n pave ext gravel pathway (task 3a) 30 n.t.s prepared by ... · pave pathway to barn sheet 1 of 8 -...

6
Schmanska Park Site Improvements Prepared by Max Madalinski Associate Parks Project Coordinator [email protected] 802-881-4000 January 16th, 2018 Sheet 1 of 8 - Plan Overview Pave Pathway to Barn (Task 3d) Pave Pathway to Basement Access (Task 3c) Pave New Parking Area (Task 3b) Rain Gardens (not included in project scope) Reconstruct Basketball Court (Task 2) Pave Ext Gravel Pathway (Task 3a) Reconstruct Tennis Courts as Tennis/ Pickleball/Caneball Courts (Task 1) 0 30 60 N N.T.S

Upload: others

Post on 28-Jan-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: N Pave Ext Gravel Pathway (Task 3a) 30 N.T.S Prepared by ... · Pave Pathway to Barn Sheet 1 of 8 - Plan Overview (Task 3d) Pave Pathway to Basement Access (Task 3c) Pave New Parking

Schm

ansk

a Pa

rk

Site

Impr

ovem

ents

Prep

ared

by

Max

Mad

alin

ski

Asso

ciat

e Pa

rks P

roje

ct C

oord

inat

orm

mad

alin

ski@

burli

ngto

nvt.g

ov80

2-88

1-40

00Ja

nuar

y 16

th, 2

018

Sh

eet 1

of 8

- Pl

an O

verv

iew

Pave

Pat

hway

to B

arn

(Tas

k 3d

)

Pave

Pat

hway

to

Base

men

t Acc

ess

(Tas

k 3c

)

Pave

New

Park

ing

Area

(Tas

k 3b

)

Rain

Gar

dens

(n

ot in

clud

edin

pro

ject

scop

e)Rec

onstruct

Baske

tball

Court (Ta

sk 2)

Pave

Ext

Gra

vel

Path

way

(Tas

k 3a

)

Reco

nstru

ct Te

nnis

Cour

ts as

Tenn

is/

Pick

leball

/Can

eball

Cour

ts (Ta

sk 1

)

030

60N

N.T.

S

Page 2: N Pave Ext Gravel Pathway (Task 3a) 30 N.T.S Prepared by ... · Pave Pathway to Barn Sheet 1 of 8 - Plan Overview (Task 3d) Pave Pathway to Basement Access (Task 3c) Pave New Parking

Schm

ansk

a Pa

rk

Site

Impr

ovem

ents

Prep

ared

by

Max

Mad

alin

ski

Asso

ciat

e Pa

rks P

roje

ct C

oord

inat

orm

mad

alin

ski@

burli

ngto

nvt.g

ov80

2-88

1-40

00Ja

nuar

y 16

th, 2

018

Sh

eet 2

of 8

- Ex

istin

g Co

nditi

ons O

verv

iew

Sch

man

ska

Par

k B

asem

ap0

6012

030

Feet¯

Grove St

Callarco

Ct

Colches

ter Ct

Bask

etba

ll Co

urt

Ext.

Park

ing

Lot

Tenn

is C

ourt

s

Bayb

erry

Com

mon

sDe

velo

pmen

t

Gre

enm

ount

Ce

met

ery

Ext. ADA-Compli a

nt

Pathway

N0

3060

120 Fe

et

Barn

Ext.

Path

way

to B

arn

(Tas

k 3d

)Ext.

Asph

alt a

ndBa

sket

ball

Cour

t to

be

rem

oved

(Tas

k 2)

Ext.

Gra

vel

Path

way

(Tas

k 3a

)

(Tas

k 1

)

030

60N

N.T.

S

Page 3: N Pave Ext Gravel Pathway (Task 3a) 30 N.T.S Prepared by ... · Pave Pathway to Barn Sheet 1 of 8 - Plan Overview (Task 3d) Pave Pathway to Basement Access (Task 3c) Pave New Parking

Prep

ared

by

Max

Mad

alin

ski

Asso

ciat

e Pa

rks P

roje

ct C

oord

inat

orm

mad

alin

ski@

burli

ngto

nvt.g

ov80

2-88

1-40

00Ja

nuar

y 16

th, 2

018

Schm

ansk

a Pa

rk

Site

Impr

ovem

ents

Sh

eet 3

of 8

- Ba

sket

ball

Cour

t Site

Pla

n

5’5’

15’

5’

50 feet

96 feet

5’

10’

8’

R-10’

R-10’

10’

9’

6’

18’

9’

R-min.

10’

R-min.

10’

10’

Install Removable BollardTRAFFICGUARD® LOCKING KEY

LOCK SERIES [RP3503L]

New Parking Area2-Accessible spaces9’x18’ w/6’ painted buffer between (typ.)

