in a fair and efficient manner, and shall monitor and review the results thereof

Yes Yes Yes

6.9 The timing of tests referred to in Paragraph 6.8, and the criteria for acceptance/ rejection of their results shall be determined by the Project Engineer in accordance with the norms /rules and Good Industry Practice. The tests shall be undertaken on a random sample basis and shall be in addition to, and independent of, the tests that may be carried out by the Concessionaire for its own quality assurance in accordance with Good Industry Practice

Yes Yes Yes

6.10 In the event that the Concessionaire carries out any remedial works for removal or rectification of any defects or deficiencies, the Project Engineer

NA YES Yes

Page 109: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 104 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

shall require the Concessionaire to carry out, or cause to be carried out, tests to determine that such remedial works have brought the Construction Works into conformity with the Specifications and Standards, and the provisions of this Paragraph 5 shall apply to such tests

6.11 In the event that the Concessionaire fails to achieve any of the Project Milestones, the Project Engineer shall undertake a review of the progress of construction and identify potential delays, if any. If the Project Engineer identifies that completion of the Project is not feasible within the time specified in the Concession Agreement, it shall require the Concessionaire to indicate within 15 (fifteen) days the steps proposed to be taken to expedite progress, and the period within which COD shall be achieved. Upon receipt of a report from the Concessionaire, the Project Engineer shall review the same and send its comments to the NMCG/ Uttar Pradesh Jal Nigam and the Concessionaire forthwith.

NA NA NA

6.12 If at any time during the construction period, the Project Engineer determines that the Concessionaire has not made adequate arrangements for the safety of workers and common

NA Yes

Page 110: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 105 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

public in the zone of construction or that any work is being carried out in a manner that threatens the safety of the workers and the common public, it shall make a recommendation to the NMCG/ Uttar Pradesh Jal Nigam forthwith, identifying the whole or part of the Construction Works that should be suspended for ensuring safety in respect thereof.

6.13 In the event that the Concessionaire carries out any remedial measures to secure the safety of suspended works and common public, it may, by notice in writing, require the Project Engineer to inspect such works, and within 3 (three) days of receiving such notice, the Project Engineer shall inspect the suspended works and make a report to the NMCG/ Uttar Pradesh Jal Nigam forthwith, recommending whether or not such suspension may be revoked by the NMCG/ Uttar Pradesh Jal Nigam.

NA NA

6.14 If suspension of Construction Works is for reasons not attributable to the Concessionaire, the Project Engineer shall determine the extension of dates set forth in the project completion schedule, to which the Concessionaire is reasonably entitled, and shall notify the NMCG/ Uttar Pradesh

NA NA

Page 111: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 106 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

Jal Nigam and the Concessionaire of the same

6.15 Upon reference from the NMCG/ Uttar Pradesh Jal Nigam, the Project Engineer shall make a fair and reasonable assessment of the costs of providing information, works and services and certify the reasonableness of such costs for payment by the NMCG/ Uttar Pradesh Jal Nigam to the Concessionaire

NA NA

6.16 The Project Engineer shall aid and advise the Concessionaire in preparing the Operation & Maintenance Manual

NA NA

6.17 Upon reference from the NMCG/ Uttar Pradesh Jal Nigam the Project Engineer shall undertake the assessment of cost of civil works, as per applicable schedule of rates, for the reduction of Scope of work if any as per Article 21.

NA NA

6.18 The Project Engineer shall review the construction progress as per payment milestones proposed by the concessionaire and provide necessary recommendation/s to Uttar Pradesh Jal Nigam for issuance of ‘Milestone Construction Certificates’

NA NA

6.19 The Project Engineer shall support the employer in ensuring that the provisions specified in Clause 8, of the Concession Agreement including those for

Yes NA Yes

Page 112: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 107 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

liquidated damages and Bonus, are being complied with

6.20 On completion of construction and at behest of Employer, the Project Engineer may review the work done as per ‘as built’ drawings and identify defects and suggest changes as per clause 8.14(a) (v) (v) of the Concession Agreement.

NA NA

6.21 Similarly, the Project Engineer may inspect the trial process and may point out the defects and cause changes or retrial of the process as per clause 8.15(d) of the Concession Agreement.

NA NA

6.22 Project Engineer shall ensure that the Concessionaire shall meet the Guaranteed Interim Availability of the existing Mathura STP and associated infrastructure within 30 days from the Effective Date of the Concession Agreement.

Yes Yes Yes

6.23 Project Engineer shall also ensure that the STP by-products and Treated Effluents discharged from the Existing Facilities meet the relevant Discharge Standards in accordance with the Clause 9.12(c) of the Concession Agreement, from 1 year from the Effective Date.

NA NA NA

7.1 In respect of the Designs, Drawings, and Documents received by the Project Engineer for its review and comments during the Operation Period, the

NA NA

Page 113: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 108 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

provisions of Paragraph 4 shall apply, mutatis mutandis

7.2 The Project Engineer shall review the O&M Manual (Clause 9.2) and the Scheduled Maintenance Programme submitted by the concessionaire and provide its recommendations on the same, including suggestions for change, if any. The O&M Manual shall cover:

a) O&M Procedures; b) O&M Plan; c) Provision of Spare Parts; d) Sampling and Testing

Methodologies; e) Storage and control of

Inventory; f) Arrangements for data

security and Integrity; g) Procedures for recording

and disposal of complaints;

h) Operational Contingencies Plans;

i) Human Resources Plans; j) EHS Plans; k) Emergency procedures; l) Management of Assets

Plans. And m) Annual Scheduled

Maintenance programme.

NA NA

7.3 The Project Engineer shall review the annual Maintenance Program furnished by the Concessionaire and send its comments thereon to the NMCG/ Uttar Pradesh Jal

NA NA

Page 114: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 109 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

Nigam and the Concessionaire within 10 (ten) days of receipt of the Maintenance Program

7.4 The Project Engineer shall review the reports generated from online monitoring systems to assess adherence to KPIs and submit the monthly KPI Adherence Report to Uttar Pradesh Jal Nigam

NA NA

7.5 The Project Engineer shall verify the daily reports submitted by the concessionaire regarding the volume of sewage and its quality re influent standards and monitor and record the same on regular basis

Yes Yes yes

7.6 The Project Engineer shall monitor, review and advise the Uttar Pradesh Jal Nigam on the reports submitted by the concessionaire as per clause 9.8(b) (iii) (A) to (G) of the Concession Agreement.

NA NA

7.7 The Project Engineer shall regularly verify the report submitted by the concessionaire on the tests conducted at the Inlet Point, the Outlet Point or at any other point at the Mathura STP for the Digested Sludge. Separately, the Project Engineer shall also have the right to take random samples of the incoming Sewage, the Digested Sludge and the Treated Effluent at any time during the O&M Period to test compliance with the Influent

NA NA

Page 115: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 110 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

Standards and the Discharge Standards.

7.8 The Project Engineer shall review the monthly status report furnished by the Schedule-2: Form of Agreement 55 Concessionaire (as required under clause 9.8(b) (iii) (E) of the Concession Agreement) and send its comments thereon to the NMCG/ Uttar Pradesh Jal Nigam and the Concessionaire within 7 (seven) days of receipt of such report.

NA NA

7.9 The Project Engineer shall inspect the Project once every month, preferably after receipt of the monthly status report from the Concessionaire, but before the 20th (twentieth) day of each month in any case, and make out an O&M Inspection Report setting forth an overview of the status, quality and safety of O&M including its conformity with the Maintenance Requirements and Safety Requirements. In a separate section of the O&M Inspection Report, the Project Engineer shall describe in reasonable detail the lapses, defects or deficiencies observed by it in O&M of the Project. The Project Engineer shall send a copy of its O&M Inspection Report to the NMCG/ Uttar Pradesh Jal Nigam and the Concessionaire

NA NA

Page 116: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 111 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

within 7 (seven) days of the inspection

7.10 The Project Engineer may inspect the project more than once in a month, if any lapses, defects or deficiencies require such inspections.

NA NA

7.11 The Project Engineer shall in its O&M Inspection Report specify the tests, if any, that the Concessionaire shall carry out, or cause to be carried out, for the purpose of determining that the project is in conformity with the Maintenance Requirements. It shall monitor and review the results of such tests and the remedial measures, if any, taken by the Concessionaire in this behalf.

NA NA

7.12 The Project Engineer shall determine if any delay has occurred in completion of repair or remedial works in accordance with the Concession Agreement, and shall also determine the Damages, if any, payable by the Concessionaire to the NMCG/ Uttar Pradesh Jal Nigam for such delay.

NA NA

7.13 The Project Engineer shall monitor and review the curing of defects and deficiencies by the Concessionaire.

NA NA

7.14 In the event that the Concessionaire notifies the Project Engineer of any

NA NA

Page 117: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 112 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

modifications that it proposes to make to the project, the Project Engineer shall review the same and send its comments to the NMCG/ Uttar Pradesh Jal Nigam and the Concessionaire within 15 (fifteen) days of receiving the proposal.

7.15 The Project Engineer shall undertake sewage flow sampling, as and when required by the NMCG/ Uttar Pradesh Jal Nigam, under and in accordance with the provisions of this agreement

NA NA

7.16 The Project Engineer shall review and report to the employer on all the reports (Daily, Monthly, Quarterly and Annual), including monthly Environmental Monitoring Reports as detailed in Schedule 11(Part G) of the Concession Agreement.

NA NA

7.17 The Project Engineer shall provide necessary training/capacity building to the operators/technicians of the STP, as and when required, so as to address the gap in skill sets of the manpower deployed by the Concessionaire

NA Yes

9.1 The Project Engineer shall determine the costs, and/or their reasonableness, that are required to be determined by it under the Concession Agreement

NA NA

9.2 The Project Engineer shall determine the period, or any

NA NA

Page 118: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 113 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

extension thereof, that is required to be determined by it under the Concession Agreement

10.1 When called upon by either Party in the event of any Dispute, the Project Engineer shall mediate and assist the Parties in arriving at an amicable settlement

NA NA

10.2 In the event of any disagreement between the Parties regarding the meaning, scope and nature of Good Industry Practice, as set forth in any provision of the Concession Agreement, the Project Engineer shall specify such meaning, scope and nature by issuing a reasoned written statement relying on good industry practice and authentic literature

NA NA

11 As and when requested by NMCG/ Uttar Pradesh Jal Nigam, the Project Engineer shall provide its opinion and assessment on the events related to Emergency, Change in Law, Force Major, Minor or total Casualties, Variation and unforeseen Site conditions etc.

NA NA

12.1 The Project Engineer shall notify its programme of inspection to the NMCG/ Uttar Pradesh Jal Nigam and to the Concessionaire, who may, in their discretion, depute their respective representatives to be present during the inspection.

NA NA NA

Page 119: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 114 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

12.2 A copy of all communications, comments, instructions, Drawings or Documents sent by the Project Engineer to the Concessionaire pursuant to this TOR, and a copy of all the test results with comments of the Project Engineer thereon shall be furnished to the NMCG/ Uttar Pradesh Jal Nigam forthwith.

Yes Yes Yes

12.3 The Project Engineer shall retain at least one copy each of all Drawings and Documents received by it, including ‘as-built’ Drawings, and keep them in its safe custody.

Yes Yes Yes

12.4 Upon completion of its assignment hereunder, the Project Engineer shall duly classify and list all Drawings, Documents, results of tests and other relevant records, and hand them over to the NMCG/ Uttar Pradesh Jal Nigam or such other person as the NMCG/ Uttar Pradesh Jal Nigam may specify, and obtain written receipt thereof. Two copies of the said documents shall also be furnished in their editable digital format or in such other medium or manner as may be acceptable to the NMCG/Uttar Pradesh Jal Nigam

Yes Yes Yes

12.5 Wherever no period has been specified for delivery of services by the Project Engineer, the Project Engineer shall act with the efficiency and urgency necessary

Yes Yes Yes

Page 120: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 115 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

for discharging its functions in accordance with Good Industry Practice.

12.6 Project Engineers shall be expected to fully comply with all the provisions of the “Terms of Reference”, and shall be fully responsible for supervising the Design, Construction and maintenance and operation of the Facility in accordance with the provisions of the Concession Agreement and other schedules. Any failure of the Project Engineer in notifying to the Employer and the Concessionaire on non- compliance of the provisions of the Concession Agreement and other schedules by the Concessionaire, non-adherence to the provision of this ToR and non-adherence to the time schedule prescribed under this ToR shall amount to non-performance.

Yes Yes Yes

12.7 The project Engineer shall develop & maintain a project website and with the approval of NMCG/UPJN post from time to time, information (textual and Audio- Visual) on project progress on a continuous basis. On completion of services as per this RFP document, the website with all necessary technical information shall be handed over to UPJN.

The Website will be launched by

1st week of October 2019

Yes

Page 121: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 116 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

14.1 Uttar Pradesh Jal Nigam may review with the Project Engineer, any or all of the documents and advice forming part of the Consultancy, in meetings and conferences which will be held at the office of the Uttar Pradesh Jal Nigam / NMCG. Uttar Pradesh Jal Nigam / NMCG may, in its discretion, require the Project Engineer to participate in extended meetings and/ or work from the offices of Uttar Pradesh Jal Nigam /NMCG and the Project Engineer shall, on a best endeavor basis and without unreasonable delay, provide such services at the offices of the Uttar Pradesh Jal Nigam/NMCG.

