narada company presentation-2016

39
Exit stored energy solutions for a demanding world

Upload: go-nps

Post on 16-Apr-2017

463 views

Category:

Engineering


7 download

TRANSCRIPT

Page 1: Narada company presentation-2016

Exit

stored energy solutions for a demanding world

Page 2: Narada company presentation-2016

stored energy solutions for a demanding world

2

Narada Company Introduction

Narada Product Roadmap

Innovative Solutions

Page 3: Narada company presentation-2016

stored energy solutions for a demanding world

Nara

3

Who is Narada

Page 4: Narada company presentation-2016

stored energy solutions for a demanding world

4

Narada CSR

Page 5: Narada company presentation-2016

stored energy solutions for a demanding world

Established

Y2006

The largest Manufacturer of industrial batteries in Asia

Lin Ping Plant Ⅱ

EstablishedY1997

EstablishedY2013

AcquisitionY2011

Acquisition Y2011

Capacity:120MWh LithiumArea: 60K m2

Capacity: 1200MWh Lithium 3M KVAH VRLA

Area: 170K m2

Lin An Plant Capacity: 3.5M KVAH VRLAArea: 115K m2

An Hui Plant

Lin Ping Plant Ⅰ

Cheng Du Plant

Capacity: 14.4 million sets plates + VRLA 700K KVAH

Area: 110K m2

Capacity: 2.5M KVAH VRLA battery + 320MWh Lithium

Area: 110K m2

Wuhan Plant EstablishedY2016

Capacity: 10M KVAH VRLAArea: 411K m2

Page 6: Narada company presentation-2016

stored energy solutions for a demanding worldR&D Ability

Chief Scientist of Narada—Mr. Herbert K. Giess

Chairman of IEC TC21 Secondary cells and batteries;

Working group leader for the establishment of the IEC

standard for VRLA Batteries IEC 60896-21 and 22/2003

Batteries International 20 04 Silver Award for Most

Outstanding Contributor across the entire Industry

Hightech

R&D center

Postdoctoral Research

Workstation

Province level R&D center

CNAS National

Approval Lab.

2011201020062000 2012 2013

National R&D

center

Province advanced

R&D center

2014

Academician Expert

Workstation

Page 7: Narada company presentation-2016

stored energy solutions for a demanding world

Cooperated with world level

institutions

R&D Ability

Page 8: Narada company presentation-2016

stored energy solutions for a demanding world

南都在海外的足迹

NARADA

FOOTPRINT IN

130 COUNTRIES

Our Customers

Page 9: Narada company presentation-2016

stored energy solutions for a demanding world

9

Narada Company Introduction

Narada Product Roadmap

Innovative Solutions

Page 10: Narada company presentation-2016

stored energy solutions for a demanding world

Telecom

Stable grid(Standby)

Semi stable(Cyclic)

Unstable(Hybrid)

Room temp(Standard life)

High temp(Intensive life)

UDS HTB-F 313K 12V 313K 2V

ICSCREXICSAcme

REXCEos

NPFC: cover all kind of condition Anti theft battery Health indicattorCoolstar cabinet

PSOC(Cyclic & hybrid)

Y1994

Y1997

Y2006

Y2008Y2009

Y2011

Y2011

Y2013

Y2010

Y2010 Y2009 Y2012 Y2014

Narada Product Roadmap

Page 11: Narada company presentation-2016

stored energy solutions for a demanding world

UPS/IDC

Civil application Commercial case

Discrete or Small

AcmeEos/LSU

REX

HRL (>400W)

Centralization & large

GPHRL (<400W)

Long term backup

Short term and long life

Large capacity, long life

Narada Product Roadmap

Page 12: Narada company presentation-2016

stored energy solutions for a demanding world

Energy storage

Civil application Commercial case

Small capacity Large capacity

ICSC

12REXC

REXC

HESS MESS ESS

Portable power Li HESS

Narada Product Roadmap

Page 13: Narada company presentation-2016

stored energy solutions for a demanding world

13

Narada Company Introduction

Narada Product Roadmap

Innovative Solutions

Page 14: Narada company presentation-2016

stored energy solutions for a demanding world

14

Listen to customers

Page 15: Narada company presentation-2016

stored energy solutions for a demanding world

15

Energy Consumption

Site energy consumption is 70% of the total, and is the key factor for power saving

Reduce the energy consumption of Aircon is key factor for Telecom industry’s energy saving and emission-reduction

Page 16: Narada company presentation-2016

stored energy solutions for a demanding world

Traditional normal battery

16

√Innovative HTB battery

With 10℃ increase on battery working temperature can help to reduce Air-con electric power by 60%-80% in BTS sites. Use Y2009 China’s telecom operators’ electric power consumption to calculate, Saving on Air-con electricity can be 6 Billion RMB/year in China =2 Million population city’s annual electric power consumption. Can save Coal consumption with 537,500Ton, reduce CO2 emission 7,400,000 Ton.

