Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye. Project. Design a stormwater drainage system for the city of Bluffdale. Assess current infrastructure Assess current drainage needs for a 100 year 24 hour storm Design of new infrastructure using EPA SWMM - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

Nathan DavisSteven ReidKristen UlmerGraduate Assistant: Nathan Dye

Page 2: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

PROJECT

N

Design a stormwater drainage system for the city of Bluffdale

•Assess current infrastructure

•Assess current drainage needs for a 100 year 24 hour storm

•Design of new infrastructure using EPA SWMM

•Prepare a cost estimate

Page 3: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

EXISTING INFRASTRUCTUREMap of Existing Inlets and Pipe LocationsMap of Existing Inlets and Pipe Locations

Page 4: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

EXISTING INFRASTRUCTURE• 3 Drains in Neighborhood

• 1 drain has no pipe exit• 2 drains empty into trench

9 Drains on Northern Street• Pipes over to Bangeter

Highway system

Page 5: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

ANALYSIS OF DRAINAGE NEEDSSTEPS Create drainage basins for

each inlet Find the depth of the 100

year 24 hour storm Calculate flow lines and

accumulations Calculate curve number

using soil type and land use data

Export information into HEC-HMS

0 5 10 15 20 25 300

0.51

1.52

2.5Type-II SCS cumu-lative depth curve

Time [hr]

Dep

th [

in]

Map of Drainage Basins

Page 6: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

HEC HMSHEC-HMS Model

HEC-HMS Output

Page 7: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

EPA SWMMNode

AverageDepth (ft)

MaximumDepth (ft)

1 0.13 0.72 0.18 0.823 0.2 1.044 0.2 1.045 0.11 0.476 0.08 0.43

Outfall 0.66 0.66

LinkMax Flow

(CFS)Max

Depth (ft)1 2.57 0.282 3.25 0.463 6.23 0.554 7 0.695 3.19 0.326 7.98 0.66

Flow Volume vs. Time in Fullest Pipe

Depth of Water in Pipe vs. Time

Depth of Water and Inlets

Depth and Flow in Pipes

Page 8: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

FINAL DESIGN

1

2

3

4

65

1b

6b5a

2b

2a

1a

4a

3

4b

5b

6a

Final DesignExisting..................

Proposed…………….Pipe Labels…………… Inlet Label……………

Page 9: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

FINAL DESIGNPipe ID Surface Upstream Surface Downstream Invert Upstream Invert Downstream Length Grade Pipe Diameter

1 4453 4447 4449.5 4443.5 307.3 2.0% 1.5

2 4447 4446 4443.5 4440.5 612.1 0.5% 1.5

3 4450 4446 4446.5 4440.5 304.4 2.0% 1.5

4 4446 4444 4440.5 4438 238.9 1.0% 1.5

5 4444 4444 4438 4437 152.4 0.7% 1.5

6 4444 4437 4437 4436 20.0 5.0% 1.5

Total Length 1635.0

Inlet ID Surface Elevation Invert Elevation Depth of Pipe1a 4453 4449.5 3.51b 4453 4450 32a 4447 4443.5 3.52b 4447 4444 33 4450 4446.5 3.5

4a 4446 4440.5 5.54b 4446 4441 55a 4444 4438 65b 4444 4438.5 5.56a 4444 4437 76b 4444 4437.5 6.5

Cross Pipes Upstream Invert Downstream Invert Grade1 4450 4449.5 2.1%2 4444 4443.5 2.1%4 4441 4440.5 2.1%5 4438.5 4438 2.1%6 4437.5 4437 2.1%

Pipe elevation and length information

Inlet elevation and box depthsCross Pipe depths

Page 10: Nathan Davis Steven Reid Kristen Ulmer Graduate Assistant: Nathan Dye

COST ANALYSISITEM QUANTITY UNIT UNIT

COSTITEMCOST

Mobilization 1 LS $ 8,000.00 $ 8,000.00

Furnish and Install 18-inch RCP Pipe 1635 LF $ 52.00 $ 85,020.00

Furnish and Install 15-inch RCP Pipe 152 LF $ 40.00 $ 6,080.00 Manhole 6 EA $ 2,550.00 $ 15,300.00 Inlet 8 EA $ 2,200.00 $ 17,600.00

Roadway Patching 596 SY $ 20.00 $ 11,913.33

Remove Surface Materials (asphalt) 1787 LF $ 9.00 $ 16,083.00

Construction Cost: $ 159,996.33 Construction Contengencies (20%): $ 31,999.27

Engineering Design and Construction Management (15%): $ 23,999.45

Total Cost: $ 215,995.05

Total Cost (Rounded): $ 216,000.00