Yes Yes Yes

15.1 The Project Engineer may prepare Issue Papers highlighting issues that could become critical for the timely completion of the Project and that require attention from Uttar Pradesh Jal Nigam/NMCG. The Project Engineer shall report to UPJN for routine activities and deliverables. All major and critical issues shall be reported to NMCG and UPJN simultaneously.

Yes Yes Yes

15.2 The Project Engineer will make a presentation on the inception report for discussion with the Uttar Pradesh Jal Nigam / NMCG at a meeting. This will be a working document. Regular communication with Uttar

Yes Yes Yes

Page 122: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 117 Monthly Progress Report – September 2019

Activities carried out as per TOR

Clause as per TOR

Scope

Period: October 2018 to March 2019 Undertaken till previous

month – August 2019

Undertaken during this month –

September 2019

Expected for next month October

2019

Pradesh Jal Nigam / NMCG is required in addition to all key communications. This may take the form of telephone/ teleconferencing, emails, and occasional meetings.

15.3 The Deliverables will be submitted as per schedule provided in this RFP

Yes Yes Yes

11. Meetings

Project Engineer undertaken and planned services during this month.

Sl. No.

Agenda of the Meeting Undertaken by Date Venue

Minutes of the meeting

No. 1 Monthly Review

Meeting 1. Mr. K.G.Singh, GM,UPJN 2. Mr. Srinivasan, Project

Manager, MACE 3. Mr. A.N.Singh, COO,

MWMPL

8th July 2019 Office of the 30 MLD

STP, Mathura

2 Review Meeting 1. Shri. D. P. Mathura, Executive Director (Technical), NMCG

2. Mr. K. G. Singh GM, UPJN Agra

3. Mr. Amit Ghosh, PM, MACE

4. Mr. A. N. Singh COO, MWMPL

28th August 2019

NMCG Office

Page 123: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 118 Monthly Progress Report – September 2019

Sl. No.

Agenda of the Meeting

Undertaken by Date Venue Minutes of

the meeting No.

3 Monthly review Meeting

4. Mr. R.K.Garg CE,UPJN 5. Mr. K.G.Singh, GM,UPJN 6. Mr. Srinivasan, Project

Manager, MACE 7. Mr. A.N.Singh, COO,

MWMPL

6th & 7th September 2019

UPJN Mathura

12. Staff deployment

The effective date announced on 15.01.2019 and the deployment of manpower, office set up has been communicated to NMCG vide letter number P968:8230 dated 05.03.2019. The Project Engineer office address at Mathura:

Mahindra Consulting Engineers Limited Madhvi - B Flat No: 402, 4th Floor,

Radha Valley, Mathura – 281 121 Uttar Pradesh.

The position of staff deployment since beginning of the project till end of is given in the following table:

Staff deployed on site at Mathura Date of deployment

Sl. No.

Designation Name of staff From To

1 Project Manager Amit Ghosh 01/02/2019 Till date 2 Civil Engineer Murugesan Jaya

Krishnan (As per agreement)

23/10/2018 Till date

3 Civil Engineer P. Ramasubramanian (As per agreement)

28/11/2018 11/01/2019

4 Civil Engineer N. Mohammed Rayyan 06/02/2019 Till date 5 Mechanical Engineer Shivanand. A 24/03/2019 30/06/2019

Page 124: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 119 Monthly Progress Report – September 2019

Staff deployed on site at Mathura Date of deployment Sl. No.

Designation Name of staff From To

6 Quality and Safety Engineer

L. Selva Kumar 07/04/2019 Till date

7 Civil Engineer K.A Weslie 15/04/2019 Till date 8 Civil Engineer T. Krishna Kumar 17/07/2019 Till date 9 Mechanical Engineer Santhosh 17/8/2019 Till date

10 Mechanical Engineer Balaji 17/8/2019 Till date

Page 125: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 120 Monthly Progress Report – September 2019

ANNEX – 1 QUALITY ASSURANCE / QUALITY CONTROL

Page 126: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 121 Monthly Progress Report - September 2019

1. Earth work

SI. No. Description IS Code

Till previous month Up to this month

(1st September– 30th September 2019)

Remarks

As

per I

S N

o of

te

st re

quire

d

No.

of T

est

cond

ucte

d

No.

of

Acc

epta

nce

No.

of R

ejec

ts

As

per I

S N

o of

te

st re

quire

d

No.

of T

est

cond

ucte

d

No.

of

Acc

epta

nce

No.

of R

ejec

ts

1

Soil compaction test at source (Borrow pit) - MDD, OMC & Soil characteristics

2720 Part VIII

02 02 02 --

Sample collected from excavated material for backfilling sent to Third party Lab, Found Acceptable limits

2 Soil compaction test at site - OMC & Degree of compaction

2720 Part II

30 30 30 - 31 31 31 -

Existing ground has been inspected and compaction test done at SBR Basin/admin before PCC and found Acceptable. Report available.

3

DCPT for soil classification and bearing capacity for Harden strata. Existing Ground improvement

IS 15284/458

6 04 04 04 -- -- -- -

Soil investigation done and submitted design calculation further Stone column piling in progress 20 TTP

4 Stone column Individual Pile load testing/Stone

IS 15284/458

6 05 05 05 10 10 10 -

Stone blanket 30mm down aggregates has been

Page 127: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 122 Monthly Progress Report - September 2019

SI. No. Description IS Code

Till previous month Up to this month

(1st September– 30th September 2019)

Remarks

As

per I

S N

o of

te

st re

quire

d

No.

of T

est

cond

ucte

d

No.

of

Acc

epta

nce

No.

of R

ejec

ts

As

per I

S N

o of

te

st re

quire

d

No.

of T

est

cond

ucte

d

No.

of

Acc

epta

nce

No.

of R

ejec

ts

blanket at 20/TTP Lakshmi nagar.

tested and found within limit as per IS 383.

2. SBR/Admin/CCT/Gravity Thickener/inlet chamber/Structural buildings /PTU/ Sub station

SI. No. Description IS Code

Till previous month Up to this month (1st August – 31st August 2019)

Remarks

As

per I

S N

o of

test

re

quire

d

No

of T

est

cond

ucte

d

No

of

Acc

epta

nce

No

of R

ejec

ts

As

per I

S N

o of

test

re

quire

d

No.

of T

est

cond

ucte

d

No.

of

Acc

epta

nce

No.

of R

ejec

ts

1

Concrete ingredients coarse-aggregate 20mm down

IS 383-2016

13 13 12 01 04 04 04 -

20mm Stocking sufficient quantity, Not receiving further materials, one rejected load sent back. Slit content -4 nos

2

Concrete ingredients coarse-aggregate 10mm down

IS 383-2016

10 10 10 - 04 04 04 - 10mm Stocking sufficient quantity, Not receiving further materials

Page 128: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 123 Monthly Progress Report - September 2019

SI. No. Description IS Code

Till previous month Up to this month

(1st August – 31st August 2019)

Remarks

As

per I

S N

o of

test

re

quire

d

No

of T

est

cond

ucte

d

No

of

Acc

epta

nce

No

of R

ejec

ts

As

per I

S N

o of

test

re

quire

d

No.

of T

est

cond

ucte

d

No.

of

Acc

epta

nce

No.

of R

ejec

ts

3

Concrete ingredients fine aggregate 4.75 mm down

IS 383-2016

26 26 26 - 04 04 04 -

Only Gradation/slit Test witnessed by UPJN / MACE. Source:- bhusavar- Rajasthan,

4 Combined Grading as per approved IIT Mix design.

IS 383-2016

whenever required

- - whenever required

- - - As per approved mix 60% of 20mm and 40% of 10mm is being used.

5 Hardened concrete Compressive strength

IS 516 &IS 456

Every 50m3 or part thereof

266 266 266 Every 50m3

or part thereof

168 168 -

Cubes taken for Raft at SBR, Admin blg& Gravity Thickener wall, 28 days compressive test to be done.

6 OPC Cement 43 Grade,(in-house Cement testing)

IS 8112-2013

Every batch or whenever required

10 10 0 Every batch or whenever

required - - -

Ultra Tech MTC available, Month of July yet to receive. And IST/FST test carried out site Lab, acceptable limit.

7 Reinforcement TMT Bars

IS 456-2001, IS

1786-1987 & IS 800-2007

As per CPWD norms

48 36 12* As per CPWD

norms 57 - -

SAIL/Vizag /Tisco Fe500 grade Steel MTC available at site for all consignments received as on date. 12*/ttp sample omitted due to

Page 129: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 124 Monthly Progress Report - September 2019

SI. No. Description IS Code

Till previous month Up to this month

(1st August – 31st August 2019)

Remarks

As

per I

S N

o of

test

re

quire

d

No

of T

est

cond

ucte

d

No

of

Acc

epta

nce

No

of R

ejec

ts

As

per I

S N

o of

test

re

quire

d

No.

of T

est

cond

ucte

d

No.

of

Acc

epta

nce

No.

of R

ejec

ts

delayed in testing process. And All 57( stp 18 & resampled 39 ttp) sample sent to third party laboratory, waiting for the Report.

8 Admixture IS 9103-

1979 Every new lot 02 02 0 Every new lot - - -

Fosroc Auromix 400 MTC available and, sample sent to third party for design mix purpose.

9 Water IS 456 -

2001 Once in six

months 01 01 -

Once in six months

- - - Acceptable range as per code IS 3526

10 Concrete Mix design

IS 10262-2000

whenever source of material changes

M10, M15, M20, M25, M30

whenever source of material changes

M10, M15, M20, M25, M30

Only M25 & M30 Approved by AMU/ NTH, Running mix is AMU for all site. And Approved outside supplier GRMC concrete in additional further Quantity.

11

Field control test: Slump /Concrete temperature/ unit weight

IS 456, SP 23 & IS 516

Every alternate truck

163 163 0 Every

alternate truck

35 35 - Verified slump at site for SBR raft/CCT wall Concrete workability and

Page 130: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 125 Monthly Progress Report - September 2019

SI. No. Description IS Code

Till previous month Up to this month

(1st August – 31st August 2019)

Remarks

As

per I

S N

o of

test

re

quire

d

No

of T

est

cond

ucte

d

No

of

Acc

epta

nce

No

of R

ejec

ts

As

per I

S N

o of

test

re

quire

d

No.

of T

est

cond

ucte

d

No.

of

Acc

epta

nce

No.

of R

ejec

ts

found acceptable limit.(Ave:100mm)

12 Bricks for frame structure

IS1077&IS5454

Every new lot. 20 bricks to be selected from a

lot of 2000-10000.

24 24

Every new lot. 20 bricks

to be selected from a lot of 2000-10000.

- - -

Two source of bricks (pipe line manhole other utilities) Test carried out at Site laboratory and recorded. Found acceptable range.

Page 131: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 126 Monthly Progress Report - September 2019

3. Pipe work:- Duct Iron/ Reinforcement -NP3

SI. No. Description IS Code

Till previous month

(1st August – 31st August 2019)

Remarks

As

per I

S N

o of

test

re

quire

d

No

of T

est

cond

ucte

d

No

of

Acc

epta

nce

No

of R

ejec

ts

As

per I

S N

o of

test

re

quire

d

No

of T

est

cond

ucte

d

No

of

Acc

epta

nce

No

of R

ejec

ts

1 Duct Iron and fittings IS 8329-

2001 1536/20

1536/20

1536/20

- 105/65/70/15

105/65/70/15

105/65/70/15

150mm di pipes 105 nos, valves gates 70 nos and fittings 65nos. M.screen 15 nos, EPDM rings MTC available as of date.

2 Reinforcement NP3 1000mm dia

IS 458-2003

342 342 342 159(380

mtrs) 159 159 -

EPDM rings received and MTC available at site.

Page 132: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 127 Monthly Progress Report - September 2019

4. Construction Running Materials / Equipment

SI. No.

