national highways authority of indianhai.org.in/spw/correspondenceissues/nhai lr. no....

6
~ ~ 'l1\i1CFfIJf uriUCb'lOI (~~3fR~~) National Highways Authority of India (Ministry of Road Transport and Highways) ~~ Karnataka Region ~ Cl>llIfC'lll, ~ REGIONAL OFFICE, BENGALURU -.rcT :i. n, ~"l! fen. tit., 1iJ1f1.fi" oro- ~ <6 -witt!, ~, 1!,'!. 1l:'l. TIh:rr ~CR'tq, ollf<'i'" - u~i1: ~, (ll;!. q;q. - "l!) iT'I,-p; "- G0 \9 ~ Sy. No. 13, 14th Km., Near Deepak Bus Stop, Nagasandra, M.S. Ramaiah Enclave, Bengaluru - Tumkur Road (NH- 4) Bengaluru . 560 073 Tele : 080 . 28397156 : 080 - 2839717 ' Fax: 080 - 28377171 .Email: [email protected] [email protected] No. NHAI/RO-BNG/Misc/2014 \ \\49 To Date: 11.07.2014 All PIUs under RO-Bangalore Sub: Creating of project specific websites for all PPP under implementation projects and PMIS - Reg. Ref.: Chairman, NHAlletter No.NHAI/Chairman/Misc/2014, dt.3/7/14 Sir, This is in continuation to training program on creating of project specific websites for all PPP under implementation projects and entering of project information in PMIS conducted at Bangalore on 5 th , 6 th and th June 2014. While imparting training,information on most of the projects under the jurisdiction of RO-Karnataka have been created / uploaded on website. Chairman, NHAI while reviewing the status on uploading noted that for some of the projects the information has not been updated fully particularly pertaining to court cases, correspondence between IE and Concessionaire etc. and delay in hosting of project specific websites and uploading the data has been viewed seriously and issued instructions to update data by 15/7/2014. Further, to monitor updating of data an institutional mechanism has been set up. The details on same are available in HO letter referred above. All PIUs are requested to take the matter seriously and to complete the activity of updating the data by zs" of every month and to ensure that the data has been updated regularly by IE/Concessionaires, Thanking you, Encl.: HO letter referred above. Copy to all IEs/Concessionaries under the jurisdiction of RO-Bangalore. Corp. Office: G-5 & 6. Sector-10, Dwarka, New Delhi - 110075. Ph.: 011-25074100

Upload: vannhan

Post on 22-May-2018

251 views

Category:

Documents


3 download

TRANSCRIPT

~ ~ 'l1\i1CFfIJf uriUCb'lOI(~~3fR~~)

National Highways Authority of India(Ministry of Road Transport and Highways)~~Karnataka Region~ Cl>llIfC'lll, ~REGIONAL OFFICE, BENGALURU-.rcT :i. n, ~"l! fen. tit., 1iJ1f1.fi" oro- ~ <6 -witt!, ~, 1!,'!. 1l:'l. TIh:rr ~CR'tq, ollf<'i'" - u~i1: ~, (ll;!. q;q. - "l!) iT'I,-p; "-G0 \9 ~

Sy. No. 13, 14th Km., Near Deepak Bus Stop, Nagasandra, M.S. Ramaiah Enclave, Bengaluru - Tumkur Road (NH- 4) Bengaluru . 560 073

Tele : 080 . 28397156: 080 - 2839717'

Fax: 080 - 28377171.Email: [email protected]

[email protected]

No. NHAI/RO-BNG/Misc/2014 \ \\49To

Date: 11.07.2014

All PIUs under RO-Bangalore

Sub: Creating of project specific websites for all PPP under implementationprojects and PMIS - Reg.

