Page 1: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

NATIONAL CONCRETE CONSORTIUMDENVER, CO, APRIL 2, 2019

Presenter
Presentation Notes
Welcome and intro
Page 2: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

2 |

MASS CONCRETE, THE OHIO DOT PERSPECTIVE

Dan Miller, PE

National Concrete Consortium, Denver, CO, April 2, 2019

MOT-75-12.62

FAI-

SR22

-23.

89

CUY-480-18.42

LUC-SR64-12.03

Page 3: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

3 |

SPECIFICATION REQUIREMENTSo ODOT CMS 511.04.A

o Concrete Components with min. dimension of…o 5 ft. or greater (columns, pier caps, piers, etc.)o 7 ft. or greater (drilled shafts)

o When bid item requires QC/QAo Contractor Supplies QC Plan for testing

o When bid item does not require QC/QAo Department tests once every 50 yd3

o Mix design is developed prior to beginning Worko Thermal Control Plan (TCP) Developed

National Concrete Consortium, Denver, CO, April 2, 2019

Page 4: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

4 |

CONCRETE MIXo QC 4 Mix Design Requirements

o Designed based on ACI 301, Section 4 (+1200 psi overdesign)

o Permeability: 2000 Coulombs or As Per Plan at 28 days o AASHTO T277 with modified cure (7d at 73 ºF, 21d

at 100 ºF)o Cementitious Contents: 470 lbs./cy3

o Max. ash and slag content may increase to 50%o Does not allow Type III cement or accelerators

o Strength: 4000 psi or As Per Plan (28 or 56 days)o Aggregates: Well Graded

National Concrete Consortium, Denver, CO, April 2, 2019

Page 5: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

5 |

TCP REQUIREMENTSo TCP Requirements

o Control temperature within the element for 28 days o Max allowable temp: 160 ºF (71 ºC)o Max differential temp: 36 ºF (20 ºC)

o Procedures and controls at time of placemento Duration and Method of Curingo Method and equipment used for controlling ∆Tso Temperature sensor types and installation details

o Monitor at hottest locationo 2 outer faces/corners and top surface

o Criteria for removal to control max ∆T

National Concrete Consortium, Denver, CO, April 2, 2019

Page 6: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

6 |

CUY-480-18.42 VALLEY VIEW

National Concrete Consortium, Denver, CO, April 2, 2019

o New 7 girder bridge between2 existing bridges

o Bridge length 4150 ft. 3% gradeo Adding capacity to I-480o Twin Structures need new decks

o Girders losing structural capacity

o Carries traffic over the Cuyahoga Rivero Piers to be all Mass Concrete (QC 4)

o Footer is on piles pad size 39’x42’o Bridge height approx. 212 ft. o Elevation difference of 50 feet (abutment to abutment)

Page 7: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

7 |

CUY-480-18.42 PROJECT LOCATION

National Concrete Consortium, Denver, CO, April 2, 2019

Page 8: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

8 |

CUY-480-18.42 PIER

National Concrete Consortium, Denver, CO, April 2, 2019

Page 9: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

9 |

CUY-480-18.42 PIER CAP

National Concrete Consortium, Denver, CO, April 2, 2019

Page 10: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

10 |

THERMAL CONTROL PLAN

National Concrete Consortium, Denver, CO, April 2, 2019

o Determined no cooling tubes requiredo R-2.5 Insulation outsideo R-5 Insulation insideo Temperature Sensors installed

o Middle of placemento Outer Edges on 2 sides

Page 11: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

11 |

CUY-480-18.42 FOOTING

National Concrete Consortium, Denver, CO, April 2, 2019

Page 12: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

12 |

CUY-480-18.42 PIER

National Concrete Consortium, Denver, CO, April 2, 2019

Page 13: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

13 |

CUY-480-18.42 PIER CAP

National Concrete Consortium, Denver, CO, April 2, 2019

Page 14: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

14 |

MOT-75-12.62 DAYTON

National Concrete Consortium, Denver, CO, April 2, 2019

o Unique Projecto Largest VECP change order in ODOT History

o Straddle bent with beams in concreteo Post-tensioned as well

o Redesign of I-75 through downtown Daytono Straddle bent required QC 4 Mass Concreteo Required “on the fly” Spec change

Page 15: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

15 |

MOT-75-12.62 MIX DESIGN USED

National Concrete Consortium, Denver, CO, April 2, 2019

o QC 4 Concrete Usedo Strength requirement of 8,000 psi (up from standard 4,000 psi)

o Supplementary Cementitious Material Requirements Changed

o New Amountso 40% Cemento 30% Slago 30% Fly Asho Also used 250 lb. of ice per yard during production

o Reason for changeo TCP testing showed that a 50/50 mix would not meet temp. requirementso Included the use of R5 Insulation