Description Codes

As

per I

S N

o of

te

st re

quire

d

As

per I

S N

o of

te

st re

quire

d

No

of T

est

cond

ucte

d

No

of

Acc

epta

nce

No

of R

ejec

ts

Remarks

1 All Auto level /Total station/ Theodolite

BIS 1492 Yearly once Yearly once 1 1 -

2 Cube testing Machine

IS 516-2001/14858-2000 Yearly once Yearly once 2 2 -

3 Laboratory weighing machine

Office of Control of legal Metrology

Table:-8,rule no :-16(3)

UP Govt

Yearly once Yearly once - - -

4 1)MWMPL -Ready Mix Concrete plant 2)Ganapti -Ready Mix Concrete Plant

IS 4926-2013

Whenever required

Whenever required

3 3 -

Page 133: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 128 Monthly Progress Report - September 2019

ANNEX 2 PHOTOGRAPHS

Page 134: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 129 Monthly Progress Report - September 2019

Mas

ani S

TP S

ite

2nd & 3rd lift wal @ SBR at Masani 30.00 MLD STP site

3rd Lift wall @ CCT at Masani 30.00 MLD STP site

Page 135: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 130 Monthly Progress Report - September 2019

Mas

ani S

TP S

ite

Footing work @ Air Blower Building

Excavtion @ Inlet Chamber @ 30MLD STP

Page 136: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 131 Monthly Progress Report - September 2019

V

rin

dav

an G

ate

IPS

Raft @ Sump at Vrindavn Gate IPS

Plastering work @ Security cabin at Vrindavan Gate IPS

Page 137: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 132 Monthly Progress Report - September 2019

TTR

O

Footing at Admin Building @ 20MLD TTP

Reinforcement work @ RO Feed Tank @ TTRO

Page 138: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 133 Monthly Progress Report - September 2019

Ben

gali

Gha

t MPS

Excavation at Sump @ Bengali Ghat MPS

Pipe

Insp

ectio

n

DI Pipe Inspection

Page 139: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 134 Monthly Progress Report - September 2019

DI Pipe Insepection

Insp

ectio

n

Manual Screen Inspection

Page 140: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 135 Monthly Progress Report - September 2019

Qua

lity

Phot

os

Cube Testing

Dry density Core compaction Test

Page 141: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 136 Monthly Progress Report - September 2019

EH

S-P

IPE

LIN

E N

ET

WO

RK

EHS-PIPE LINE NET WORK

Excavation Protection at 30MLD Masani.

Page 142: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 137 Monthly Progress Report - September 2019

Concrete crew at 20 TTP Lakshmi nagar

Page 143: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated

infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 138 Monthly Progress Report - September 2019

ANNEX - 3 OUTWARD CORRESPONDENCE LIST OF September

2019

Page 144: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 139 Monthly Progress Report – September 2019

ANNEX 3 - OUTWARD CORRESPONDENCE LIST OF September 2019 SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 1 P986:9805 03/09/2019 The General Manager,

Yamuna Pollution Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Instrument Schedule for Bengali Ghat MPS, Instrument Schedule for Cant Nalla IPS, Instrument Schedule for Chintaharan IPS, Instrument Schedule for Swami Ghat IPS, and recommended for approval with notes for Instrument Schedule for Diary farm MPS Trans Yamuna Zone

2 P986:9807 03/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on techinical data sheet of submersible pumps for IPS and MPS - R2

3 P986:9809 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommendation for approval on HT room, Transformer yard and MCC control room for 30 MLD STP for Masani Zone- Revision 01

4 P986:9810 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Observations on Layout & GA for Masani I&D and recommended for approval with notes on HFC, HFD and PDC for

Page 145: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 140 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

Masani I&D in Masani Zone-Revision 1

5 P986:9811 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Technical datasheet of manual screen for Dhruv Ghat I&D (R0) and Recommended for approval with notes on Technical datasheet of Gates (R1) for IPS and MPS

6 P986:9812 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Civil GA & Reinforcement details of Krishna Ganga I&D and Civil GA & Reinforcement details of Masani I&D in Masani Zone-Revision 0

7 P986:9813 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on process design & mechanical design calculation of Vishram Ghat I&D in Trans-Yamuna Zone-Revision 1

8 P986:9814 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on 11/0.433 kV substation / PMCC/MCC room architect drawing for Bengali Ghat MPS on Trans Yamuna Zone-Revision 1

9 P986:9815 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer,

NA Recommended for approval with notes on Valve Schedule for

Page 146: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 141 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

Masani 30 MLD STP in Masani Zone- Revision 0

10 P986:9816 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Datasheet of Sluice Gates for 30MLD capacity STP in Masani Zone -Revision 1

11 P986:9817 04/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommented for approval with notes on Mechanical GA and Data sheets for UF Backwash pumps, High pressure pumps, treated water transfer pump, RO feed pumps, RO CIP pumps & Disc filter Backwash pump - 20 MLD capacity of TTP at Laxmi Nagar in Trans Yamuna Zone.

12 P986:9818 05/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on QAP for Pressure gauge, Temperature transmitter, Earthing material, Cable tray (R1) and Recommended for approval with notes on QAP for PLC Panel (R1)

13 P986:9819 05/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Recommended for approval with notes on datasheet for Disc filter feed pump for 20 MLD TTP at Laxmi Nagar in

Page 147: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 142 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

Trans Yamuna Zone-Revision-2

14 P986:9820 05/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Datasheet for SAS pump for 30MLD Masani STP in Masani Zone – Revision 3

15 P986:9822 05/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on P&ID for Dairy Farm I&D & Cant I&D (R2) Only CRS and PDC for Dairy Farm I&D (R1) in Trans-Yamuna Zone

16 P986:9823 05/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Design calculation (R2), Civil GA & R/F details (R2) and Structural GA of pipe supporting structures of Disc Filter (R0) for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone

17 P986:9824 05/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Arch. drawing, Design Calculation, Column & Foundation details, Plinth beam, Tie beam, Roof beam, roof slab details of 33/0.433 kV substation/PMCC/MCC Building for 20 MLD TTP at Laxmi Nagar in Trans-

Page 148: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 143 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject Yamuna Zone -Revision 01

18 P986:9826 05/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on HFC (R2), HFD (R1) and PDC (R0) for Gau Ghat I&D in Trans-Yamuna Zone

19 P986:9827 05/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on QAP of Knife Gate Valve (R2) and CI Thimble Mounted Single Faced Sluice Gate (R1)

20 P986:9828 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observation on PLC IO list for Bengali Ghat, Chintaharan IPS, Dairy Farm, Cant Nalla and Swami Ghat in Trans-Yamuna zone-Revision 0

21 P986:9829 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Design calculation of filter water tank/secondary effluent treated tank and Civil GA of filter water tank /secondary effluent treated tank for 20MLD TTP in Trans Yamuna Zone- Revision 0

22 P986:9830 06/09/2019 The General Manager, Yamuna Pollution

Control Unit - 1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer,

NA Recommended for approval on vendor credentials

Page 149: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 144 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

23 P986:9831 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Valve Schedule for 30 MLD STP at Masani in Masani Zone- Revision 1

24 P986:9832 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on datasheet for RO Membrane for 20 MLD TTP at Laxmi Nagar in Trans Yamuna Zone -Revision 2

25 P986:9833 06/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Details to be include in Inspection call letter

26 P986:9834 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on QAP for Detritor, Horizontal centrifugal pump, Vertical centrifugal Pump, Storage tank / Dosing tanks / Tower and HDPE Pipes & Fittings, Stainless steel globe valve, cartridge filter, Storage Tank / Dosing Tanks / DG Tower and SS Pipe for MPS/IPS/I&D

Page 150: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 145 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject / STP & TTP Zone – R0 & R1

27 P986:9835 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on lighting fixture datasheet for Vrindavan IPS, Masani MPS, Krishnaganga IPS and 20 MLD TTP for Masani and Trans Yamuna Zone- Revision 1

28 P986:9836 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Proposed piping route drawing and L-Section from Jaisinghpura I&D to Jaisinghpura MPS in Masani Zone-Revision 2

29 P986:9837 06/09/2019 The Director General, National Mission for

Clean Ganga, Ministry of Water Resources, River

Development & Ganga Rejuvenation,

Government of India, 1st Floor, Major, Dhyan

Chand National Stadium,

India Gate, New Delhi-110002

Monthly progress report for

the month of August 2019

1. Dr. Pravin Kumar, Director (T-III), NMCG. 2. The General Manager, Yamuna Pollution Control Unit, UPJN, Agra. 3. The Chief Engineer, Agra zone, UPJN, Agra. 4. Mr. Maharaj Singh, Project Manager, Drainage and Sewerage Unit, UPJN, Mathura.

NA Submission of monthly progress report for the month of August 2019

30 P986:9838 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Recommended for approval with notes on Design calculation, Civil GA and Reinforcement details for Air Blower Building in 30 MLD new

Page 151: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 146 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

STP in Masani Zone -Revision 03

31 P986:9839 06/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Design calculation, Civil GA & Reinf. details of Foundation, Column, Plinth Beam and Crane, Roof Beam, slab of chlorination cum tonner room for 30 MLD new STP at Masani in Masani Zone-Revision 2

32 P986:9840 07/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on CCTV & EPAX Block Diagram (R1) for Masani MPS in Masani Zone and System Configuration (R2) for Bengali Ghat MPS in Trans Yamuna Zone

33 P986:9843 09/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Cable route & Tray layout of Jaisinghpura MPS for Masani zone- Revision 0

34 P986:9844 09/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Design calculation, Civil GA, R/F details and Structural GA of shed for N-Pit & Blending Disposal Tank for 20 MLD TTP at Laxmi Nagar in Trans-

Page 152: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 147 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject Yamuna Zone -Revision 1

35 P986:9846 09/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on 11/.433 kV Substation / PMCC / MCC room GA drawing for Dairy farm MPS (R1), and cable routing layout for Krishnaganga IPS (R1) in Trans Yamuna & Masani Zone- Revision 1

36 P986:9847 09/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Instrument schedule for 20 MLD TTP in Trans-Yamuna Zone-Revision 0

37 P986:9848 09/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Proposed piping route drawing and L-Section from Ambakhar I&D to Existing Common Chamber Near Dairy Farm MPS in Trans Yamuna Zone-Revision 0

38 P986:9851 10/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Design calculation, Civil GA and Reinforcement details of Thickened sludge sump for 30 MLD new STP in Masani Zone -Revision 0

39 P986:9853 10/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer,

NA Recommended for approval and Recommended for approval with notes on

Page 153: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 148 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

Instrument Datasheets for Bengali Ghat MPS, Chintaharan IPS, Dairy Farm MPS, Cant Nalla IPS & Swami Ghat IPS in Trans Yamuna Zone-Revision 0

40 P986:9854 10/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Instrument Schedule for Dairy Farm MPS in Trans-Yamuna Zone - Revision 1

41 P986:9855 11/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Civil Structural Design, Civil GA & Reinforcement details of SBR for 30 MLD new STP in Masani Zone- Revision-4

42 P986:9856 11/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Mechanical GA drawing of Secondary Effluent Treated Tank and Filtered Water Storage Tank for 20MLD TTP in Trans-Yamuna Zone–Revision 3

43 P986:9858 12/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Mechanical GA drawing of RO skid for 20 MLD TTP at Laxmi Nagar in Trans Yamuna Zone-Revision 3

Page 154: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 149 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 44 P986:9859 12/09/2019 The General Manager,

Yamuna Pollution Control Unit

-

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Inspection of DI pipes & fittings at M/s Electro Steel Castings Ltd, Khardah (Kolkata)

45 P986:9860 12/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Instrument Schedule for 30 MLD STP Masani in Masani Zone- Revision 0

46 P986:9861 12/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on PLC IO list (Only CRS) for Bengali Ghat MPS, Chintaharan IPS, Dairy Farm MPS, Cant Nalla IPS and Swami Ghat IPS in Trans Yamuna Zone-(Revision 0)

47 P986:9862 12/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with observations on PLC document for Vrindavan gate IPS, Masani MPS, Krishnaganga IPS (R1) and Jaisinghpura MPS (R0) in Masani Zone

48 P986:9863 12/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Technical datasheet for Ball valves (only CRS) of IPS & MPS in Masani and Trans Yamuna Zone-Revision 0

Page 155: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 150 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 49 P986:9864 12/09/2019 The General Manager,

Yamuna Pollution Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Mechanical GA Drawing of Alkali Dosing Tank for N-Pit with agitator for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone - Revision 1

50 P986:9865 13/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on 11/.433 kV Substation / PMCC / MCC room GA drawing for Masani MPS in Masani Zone -Revision 2

51 P986:9866 13/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Proposed piping route drawing and L-Section from Mahadev Ghat I&D to Existing Inlet Chamber near Dairy Farm MPS in Trans Yamuna Zone-Revision 0

52 P986:9867 14/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes indicated in CRS on P&ID of 30 MLD new STP at Masani-R5

53 P986:9868 14/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Mechanical GA drawing for Jaisinghpura MPS in Masani Zone -Revision 1

Page 156: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 151 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 54 P986:9869 14/09/2019 The General Manager,

Yamuna Pollution Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Civil GA & Reinforcement details of Cant I&D and Recommended for approval on Civil GA & Reinforcement details of Dhruv Ghat I&D in Trans Yamuna Zone-Revision 0

55 P986:9870 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommendation for approval with note on Instrument Hook up for Jaisinghpura MPS in Masani Zone--Revision 0

56 P986:9871 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Quality assurance plan of LT Power and Control cable, Instrument cable, HT Panel, Transmitter (Pressure, DP, flow & Level) (R1) and PLC Panel (R2)

57 P986:9872 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on CRS for PLC IO list for Bengali Ghat, Chintaharan IPS, Dairy Farm MPS, Cant Nalla IPS and Swami Ghat IPS in Trans Yamuna Zone-Revision 0

58 P986:9873 16/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Laying of 500 mm Dia. Rising main pipeline across Bengali Ghat Bridge at Trans Yamuna Zone.