Ref.: Chairman, NHAlletter No.NHAI/Chairman/Misc/2014, dt.3/7/14

Sir,

This is in continuation to training program on creating of project specific websites forall PPP under implementation projects and entering of project information in PMISconducted at Bangalore on 5th

, 6th and th June 2014. While imparting training,informationon most of the projects under the jurisdiction of RO-Karnataka have been created / uploadedon website. Chairman, NHAI while reviewing the status on uploading noted that for some ofthe projects the information has not been updated fully particularly pertaining to court cases,correspondence between IE and Concessionaire etc. and delay in hosting of project specificwebsites and uploading the data has been viewed seriously and issued instructions toupdate data by 15/7/2014. Further, to monitor updating of data an institutional mechanismhas been set up. The details on same are available in HO letter referred above.

All PIUs are requested to take the matter seriously and to complete the activity ofupdating the data by zs" of every month and to ensure that the data has been updatedregularly by IE/Concessionaires,

Thanking you,

Encl.: HO letter referred above.

Copy to all IEs/Concessionaries under the jurisdiction of RO-Bangalore.

Corp. Office: G-5 & 6. Sector-10, Dwarka, New Delhi - 110075. Ph.: 011-25074100

---,.

~<I~~~~ qftqij"'l ~ (l;jfi1ln~)

National Highways Authority of India(Ministry of Road Transport and Highways)-;;fi"-5~ 6, ~-10, ~, Oft ~ -110075G-5 & 6, Sector-10, Dwari(a, New Delhl-11 0075

~ IPhone: 91-11-25074100125074200

tl;<m IFax: 91-11-25093507 I 25093514

tffi'I'-/Extn.: 2223 I 2318 I 2468 I 2553

No.NHAI/Chairman/Misc/2014 July 3,2014

ToAll Regional Officer( s)National Highways Authority of IndiaBangalorejBhopal/Bhubneshwar/ChandigarhjChennai/Delhi/Gandhinagar jGuwahati/Hyderabad/Jaipur /JammujThiruvanthapuramjKolkata/Lucknow jNagpur /Patna/Ranchi/Dehradun

Dear All,

In my D.O. letter dated 29th April, 2014 addressed to you with copy to all PDsand Independent Engineers, instructions were given for creating Project Specificwebsites for all PPP under implementation Projects. Further to this, similarinstructions were also issued for projects under O&M. Format and Guidelines forcreating websites were also hosted on the NHAI website.

2. On review of the status on 02.07.2014, it is seen that 137 project specificwebsites have been created and balance 76 project specific websites are still to behosted [list attached]. It is also seen that in some of the created web sites, data hasnot been fully uploaded/up-to-date, particularly pertaining to court cases,correspondence between IE and Concessionaire etc. Delay in hosting of projectspecific websites and uploading the data has been viewed verj seriously and allconcerned are directed to ensure that by 15.07.2014 websites for all projects arecreated / hosted with data up-to-date.

3. For setting up Institutional Mechanism for monitoring of PPP Projects, aProject Monitoring System has been developed and in this regard, Member (PPP)had issued an Office Memorandum No.11013/DMS/2013 dated April 28,2014 whichinter alia stated that:-

a) All the concerned PDs will be responsible for entry of data in PPP MonitoringSystem for pre-construction, under construction and O&M PPP Projects andROs will be responsible for approval of data entered in PPP MonitoringSystem. This entire activity was to be completed by 31.05.2014.

b) Data entry shall be a monthly activity and entire activity will be completed by25th of every month.

c) A training Manual and Instructions have been sent to all PDs and a report wasto be generated by 28th of each month to ensure non-compliance of data entryby PDs.

Contd ....2j·

-2-

d) Non compliance report will be linked to performance of PD/lEs and ifnecessary, will be linked to the release of monthly bill of IndependentEngineer.

4. Hands on training for all Concessionaires, Independent Engineers and staff ofROs / PIUs has been imparted in the month of May & June, 2014 for Maharashtra,Madhya Pradesh, Chhatisgarh & Karnataka. Similar trainings are being organized forother States also.

5. Websites of individual projects is proposed to be hyperlinked with theInformation Portal of, as per details given below:-

Portals Information proposed to be hyperlinked

(a) Project Monitoring System Land acquisition, various clearances,progress of work, O&M etc.

