national highways in north eastern region at a glance
DESCRIPTION
PRESENTATION ON ACTION PLAN OF NORTH EASTERN STATES IN RESPECT OF MINISTRY OF ROAD TRANSPORT AND HIGHWAYS. NATIONAL HIGHWAYS IN NORTH EASTERN REGION AT A GLANCE. North Eastern States comprise Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura. - PowerPoint PPT PresentationTRANSCRIPT
PRESENTATION
ON
ACTION PLAN OF NORTH EASTERN STATES IN RESPECT OF MINISTRY
OF ROAD TRANSPORT AND HIGHWAYS
1
NATIONAL HIGHWAYS IN NORTH EASTERN REGION AT A GLANCE
• North Eastern States comprise Arunachal Pradesh, Assam, Manipur, Meghalaya, Mizoram, Nagaland, Sikkim and Tripura.
2
State wise National Highways and length
• Arunachal Pradesh : 52, 52A, 153, 229, 52B Ext, 37 Ext. & 315A. [2027 km]
• Assam : 31, 31B, 31C, 36, 37, 37A, 38, 39, 44, 51, 52, 52A, 52B, 53, 54, 61, 62, 127B, 151,152, 153, 154 & 315A [2940 km]
• Manipur : 39, 53, 102A, 102B, 137, 150 & 155 [1317 km]• Meghalaya : 40, 44, 51, 62 & 127B [1171 km]• Mizoram : 44A, 54, 54A, 54B, 150, 154& 502A [1027 km]• Nagaland : 36, 39, 61, 150 & 155 [494 km]• Sikkim : 31A & 310 [149 km]• Tripura : 44, 44A [400 km]
3
Comparison with National Average
• TOTAL NH LENGTH - 76818 KM• IN NE STATES - 9525 KM (12.40%)
ALL INDIA NE REGION• Length (km) / 1000 sq km 23.4 38.82• Length (km) /
lakh population 7.5 60.544
Major Road Development Programme in NE Region
• NHDP-II (East-West Corridor)• NHDP-III• Special Accelerated Road Development
Programme in North East (SARDP-NE)– Phase ‘A’– Arunachal Pradesh Package of Roads and
Highways– Phase ‘B’ (approved for DPR preparation only)
5
Major Road Development Programs in North East Region
LEGEND :-1. Arunachal Package2. SARDP NE, Phase- A3. SARDP NE, Phase- B4. East West Corridor5. NHDP III5. NH/Roads (In-Progress under SARDP-NE )
6. Completed stretches) NH Network with PWD with BRO NH yet to be Entrusted
TawangVijaynagar
Panchao
Golaghat
Chandel
Tura
Lunglei
Seling
Champai
Palel
Peren
Kailasahar
Seppa
Balipara
Koloriang
Yingkiong
Pasighat
Anini
HawaiAlong
Ziro
Bishing
Jido
Singa
Sarkam Point
Jorging
Rowta
Maram
Theriat
Tuipang
Saiha
Ukhrul
Mokokchung
Migging
Bile
Tato
Taliha
Pango
AIZAWL
Mangan
Sivoke
Baghmara
SIKKIM
MIZORAM
NAGALAND
ARUNACHAL PRADESH
CHINA
BHUTAN
BANGLADESH
MYANMAR
Mahadevpur
NATHULA
Srirampur
Silchar
GUWAHATI
IMPHAL
GANGTOK
ITANAGAR
AGARTALA
AIZAWL
MEGHALAYA
Boxirhat
Pangsu Pass
Kajiranga
Jhanji
Dimapur
Tuensang
Moreh
Sabroom
150
31C
155
Daboka
Paikan
31A
54B
54A
Roing
Barapani
Namchik
61Nagaon
Dhola
Makum
Bimlapur
52B
52B
Dhubri
Kokrajhar Barpeta
BaskaUdalguri
Morigaon
Diphu
Tamenglong
Lumla
Tashigaon
Silghat
Longleng
Mon
Zunheboto
Zhamai
Goalpara
BaihataCharali
Dudhnai
Dalu
Gyalshing
Namchi
Melli
Singtam
`
Yupia
Road serving Kaladan Project
Daporijo
Bame
TezpurNumaligarh
Merangkong
Kanubari
Mawthabah
Chaigaon
ASSAM
Demagiri
TRIPURA
Manu
JowaiBypass
ShillongBypass
SilcharBypass
Haflong
Nongstoin
DibrugarhBypass
Athibung
Khelema
6251
31
3637
37
61
39
54
39
40
44
5339
54
44
44
155
151
150
152
229 52
52
52
37
229
38153
44E