Page 157: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 152 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

59 P986:9874 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Architectural drawing of type A & B staff quarters for 30 MLD STP in Masani Zone–Revision 1

60 P986:9875 16/09/2019 The Director General, National Mission for

Clean Ganga, Ministry of Water Resources, River

Development & Ganga Rejuvenation,

Government of India, 1st Floor, Major, Dhyan

Chand National Stadium,

India Gate, New Delhi-110002

Monthly inspection report for

the month of Spetember

2019

1. Executive Director, NMCG. 2. Dr. Pravin Kumar, Director (T-III) NMCG. 3. The General Manager, Yamuna Pollution Control Unit, UPJN, Agra. 4. The Chief Engineer, Agra zone, UPJN, Agra. 5. Mr. Maharaj Singh, Project Manager, Drainage and Sewerage Unit, UPJN, Mathura.

NA Submission of monthly inspection report for the month of Spetember 2019

61 P986:9876 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Design calculation, Civil GA & Reinforcement drawing of 11/0.433 kV Substation/PMCC/MCC room for Vrindavan Gate IPS in Masani Zone-Revision 2

62 P986:9877 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Recommended for approval on Architectural drawing of 11/0.433 kV substation/PMCC/MCC room for Vrindavan IPS,

Page 158: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 153 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

in Masani Zone, -Revision 1

63 P986:9878 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on proposed piping route drawing and L-Section drawing from Bengali Ghat MPS (only CRS) and Dairy Farm MPS to Existing Manhole near BPT in Trans-Yamuna Zone

64 P986:9880 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA New Mathura HAM STP Website designing - Compliance on comments issued regarding.

65 P986:9881 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Instrument Datasheet for Bengali Ghat MPS, Chintaharan IPS, Dairy Farm MPS, Cant Nalla IPS & Swami ghat IPS in Trans-Yamuna Zone-Revision 1

66 P986:9884 16/09/2019 The Director General, National Mission for

Clean Ganga, Ministry of Water Resources, River

Development & Ganga Rejuvenation,

Government of India, 1st Floor, Major, Dhyan

Chand National Stadium,

Monthly inspection report for

the month of August 2019

1. Executive Director, NMCG. 2. Dr. Pravin Kumar, Director (T-III) NMCG. 3. The General Manager, Yamuna Pollution Control Unit, UPJN, Agra. 4. The Chief Engineer, Agra zone, UPJN, Agra. 5. Mr. Maharaj Singh,

NA Submission of monthly inspection report for the month of August 2019

Page 159: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 154 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject India Gate, New Delhi-

110002 Project Manager, Drainage and Sewerage Unit, UPJN, Mathura.

67 P986:9885 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on CRS of Instrument Schedule for Dairy Farm MPS in Trans-Yamuna Zone-Revision 1

68 P986:9886 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Instrument Schedule for 20 MLD TTP in Trans-Yamuna Zone- Revision 1

69 P986:9887 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Mechanical GA drawing of Chlorination cum tonner room for 30MLD Masani STP in Masani Zone-Revision 3

70 P986:9888 16/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Inspection of Manual bar screens at M/s Triveni Engineering & Industries Ltd., Noida (U.P)

71 P986:9889 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Recommended for First Milestone Certificate – Masani Zone

Page 160: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 155 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

72 P986:9890 16/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for First Milestone Certificate – Trans Yamuna Zone

73 P986:9892 17/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Mechanical GA drawing of SBR basin for 30 MLD STP for Masani in Masani Zone-Revision 7

74 P986:9893 17/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on CRS of PLC IO list for Jaisinghpura MPS in Masani Zone-Revision 0

75 P986:9894 17/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Design calculation, Architectural details, Civil GA & reinforcement details of LT panel/PLC room for Jaisinghpura MPS in Masani Zone Mathura- Revision 0

76 P986:9895 17/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Observations indicated in CRS on Design calculation, Architectural details, Civil GA & reinforcement details of

Page 161: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 156 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

security room for Jaisinghpura MPS, in Masani Zone -Revision 0

77 P986:9896 17/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Design calculation, Architectural details, Civil GA & reinforcement details of 11/0.433 kV Substation/PMCC/MCC for Dairy Farm MPS in Trans Yamuna Zone-Revision 0

78 P986:9897 17/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Datasheet of Centrifuge feed pump (R1) and QAP for Screw pump (R0) for 30MLD Masani STP

79 P986:9898 17/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on LT Power Cable Voltage Drop & Sizing Calculation on Vrindavan IPS (R1), Masani MPS (R1), Krishna ganga IPS (R1), and HT & LT cable schedule on Vrindavan IPS (R1), & Masani MPS (R1), LT cable schedule on Krishna ganga IPS (R1), and observation on Control Cable Schedule of Vrindavan IPS (R1), & Masani MPS (R1), LT cable schedule on

Page 162: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 157 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject Krishna ganga IPS (R1), Masani Zone

80 P986:9899 17/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations / Recommended for approval / Recommended for approval with notes on Pipe schedule, Site Layout, Mechanical GA drawing, Piping Layout & L-section, Datasheet of Gates for Masani & Trans Yamuna Zone

81 P986:9900 18/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on datasheet of SBR decanter for 30 MLD STP at Masani in Masani Zone-Revision 2

82 P986:9901 18/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Arch. drawing ,Design calculation, Column & Foundation details, Plinth Beam, Tie Beam, Roof Beam & Slab Details and soil investigation report for 11/0.433 kV Substation/PMCC/MCC for Cant Nalla IPS at Mathura in Trans Yamuna Zone -Revision 0

83 P986:9902 18/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer,

NA Recommended for approval with notes indicated in CRS on Design calculation, Civil

Page 163: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 158 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

GA & R/F details (R3), Structural GA of pipe supporting structures (R1) for Disc Filter for 20 MLD TTP at Laxmi Nagar in Trans Yamuna Zone

84 P986:9903 18/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Civil GA & Reinforcement details for Gau Ghat I&D in Trans Yamuna Zone -Revision 0

85 P986:9904 18/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Local Control Panel Drawing of mechanical screen & Belt conveyors for Bengali Ghat MPS, Dairy Farm MPS, Jaisinghpura MPS, Masani MPS and Vrindavan gate IPS in Masani & Trans Yamuna Zone- Revision 1

86 P986:9905 18/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Datasheet of Polyelectrolyte dosing pump for 30 MLD Masani STP in Masani Zone-Revision 1

87 P986:9906 18/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Recommended for approval with notes on GA Drawing and Data Sheet of Sluice Gate Valve for 20 MLD TTP at Laxmi Nagar in Trans

Page 164: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 159 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

Yamuna Zone-Revision 2-

88 P986:9907 18/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on QAP of Ultrafiltration (CMF System) and Observations on QAP of Sluice Valve-Revision 0

89 P986:9909 19/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on CCTV & EPAX Block diagram for Swami Ghat IPS in Masani Zone-Revision 1

90 P986:9911 19/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Arch. drawing, Design calculation, Column & Foundation details, Plinth Beam, Tie Beam, Roof Beam & Slab Details and soil investigation report for 11/0.433 kV Substation/PMCC/MCC for Masani MPS in Masani Zone- Revision 0

91 P986:9914 19/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on HFC (R3), HFD (R3) and PDC (R3) of Chintaharan IPS in Trans-Yamuna Zone

Page 165: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 160 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 92 P986:9915 19/09/2019 The General Manager,

Yamuna Pollution Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Technical datasheet of Gates for I&D in Masani/Trans Yamuna Zone (R0)

93 P986:9917 20/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on LT cable schedule and Observations on LT Power Cable Voltage Drop & Sizing and Control Cable Schedule for Jaisinghpura MPS, Masani Zone -Revision 0

94 P986:9918 20/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Soil investigation report for Chintaharan IPS, Swamighat IPS and Krishnaganga IPS in Masani and Trans Yamuna Zone-Revision 0

95 P986:9919 20/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on GA of thickener mechanism (R3) and basic data sheet for sludge thickener mechanism (R3) for 30 MLD Masani STP in Masani Zone-R3

96 P986:9920 21/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Recommendation for issuance of manufacturing clearance for Electro Mechanical Components

Page 166: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 161 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

97 P986:9921 21/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on proposed piping route drawing and L-Section drawing from Bengali Ghat MPS to Existing Manhole near BPT, Dairy Farm MPS to Existing Manhole near BPT, Mahadev Ghat I&D to Existing Common Chamber near Dairy Farm MPS and Ambakhar I&D to Existing Common Chamber Near Dairy Farm MPS in Trans Yamuna Zone

98 P986:9923 21/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Design calculation & Structural GA of UF-RO Shed for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone -Revision 1

99 P986:9924 23/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Design calculation, Civil GA & reinforcement drawing of Jaisinghpura MPS, in Masani Zone-Revision 2

100 P986:9925 23/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer,

NA Recommended for approval with notes on Design calculation of substructure, Civil GA &

Page 167: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 162 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

Reinforcement Detail of UF RO Shed for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone -Revision 01

101 P986:9926 23/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Inspection of Knife Gate Valve, Sluice Gate, Sluice valve & Butterfly Valve at M/s Indian Valve (Calcutta) Pvt. Ltd., Howrah

102 P986:9927 23/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended to accord dispatch clearance for Chlorine Tonner in favour of M/s. ISGEC Heavy Engineering Limited, Yamunanagar

103 P986:9928 23/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Civil Structural Design (R4), Civil GA (R5) & Reinforcement details (R4) of SBR for 30 MLD new STP in Masani Zone

104 P986:9929 23/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended to accord dispatch clearance for DI Fittings in favour of M/s. Electro Steel Castings Ltd

105 P986:9930 23/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer,

NA First milestone pending works

Page 168: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 163 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

106 P986:9932 24/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Instrument Hook up drawings for Jaisinghpura MPS- in Masani Zone- Revision 1

107 P986:9935 24/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Design calculation, Architectural details, Civil GA & reinforcement details of security room for Jaisinghpura MPS, in Masani Zone- Revision 1

108 P986:9936 24/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Civil GA & Reinforcement details of DG foundation at Dairy Farm MPS in Trans Yamuna Zone-Revision 1

109 P986:9940 24/09/2019 The General Manager, Yamuna Pollution

Control Unit

QAP for Manual Screen

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended to issue dispatch clearance for Manual Screen in favour of M/s. Triveni Engineering & Industries Ltd

110 P986:9941 24/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Inspection of RCC NP3 pipes at M/s Pragati Concrete Udyog, Palwal, Haryana

Page 169: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 164 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

111 P986:9942 24/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Inspection of DI pipes at M/s Electrosteel Castings Ltd., Khardah (Kolkata)

112 P986:9943 24/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on QAP of SS pipe for handrail (R0)

113 P986:9944 24/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Non- Adherence of EHS at Masani and Trans Yamuna Zone

114 P986:9939 25/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Vendor Drawing / Documents of Transformer for 20 MLD TTP in Trans Yamuna Zone - R1

115 P986:9945 25/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on design calculation of substructure, Civil GA & Reinforcement Detail of thickened sludge sump

Page 170: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 165 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject for 30 MLD new STP in Masani Zone R1

116 P986:9946 25/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Design calculation, Architectural details, Civil GA & reinforcement details of 11/0.433 kV Substation/PMCC/MCC for Dairy Farm MPS in Trans Yamuna Zone

117 P986:9947 25/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval / Recommended for approval with notes on Pipe schedule, Mechanical GA drawing, Process Design & Mechanical Design Calculation, Technical Datasheet of Manual Screen and Technical Datasheet of Belt Conveyor for Masani & Trans Yamuna Zone

118 P986:9948 25/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Technical Data Sheet of Gates for Masani MPS in Masani Zone -Revision 2

119 P986:9949 25/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra

NA Soil Investigation Report of Cant Nala IPS in Trans Yamuna Zone-Revision 0

Page 171: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 166 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 3. Mr. Maharaj Singh, Project Manager

120 P986:9951 26/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on HFC , HFD and PDC of Chintaharan IPS in Trans-Yamuna Zone-Revision 3

121 P986:9952 26/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on interim availability liquidated damage

122 P986:9953 26/09/2019 The General Manager, Yamuna Pollution

Control Unit -

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA 1st milestone invoice by MWMPL for the submittal of the Concessionaire

123 P986:9954 26/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on DG set QAP for Masani & Trans Yamuna Zone -Revision 2

124 P986:9955 26/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on Pipe Schedule for 30 MLD STP at Masani in Masani Zone - Revision 0

Page 172: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 167 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 125 P986:9956 26/09/2019 The General Manager,

Yamuna Pollution Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended to accord dispatch clearance for 1000 mm dia RCC NP3 Pipe in favour of M/s. Pragati Concrete Udyog, Palwal, Haryana

126 P986:9957 26/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Mechanical GA drawing of N-Pit and blending disposal tank of 20 MLD TTP at Laxmi Nagar in Trans Yamuna Zone- Revision-3

127 P986:9958 27/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Cable Schedule for Bengali Ghat MPS, Chintaharan IPS, Dairy Farm MPS, Cant Nalla IPS and Swami Ghat IPS at Trans-Yamuna Zone- Revision 0

128 P986:9959 27/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Instrument Schedule for 30 MLD STP at Masani in Masani Zone- Revision 1

129 P986:9960 27/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with note on Instrument Schedule for 20 MLD TTP at Laxmi nagar in Trans Yamuna Zone- Revision 1

Page 173: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 168 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 130 P986:9961 27/09/2019 The General Manager,

Yamuna Pollution Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations indicated in CRS on P&ID of 30 MLD STP at Masani for Masani Zone- Revision 6

131 P986:9962 27/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Credentials of Railway Contractors for Trenchless Work in Masani Zone & Pipe Laying Work across Bengali Ghat Railway Bridge in Trans Yamuna Zone

132 P986:9964 28/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on Design calculation of filter water tank/secondary effluent treated tank and Civil GA of filter water tank /secondary effluent treated tank for 20MLD TTP at Laxmi Nagar in Trans Yamuna Zone- Revision 1

133 P986:9965 28/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval on Re-bar drawing of filter water tank /secondary effluent treated tank for 20MLD TTP at Laxmi Nagar in Trans Yamuna Zone- Revision 0

134 P986:9967 28/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi.

NA Observations on datasheet and GA of Detritor Mechanism for

Page 174: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 169 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

Masani STP–30MLD in Masani Zone -Revision-2

135 P986:9968 28/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on control cable data sheet of 20 MLD TTP at Laxmi Nagar in Trans Yamuna, Zone – Revision 1

136 P986:9969 28/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observation on Instrument datasheet for Temperature Switch and Differential Pressure Flow Transmitter (Annubar) of 30 MLD STP for Masani in Masani Zone- Revision 0

137 P986:9970 28/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Instrument datasheet for Electromagnetic flow meter, Temperature transmitter, Ultrasonic type flow meter and Pressure Indicator & Recommended for approval on Instrument Datasheet for Differential Level Transmitter & Recommended for approval with notes on Instrument Datasheet for Ultrasonic type level transmitter of 30 MLD STP for Masani in Masani Zone- Revision 0

Page 175: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 170 Monthly Progress Report – September 2019

SI. No.

