N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26 th , 2018 Alderman Michael J. Murphy Mike Amsden, AICP – Multimodal Unit Manager

Upload: others

Post on 30-Jun-2020

7 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

N. Hawley Rd. Complete Streets ProjectW. Wisconsin Ave. to W. Vliet St.

June 26th, 2018

Alderman Michael J. Murphy

Mike Amsden, AICP – Multimodal Unit Manager

Page 2: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Project Goals• Reduce speeding

• Reduce crashes

• Improve safety & comfort for all users

Project Scope• Pavement markings, signs, flexible delineators

Page 3: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman
Page 4: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Motor Vehicle Characteristics

• 2 lanes of traffic in each

direction

• 14,600 motor vehicles/day

• 89% of people observed

speeding

• 8% driving over 40mph

• Fastest observed speed of

63mph63mph

Page 5: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

HIT BY A VEHICLE

TRAVELING AT:

20MPH

13%Likelihood of

fatality or

severe injury

Source: Tefft, Brian C. Impact speed and a pedestrian’s risk of

severe injury or death. Accident Analysis & Prevention. 50. 2013.

Page 6: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

HIT BY A VEHICLE

TRAVELING AT:

30MPH

40%Likelihood of

fatality or

severe injury

Source: Tefft, Brian C. Impact speed and a pedestrian’s risk of

severe injury or death. Accident Analysis & Prevention. 50. 2013.

Page 7: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

HIT BY A VEHICLE

TRAVELING AT:

40MPH

Source: Tefft, Brian C. Impact speed and a pedestrian’s risk of

severe injury or death. Accident Analysis & Prevention. 50. 2013.

73%Likelihood of

fatality or

severe injury

Page 8: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Crash Map/Diagram

N

122 crashes in 5 years

• 1 fatal crash

• 40 injury crashes leading to 57 injuries

• 4 bicyclists injured

• 4 pedestrians injured

Page 9: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Proposed Complete Streets Design• ‘Road diet’ or ‘right-sized street’

• 4 lanes of motor vehicle traffic to 2 or 3

• Improvements for people walking, biking, and driving

• Crashes reduced up to 47%

• Speed reduction

• Minimal effect on traffic flow

Page 10: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Existing Conditions – Wisconsin to Viaduct

• 20mph School Zone speed limit

• 4 lanes at intersection with no turn lanes

• Time restricted parking or no parking allowed

• Hawley Environmental School and Vision Forward Association nearby

• Intersection operates at a Level of Service (LOS) B during peak hour

Page 11: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Existing Conditions – Wisconsin to Viaduct

Page 12: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Existing Conditions – Wisconsin to Viaduct

Page 13: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Proposed Conditions• 4->3 reconfiguration

• New turn lanes

• Potential increase in parking

• Level of Service C (stable flow at

or near free flow) during peak hour

BenefitsBenefits

• Reduces speeding

• Exiting and entering Hawley will

be easier

• Improved pedestrian experience

Page 14: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman
Page 15: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman
Page 16: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Existing Conditions – Hawley Road Viaduct• 4 lanes with curb attached 5’ sidewalks

• High speeds due to large intersection spacing

• Yield controlled on-ramps

• No bike accommodations

Page 17: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Proposed

Conditions• 4->2 reconfiguration

• Protected bike lanes

• Green pavement markings

at potential conflict points

• Stop sign at SB on-ramp

Benefits

• Reduces speeding

• Eliminates passing on the

right / reckless driving

• Creates buffer between

driving lanes and sidewalks

Page 18: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman
Page 19: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman
Page 20: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Protected Bike Lanes Can…Image Credit: Jeramey Jannene, Urban Milwaukee

• Reduce injuries to all street users by over 50%

• Increase the number of people bicycling by upwards of 75%

• Make a street more comfortable for people biking, walking, & driving

Page 21: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Existing Conditions – Viaduct to Vliet

• One lane in each direction

• Parking allowed on both sides of the street, but very lightly used

• Lack of parked cars leads to higher speeds and difficult crossings

• No bike accommodations

Page 22: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Proposed

Conditions• Parking consolidated to

one side of the street

• Bike lanes NB & SB

Benefits

• Improved crossing • Improved crossing

experience for pedestrians

• Reduced speeds

Page 23: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman
Page 24: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman
Page 25: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

Proposed Conditions – Lloyd St Example

Page 26: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

• Reduced speeding, reckless driving, and crashes

• Easier to turn onto / off of Hawley Road

• Improved pedestrian experience

• Reduced sidewalk bike riding

• Connections to Oak Leaf Trail and existing bike network

Project Benefits

Page 27: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

• Finalize design and project cost

• Confirm parking impacts

• Advertise and select contractor

• Installation late 2018 or early 2019

Next Steps

Page 28: N. Hawley Rd. Complete Streets Project - Milwaukee › ImageLibrary › Groups › ...N. Hawley Rd. Complete Streets Project W. Wisconsin Ave. to W. Vliet St. June 26th, 2018 Alderman

For additional information contact:

Department of Public Works

[email protected]

414-286-CITY (2489)

Thank you!