SHILLONG
44A
150
Nechipu
Hoj
Potin
Pahumara
Lumding
KhonsaChanglang
Sadia
NorthLakhimpur
Jonai
KOHIMA
154
54
54
37
Kumarghat
Wakhaji
Pangin
Akajan
Jorabat
Wokha
Kukital
Phek
Williamnagar
Rangpo
BagdograSilliguri
Naya Bazar
Chalsa
WESTBENGAL
Bogibeel bridge with NHAI
Menla
Jaldhaka
31
Ranipul
CHINA
Shankshak
Tengnoupal
Yaingpokpi
MANIPUR
31B
37
62
40 40
36
37A
52A
52A
52
52
52B
150
53Badarpur
Jiribam
36 54
153
Km 95 – 118 of NH 54
Km 10 – 18 of NH 154
Boko
Mawshynrut
`
NHAI
7
Projects Taken up by NHAI in NE States
Programme Length(km)Length(km) Cost (Rs. Crore)Cost (Rs. Crore)
NHDP (Phase-II)NHDP (Phase-II) 670 670 6000 6000East West Corridor East West Corridor NHDP (Phase-III) NHDP (Phase-III) 110 110 400 400on BOT(Toll) Basis on BOT(Toll) Basis
(SARDP-NE) (SARDP-NE) 394 394 3945 3945On BOT (Annuity) basisOn BOT (Annuity) basis
Total Total 1182 Km 1182 Km 10345 10345
BRIEF ON EAST WEST CORRIDOR PROJECTS IN ASSAM
Total length in Assam = 670 kmStarts from Silchar (km 306.25 of NH-54) and ends at Assam/West Bengal Border (km 0 of NH-31C) Srirampur Passes through Silchar, Maibong, Lumding, Daboka, Nagaon, Sonapur, Guwahati, Nalbari and Bijni
Four laning completed = 18 km (Guwahati Bypass)To be awarded after completion of 2 laning by State PWD (progress 70%) = 31 km Under Implementation = 621 km
Status of Four Laning Works on EW corridor
Under Implementation = 621 km (26 packages)
4-laned completed up to March, 10 = 126.0 Km
4-lane completed in the year 2010-11 = 160.0 Km
4-lane completed in the year 2011-12 = 104.0 Km
4-lane completed in the year 2012-13 = 4.46 Km
Total 4-laning completed up to May, 12 = 394.46km
Balance length = 226.54 Km
Target for the year 2012-13 = 104 Km
Target for the year 2013-14 = 122.54 Km
Continued• The stretch of 31 km from Balachera to Herangajo is being
widened from single lane to two lanes by the State PWD. Clearance for Borail Wild Life and Borail Reserve forest is awaited. Four laning would be done after completion of two lane by PWD, Assam.
• Most of the contracts were awarded in November/December 2005.
• All the contractors had mobilized to site and works are in progress except in 5 contract packages in NC Hills district where the work has been stopped by the previous contractors since April’2008 due to non-handing over of encumbrance free site and law & order situation. All the five civil packages of NC Hills district had been foreclosed and re-awarded.
• Entire East West Corridor is targeted for completion by March, 2013 except the five packages of NC Hills district re-awarded for the balance work targeted for completion March, 2014.
Status of NHDP (III) Projects in Meghalaya
State NH Stretch Length (km)
Cost for 2-laning (Rs. crore)
Remarks
Meghalaya 44 Jowai-Meghalaya/
Assam Border (Ratachhera)
102 390.7 Work awarded on 20th March, 2012 to M/s Simplex Infrastructure Pvt. Ltd., Kolkatta and concession agreement signed on 05.06.2012.
TotalTotal 102102 390.7390.7
14
Status of SARDP – NE Projects on BOT (Annuity)
Stretch NH Length (km)
TPC(Rs. Cr.)