Document No. Date To (Organization) Enclosed Copies To Subject

File No. Subject 138 P986:9971 28/09/2019 The General Manager,

Yamuna Pollution Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Recommended for approval with notes on datasheet for N – Pit transfer pump for 20 MLD TTP at Laxmi Nagar in Trans Yamuna Zone-Revision-1

139 P986:9972 30/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on LT Power and Control Cable Datasheet of Vrindavan IPS (R1), Masani MPS (R1), Krishna Ganga IPS (R1) in Masani Zone

140 P986:9975 30/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations and Recommended for approval on Instrument datasheet for Analysers for 20 MLD TTP at Laxmi Nagar in Trans Yamuna Zone- Revision 0

141 P986:9976 30/09/2019 The General Manager, Yamuna Pollution

Control Unit

Compliance resolution

sheets.

1. Dr. Pravin Kumar, Director (T-III), NMCG, New Delhi. 2. The Chief Engineer, UPJN, Agra 3. Mr. Maharaj Singh, Project Manager

NA Observations on Instrument datasheet for Analysers for 30 MLD STP at Masani Zone- Revision 0

Page 176: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 171 Monthly Progress Report - September 2019

ANNEX - 4 INWARD CORRESPONDENCE LIST OF September

2019

Page 177: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 172 Monthly Progress Report - September 2019

ANNEX 4 - INWARD CORRESPONDENCE LIST OF September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. 1 MWMPL/2019-20/C/772 02-09-2019 MWMPL KC

DHAWAN Y 19 Your Email dated 14-08-19, 16-08-

19, 19-08-19 & 28-08-19 regarding observations on Quality Assurance Plan of vertical centrifugal pump, HDPE pipe & fitting, SS pipe, Pressure Gauges, Temperature transmitter, Storage Tank/Dosing Tank/G tower

2 MWMPL/2019-20/C/786 03-09-2019 MWMPL KC DHAWAN

Y 1 Submission of Valve Schedule For 30 MLD Masani STP

3 MWMPL/2019-20/C/783 03-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 14-08-19 regarding Recommendation for approval with notes on Mechanical GA and Data Sheet of Disc Filter Feed Pump - rev. 1 for 20 MLD TTP at Laxmi Nagar in trans Yamuna zone.

4 MWMPL/2019-20/C/785 03-09-2019 MWMPL KC DHAWAN

Y 5 Your Email dated 19-08-19 regarding observations on 600 dia pipe crossing over Gokul Barrage Bridge from Irrigation department.

5 MWMPL/2019-20/C/784 03-09-2019 MWMPL KC DHAWAN

Y 2 Submission of revised Data Sheet for Sluice Gate-R2 for 30 MLD STP at Masani

6 752/Mathura Namami Gange/374

31-08-2019 UPJN Deepak Chauhan

N Regarding Material Dispatch Clearance Certificate for Dismantling Joints

7 750/Mathura Namami Gange/373

31-08-2019 UPJN Deepak Chauhan

N Regarding Material Dispatch Clearance Certificate for DI Fittings.

8 MWMPL/2019-20/C/775 02-09-2019 MWMPL KC DHAWAN

Y 10 : Your Email dated 24-07-19 regarding recommendation for

Page 178: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 173 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. approval on Design calculation, civil GA & reinforcement drawing of 11/0.433KV substation/PMCC/MCC room drawing for Vrindavan gate IPS, in Masani Zone, Mathura.

9 MWMPL/2019-20/C/778 02-09-2019 MWMPL KC DHAWAN

Y 4 Your Email dated 26-02-19 regarding observations on Architectural drawing of type A & B staff quarters for 30 MLD new STP in Masani Zone at Mathura.

10 MWMPL/2019-20/C/780 02-09-2019 MWMPL KC DHAWAN

Y 14 Your Email dated 14-08-19 regarding observations on Design calculation, Civil GA, R/F details and Structural GA of shed for N-Pit & Blending Disposal Tank for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone at Mathura

11 MWMPL/2019-20/C/779 02-09-2019 MWMPL KC DHAWAN

Y 9 Your Email dated 12-08-19 regarding observations on Design calculation, Civil GA & R/F details of Disc Filter for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone at Mathura.

12 MWMPL/2019-20/C/777 02-09-2019 MWMPL KC DHAWAN

Y 8 Your Email dated 20-08-19 regarding observations on Arch. drawing, Design calculation, Column & Foundation details, Plinth Beam, Tie Beam, Roof beam, roof slab details of 33/0.433 KV substation/PMCC/MCC Building for 20 MLD TTP at Laxmi Nagar

13 MWMPL/2019-20/C/773 02-09-2019 MWMPL KC DHAWAN

Y 9 Submission of Revised Lighting Fixture datasheet of Masani &

Page 179: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 174 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. Trans-Yamuna Zone as per comments received from MACE, for Mathura Project

14 MWMPL/2019-20/C/782 02-09-2019 MWMPL KC DHAWAN

Y 1 Submission of Cable Routing & Tray Layout Drawing for Jaisinghpura MPS of Masani Zone

15 MWMPL/2019-20/C/781 02-09-2019 MWMPL KC DHAWAN

Y 6 Submission of Revised Electrical drawing of Masani & Trans-Yamuna Zone as per comments received from MACE, for Mathura Project

16 MWMPL/2019-20/C/776 02-09-2019 MWMPL KC DHAWAN

Y 3 Your Email dated 16-07-19 regarding observations on Architectural drawing of 11/0.433KV substation/PMCC/MCC room for Vrindavan gate IPS, in Masani Zone, Mathura

17 MWMPL/2019-20/C/774 02-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Revised Piping Layout & L-section for Jaisinghpura I&D to Jaisinghpura MPS Masani Zone As per Email Dated 4-5-19 / as per new site Location

18 MWMPL/2019-20/C/788 04-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Data Sheet For SAS Pump in response your comments vide letter no. MACE:P986:9590 dated 25-07-19 regarding observations on Data Sheet For SAS Pump -R2 Of 30 MLD STP at Masani

19 3302/Mathura Namami Gange/1008

04-09-2019 UPJN K.G. Singh N Regarding vetting of Design and socuments submitted by MWMPL for Mathura Sewerage Project on

Page 180: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 175 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. Hybrid Annuity based PPP mode under Namami Gange

20 3301/Mathura Namami Gange/1007

04-09-2019 UPJN K.G. Singh N Regarding QAPs approval. (GM Letter No. 3301 Dt. 04.09.2019)

21 MWMPL/2019-20/C/791 04-09-2019 MWMPL KC DHAWAN

Y 2 Submission of revised Quality Assurance Plan of Masani & Trans-Yamuna Zone

22 MWMPL/2019-20/C/793 05-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Valve Schedule For 30 MLD STP at Masani

23 MWMPL/2019-20/C/789 05-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 07-08-19 regarding observation on GA drawing and Data Sheet of Sluice Gate Valve - R1 for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone

24 MWMPL/2019-20/C/790 04-09-2019 MWMPL KC DHAWAN

Y 6 Your Email dated 27-08-19 regarding observations on Design calculation, Civil GA and reinforcement details of chlorination cum tonner room for 30 MLD new STP in Masani Zone at Mathura

25 MWMPL/2019-20/C/792 04-09-2019 MWMPL KC DHAWAN

Y 6 Your Email dated 27-08-19 regarding observations on Design calculation, Civil GA and reinforcement details of chlorination cum tonner room for 30 MLD new STP in Masani Zone at Mathura

26 MWMPL/2019-20/C/787 05-09-2019 MWMPL KC DHAWAN

Y 6 Submission of Piping Layout & L-Section Drawings of Ambakhar I&D to Existing common chamber near Dairy Farm MPS for Trans Yamuna Zone Mathura

Page 181: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 176 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. 27 MWMPL/2019-20/C/794 05-09-2019 MWMPL KC

DHAWAN Y 3 Submission of Data Sheet of

Polyelectrolyte Dosing Pump For 30 MLD STP at Masani

28 MWMPL/2019-20/C/798 06-09-2019 MWMPL KC DHAWAN

Y 25 Submission of Arch. drawing ,Design calculation, Column & Foundation details, Plinth Beam ,Tie Beam,Roof Beam & Slab Details and soil investigation report for Masani MPS and Cant Nalla IPS at Mathura

29 MWMPL/2019-20/C/796 06-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Design calculation, Civil GA and reinforcement details of thickened sludge sump for 30 MLD new STP in Masani Zone at Mathura.

30 MWMPL/2019-20/C/797 06-09-2019 MWMPL KC DHAWAN

Y 8 Your Email dated 21-05-19 regarding observations on Civil Structural design, Civil GA & Reinforcement details of SBR for 30MLD new STP at Masani Zone, Mathura

31 MWMPL/2019-20/C/800 04-09-2019 MWMPL KC DHAWAN

Y 4 Notice to inspection of work against completion of 1st Payment Milestone for Trans-Yamuna Zone

32 MWMPL/2019-20/C/799 04-09-2019 MWMPL KC DHAWAN

Y 5 Notice to inspection of work against completion of 1st Payment Milestone for Masani Zone

33 Email Dated 09-Sep-19 04-09-2019 MWMPL KC DHAWAN

N Notice to inspection of work against completion of 1st Payment Milestone for Masani Zone

34 MWMPL/2019-20/C/795 07-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Process Design & Mechanical Design Calculation-R3, Hydraulic Calculation-R3 & Hydraulic Flow Diagram-R3 of Chintaharan IPS as per the revised

Page 182: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 177 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. levels of Gaughat and Chintaharan I & D

35 MWMPL/2019-20/C/803 07-09-2019 MWMPL KC DHAWAN

Y 1 Your Email dated 17-05-19 regarding recommendation for approval on Mechanical GA drawing of Secondary Effluent Treated Tank and filtered water storage tank - Rev. 2 at Laxmi Nagar in trans Yamuna zone

36 MWMPL/2019-20/C/801 07-09-2019 MWMPL KC DHAWAN

Y 1 Your Email dated 05-08-19 regarding Observation on Mechanical GA Drawing of Disc Filter- R2 For 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone

37 MWMPL/2019-20/C/807 09-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Instrument Schedule for Dairy Farm MPS at Trans-Yamuna Zone, Mathura

38 MWMPL/2019-20/C/806 09-09-2019 MWMPL KC DHAWAN

N Request for inspection of DI pipes & fittings

39 MWMPL/2019-20/C/805 07-09-2019 MWMPL KC DHAWAN

Y 6 Your Email dated 05-08-19 regarding observations on Design calculation & Structural GA of UF-RO Shed for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone at Mathura

40 MWMPL/2019-20/C/804 07-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Civil GA & Reinforcement details of Gaughat I&D, Dhruvghat I&D and Cant I&D for Mathura Project

41 MWMPL/2019-20/C/813 10-09-2019 MWMPL KC DHAWAN

Y 6 Submission of Revised Local Control Panel Drawing of Mechanical Screen & Belt conveyors for MPS/IPS for Masani/Trans Yamuna Zone as

Page 183: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 178 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. per comments received from MACE vide Letter No. MACE: P986: 9674 dated on 09th August 2019, for Mathura Project.