1) Solution for Saving HTB

Page 17: Narada company presentation-2016

stored energy solutions for a demanding world

17

8 Patents (6 invention) for original innovation by Narada leading the battery industry.

Various models for choice

1) Solution for Saving HTB

Page 18: Narada company presentation-2016

stored energy solutions for a demanding world

CapEx & OpEx saving (HTB + Free Cooling)

Site Type

CapEx Calculation

Battery Cost Air-Con Cost Installation Cost Subsidy Tax

Standard battery +

A/CApprox. USD1700 Approx. USD2000

Considered same

HTB + Fan Approx. USD2500 Approx. USD200

CapEx Saving USD1000 per site

OpEx Saving Approx. USD 3100 per site per year

18

1) Solution for Saving HTB

Page 19: Narada company presentation-2016

stored energy solutions for a demanding world

19

Benefits with above modality:• Generator runtime savings 50% (10 Hours/Day 5 Hours/Day)

• Generator Life Span increased 50% thus less servicing – at least 7 less servicing / year• 50% Fuel that is equivalent to total 4563 Liter of diesel costing about USD 4563 per year• Longer warranty period – 3 years with such application model means 50% warranty support

increased compare to existing battery• Battery average cost per year reduced by 5%• Battery replacement cost reduced by 33%• Reduce the CO2 Emission by using Narada HTB• 13.28 Ton/year CO2 Emission can be reduced

Total Direct Savings Per Year Per Site is USD7920!

1) Solution for Saving HTB

Page 20: Narada company presentation-2016

stored energy solutions for a demanding world

20

HTB Market Reference

Page 21: Narada company presentation-2016

stored energy solutions for a demanding world

ICS series: Intensive Cycle Service Battery An innovative design and manufacture battery solution, 3 times better cycle life compare to normal battery in same dimension.

12V: ICS (NDC)

2V: ICS (Eos Plus)

Standard/Certificate Compliance

• IEC60896-21/22

• BS6290

• UL

• CE

2) Solution for Saving ICS

Page 22: Narada company presentation-2016

stored energy solutions for a demanding world

22

Comparison with Northstar Blue battery

2.5 times better than Northstar blue @ 80%DOD

1.8 times better than Northstar blue @ 60%DOD

1.6 times better than Northstar blue @ 40%DOD

Solution for Saving----ICS

Page 23: Narada company presentation-2016

stored energy solutions for a demanding world

23

Comparison with Enersys SBS-EON battery

1.6 times better than Enersys SBS-EON @ 80%DOD

1.2 times better than Enersys SBS-EON @ 60%DOD

Similar performance with Enersys SBS-EON @ 60%DOD

2) Solution for Saving ICS

Page 24: Narada company presentation-2016

stored energy solutions for a demanding world4.- TCO considerations

•Design for Poor Grid area

•Design for Renewable Energy Solution

•Design for Cyclic application

•Design for Energy Storage

•Modular design for easier Capacity increase

Example:

Pakistan •Previous 12V battery: 1Y-2Y warranty•Now ICS battery: 4Y warranty

2) Solution for Saving ICS

Page 25: Narada company presentation-2016

stored energy solutions for a demanding world

OpEx saving – ICS + peak shifting

Past: floating, 5-7 years life;

Now: discharge at peak time to save cost,

5-7 years life;

ROI for Russia: 2-3 years

2) Solution for Saving ICS

Page 26: Narada company presentation-2016

stored energy solutions for a demanding world

26

Narada Pb-C Battery Development Listed in ALABC R&D Project

ALABC-Advanced Lead Acid Battery Consortium (the international highest

lead acid battery level orgnization

Since the beginning of ALABC history, Narada is the sole enterprise who

undertake the ALABC R&D project from China。

Mr. Boris Monhov, vice chairman of ALABC, has visited Narada and commended that Narada Pb-C battery has reached international advanced level.

3) Solution for Saving RexC Lead Carbon

Lead Carbon Battery’s scientific and technical achievements evaluation by National Energy Administration

Page 27: Narada company presentation-2016

stored energy solutions for a demanding world

Lead carbon technology

Electrochemical ActiveCarbon

angLow rate discharge

High rate discharge

Recharge

Avoid lead sulfation crystal shelter;

Recover lead sulfation to active lead.

3) Solution for Saving RexC Lead Carbon

Page 28: Narada company presentation-2016

stored energy solutions for a demanding worldEnergy Storage System (ESS)

3) Solution for Saving RexC Lead Carbon

Page 29: Narada company presentation-2016

Exit

Advantages of Energy storage system

Peak load shifting, Increase power station efficiency.

reduce investment of national electric power network.