Present status
Jorabat- Barapani
40 62 536 Financial closure achieved on12.01.11. Physical Progress of about 39.56% achieved so far.
Shillong Bypass 4044
50 226 Financial closure achieved on 07.02.11 . Physical Progress of about 50% achieved so far.
Jorhat – Demow 37 81 889 RFQ re-invited on 08.06.2012
Demow – Dibrugarh
37 46 536.29 RFQ re-invited on 08.06.2012
Numaligarh – Jorhat
37 51 659.47 RFQ re-invited on 08.06.2012
Dimapur - Kohima
39 81 902 RFQ will be invited by July, 2012
SPECIAL ACCELERATED ROAD DEVELOPMENT
PROGRAMME IN NORTH EAST (SARDP-NE)
16
Objectives of SARDP-NE
• Upgrade National Highways connecting State Capitals to 2/ 4 lane;
• To provide connectivity of all 88 District Headquarter towns of NER by at least 2-lane road;
• Provide road connectivity to backward and remote areas of NE region to boost socio - economic development;
• Improve roads of strategic importance in border area;
• Improve connectivity to neighboring countries
17
SARDP-NE at a Glance
18
Phase ‘A’ (EPC component)
- 3213 km (Rs 12821 cr)
Phase ‘A’ (roads approved ‘in-principle’)
- 886 km ( Rs 8948 cr)
Total Phase ‘A’ - 4099 km (Rs 21769 cr)
Arunachal Pradesh Package as per Cabinet decision dt 9.1.2009
- 2319 km (Rs 11919 cr)
Total Phase ‘A’ & Arunachal Package
- 6418 km (Rs 33688cr)
Phase ‘B’ - 3723 km (Rs. 64 crore approved for DPR preparation only)
Total of SARDP-NE - 10141 km (Rs. 33752 cr)(NH 4798km (47%), SR (5343km(53%))
19
Length in km
STATE
SARDP-NE Phase 'A'Arunachal Pradesh Package
of Roads and Highways SARDP-NE Phase 'B' Grand Total
NHs SR/GS Total NHSR/GS/
StrtgTotal NH
SR/GS/ Strtg
Total NHSR/GS/
StrtgTotal
Arunachal Pradesh
52 212 264 1346 835 2181 0 931 931 1398 1978 3376
Assam 1179 177 1356 126 12 138 0 285 285 1305 474 1779
Manipur 39 166 205 0 0 0 0 202 202 39 368 407
Meghalaya 259 526 785 0 0 0 161 201 362 420 727 1147
Mizoram 221 100 321 0 0 0 416 272 688 637 372 1009
Nagaland 81 350 431 0 0 0 622 169 791 703 519 1222
Sikkim 80 505 585 0 0 0 0 68 68 80 573 653
Tripura 130 22 152 0 0 0 86 310 396 216 332 548
Total 2041 2058 4099 1472 847 2319 1285 2438 3723 4798 5343 10141
State-wise road length distribution under SARDP-NE
SR: State Road; GS: General Staff roads & Strtg: Strategic roads
Progress of SARDP-NE
20
Item
Phase ‘A’ Arunachal Package
EPCIn principle incl. BOT
Total EPCHybrid BOT
(Annuity) Total
Total Length (km)3213 km (Rs 12821
cr)
886 km * (Rs 8948
cr)
4099 km (Rs 21769
cr)
1543km (Rs 6808
cr)
776 km (Rs 5111 cr)
776 km (Rs 5111 cr)
Works sanction/ awarded
2259 Km (Rs 9160
cr)
132 Km (Rs 1026cr)
2391 Km (Rs 10186
cr)
558 km (Rs 2699 cr)
774 km (Rs 5111
cr)
1332 km (Rs 7810
cr)
3723 km (Rs 17996 cr)
Roads completed 818 km 34 km 852 km 40 km Nil 40 km
Target for completion March, 2015 for ongoing works June, 2016
* Out of 886 km NHAI is implementing 39 4 km on BOT(Annuity), MoRT&H 140 km on BOT(Annuity) & 347km on EPC
21
Performance of SARDP-NE
Year
Sanctions/AwardsLength
completed (km)
Financial (Rs. Crore)
Length (km)Cost
(Rs. Crore)Allocation Expenditure
2006-07 501 1285 Preliminary 550 450
2007-08 240 615 150 700 652
2008-09 187 835 290 1000 637
2009-10 188 1070 156 1200 676
2010-11 1615 9439 146 1500 1065
2011-12 992 4752 150 1950 1940
Total 3723 17996 892 6900 5420
22
Quarterly Targets for 2012-13 for SARDP-NE including Arunachal Pradesh Package.