Ext. Asphalt to be removed

Ext. path to remain

Ext. Gravel path to be paved

Appx. 180’L x 8-10’ W(width varies)

New Asphalt Pathway

Ext. 8” Corrugated Stormwater Pipe to remain

Catch basins to be covered with Coir mat/silt barrier during construction

Ext. Fence to remain

Ext. catch basin

w/grate

5’

5’

Widened to 8’ min.

Line painting layout and siting of standards to be

provided by court construction contractor

5’8’

Ext. Asphalt to be removed

Match asphalt to width of ext.

basement access24’

Remove ext. gravel path and replace with

asphalt path Max running slope 5%

Ext. timber retaining wall to remain

Ext. steps to remain

Ext. Barn

Ext. Deck to remain

5’

7’

Ext. catch basin

w/grate

0 20feet

1”= 20 feet10’ contours

N

Page 4: N Pave Ext Gravel Pathway (Task 3a) 30 N.T.S Prepared by ... · Pave Pathway to Barn Sheet 1 of 8 - Plan Overview (Task 3d) Pave Pathway to Basement Access (Task 3c) Pave New Parking

Prep

ared

by

Max

Mad

alin

ski

Asso

ciat

e Pa

rks P

roje

ct C

oord

inat

orm

mad

alin

ski@

burli

ngto

nvt.g

ov80

2-88

1-40

00Ja

nuar

y 16

th, 2

018

Schm

ansk

a Pa

rk

Site

Impr

ovem

ents

Sh

eet 4

of 8

- Ba

sket

ball

Cour

t Col

or/D

rain

age

Plan

0 20feet

1”= 20 feet10’ contours

N

Ext. 8” Corrugated Stormwater Pipe to remain

Ext. catch basin

w/grate

Ext. catch basin

w/grate

Courts to

be painted

Dark Green w

ith w

hite lin

e paint

Use zones t

o be painted Maroon

.8-1% slope max.

.8-1% slope max.

2%

Grade Grass Swale to

existing Catch Basin

Grade Gras

s Swale

to

existing C

atch Basi

n

Grade Gras

s Swale

to

existing C

atch Basi

n

2%

2%

2%Crown new pathways at 2%

in either direction

Crown new pathway 2% in either direction

Grade 6” wide grass

swale as needed

Page 5: N Pave Ext Gravel Pathway (Task 3a) 30 N.T.S Prepared by ... · Pave Pathway to Barn Sheet 1 of 8 - Plan Overview (Task 3d) Pave Pathway to Basement Access (Task 3c) Pave New Parking

Prep

ared

by

Max

Mad

alin

ski

Asso

ciat

e Pa

rks P

roje

ct C

oord

inat

orm

mad

alin

ski@

burli

ngto

nvt.g

ov80

2-88

1-40

00Ja

nuar

y 16

th, 2

018

Schm

ansk

a Pa

rk

Site

Impr

ovem

ents

Sh

eet 5

of 8

- Te

nnis

Cou

rts S

ite P

lan

0 20feet

1”= 20 feet

N

8’

21’

21’

44’

44’

78’

16’

36’

20’

10’

12’

8’

17’

8.5’

8.5’Ext. Courts surface and

base to be removedAppx. 99’x120’.

Install 4-6” topsoil,seed, and mulch

over approximately 4’x120’ section of removed court.

Install new 10’-tallvinyl-coated, black,

chain link fencewith gates as shown

Appx. edge ofext. woods

4’ gate

8’ gatecentered on

use zone

4’ gateNew Tennis Court

New Pickleball Court

New Caneball Court

Provide Tree protection for ext. trees and landscaping

Clear and Grub brush

10’

20’

0.8-1% slope

0.8-1% slope

Court Construction Contractor to provide line layout for all courts and site net posts.

Court colors to match color plan of basketball courts (see Sheet 4).Courts to be dark green with white line paint and maroon use zones

Page 6: N Pave Ext Gravel Pathway (Task 3a) 30 N.T.S Prepared by ... · Pave Pathway to Barn Sheet 1 of 8 - Plan Overview (Task 3d) Pave Pathway to Basement Access (Task 3c) Pave New Parking

Prep

ared

by

Max

Mad

alin

ski

Asso

ciat

e Pa

rks P

roje

ct C

oord

inat

orm

mad

alin

ski@

burli

ngto

nvt.g

ov80

2-88

1-40

00Ja

nuar

y 16

th, 2

018

Schm

ansk

a Pa

rk

Site

Impr

ovem

ents

Sh

eet 6

of 8

-Cou

rt C

onst

ruct

ion

Det

ails

Standard Court Reconstruction SectionN.T.S.

Net-Post Footing Detail (USTA specification)N.T.S.

Net Anchor Detail (USTA specification)N.T.S