national highways 1:4000 on nh-8 at km …forestsclearance.nic.in › writereaddata › forma ›...

1
DPR Study for Construction of New Bridge Across Varsova Creek on NH-8 at Km 497.292 Revisions Ph : 4086-3000, Fax 2685-5252 Prepared by Designed by Checked by Approved by File Name : A-8, Green Park, New Delhi - 110016 Intercontinental Consultants & Technocrats Pvt.Ltd, July. 2016 R0 Date Revisions INITIAL PLAN Description Checked by NATIONAL HIGHWAYS AUTHORITY OF INDIA 1:4000 DGPS MAP OF VARSOVA BRIDGE ROW ROW ROW PROW PROW PROW Legend:- Proposed Centerline Proposed Right of Way Existing Right of Way Diverted Forest Land (Mangrove) DRAWING NO:- NHAI/VARSOVA/DGPS/01/R0 HARPREET SODHI ANJU ASEEM PRABHAKAR B.K.SWAIN Paper size-A2

Upload: others

Post on 06-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: NATIONAL HIGHWAYS 1:4000 on NH-8 at Km …forestsclearance.nic.in › writereaddata › FormA › DetailsOf...DPR Study for Construction of New Bridge Across Varsova Creek on NH-8

DPR Study for Construction of New Bridge Across Varsova Creekon NH-8 at Km 497.292

RevisionsPh : 4086-3000, Fax 2685-5252

Prepared by Designed by Checked by Approved by File Name :

A-8, Green Park, New Delhi - 110016

Intercontinental Consultants & Technocrats Pvt.Ltd,July. 2016R0

DateRevisions

INITIAL PLAN

Description Checked by

NATIONAL HIGHWAYSAUTHORITY OF INDIA

1:4000DGPS MAP OF

VARSOVA BRIDGE

ROW ROW ROW

PROW PROW PROW

Legend:-Proposed CenterlineProposed Right of WayExisting Right of WayDiverted Forest Land (Mangrove)

DRAWING NO:- NHAI/VARSOVA/DGPS/01/R0

HARPREET SODHIANJU ASEEM PRABHAKARB.K.SWAIN

Paper size-A2