42 MWMPL/2019-20/C/809 10-09-2019 MWMPL KC DHAWAN

Y 12 : Your Email dated 14-08-19, 26-08-19, 28-08-19, & 05-09-19 regarding observations on Quality Assurance Plan of LT power & control cable, instrument cable, HT panel, PLC panel, Transmitter (Pressure, DP, Flow & Level), and submission of QAP for Ultraf

43 MWMPL/2019-20/C/802 07-09-2019 MWMPL KC DHAWAN

Y 2 Submission of revised P & I Diagram-R5 for 30 MLD Masani STP

44 MWMPL/2019-20/C/812 10-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 06-07-19 regarding Observation on Mechanical GA Drawing of Alkali dosing tank for N-pit with agitator - Rev. 0 at Laxmi Nagar in trans Yamuna zone

45 MWMPL/2019-20/C/808 10-09-2019 MWMPL KC DHAWAN

Y 5 Submission of CRS for PLC IO List for Bengali Ghat, Chintaharana IPS, Dairy Farm, Cant Nalla & Swami Ghat at Trans-Yamuna Zone, Mathura

46 MWMPL/2019-20/C/811 10-09-2019 MWMPL KC DHAWAN

Y 1 Revised as per Approved Mechanical GA and Data Sheet of RO Pressure Tube (Doc. No. PXD-1305-106-12-033_R3) for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone

47 MWMPL/2019-20/C/814 10-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Mechanical GA Drawing Of SBR Basin-R7 for 30 MLD Masani STP as per the

Page 184: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 179 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. revision of decanter arrangement recommended by decanter supplier

48 MWMPL/2019-20/C/817 10-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Revised Data Sheet Of Centrifuge Feed Pump-R1 For 30 MLD Masani STP

49 MWMPL/2019-20/C/815 10-09-2019 MWMPL KC DHAWAN

Y 1 Submission of Only CRS for Technical Datasheet of Ball Valves for IPS/MPS for Masani/Trans Yamuna Zone as per Email dated 17-07-19/06-09-19

50 MWMPL/2019-20/C/816 10-09-2019 MWMPL KC DHAWAN

Y 13 Submission of Revised Piping Layout & L-section for Dairy farm MPS to Manhole near BPT & As per Email Dated 30-08-19 /22-08-19 for Trans Yamuna Zone

51 MWMPL/2019-20/C/819 11-09-2019 MWMPL KC DHAWAN

Y 1 Submission of Instrument Hook Up drawings for Jaisinghpura MPS

52 MWMPL/2019-20/C/820 11-09-2019 MWMPL KC DHAWAN

Y 1 Submission of Data Sheet For SBR Decanter -R2 for 30 MLD Masani STP as per the revision of decanter arrangement recommended by decanter supplier

53 Email Dated 12-Sep-19 12-09-2019 MWMPL KC DHAWAN

Y 5 NMCG-MWMPL-Observations on P&I diagram-R2,process design & mechanical design calculation-R1,HFC-R1,HFD-R1,PD-R1, Topo-R1,layout-R1, CCTV & system config-R1 for Swami Ghat IPS & Swami Ghat and Rani Ghat I&D-R0-Sent-Reg

54 Email Dated 12-Sep-19 12-09-2019 MWMPL KC DHAWAN

Y 4 Your Email dated 24-07-19 regarding recommendation for approval on Design calculation,

Page 185: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 180 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. civil GA & reinforcement drawing of 11/0.433KV substation/PMCC/MCC room drawing for Vrindavan gate IPS, in Masani Zone

55 3341/Mathura Namami Gange/1013

09-09-2019 UPJN K.G. Singh N Regarding inspection of works for completion of First payment milestone for Masani Zone and Trans Yamuna Zone

56 3352/Mathura Namami Gange/1014

11-09-2019 UPJN K.G. Singh N Regarding veting of design, drawings and documents submitted by MWMPL for Mathra sewerage Project on Hybrid Annuity based PPP mode under Namami Gange

57 MWMPL/2019-20/C/825 12-09-2019 MWMPL KC DHAWAN

Y 10 Resubmission of Instrument Datasheet for Bengali Ghat, Chintaharana IPS, Dairy Farm, Cant Nalla & Swami Ghat at Trans-Yamuna Zone, Mathura

58 MWMPL/2019-20/C/826 12-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Mechanical GA Drawing Of Chlorination Cum Tonner Room -R3 Of 30 MLD Masani STP

59 MWMPL/2019-20/C/824 12-09-2019 MWMPL KC DHAWAN

Y 1 Submission of CRS for Instrument Schedule for Dairy Farm MPS R1 at Trans-Yamuna Zone, Mathura

60 MWMPL/2019-20/C/823 12-09-2019 MWMPL KC DHAWAN

Y 2 Resubmission of Instrument Schedule for 20 MLD TTP R1, Trans-Yamuna Zone, Mathura w.r.t Observations received vide MACE:P 986 9847 dtd 09.09.19

61 MWMPL/2019-20/C/831 13-09-2019 MWMPL KC DHAWAN

Y N Request for inspection of Manual Bar Screens

Page 186: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 181 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. 62 MWMPL/2019-20/C/829 14-09-2019 MWMPL KC

DHAWAN Y 7 Submission of Revised Electrical

Documents of Masani Zone, as per comments received from MACE vide Letter No. MACE: P986:9603 Dated 26Jul2019, for Mathura Project

63 MWMPL/2019-20/C/821 12-09-2019 MWMPL KC DHAWAN

Y 19 Submission of Revised Electrical document of Masani Zone as per comments received from MACE, for Mathura Project.

64 MWMPL/2019-20/C/822 12-09-2019 MWMPL KC DHAWAN

Y 4 Submission of Electrical document of Jaisinghpura MPS of Masani Zone, for Mathura Project

65 MWMPL/2019-20/C/827 13-09-2019 MWMPL KC DHAWAN

Y 5 Submission of GA of Thickener Mechanism & Basic Data Sheet Of Sludge Thickener Mechanism-R3 in response your comments vide letter no. MACE:P986:9464 dated 09-07-19 regarding observations on GA of Thickener Mechanism & Basic Data Sheet Of Sludge Thickener

66 MWMPL/2019-20/C/830 14-09-2019 MWMPL KC DHAWAN

Y 4 Submission of Revised Electrical Document of 20MLD TTP, Transyamuna Zone, as per comments received from MACE vide Letter No. MACE: P986:9599 Dated 26Jul2019, for Mathura Project

67 MWMPL/2019-20/C/821 12-09-2019 MWMPL KC DHAWAN

Y 19 Submission of Revised Electrical document of Masani Zone as per comments received from MACE, for Mathura Project.

68 MWMPL/2019-20/C/825 12-09-2019 MWMPL KC DHAWAN

Y 10 Resubmission of Instrument Datasheet for Bengali Ghat,

Page 187: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 182 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. Chintaharana IPS, Dairy Farm, Cant Nalla & Swami Ghat at Trans-Yamuna Zone, Mathura

69 MWMPL/2019-20/C/826 12-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Mechanical GA Drawing Of Chlorination Cum Tonner Room -R3 Of 30 MLD Masani STP

70 MWMPL/2019-20/C/824 12-09-2019 MWMPL KC DHAWAN

Y 1 Submission of CRS for Instrument Schedule for Dairy Farm MPS R1 at Trans-Yamuna Zone, Mathura

71 MWMPL/2019-20/C/823 12-09-2019 MWMPL KC DHAWAN

Y 2 Resubmission of Instrument Schedule for 20 MLD TTP R1, Trans-Yamuna Zone, Mathura w.r.t Observations received vide MACE:P 986 9847 dtd 09.09.19

72 MWMPL/2019-20/C/834 14-09-2019 MWMPL KC DHAWAN

Y 14 Submission of Design calculation, Architectural details, Civil GA & reinforcement details of 11/0.433 KV Substation/PMCC/MCC for Dairy Farm MPS

73 MWMPL/2019-20/C/832 14-09-2019 MWMPL KC DHAWAN

Y 4 Submission of Design calculation, Architectural details, Civil GA & reinforcement details of security room for JAISINGHPURA MPS, in Masani Zone, Mathura

74 MWMPL/2019-20/C/833 14-09-2019 MWMPL KC DHAWAN

Y 10 Submission of Design calculation, Architectural details, Civil GA & reinforcement details of LT panel/PLC room for Jaisinghpura MPS (in Masani Zone), Mathura

75 MWMPL/2019-20/C/828 13-09-2019 MWMPL KC DHAWAN

Y 23 Submission of Revised Pipe Schedule, Site Layout ,Technical datasheet of Manual & Mechanical screen ,Technical datasheet of Gates, Mechanical G.A. ,Piping

Page 188: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 183 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. Layout & L-Section for Masani Zone & Trans Yamuna Zone as per Email Dated10-07-19/15-07-19

76 E-Mail dated 16-09-2019 16-09-2019 MWMPL KC DHAWAN

Y 3 HFC, HFD & PDC Of Chintaharan IPS

77 MWMPL/2019-20/C/835 16-09-2019 MWMPL KC DHAWAN

Y 3 : Your Email dated 27-08-19 regarding observations on Quality Assurance Plan of PMCC, Capacitor & soft starter panel and fresh submission of QAP for Motors

78 MWMPL/2019-20/C/837 16-09-2019 MWMPL KC DHAWAN

Y 1 Submission of Technical Datasheet of Gates for I&D Masani / Trans Yamuna Zone, Mathura

79 MWMPL/2019-20/C/836 Mail 1 of 2

16-09-2019 MWMPL KC DHAWAN

Y 4 Regarding electricity bill payment for all the sites under rehabilitation work in Masani Zone & Trans-Yamuna Zone

80 MWMPL/2019-20/C/836 Mail 2 of 2

16-09-2019 MWMPL KC DHAWAN

Y 1 Regarding electricity bill payment for all the sites under rehabilitation work in Masani Zone & Trans-Yamuna Zone

81 MWMPL/2019-20/C/838 16-09-2019 MWMPL KC DHAWAN

Y 3 Submission of soil investigation report for Chintaharan IPS, Swamighat IPS and Krishanganga IPS at Mathura

82 MWMPL/2019-20/C/840 16-09-2019 MWMPL KC DHAWAN

Y 6 Your Email dated 29-06-19 regarding recommendation for approval on Design calculation, Civil GA & reinforcement drawing of Jaisinghpura MPS, in Masani Zone, Mathura

83 MWMPL/2019-20/C/841 16-09-2019 MWMPL KC DHAWAN

Y 6 Your Email dated 06-09-19 regarding observations on Design

Page 189: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 184 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. calculation, Civil GA of filter water tank/Secondary Effluent Treated Tank for 20 MLD TTP at Laxmi Nagar, for Mathura Project

84 MWMPL/2019-20/C/839 16-09-2019 MWMPL KC DHAWAN

Y 6 Your Email dated 10-08-19 regarding observations on Design calculation of substructure, Civil GA & Reinforcement Detail Of UF RO Shed for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone at Mathura

85 MWMPL/2019-20/C/842 16-09-2019 MWMPL KC DHAWAN

Y 3 Your Email dated 05-09-19 regarding observations on Design calculation, Civil GA & R/F details, Structural GA of Disc Filter for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone at Mathura

86 E-Mail dated 18-09-2019 18-09-2019 MWMPL KC DHAWAN

Y 1 Revised PDC Of Chintaharan IPS

87 MWMPL/2019-20/C/846 18-09-2019 MWMPL KC DHAWAN

Y 5 Submission of Cable schedule for Bengali Ghat, Chintaharana IPS, Dairy Farm, Cant Nalla & Swami Ghat at Trans-Yamuna Zone, Mathura

88 MWMPL/2019-20/C/851 19-09-2019 MWMPL KC DHAWAN

Y 4 Request for Material Dispatch Clearance Certificate (MDCC) for Knife Gate Valve, Non Return Valve, Sluice Valve & Sluice Gate

89 MWMPL/2019-20/C/844 17-09-2019 MWMPL KC DHAWAN

Y 5 Submission of CRS for PLC IO List for Bengali Ghat, Chintaharan IPS, Dairy Farm, Cant Nalla & Swami Ghat at Trans-Yamuna Zone, Mathura

90 MWMPL/2019-20/C/843 17-09-2019 MWMPL KC DHAWAN

Y 1 Resubmission of Instrument Schedule for 20 MLD TTP R1,

Page 190: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 185 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. Trans-Yamuna Zone, Mathura w.r.t Observations received vide MACE:P 986 9886 dtd 16.09.19

91 MWMPL/2019-20/C/852 19-09-2019 MWMPL KC DHAWAN

Y 4 Submission of Reinforcement details of filter water tank/Secondary Effluent Treated Tank for 20 MLD TTP for Mathura Project.