Stabilize green energy input, increase the quality of solar/wind power.

Emergency energy supply.

Motorized energy solution.

Core technology – ESS

Page 30: Narada company presentation-2016

stored energy solutions for a demanding world

30

2014-State Grid Luxi Island 4MW

Energy Storage Project

2011-DongFuShan Island Renewable

Energy Storage Micro Grid Project

2013-Tulufan Energy Storage System for

Smart Grid Project-1st MW level

2013-Jiangsu Dafeng seawater

desalination 1.8MWH ESS project

RexC Battery Market Reference

Page 31: Narada company presentation-2016

stored energy solutions for a demanding world

31

Pb-C battery application projectEnergy storage

scaleEnergy storage

technologyFunction

Lin'an optical storage integration enterprise class grid Battery energy

storage system0.5MW/2MWH

Pb-C battery/Lithium

batteryPower smoothing, load shifting

National class wind & optical storage and delivery demonstration

base project1MW/6MWH

Pb-C battery/Gel battery

Power smoothing, load shifting, ramp control

State Grid Wenzhou Luxi island on-grid demonstration project

2MW/4MWH Pb-C batteryIsland new energy on-grid electric power generation,

power smoothingJiangsu Dafeng seawater

desalination system smart grid project

1.5MW/1.8MWH Pb-C batteryNew energy join up on grid,

power smoothing

South Grid Zhuhai Wanshan island new energy grid demonstration

project2.5MW/8.4MWH Pb-C battery

Island new energy off-grid elelctric power generation,

power smoothingGuangcheng energy storage grid

project1.5MW/1.5MWH Pb-C battery

New energy join up on grid, power smoothing, load shifting

Tulufan new energy city power grid demonstration project

1MW/2MWH Pb-C batteryEnergy centralized management, power smoothing, load shifting

South Grid optical storage integration project

500KW/2.1MWHPb-C battery and lithium battery

Power smoothing, load shifting

Beijing container energy storage system

150KW/275KWH Pb-C batteryEnergy centralized management, power smoothing, load shifting

Narada Market Reference

Page 32: Narada company presentation-2016

stored energy solutions for a demanding world

32

4) Solution for Saving LiFePO4 Lithium Battery

Page 33: Narada company presentation-2016

stored energy solutions for a demanding world

33

Advantage of LiFePO4 Li-Ion

More safe

More cabinet space for equipment

Less weight for rooftop or pole-mounted sites

No active cooling system required

Easier site planning and installation

Simplified power systems

High operational reliability

Long serving life

Dev

elo

p Cell performance

Module performance

Size

Layout

Connection

Thermal management

Etc.

BMS function

Page 34: Narada company presentation-2016

stored energy solutions for a demanding world

34

Reliance

48V300Ah Outdoor

China Telecom

48V10Ah Outdoor

China Mobile

48V200Ah Outdoor

State Grid

Energy Storage

lithium Battery Market Reference

Page 35: Narada company presentation-2016

stored energy solutions for a demanding world

5) Solution for Saving HRL

HRL for switch room

Field scenarios

Customer requirement

Technical features

Product type Competitors

HRL series

• IDC Modular standard cabinet: 600mm*1200mm*2500mm

• Can install 2 banks of HRL700 battery

• Total voltage is 240V D.C.

• Backup 168KW for 15 min

Page 36: Narada company presentation-2016

Exit 36

Normal version (GP) High rate version (HRL) Benefits of HRL

Power 400KVA 400KVA

Battery type 6-FM-150 12HRL700 (180Ah)

Battery

quantity

40 pcs * 4 = 160 pcs 40 pcs * 3 = 120 pcs 40 pcs less

Battery

output

160pcs*6*450W=432KVA 120pcs*6*700W=504KVA

Spare power 8% 26% Spare power increased

18%

Battery

weight

7360kg 7080kg Total weight reduced

4%

Installation

space

3140*600*920 mm3

Ⅹ 4 Strings

3140*600*920 mm3

X 3 Strings

Battery space reduced

25%

Battery &

rack cost

Total cost saved 22%

5) Solution for Saving-HRL

Conclusion: Battery qty. could be reduced 40 pcs but gaining additional 26%

Power with Narada HRL application. 22% Capex can be saved.

Page 37: Narada company presentation-2016

stored energy solutions for a demanding world

37British Telecom Datacenter

(625KVA-1100KVA)

Latin Sky On line

Data center

Russian Bank Datacenter

China Mobile International DataHabour

US Digital Reality

Data centerBaidu UPS

Datacenter Market Reference

Page 38: Narada company presentation-2016

stored energy solutions for a demanding world

38

Green Production

As a socially responsible company, Narada has obligation to protect the environment.

Page 39: Narada company presentation-2016

Exit

stored energy solutions for a demanding world

Your ideal global partner of power energy solutions.