national groundwater & contaminated land centre environment … ward.pdf · 2017-07-18 · •...
TRANSCRIPT
![Page 1: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/1.jpg)
WATER FRAMEWORK DIRECTIVEWATER FRAMEWORK DIRECTIVE
Groundwater Monitoring Groundwater Monitoring
RequirementsRequirements
Rob WardRob WardNational Groundwater & Contaminated Land CentreNational Groundwater & Contaminated Land Centre
Environment AgencyEnvironment Agency
© Environment Agency 2002
![Page 2: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/2.jpg)
OVERARCHING OBJECTIVESOVERARCHING OBJECTIVES
• Coherent and comprehensive overview of water status in each River Basin District
• For Groundwater, programmes shall cover both monitoring and assessment of chemical and quantitative status
• Monitoring programmes shall be operational by Dec 2006
• Monitoring will be in accordance with Annex V
© Environment Agency 2002
![Page 3: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/3.jpg)
WFDWFD
GroundwaterGroundwater
MonitoringMonitoring
Bodies used forDrinking WaterQ>100m3/day
All GW Bodies(or groups)
WATER LEVELAssesment of quantitative status
Assessment of available resource
STATUSGood: Green
Poor: Red
NETWORKSufficient and Representative
Density and Frequency
QUANTITATIVE STATUS
Water Level
All GW Bodies(or Groups)
Bodies used forDrinking WaterQ>100m3/day
SURVEILLANCEO2,pH,EC,NO3,NH4
Validate RA and trends
TRENDUpward: Black Dot
Downward: Blue Dot
STATUSGood: Green
Poor: Red
OPERATIONALAll "at risk" bodies
Representative networkMin. freq. = once p.a.
CHEMICAL STATUS
Water QualityConductivity/Pollutants
OBJECTIVESArticles 4, 7 8 and
Annex II and V
OTHER RELATEDMONITORING
GROUNDWATER MONITORING
© Environment Agency 2002
![Page 4: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/4.jpg)
Quantitative StatusQuantitative Status
• Status refers to level as the key parameter
• Water levels to be used to demonstrate that
available groundwater resource is not
exceeded by long-term annual average rate of
abstraction
• Reliable Assessment for all bodies (or groups)
including assessment of available resource
• Network and monitoring to support this -
however can’t achieve it on its own. It is only
one of the parameters that is required© Environment Agency 2002
![Page 5: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/5.jpg)
Water Level MonitoringWater Level Monitoring
Provide reliable assessment of Quantitative
Status of GW Body
CONCEPTUAL
MODEL
Density
Sufficient to estimate GW Level
For “at risk” -sufficient to assess
impacts
Sufficient to estimate
direction and flows
across MS boundaries
Frequency
Sufficient to assess Status
For “at risk” -sufficient to assess
impacts
Sufficient to estimate
direction and flows
across MS boundaries
Resource Assessment
Methodology and
associated data
© Environment Agency 2002
![Page 6: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/6.jpg)
Chemical StatusChemical Status
• Parameters: Conductivity and Pollutants
• Concentrations of pollutants:
– do not exhibit effects of intrusions
– do not exceed quality standards
– will not result in failure to achieve Art. 4 objectives for surface waters, diminution of ecological or chemical quality or in significant damage to terrestrial ecosystems.
• Additional criterion for quality is that of anthropogenically induced trend assessment
• Network(s) need to be capable of determining status and trends: two types of monitoring identified - Operational and Surveillance
© Environment Agency 2002
![Page 7: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/7.jpg)
Surveillance MonitoringSurveillance Monitoring
• To supplement RA (characterisation etc)
• Data for trend assessment (natural and anthropogenic)
• Parameters: Core set plus indicative pollutants from risk assessment
• Inform additional (Operational) monitoring requirement
© Environment Agency 2002
![Page 8: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/8.jpg)
Operational MonitoringOperational Monitoring
• Only in groundwater bodies (or groups) identified as being “at risk” following impact assessment and surveillance monitoring
• To establish chemical status of all “at risk”bodies
• To establish presence of any long term anthropogenically induced trends in pollutant concentrations
• Network to provide data representative of whole body (or group)
• Frequency: sufficient to detect impacts but at least once per year
© Environment Agency 2002
![Page 9: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/9.jpg)
Pollutant TrendsPollutant Trends
• Data from both surveillance and operational monitoring to be used
• Objective: to identify any long term anthropogenically induced upward trends and their reversal
• Trends calculations shall be done for the body as a whole (or group)
• Statistical significance and confidence must also be determined
© Environment Agency 2002
![Page 10: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/10.jpg)
Interpretation of StatusInterpretation of Status
• Chemical status for a groundwater body will be determined by aggregating data for the body as a whole
• Where standards have been set (or are relevant), the mean value of the results will be used to demonstrate compliance
• Results of both quantitive and chemical status along with pollutant trends are to be presented on a colour-coded map
© Environment Agency 2002
![Page 11: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/11.jpg)
GW Body Characterisation
(2004)
At Risk?SurveillanceMonitoring
At Risk?
OperationalMonitoring
StatusAssessment
Operational
Monitoring
StatusAssessment At Risk?
Trend Assessment
YESNO
+ 6
YEARS
+ 6 YEARS
2006
NO
YES
2007
2014
2014
2014
Characterisation, monitoring, status and trend assessment
YES
NO
Group/
Divide
2008-2014
© Environment Agency 2002
![Page 12: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/12.jpg)
Current situationCurrent situation
• In England and Wales: Quantitative monitoring reasonably well established and a strategy for quality monitoring being implemented
• In Scotland: limited monitoring currently undertaken but a strategy being developed
• Main areas of concern are the poorly permeable aquifers that will be defined as groundwater bodies but have very little monitoring
• Resource Assessment and Management (RAM) Framework and CAMS process will support quantitative aspects
© Environment Agency 2002
![Page 13: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/13.jpg)
Other WFD groundwater monitoring Other WFD groundwater monitoring
requirementsrequirements
• For “at risk” bodies….where relevant…..