92 MWMPL/2019-20/C/848 18-09-2019 MWMPL KC DHAWAN

Y 1 Submission of CRS for IO List for Jaisinghpura MPS at Masani Zone, Mathura

93 MWMPL/2019-20/C/849 18-09-2019 MWMPL KC DHAWAN

Y 4 Submission of CRS for Drawing of PLC and SCADA Panel GN, GA, BOM, Power and Control Schematic for Vrindavan Gate, Masani MPS , Krishnaganga IPS and Jaisinghpura MPS

94 MWMPL/2019-20/C/845 18-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Pipe Schedule For 30 MLD Masani STP-R0 and P & I Diagram For 30 MLD Masani STP-R6

95 MWMPL/2019-20/C/840 18-09-2019 MWMPL KC DHAWAN

Y 11 Submission of Revised Piping Layout & L-Section Drawings as per Email Dated 10-09-19/ 13-09-19/16-09-19 for Trans Yamuna Zone

96 MWMPL/2019-20/C/848 18-09-2019 MWMPL KC DHAWAN

Y 2 Request for Material Dispatch Clearance Certificate (MDCC) for DI pipes & fittings

97 MWMPL/2019-20/C/847 18-09-2019 MWMPL KC DHAWAN

Y 1 Submission of Instrument Hook Up drawings for Jaisinghpura, Mathura

98 E-mail dated 19-09-2019 19-09-2019 MWMPL KC DHAWAN

Y 5 Revised Document Of Sludge Thickener For 30 MLD Masani STP

Page 191: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 186 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. 99 E-mail dated 19-09-2019 19-09-2019 MWMPL KC

DHAWAN Y 7 Your Email dated 06-09-19

regarding observations on Design calculation, Civil GA of filter water tank/Secondary Effluent Treated Tank for 20 MLD TTP at Laxmi Nagar, for Mathura Project

100 E-mail dated 19-09-2019 19-09-2019 UPJN GM Y 1 Regarding 1st Milestone Completion Certificate for Trans Yamuna Facilities in Mathura

101 E-mail dated 19-09-2019 19-09-2019 UPJN GM Y 1 Regarding 1st Milestone Completion Certificate for Masani Facilities in Mathura

102 E-mail dated 20-09-2019 19-09-2019 MWMPL KC DHAWAN

Y 3 HFC, HFD & PDC Of Chintaharan IPS

103 MWMPL/2019-20/C/863 20-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Revised DG set document of 20MLD TTP Transyamuna as per comments received from MACE vide Letter No. MACE: P986:9503 Dated 13 Jul2019 for Mathura Project

104 MWMPL/2019-20/C/861 20-09-2019 MWMPL KC DHAWAN

Y 2 Request for Material Dispatch Clearance Certificate (MDCC) for DI fittings

105 MWMPL/2019-20/C/866 20-09-2019 MWMPL KC DHAWAN

Y 1 Submission of Quality Assurance Plan of SS pipes for hand railing

106 MWMPL/2019-20/C/864 20-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Data sheets for PLC Document-Bengali Ghat, Chintaharana, Dairy Farm, Cant Nalla, Swami Ghat for 20MLD TTP at Transyamuna Zone, Mathura

107 MWMPL/2019-20/C/859 20-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Process Design & Mechanical Design Calculation, Hydraulic Calculation & Hydraulic Flow Diagram of Chintaharan IPS

Page 192: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 187 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. in response to the telephonic discussion with MACE

108 MWMPL/2019-20/C/857 20-09-2019 MWMPL KC DHAWAN

Y 4 Your Email dated 10-09-19 regarding observations on Design calculation, Civil GA and reinforcement details of thickened sludge sump for 30 MLD new STP in Masani Zone at Mathura

109 MWMPL/2019-20/C/853 19-09-2019 MWMPL KC DHAWAN

Y 2 Request for Material Dispatch Clearance Certificate (MDCC) for Chlorine tonner

110 MWMPL/2019-20/C/856 20-09-2019 MWMPL KC DHAWAN

Y 6 Submission of Data sheets for Analysers for 30MLD STP Masani, Mathura

111 MWMPL/2019-20/C/854 19-09-2019 MWMPL KC DHAWAN

Y 3 Your Email dated 08-02-19 regarding observations on Architectural drawing of chlorination cum tonner room for 30 MLD new STP in Masani Zone at Mathura

112 MWMPL/2019-20/C/860 20-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Revised Transformer document of 20MLD TTP Transyamuna as per comments received from MACE vide Letter No. MACE: P986:9476 Dated 10 Jul2019 for Mathura Project

113 MWMPL/2019-20/C/865 20-09-2019 MWMPL KC DHAWAN

Y 16 Submission of Revised Pipe Schedule, Technical datasheet of Manual screen for Masani Zone & Trans Yamuna Zone as per Email Dated17-09-19/14-09-19

114 MWMPL/2019-20/C/867 20-09-2019 MWMPL KC DHAWAN

Y 10 Your letter no. 1213/Namami Gange/1722 dated 12-09-19 regarding observations on 600 dia

Page 193: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 188 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. pipe crossing over Gokul Barrage Bridge

115 MWMPL/2019-20/C/858 20-09-2019 MWMPL KC DHAWAN

Y 6 Submission of Data sheets for Analysers for 20MLD TTP at Transyamuna Zone, Mathura

116 MWMPL/2019-20/C/869 21-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 10-08-19 regarding observations on Civil GA & Reinforcement details of DG foundation at Dairy Farm MPS in Trans Yamuna Zone, Mathura

117 MWMPL/2019-20/C/862 20-09-2019 MWMPL KC DHAWAN

N Request for inspection of Knife Gate Valve, Sluice Gate, Sluice Valve & Butterfly Valve

118 MWMPL/2019-20/C/855 20-09-2019 MWMPL KC DHAWAN

Y 3 Your Email dated 17-09-19 regarding observations on Design calculation, Architectural details, Civil GA & reinforcement details of security room for JAISINGHPURA MPS, in Masani Zone, Mathura

119 MWMPL/2019-20/C/872 21-09-2019 MWMPL KC DHAWAN

Y 4 Your Email dated 11-09-19 regarding observations on Civil Structural design, Civil GA & Reinforcement details of SBR for 30MLD new STP at Masani Zone, Mathura

120 MWMPL/2019-20/C/871 21-09-2019 MWMPL KC DHAWAN

Y 7 Your Email dated 17-09-19 regarding observations on Design calculation, Architectural details, Civil GA & reinforcement details of LT panel/PLC room for Jaisinghpura MPS (in Masani Zone), Mathura

121 MWMPL/2019-20/C/870 21-09-2019 MWMPL KC DHAWAN

Y 17 Your Email dated 17-09-19 regarding observations on Design calculation, Architectural details,

Page 194: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 189 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. Civil GA & reinforcement details of 11/0.433 KV Substation/PMCC/MCC for Dairy Farm MPS (Trans Yamuna Zone, Mathura).

122 MWMPL/2019-20/C/867 20-09-2019 MWMPL KC DHAWAN

Y 10 Your letter no. 1213/Namami Gange/1722 dated 12-09-19 regarding observations on 600 dia pipe crossing over Gokul Barrage Bridge

123 MWMPL/2019-20/C/876 21-09-2019 MWMPL KC DHAWAN

Y 1 Request for Material Dispatch Clearance Certificate (MDCC) for Manual Screen

124 MWMPL/2019-20/C/873 21-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Instrument Schedule for 30 MLD STP at Masani Zone, Mathura

125 3527/ Mathura Namami Gange /1087

21-09-2019 UPJN GM N Regarding vetting of Design, Drawings and documents submitted by MWMPL for Mathura

126 E-Mail dated 23-09-2019 23-09-2019 MWMPL KC DHAWAN

N Your letter no. 1213/Namami Gange/1722 dated 12-09-19 regarding observations on 600 dia pipe crossing over Gokul Barrage Bridge

127 MWMPL/2019-20/C/879 23-09-2019 MWMPL KC DHAWAN

Y 3 Submission of GA Of Detritor Mechanism & Data Sheet For Detritor Mechanism For 30 MLD Masani STP in response your comments vide letter no. MACE:P986:9583 dated 25-07-19 regarding observations on GA Of Detritor Mechanism & Data Sheet For Detritor

Page 195: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 190 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. 128 MWMPL/2019-20/C/877 21-09-2019 MWMPL KC

DHAWAN Y 2 Submission of Revised Technical

Datasheet of Gates for Masani MPS as per Email Dated 17-09-19.

129 MWMPL/2019-20/C/880 23-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Local Control Panel Drawing of Detritor Mechanism & Thickener for 30MLD MASANI STP

130 MWMPL/2019-20/C/884 23-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Electrical document of 20MLD TTP Transyamuna of Transyamuna Zone, for Mathura Project

131 MWMPL/2019-20/C/882 23-09-2019 MWMPL KC DHAWAN

N Request for inspection of RCC NP3 pipes

132 MWMPL/2019-20/C/883 23-09-2019 MWMPL KC DHAWAN

N Request for inspection of DI pipes

133 E-Mail dated 24-09-2019 24-09-2019 MWMPL KC DHAWAN

N Request for inspection of RCC NP3 pipes

134 MWMPL/2019-20/C/889 24-09-2019 MWMPL KC DHAWAN

N Your letter for first milestone completion for Masani Facilities vide ref. no. 3449/Mathura Namami Gange/1055 dated 18-09-19 and 3450/Mathura Namami Gange/1056 dated 18-09-19

135 MWMPL/2019-20/C/885 24-09-2019 MWMPL KC DHAWAN

Y 1 Submission of PLC IO List for 30 MLD STP at Masani Zone, Mathura

136 MWMPL/2019-20/C/886 24-09-2019 MWMPL KC DHAWAN

Y 1 Your Email dated 08-07-19 regarding recommendation for approval with observation on P & I Diagram- rev. 8 at Laxmi Nagar in trans Yamuna zone.

137 MWMPL/2019-20/C/888 24-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 26-04-19 regarding recommendation for approval with notes on Mechanical GA Drawing N-pit & Blending

Page 196: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 191 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. disposal tank- Rev. 2 at Laxmi Nagar in trans Yamuna zone

138 MWMPL/2019-20/C/878 24-09-2019 MWMPL KC DHAWAN

Y 6 Submission of Revised Process Design & Mechanical Design Calculation-R2, Hydraulic Flow Calculation-R2, Hydraulic Flow Diagram-R2, P & I Diagram-R2 & Layout and GA-R2 For Dhruvghat I & D

139 MWMPL/2019-20/C/881 23-09-2019 MWMPL KC DHAWAN

Y 6 Submission of Instrument Data Sheets for 30 MLD STP at Masani Zone, Mathura

140 MWMPL/2019-20/C/887 24-09-2019 MWMPL KC DHAWAN

Y 1 Your Email dated 21-08-19 regarding Observation on Mechanical GA and data sheet of N-Pit Transfer Pump - Rev. 0 at Laxmi Nagar in trans Yamuna zone

141 827 / Mathura Namami Gange /394

24-09-2019 UPJN PM N Regarding MDCC of Chlorine Tonners

142 828 / Mathura Namami Gange /395

24-09-2019 UPJN PM N MDCC for Manual Screens

143 MWMPL/2019-20/C/901 25-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Monthly EHS site checklist for August'19 as per approved ESHMP plan for construction of new facilities and rehabilitation work for Masani Zone and Trans-Yamuna Zone

144 MWMPL/2019-20/C/890 24-09-2019 MWMPL KC DHAWAN

Y 4 Your letter for first milestone completion for Masani Facilities vide ref. no. 3449/Mathura Namami Gange/1055 dated 18-09-19 and 3450/Mathura Namami Gange/1056 dated 18-09-19 and

Page 197: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 192 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. our letter no. MWMPL/19-20/C/874 dated 20-04-19

145 MWMPL/2019-20/C/899 25-09-2019 MWMPL KC DHAWAN

Y 2 Submission of Instrument Data Sheets for 30 MLD STP at Masani Zone, Mathura

146 MWMPL/2019-20/C/892 25-09-2019 MWMPL KC DHAWAN

Y 11 Your Email dated 16-08-19, 19-08-19, 20-08-19, 22-08-19, 18-09-19 & 19-09-19 regarding observations on Quality Assurance Plan of Disc Filter, RO Membrane, UF Membrane, Screw Pump, Sluice Valve, Decanter & DG set

147 MWMPL/2019-20/C/904 25-09-2019 MWMPL KC DHAWAN

Y 2 Submission of credentials of railway contractors for trenchless work in Masani Zone and pipe laying work under Bengali Ghat Railway Bridge.

148 MWMPL/2019-20/C/889 24-09-2019 MWMPL KC DHAWAN

N 4 Your letter for first milestone completion for Masani Facilities vide ref. no. 3449/Mathura Namami Gange/1055 dated 18-09-19 and 3450/Mathura Namami Gange/1056 dated 18-09-19

149 E-Mail dated 25-09-2019 25-09-2019 UPJN GM Y 5 Your letter for first milestone completion for Masani Facilities vide ref. no. 3449/Mathura Namami Gange/1055 dated 18-09-19 and 3450/Mathura Namami Gange/1056 dated 18-09-19 and our letter no. MWMPL/19-20/C/874 dated 20-04-19

150 MWMPL/2019-20/C/893 25-09-2019 MWMPL KC DHAWAN

Y 6 Your Email dated 20-09-19 regarding observations on soil investigation report for

Page 198: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 193 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. Chintaharan IPS, Swamighat IPS and Krishanganga IPS at Mathura

151 MWMPL/2019-20/C/898 25-09-2019 MWMPL KC DHAWAN

Y 6 Submission of Design calculation, Civil GA & reinforcement details of Receiving Chamber & Mech. Screen for Dairy Farm MPS

152 MWMPL/2019-20/C/902 25-09-2019 MWMPL KC DHAWAN

Y 5 Submission of Civil GA & Reinforcement details of Ambakhar I&D, Chintaharan I&D, jaisinghpura I&D, Dairy farm I&D and Mahadev I&D for Mathura Project.

