Page 1: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

IFIN-HH

Serban Constantinescu, Ciubancan Mihai, Teodor Ivanoaica

Page 2: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

During the last year the LHCb site is growing again as the group requires computing capacities for LHCb collaboration.

Last years the site was running with low resources as the site was divided ( between the DPETI data center and the improper room from the firs floor of the building)

Site is at this moment completly moved to DPETI Data center and it is able to run again at full capacity, all nodes installed and running.

Page 3: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb Last year's capacity: Only 28 cores installed Only 500GB storage on the SE 1 Gbps ethernet switch Biggest problems were caused by electrical

problems and cooling problems as we were located in two places( one of those places doesn't have an appropriate cooling system)

Page 4: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

The site at this moment : The site is upgraded to 120 cores The storage is still 500 GB New User Interface 6 TB space A new switch 1Gbps with uplink direct in 10

Gbps stack switch

Page 5: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

LHCb VO in Romania is present at three sites:

RO-11-NIPNE dedicated to LHCb collaboration

RO-07-NIPNE the site that supports ATLAS,LHCb and ALICE

RO-15-NIPNE dedicated to ILC

Page 6: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

The group required the user interface with larger storage for local jobs

Also RO-07-NIPNE will be registered in DIRAC system at LHCb, as the group needs to store some data sets.

We need to regiester a storage element in DIRAC system.

At this moment all the three sites are active in the LHCb computing

Monitored by CERN teams

Page 7: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

Page 8: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

Page 9: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

Page 10: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

Page 11: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

As we can see RO-07 is still the major supplier for computing resources for LHCb.

Providing also a very good efficiency for LHCb jobs.

Page 12: National Grid's Contribution to LHCb

National Grid's Contribution to LHCbGrid monitoring:

- We use local NAGIOS provided by RO-07-NIPNE to monitor the services of LHCb sites in Romania

-We have frequent problems with the OPS jobs from Cluj, so we need a relialble monitoring tool

- We use the cern monitors to identify the failing jobs

-We use the local cacti monitor for bandwidth and throughput statistics for the site.

Page 13: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

The running jobs monitored in the DIRAC system and presented in those slides are only the production jobs.

The biggest site runnng jobs is RO-07 RO-15 has also a good statistics RO-11 had been upgraded but still needs

some hardware upgrades

Page 14: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

Future plans: Ram memory required very fast as some

nodes are old and have only 2GB ram Storage needed for the next period Rumors (it is discussed at cern) that LHCb

is planning to do reconstruction in Tier 2 sites so the storage will be required

Page 15: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

As a future plan for the next year is to monitor with cacti pluggins some grid services

Also the network connection we'll be upgraded to 10Gbps

Providing the tools for Lhcb group to run jobs on local sites

Also we need to be prepared as the LHCb will run reconstruction on Tier 2 sites.

Page 16: National Grid's Contribution to LHCb

National Grid's Contribution to LHCbThe LHCb group is trying to run jobs locally very

soon.

The user interface and the required software will be provided by RO-11-NIPNE site, but the jobs will run on all the sites.

Also the group is envolved in DIRAC development and soon we'll test the framework locally.

Page 17: National Grid's Contribution to LHCb

National Grid's Contribution to LHCb

Hopefully we'll be able to run at full capacity on RO-11 next year

RO-11 should add another 160 cores pretty soon as we'll be upgrading the nodes and the storage server

RO-07 will still be the biggest support site for LHCb group

RO-15 will give more resources pretty soon