PEOPLE | PERFORMANCE | PRODUCTIVITY www.tempoaust.com TEMPO CLIENT & END CLIENT SCOPE OF WORK The NBWT project was developed to increase the Nammuldi mine’s output capacity from 6 million tonnes per annum (Mtpa) to 16 Mtpa and incorporated new mine facilities, process facilities and other infrastructure. Whilst on site, Tempo Construction & Maintenance was a provider of structural mechanical and piping erection & installation services. Tempo ‘s management and supervision team where brought in to assist with the construction of the train loadout system including structural steel, load out bin and conveyors from the drive station. This scope of works was awarded to tier 1 contractor Civmec and Tempo assisted Civmec as a preferred sub-contractor for the SMP works. LOCATION Parker Point, WesternAustralia COMMODITY Iron Ore DISCIPLINES Structural, Mechanical, Piping PROJECT SUMMARY Construction team (6) 7500 man hours CONTRACT START AND END DATES August 14 to December 14 NAMMULDI – TRAIN LOADOUT & STOCKYARD PROJECT

Upload: trinhnhi

Post on 27-Aug-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

PEOPLE | PERFORMANCE | PRODUCTIVITY www.tempoaust.com

TEMPO CLIENT & END CLIENT

SCOPE OF WORK

The NBWT project was developed to increase the Nammuldi mine’s output capacity from 6 million tonnes per annum (Mtpa) to 16 Mtpa and incorporated new mine facilities, process facilities and other infrastructure.Whilst on site, Tempo Construction & Maintenance was a provider of structural mechanical and piping erection &installation services. Tempo ‘s management and supervision team where brought in to assist with the construction of the train loadout system including structural steel, load out bin and conveyors from the drive station. This scope of works was awarded to tier 1 contractor Civmec and Tempo assisted Civmec as a preferred sub-contractor for the SMPworks.

LOCATIONParker Point, WesternAustralia

COMMODITYIron Ore

DISCIPLINESStructural, Mechanical,Piping

PROJECT SUMMARYConstruction team (6)7500 man hours

CONTRACT START AND END DATESAugust 14 to December 14

NAMMULDI –TRAIN LOADOUT &STOCKYARDPROJECT