153 MWMPL/2019-20/C/903 25-09-2019 MWMPL KC DHAWAN

Y 4 Request for Material Dispatch Clearance Certificate (MDCC) for RCC NP3 pipes

154 MWMPL/2019-20/C/896 25-09-2019 MWMPL KC DHAWAN

Y 7 Submission of Design calculation, Column and foundation details, Plinth, tie, roof beam & slab details and DG set foundation details of Swami Ghat IPS

155 MWMPL/2019-20/C/895 25-09-2019 MWMPL KC DHAWAN

Y 7 Submission of Design calculation, Column and foundation details, Plinth, tie & roof beam details and DG set foundation details of Krishanganga IPS

156 MWMPL/2019-20/C/894 25-09-2019 MWMPL KC DHAWAN

Y 5 Submission of Design calculation, Column and foundation details, Plinth beam & roof beam details of Chintaharan IPS

157 MWMPL/2019-20/C/897 25-09-2019 MWMPL KC DHAWAN

Y 22 Your Email dated 21-09-19 regarding observations on Design calculation & Structural GA of UF-RO Shed for 20 MLD TTP at Laxmi Nagar in Trans-Yamuna Zone at Mathura

Page 199: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 194 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. 158 MWMPL/2019-20/C/905 26-09-2019 MWMPL KC

DHAWAN Y 10 Your Email dated 31-07-19

regarding observations on Design Calculation, Civil GA and and Reinforcement details of Centrifuge Building for 30MLD STP

159 MWMPL/2019-20/C/908 26-09-2019 MWMPL KC DHAWAN

N Request for inspection of DI pipes & fittings

160 MWMPL/2019-20/C/907 26-09-2019 MWMPL KC DHAWAN

Y 1 Your Email dated 12-09-19 regarding Observation on Mechanical GA Drawing of Alkali dosing tank for N-pit with agitator - Rev. 1 at Laxmi Nagar in trans Yamuna zone

161 MWMPL/2019-20/C/906 26-09-2019 MWMPL KC DHAWAN

Y 3 Submission of Documents for Jaisinghpura MPS at Masani Zone, Mathura

162 3622/Mathura Namami Gange/21

27-09-2019 UPJN GM Y 1 Regarding 1 "Milestone Payment Invoice

163 MWMPL/2019-20/C/910 27-09-2019 MWMPL KC DHAWAN

Y 5 Submission of Revised Equipment GA Of Agitator For Poly Tank-R1 & Data Sheet Of Agitator For Polyelectrolyte Dosing Tank-R1 For 30 MLD Masani STP

164 MWMPL/2019-20/C/914 27-09-2019 MWMPL KC DHAWAN

Y 1 Request for Material Dispatch Clearance Certificate (MDCC) for DI fittings

165 MWMPL/2019-20/C/912 27-09-2019 MWMPL KC DHAWAN

Y 13 Our meeting at irrigation department office on 24.09.2019, your letter no. 1213/Namami Gange/1722 dated 12-09-19 & 1248/Namami Gange/1808 dated 21-09-19 regarding observations on 600 dia pipe crossing over Gokul Barrage Bridge.

Page 200: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 195 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. 166 MWMPL/2019-20/C/911 27-09-2019 MWMPL KC

DHAWAN Y 6 Your letter vide ref. no.

3622/Mathura Namami Gange Escrow/21 dated 27-09-19 regarding observations of first milestone invoice

167 MWMPL/2019-20/C/916 27-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 18-09-19 regarding observations on Civil GA & Reinforcement details of Gaughat I&D for Mathura Project.

168 MWMPL/2019-20/C/913 27-09-2019 MWMPL KC DHAWAN

Y 4 Your Email dated 04-09-19 regarding observations on Civil GA & Reinforcement details of Masani I&D , Civil GA & Reinforcement details of Krishanganga I&D for Mathura Project

169 MWMPL/2019-20/C/917 27-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 14-09-19 regarding observations on Civil GA & Reinforcement details of Cant I&D for Mathura Project

170 E-Mail dated 28-09-2019 28-09-2019 MWMPL KC DHAWAN

Y 2 Resubmission Of HFC & HFD Of Cant IPS

171 MWMPL/2019-20/C/920 29-09-2019 MWMPL KC DHAWAN

Y 2 Request for Material Dispatch Clearance Certificate (MDCC) for Knife Gate Valve, Non Return Valve, Sluice Valve & Sluice Gate

172 MWMPL/2019-20/C/918 28-09-2019 MWMPL KC DHAWAN

Y 12 Your Email dated 25-09-19 regarding observations on Design calculation, Architectural details, Civil GA & reinforcement details of 11/0.433 KV Substation/PMCC/MCC for Dairy Farm MPS (Trans Yamuna Zone, Mathura).

173 MWMPL/2019-20/C/919 28-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 24-09-19 regarding observations on Civil GA

Page 201: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 196 Monthly Progress Report - September 2019

Sl. No. Document No Letter Date From Attachments Subject

Organization Writer Y/N No. & Reinforcement details of DG foundation at Dairy Farm MPS in Trans Yamuna Zone, Mathura

174 MWMPL/2019-20/C/920 E-mail dated 30-09-2019

30-09-2019 MWMPL KC DHAWAN

Y 4 Request for Material Dispatch Clearance Certificate (MDCC) for Knife Gate Valve, Non Return Valve, Sluice Valve & Sluice Gate

175 MWMPL/2019-20/C/921 30-09-2019 MWMPL KC DHAWAN

Y 1 Request for Material Dispatch Clearance Certificate (MDCC) for DI pipes

176 MWMPL/2019-20/C/924 30-09-2019 MWMPL KC DHAWAN

Y 2 Your Email dated 04-07-19 regarding Observation on Piping Layout - rev. 0 for 20 MLD TTP at Laxmi Nagar in trans Yamuna zone

Page 202: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 197 Monthly Progress Report - September 2019

ANNEX - 5 EHS TARGET & ACHIEVEMENT

Page 203: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 198 Monthly Progress Report - September 2019

1. ESHS targets, achievements and compliance report Month of September 2019

ESHS target and achievement

Health & Safety Targets and Goals

Sl. No. Goals Till previous

month Up to this month of September 2019 (01.09.2019 to 30.09.2019)

1 Zero total recordable injuries NA Complied 2 All personnel Health and Safety inducted NA Not inducted Including All

Engineering staff - pending issue. 3 100% incident reporting and investigation NA NA 4 100% adherence of usage of appropriate PPE’s at work NA In completed as of now – Pending

issue 5 Executing construction work with least disturbance to the

environment, adjoining road users and traffic-PIPE Line network

NA Lacking many location, poor traffic management, safety norms not followed up as per approved EHS.-serious issues

Page 204: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 199 Monthly Progress Report - September 2019

HSE Training and competence adherence

Sl. No.

Description Till previous

month Up to this month of September 2019 (01.09.2019 to 30.09.2019)

1 Issue of a photo identity card duly signed by the authorized representative of the company / subcontractor before they are engaged for any work

NA Manpower keep changing daily basis-not consistency incomplete task

2 HSE induction training at the first day of their joining explaining the nature of the work for all the personnel working at site on the following topics • Hazard identification procedure - Hazards on site

• Fails• Slip trip• Electricity• Working at height• Excavation• Drop objects• Machinery• Material handling (Manual and mechanical)• Transportation• Site housekeeping• Fire

• Personnel protective equipment• What is available• How to obtain it?• Correct use and care

• Health• Site welfare facilities

NA Reinforcement labor shed not provided, Bench mounted steel cutter-not done at yard -Not yet-

Poor Housekeeping - improper approach roads - Incomplete task

Not found proper safety hard Barricades/shoring around deep excavation areas/pipe lines, no signage board - Pending

Page 205: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 200 Monthly Progress Report - September 2019

Sl. No.

Description Till previous

month Up to this month of September 2019 (01.09.2019 to 30.09.2019)

• Potential health hazards• First Aid / CPR

• Duties of contractor• Brief outline of the responsibilities of the contractor by law• Details of accident prevention policy• Building and other constructions welfare law

• Employer’s duties• Brief outline of responsibilities of employee• Site safety rules

3 Tool box meetings Key issues discussed at Daily Tool Box meetings includes

• The job to be done• Awareness of hazards, risks & control measures

associated with specific activity, review safe workpractices

• Active involvement of crew and open discussion on anyconcerns and commitment to work safely

NA Complied

4 Behavior modification and disciplinary action NA None 5 Post-accident or near miss meeting NA Occurred and Reported

Page 206: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 201 Monthly Progress Report - September 2019

HSE Inspections and submission of reports Sl. No.

Description Till previous

Month 1 Planned General inspection NA Conducted 2 Routine inspection NA Conducted

2.1 Daily inspection of plant and equipment by operator NA Conducted 2.2 Weekly inspection of scaffold by scaffolding supervisor NA NA 2.3 Monthly inspection of electrical hand tools by

competent electrical supervisor NA Conducted

2.4 Quarterly inspection of temporary electrical systems by competent electrical supervisor

NA Not yet

2.5 Yearly inspection of lifting machinery, lifting appliances, equipment and gears by Government approved competent person

NA NA

2.6 Half yearly inspection of pressure vessels by Govt approved competent person

NA NA

3 Specific inspection NA Inspection performed before a heavy lifting operation NA Conducted Inspection performed before and after the entry of person into a confined space

NA Conducted

Inspection performed before and after welding and gas cutting operation

NA NA

Inspection of formwork before concreting by formwork erector

NA NA

4 Other inspection NA Inspections by labor department of government NA Joint inspection to be done-pending Client site HSE management team NA Not available

Up to this month of September 2019 (01.09.2019 to 30.09.2019)

Page 207: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 202 Monthly Progress Report - September 2019

Sl. No.

Description Till previous

Month 5 Monthly HSE Report submission covering

• Monthly minor accident, serious incident details• Average manpower details, man-hours works• Lost time (no of working days)• Number of training / tool box talk• Number of people trained• HSE committee minutes of meeting• HSE inspection, etc.

NA Complied some issues except Provide display Board outside of the site office and updating daily basis.

Millions man- hour data-pending

6 HSE Bulletin board indicating

• Safety promotions / awards• Safety meeting dates and times• Emergency phone numbers• QHSE policies• Safety alerts

NA Available

7 Risk assessment prior to start of any new work – Report NA Conducted by HSE officers 8 Availability of method statement for operational control

of significant occupational health & safety risk levels NA Available at site office

9 Statement of confirming the medical examination of all employees and workmen

NA Complied

10 Availability of first aid box with each crew (mention the number of first aid box availability)

NA Available /not found approved first Aiders-to be deploy asap.

11 Statement of confirming the welfare measures for workers

NA Not found

One latrine for every 20 workers up to 100 workers and thereafter one for every additional 50 workers

NA Provided

Up to this month of September 2019 (01.09.2019 to 30.09.2019)

Page 208: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 203 Monthly Progress Report - September 2019

Sl. No.

Description Till previous

Month In addition one urinal accommodation provided for every 100 workers

NA Provided

Separate latrine and urinals accommodation similar to above for ladies

NA Provided

Drinking water facility within a distance of 200 m from the place of work for all workers

NA Provided

Provision of labor accommodation NA Provided Provision of creche (if female workers are more than 50) NA NA Measures to prevent mosquito breeding/snakes and other insects

NA Pesticide applied-action taken

Permit to work system (if applicable) NA Not yet 12 PPE adherence NA

Head protection for MWMPL employees, All sub-contractors, Electricians, Safety professionals, All workmen and Visitors Safety helmet color code (every helmet having the logo)

NA Provided, but not found logo, induction stickers

Hearing protection NA Required at all pumping station, Eye protection NA Required at all pumping station, Foot protection NA Required at all pumping station, Fall arresting system NA Required at all pumping station, Hand protection NA Provided Respiratory protection NA Required at all pumping station/confined areas Other PPE – 10% spares availability NA Provided

13 Qualification of operator of lifting appliances and of signaler etc.

NA Adhered

Up to this month of September 2019 (01.09.2019 to 30.09.2019)

Page 209: National Mission for Clean Ganga (NMCG) Ministry of Water … · 2019. 10. 4. · Namami Gange programme and the Ganga 2016 Order, the Jal Nigam, in association with the NMCG, has

Development of STP’s & TTP Projects along with associated infrastructure in Mathura under Hybrid Annuity based PPP Mode

Page 204 Monthly Progress Report - September 2019

Sl. No.

Description Till previous

Month Above 21 years of age and possesses a valid heavy transport driving license as per motor vehicle act and rules Competent and reliable Possesses the knowledge of inherent risks involved in the operation of lifting appliances Periodical medical examination conducted

14 Sufficient lighting especially during night work NA Provided 15 Fire prevention and fighting system availability NA Provided 16 Adherence of environment management system – Air

quality, Water quality, Wastewater handling, waste handling, hazardous waste handling and energy management

NA Adhered as per the applicable law in some cases like Air quality, Action to be taken waste water, hazardous system

HSE communication and awareness campaign conducted Sl. No.

Description Status Planned

1 Tool box meeting Adhered Adhered 2 Firefighting system Not yet Adhered

3 Safety weekly meeting Not yet Adhered 4 Poor communication system Unidentified To be improve

Up to this month of September 2019 (01.09.2019 to 30.09.2019)