(b) Toll Information System Location of Toll Plaza, Toll Notifications,Toll Rates, Toll stretch etc.

(c) Legal Management System Arbitration / Court cases

6. It is imperative that information in above mentioned softwares/portal shouldbe regularly updated by the concerned PD/RO by 15.07.2014.

Yours faithfully,~y(R.P. Singh)

ChairmanEnd: As above "".

Copy to:

All PDs

·'Project N'ame NH No Total funded State

S.No Length By

1 Vijayawada-Gundugolanu Section 5 103.59 BOT Andhra Pradesh2 Six Laning of Nellore-Chilkaluripet 5 183.52 BOT Andhra Pradesh3 Chilkaluripet - Vijayawada (Six lane) 5 82.5 BOT Andhra Pradesh4 vijayawada-Machhlipatnam 9 64.611 BOT Andhra Pradesh5 Kudapa-Mydukur-Kurnool 18 188.752 BOT Andhra Pradesh6 Four ianlng of Kaithal - Rajasthan border 65 166.25 BOT Haryana7 4-Laning of Rohtak-Jind 71 48.6 BOT Haryana8 Rohtak - Bawal(Approved Length 97 Km) 71 83.65 BOT Haryana9 4-Laning'of Punjab/Haryana Border-Jind 71 68 BOT Haryana

10 Delhi/Haryana Border to Rohtak 10 63.49 BOT Haryana11 4-Laning of Rohtak - Hissar section 10 98.81 BOT Haryana12 Panipat - Jalandhar (Six lane) 1 291 BOT Har[116]/Pun[175.1]13 Four Laning of Ki>ratpur~NerChowk Section 21 84.32 BOT Himanchal Pradesh14 4 Laning of Barhi - Hazaribagh 33 41.314 BOT Jharkhand15 Hazaribagh-Ranchi 33 75 Annuity Jharkhand16 Ranchi - Rargaon - Jamshedpur 33 163.5 Annuity Jharkhand17 Four lanning of Ludhiyana- Talwandi section 95 78 BOT Punjab18 Amritsar - Pathankot 15 106 BOT Punjab19 Jaipur-Reengus 11 54 BOT Rajasthan

List of UI Project specific websites to be created

..20 Nandigama - Vijayawada 9 35 BOT Andhra Pradesh

21 Ankapalli - Tuni 5 58.947 Annuity Andhra Pradesh

22 Tuni - Dharmavaram (AP-16) 5 47 Annuity Andhra Pradesh

23 Dharmavaram - Rajahmundry (AP-15) 5 53 Annuity Andhra Pradesh

24 Nellore Bypass 5 17.166 Annuity Andhra Pradesh

25 Nellore - Tada (AP-7) 5 110.517 BOT Andhra Pradesh

26 Farukhanagar to Kottakata (NS-2/AP-3) 7 46.16 BOT Andhra Pradesh"

27 Farukhanagar to Kotakatta (NS-2/ AP-4) 7 55.74 BOT, Andhra Pradesh

28 Islam Nagar to Kadtal (NS-2/BOT/AP-7) 7 53.01 Annuity Andhra Pradesh

29 Armur to Kadloor Yellareddy {NS-2/AP-l} 7 59 BOT Andhra Pradesh

30 Kadloor Yellareddy to Gundla Pochampalli (NS- 7 85.74 Annuity Andhra Pradesh

2/BOT/AP-2)31 Hvderabad Bangalore section (NS-2/BOT / AP-S) 7 74.65 Annuity Andhra Pradesh

32 MH/AP border to Islam Nagar (NS-2/BOT/AP-6) 7 54.6 Annuity Andhra Pradesh

33 Kadal to Armur (NS-2/BOT/AP-8) 7 31 Annuity Andhra Pradesh

34 Hyderabad-Yadgiri {Approved Length 30} 202 35.65 BOT Andhra Pradesh

35 Hyderabad-Vijayawada 9 181.63 BOT Andhra Pradesh

36 Kosi Bridge including approaches and Guide 57 10.63 Annuity Bihar

Bond & Afflux Bond (BR-S)