Page 16: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

16 |

MOT-75-12.62 DETAILS

National Concrete Consortium, Denver, CO, April 2, 2019

Page 17: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

17 |

MOT-75-12.62 DETAILS

National Concrete Consortium, Denver, CO, April 2, 2019

Page 18: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

18 |

MOT-75-12.62 REINFORCEMENT AND DUCTS

National Concrete Consortium, Denver, CO, April 2, 2019

Page 19: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

19 |

MOT-75-12.62 INSULATION ON BEAMS

National Concrete Consortium, Denver, CO, April 2, 2019

Page 20: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

20 |

MOT-75-12.62 DETAILS

National Concrete Consortium, Denver, CO, April 2, 2019

Page 21: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

21 |

MOT-75-12.62 SENSOR LOCATION

National Concrete Consortium, Denver, CO, April 2, 2019

Page 22: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

22 |

MOT-75-12.62 SENSOR LOCATION

National Concrete Consortium, Denver, CO, April 2, 2019

Page 23: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

23 |

MOT-75-12.62

National Concrete Consortium, Denver, CO, April 2, 2019

Page 24: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

24 |

MOT-75-12.62

National Concrete Consortium, Denver, CO, April 2, 2019

Page 25: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

25 |

MOT-75-12.62

National Concrete Consortium, Denver, CO, April 2, 2019

Page 26: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

26 |

FAI-SR22-23.89 RUSHVILLE

o Bridge over RR/Creeko Cap and Columns

o Both used Mass Concrete

o 520 foot long bridgeo 2- 6’x6’x45.5’ Columns per pier o Cap dimensions of 6’x6.75’x47’

National Concrete Consortium, Denver, CO, April 2, 2019

Page 27: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

27 |

FAI-SR22-23.89 DETAIL

National Concrete Consortium, Denver, CO, April 2, 2019

Page 28: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

28 |

FAI-SR22-23.89 TCP

o Analysis found cooling tubes beneficialo No tubes: Initial concrete temp. of 71 ºFo With tubes: Initial concrete temp. of 86 ºF

o Cooling tubes selected and usedo R-5 Insulation also used to insulate concrete

o Water used in cooling tubes sourced from river nearby

o Temperature sensors placed mid-height

National Concrete Consortium, Denver, CO, April 2, 2019

Page 29: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

29 |

FAI-SR22-23.89 COOLING TUBE DETAIL

National Concrete Consortium, Denver, CO, April 2, 2019

Page 30: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

30 |

FAI-SR22-23.89 COOLING DETAIL (COLUMN)

National Concrete Consortium, Denver, CO, April 2, 2019

Page 31: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

31 |

FAI-SR22-23.89 COOLING DETAIL (CAP)

National Concrete Consortium, Denver, CO, April 2, 2019

Page 32: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

32 |

FAI-SR22-23.89 RUSHVILLE

National Concrete Consortium, Denver, CO, April 2, 2019

Page 33: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

33 |

FAI-SR22-23.89 RUSHVILLE

National Concrete Consortium, Denver, CO, April 2, 2019

Page 34: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

34 |

FAI-SR22-23.89 RUSHVILLE

National Concrete Consortium, Denver, CO, April 2, 2019

Page 35: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

35 |

FAI-SR22-23.89 RUSHVILLE

National Concrete Consortium, Denver, CO, April 2, 2019

Page 36: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

36 |

LUC-SR64-12.03 WATERVILLE

National Concrete Consortium, Denver, CO, April 2, 2019

Page 37: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

37 |

LUC-SR64-12.03 WATERVILLE

National Concrete Consortium, Denver, CO, April 2, 2019

Page 38: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

38 |

LUC-SR64-12.03 WATERVILLE

National Concrete Consortium, Denver, CO, April 2, 2019

Page 39: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

39 |

LUC-SR64-12.03 WATERVILLE

National Concrete Consortium, Denver, CO, April 2, 2019

Page 40: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

40 |

CONCLUSIONS/PERSPECTIVE

o Beneficial for large elementso 5 feet seems to work for minimum length

o Caution with Thermal Control Planso Contractors’ responsibilityo District reviewso Concerns on what to look for and how to track

o Monitor contractor in the field for compliance

o Make sure elements are not submerged during curing

National Concrete Consortium, Denver, CO, April 2, 2019

Page 41: NATIONAL CONCRETE CONSORTIUM...Apr 06, 2019  · National Concrete Consortium, Denver, CO, April 2, 2019. MOT-75-12.62. FAI-SR22-23.89 CUY-480-18.42 . ... o R-2.5 Insulation outside

41 |

?QUESTIONS

Last updated 4/8/2019