narrow pavement widening - waco district
DESCRIPTION
This presentation highlights highway pavement widening practices in the Waco District. Prepared by Don Miller and John Jasek. Please remember to cite this research if the information you find here is used.TRANSCRIPT
Waco District Experience
Project 0-6748:Narrow Pavement Widening
Don Miller, P.E. – Waco DesignJohn Jasek, P.E. – Director
Construction
Waco District‘Mixed Climate’
30 – 35 inches rain(when not in drought)Hot in summerCold in winter
Some sulfate soilsHeavy claysHeavy trucks
FM 56 Bosque County
FM 56 Before Widening
FM 56 Before Widening
FM 56 Before Widening
FM 56 During Construction
FM 56 During Construction
FM 56 During Construction
FM 56 During Construction
FM 56 During Construction
FM 56 During Construction
After level-up
After Seal Coat
FM 56 Finished Product
FM 56 Finished Product
Have Experienced Problems with pavement failures
FM 309 Hill County
FM 309 Finished Product
FM 309 Finished Product
FM 309 Experiencing joint cracking due to drought
FM 309 Experiencing joint cracking due to drought
Questions ???