Cummulative Targets
Q1 Q2 Q3 Q4
Physical Completion (km) 0 12 135 300
Sanction of works
Length (km) 146 509 799 1980
Amount (Rs in
crore)607 3250 4912 11470
23
Sl. No. States Length (km) Cost
(Rs. Crore)1 Arunachal Pradesh 952 5,4612 Assam 263 2,2443 Manipur 58 2404 Meghalaya 387 2,3065 Mizoram 0 06 Nagaland 0 07 Sikkim 190 8298 Tripura 130 390 Total 1,980 11,470
Statewise Targets for sanction during 2012-13 under SARDP-NE including Arunachal Pradesh Package.
NH-52
NH-52
NH-37
LEGEND :-
A. Roads under Arunachal Package Road stretches proposed on Annuity basis
B. Roads under Phase ‘A’C. Roads under Phase ‘B’ Work in going on in stretch Other National Highways East West Corridor
DISTRICT HEADQUARTER TOWN
BaihataCharali
To Srirampur
ITANAGAR
ZORAM
NH-52B
NH-37A
MAHADEVPUR
BIMLAPUR
BALIPARA
RUPAI
AKAJAN
NECHIPU
SADIA
DHOLA
NUMALIGARH
DIBRUGARH
Roads covered for Roads covered for improvement inimprovement inArunachal Pradesh Arunachal Pradesh under SARDP-NEunder SARDP-NE
GOHPUR
SILGHAT
TINSUKIA
Tawang
Bomdila
Seppa
Koloriang
Daporijo
Aalong
Yingkiong
Anini Roing
Tezu
HawaiZiro
Yupia
Khonsa
Changlang
Pasighat
SIBSAGAR
NAMCHIK
MARIYUNG
JONAI
PANGSU PASS
JAIRAMPUR
GUWAHATI
KANUBARI
TOSILCHAR
Hoj
NAGAON
NORTHLAKHIMPUR
BANDER DEWA
Potin
PAKA BAME
PANGINBOMJIR
CHOWKHAM
Being improved to 2 lane by BRO under China Study Group(CSG)
Aalong
PANGIN
Koronu
Paya
Lalpul
TASHIGAONG
LUMLA
TAHILA
TATO
LUNGTE
PONGO
MIGGING
GORGING
BILE
BISHING
JIDO
SINGA
SAKRAM POINT
229
229
52
52
52B
153
52B52B
229
HOLONGI
ROUTE OF 4 LANE CONNECTIVITY OF ITANAGAR WITH EAST WEST CORRIDOR AT NAGAON
37 Ext
Details of sanctions in the North Eastern States entrusted to State PWDs under NH(O) in the last five years
States 2007-08 2008-09 2009-10 2010-11 2011-12No. Amount
(Rs. In Crores)
No. Amount (Rs. In Crores)
No. Amount (Rs. In Crores)
No. Amount (Rs. In Crores)
No. Amount (Rs. In Crores)
Arunachal Pradesh
0 0 1 4.78 0 0 0 0 0 0
Assam 16 112.12 16 215.12 17 292.06 3 79.88 3 430.65
Manipur 3 37.97 4 30.38 9 132.22 0 0 10 34.57
Meghalaya7 43.87 9 81.78 7 137.55 0 0 3 21.72
Mizoram 5 21.95 5 40.26 11 63.82 0 0 4 45.89
Nagaland 13 47.08 9 57.9 1 8.42 1 93.68 0 0
Sikkim - - - - - - - - - -
Tripura - - - - - - - - - -
Total 44 262.99 44 430.22 45 634.07 4 173.56 20 532.8325
Allotment and expenditure in the North Eastern States entrusted to State PWDs under NH(O) in the last five years
States 2007-08 2008-09 2009-10 2010-11 2011-12Allot-ment
Expen-diture
Allot-ment
Expen-diture
Allotment Expen-diture
Allot-ment
Expen-diture
Allot-ment
Expen-diture
Arunachal Pradesh
6.00 5.65 1.10 1.10 0.0 0.00 7.00 0.00 0.0 0.0
Assam 86.00 86.59 90.0 86.30 172.00 200.51 172.00 171.67 230.0 197.04