List of O&M Projects - Web sites to be created

" •. , ' -FundedProject Name NHNo Total State

S.No Length By37 End of Durg Bypass - Chattisgarh / Maharashtra 6 82.685 BOT Chattisgarh

Border

38 Badarpur Elevated Highways 2 4.4 BOT Delhi [2. 71iHaryana[1. 7]

39 Delhi - Gurgaon Section (Access Controlled 8/6 8 27.7 BOT Delhi{9.7J/Haryana[18]Lane)

40 RaJkot Bypass & Gondal Jetpur (Package-VII) 8B 36 BOT Gujarat

41 Vadodara to Bharuch Package BOT-l (Six lane) 8 83.3 BOT Gujarat

42 Bharuch to Surat Package BOT- II (Six lane) 8 65 BOT Gujarat48.32(Six lane completed) 16.G8 (Four lanecompleted)

43 Panipat Elevated Highway (Six lane) 1 10 BOT Haryana

44 Panipat - Rohtak 71A 80.858 BOT Haryana

45 Zirakpur - Parwanoo 22 28.69 BOT Har[20]/HP[6.69]/Pun[2]

4G Ambala - Zirakpur 21,22 36 BOT Haryana[G]/Punjab[30]

47 Thrissur to Angamali (KL-I) 47 40 BOT Kerala

48 Lakhnadon to MP/MH Border (NS-l/BOT/MP-2) 7 40.11 Annuity Madhya Pradesh

49 Gwalior Bypass (NS-l/BOT/MP-l) 75,3 42 Annuity Madhya Pradesh

50 Lakhnadon to MP/MH Border (NS-1/BOT/MP-3) 7 27.73 Annuity Madhya Pradesh

Sl Guna Bypass 3 14 BOT Madhya Pradesh

52 Indore-Khalghat 3 80 BOT Madhya Pradesh

53 Khalghat - MP/Maharashtra Border 3 82.8 BOT Madhya Pradesh

54 Satara - Kagal 4 133 BOT Maharashtra

S5 Pune - Khed 50 30 BOT Maharashtra

S6 Kondhali - Telegaon 6 50 BOT Maharashtra'-,

57 Dhule -Pimpalgaon 3 118 BOT Maharashtra

58 Gonde-Vadape (Thane) 3 100 BOT Maharashtra

59 2-Laning of Shilong-Bypass 40 & 48.76 Annuity Meghalaya

60 Amritsar - Wagha border 1 35.93 Annuity Punjab

61 Jalandhar - Amritsar 1 49 BOT Punjab

62 Kurali - Kiratpur 21 42.9 BOT Punjab

63 Mahapura (near Jaipur) - Kishangarh (G Lane) 8 90.38 BOT Rajasthan

64 ROBat Kishangarh 8 1 BOT Rajasthan

6S Bharatpur-Mahua 11 57 BOT Rajasthan

66 Mahua-Jalpur 11 108 BOT Rajasthan

67 Palanpur to Swaroopganj 14 76 Annuity Raj[421/Guj[34}

68 Gorakhpur Bypass 28 32.6 Annuity Uttar Pradesh

1.

Project Name NH No Total Funded State

S.No Length By69 Bara to Orai 2,2S 62.8 Annuity Uttar Pradesh

70 Jhansl to Lalitpur (NS-l/BOT/UP-3) 26 49.3 Annuity Utta r Pradesh

71 Meerut-Muzaffarnagar 58 79 BOT Uttar Pradesh

72 Sitapur - Lucknow 24 75 BOT Uttar Pradesh

73 Agra - Bharatpur 11 45 BOT UP[24.751/Raj[20.25]

74 Panagarh - Palsit 2 64.457 Annuity West Bengal

75 Palsit - Dankuni 2 65 Annuity West Bengal

76 Vivekananda Bridge and Approach 2 6 BOT West Bengal

-',