– Location of abstractions (>10 m3/day or serving >50 people) and annual average abstraction rates
– Chemical composition of water abstracted from body
– Discharges to groundwater bodies - location, rate and composition
– Land use
© Environment Agency 2002
![Page 14: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/14.jpg)
Supporting InitiativesSupporting Initiatives
• Europe: Common Implementation Strategy
– Work Packages to support implementation
• Monitoring: guidance on requirements
• Data aggregation and trend assessment
• Environment Agency Groundwater Monitoring Strategy
– Framework for Quality Monitoring
• Guidance on network design
• Risk-based monitoring
© Environment Agency 2002
![Page 15: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/15.jpg)
Quality monitoring strategyQuality monitoring strategy
• Development of a strategic framework for monitoring:
– Strategic Drivers and Objectives
• Water Framework and Daughter Directives
– Strategy planning and prioritisation of needs
• Business Planning
• National/Regional needs and priorities
– Implementation
• Conceptual model development/network design
• Monitoring, interpretation and reporting© Environment Agency 2002
![Page 16: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/16.jpg)
SURFACE WATER
QUANTITY
SURFACE WATER
QUALITY
GROUNDWATER QUALITY
Baseline
Trends
Impacts
Compliance
STATUS
GROUNDWATER QUANTITY
Natural variation
Trends
Impacts
STATUS
RESOURCE
POTENTIAL
FLOODING
KEY ISSUES
ENVIRONMENTAL OBJECTIVES
CONSERVATION OF ECOSYSTEMS
STATUS
DIFFUSE
POLLUTION
GROUNDWATER
DIRECTIVE:
Groundwater
Regulations
IPC
IPPC
Water Resources Act
Waste Management
Licensing Regs
NITRATE DIRECTIVE
SURFACE WATER
DIRECTIVES
WA
TE
R F
RA
ME
WO
RK
DIR
EC
TIV
E
GROUNDWATER MONITORING -ENVIRONMENTAL & LEGISLATIVE CONTEXT
ECOLOGICAL
STATUS
POINT
SOURCE POLLUTION
© Environment Agency 2002
![Page 17: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/17.jpg)
Priority Level Principal Purpose/Criteria
Recharge (Unconfined)1a
Discharge
1b Confined Aquifer
Land Use – Arable
Land Use - Urban
Land Use - Grassland
Land Use – Semi-natural vegetation
2
Land Use - Forestry
3 Land Use – Arable (deep/shallow)
4 Land Use – Urban sub-division
(industrial/residential)
5 3-D monitoring
3 - 5 Local/Other criteria – specific
Pressures/Impacts
Network Design MatrixNetwork Design Matrix
© Environment Agency 2002
![Page 18: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/18.jpg)
Determinand Determinand and Frequency and Frequency
SelectionSelection
UNRESPONSIVE
FREQUENCY 2
OPERATIONAL SUITES
LAND USE/ PRESSURES
RESPONSIVE
STANDARD
FREQUENCY 1
SURVEILLANCE SUITES
LAND USE/ PRESSURES
SELECTIVESTANDARDSELECTIVE
© Environment Agency 2002
![Page 19: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/19.jpg)
Sampling FrequencySampling Frequency
Hydrochemical Determinand
Unresponsive Responsive
Outcrop 3 years 6 monthlySLOW
Confined 6 years Annual
Outcrop Annual Quarterly
Hy
dro
ge
olo
gy
FASTConfined 3 years 6 monthly
Surveillance Operational
© Environment Agency 2002
![Page 20: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/20.jpg)
Guidance on MonitoringGuidance on Monitoring
• CIS Project will produce guidance on monitoring for each water body category
• The guidance will contain detailed technical information on requirements for:
– monitoring each quality element
– representative site selection
– frequency and density to achieve adequate confidence
– statistical testing
• Will draw on Member States experience and develop a “tool kit”
© Environment Agency 2002
![Page 21: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/21.jpg)
Minimum number of sites, Network Criterion, Treatment of LOQ values
Data Aggregation Trend Assessment Trend ReversalAssessment
Regularisation
Spatial aggregation
arithmetic mean and CL
weighted arithmeticmean and CL
optional
Kriging mean and CL
Regularisation
Spatial aggregation
Trend assessment
Starting point
Min. length of time series
Max. length of timeseries
Frequency of trendtesting
Starting point
Min. length of time series
Max. length of time series
Data Aggregation and Trend Data Aggregation and Trend
AssessmentAssessment
• Project focused on the development of particular algorithms for:
– the identification of trends in pollutants (Annex V 2.4.4)
– data aggregation method for chemical status assessment (Annex V 2.4.5) © Environment Agency 2002
![Page 22: National Groundwater & Contaminated Land Centre Environment … Ward.pdf · 2017-07-18 · • In Scotland: limited monitoring currently undertaken but a strategy being developed](https://reader034.vdocuments.mx/reader034/viewer/2022042409/5f2686f3acc4d2690500c4eb/html5/thumbnails/22.jpg)
SUMMARYSUMMARY
• Specific monitoring requirements to support WFD
• Risk-based approach proposed
• Monitoring needs to be consistent with other needs - statutory and environmental
• Need to continue to contribute to EU developments
• Partnership approach needed to deliver effective monitoring and benefits
© Environment Agency 2002