Manipur 12.00 10.24 23.65 23.65 19.65 19.65 55.00 64.08 78.00 47.09
Megha-laya22.00 22.33 50.00 50.77 60.00 64.08 65.00 79.08 83.50 82.76
Mizoram 15.00 15.00 19.00 13.55 28.00 5.42 43.00 24.22 60.00 40.81
Nagaland 12.00 10.20 30.62 30.62 40.00 31.68 47.00 26.94 54.00 19.63
Sikkim - - - - - - - - - -Tripura - - - - - - - - - -
Total 153 150.01 214.37 205.99 319.65 321.34 389 365.99 505.5 387.33
26
(in Rs. Crore)
Targets for 2012-13 the North Eastern States entrusted to State PWDs under NH(O)
States Sanction of projects
(Rs in cores)
Allocation/ Expenditure(Rs in cores)
Physical targets (Widening/strengthening
/IRQP) (in km)
Arunachal Pradesh 21.00 6.00 6.00
Assam 236.00 225.00 105.38Manipur 96.00 62.00 41.00
Meghalaya 230.00 101.77 65.00
Mizoram 286.00 107.00 62.00
Nagaland 193.00 85.00 21.00
Sikkim - - -Tripura - - -
Total 1062 Cr. 586.77 Cr. 300.38 km.
27
ISSUES REQUIRING SUPPORT OF STATE GOVT.• Expedite completion of Land Acquisition and utility shifting
prior to award of the project so that land is free from encumbrance and will in turn expedite completion of the project.
• To expedite Environment and Forest clearance wherever necessary.
• To enhance the capacity of the State PWDs at the Division level for effective implementation and monitoring of the projects.
28
29
Length of roads included under Phase ‘A’ and Arunachal Package of SARDP-NE.State Program
meNH length identified under the programme with
various Agencies (km)Non NH length identified under the programme
with various Agencies (km)Grand Total
PWD BRO NHAI M/O RT&H
Total PWD BRO NHAI M/O RT&H
Total
Arunachal Pradesh (NH = 1472 km)
Phase ‘A’ 52 0 0 0 52 0 212 0 0 212 264
Arunachal Package 448 140 0 748 1336 185 660 0 0 845 2181
Sub Total 500 140 0 748 1388 185 872 0 0 1057 2445
Assam(NH = 2942 km)
Phase ‘A’ 568 270 201 140 1179 177 0 0 0 177 1356
Arunachal Package 98 0 0 28 126 0 12 0 0 12 138
Sub Total 666 270 201 168 1305 177 12 0 0 189 1494
Manipur (NH = 966 km)
Phase ‘A’0 39 0 0 39 0 174 0 0 174 213
Meghalaya (NH = 810 km)
Phase ‘A’83 112 64 259 526 0 0 0 526 785
Mizoram (NH = 927 km)
Phase ‘A’199 22 0 0 221 100 0 0 0 100 321
Nagaland (NH = 494 km)
Phase ‘A’0 0 81 0 81 342 0 0 0 342 423
Sikkim (NH = 45 km*)
Phase ‘A’8 72 0 0 80 199 306 0 0 505 585
Tripura (NH = 400 km)
Phase ‘A’0 130 0 0 130 0 22 0 0 22 152
TOTAL Phase ‘A’ 910 533 394 204 2041 1344 714 0 0 2058 4099
Arunachal Package 546 140 0 776 1462 185 672 0 0 857 2319
GRAND TOTAL 1456 673 394 980 3503 1529 1386 0 0 2915 6418
* Out of 95km length of NH-31A, 80km is included under Phase A of SARDP-NE, 50km is in West Bengal and 30km is In Sikkim