n figure a13.1 - transport scotland · a9-a96is-jac-egn-xxx-fg-en-1322 proposed scheme (dmrb stage...

5
D D D D D D D D SWF04 (Scretan Burn) SWF03 (Beechwood Burn) SWF05 SWF04 (Scretan Burn) SWF02 (Inshes Burn) SWF10 (Tower Burn) SWF09 SWF08 (Cairnlaw Burn) SWF02 (Inshes Burn) SWF04 (Scretan Burn) C08 SWF07 SWF06 SWF01 (Mill Burn) SWF08 (Cairnlaw Burn) SWF11 SWF12 C09 C04 C07 C03 C02 C05 C06 C01 C10 SWF02 (Inshes Burn) Cradlehall Business Park SWF05 SWF03 (Beechwood Burn) A9 INVERNESS HIGHLAND MAIN LINE RAILWAY SMITHTON CULLODEN A96 INSHES INVERNESS CAMPUS ABERDEEN TO INVERNESS RAILWAY LINE MORAY FIRTH CRADLEHALL RESAURIE STRATTON C1032 BARN CHURCH ROAD B9006 CULLODEN ROAD RAIGMORE INTERCHANGE U1124 CAULFIELD ROAD INVERNESS RETAIL AND BUSINESS PARK U1058 CAULFIELD ROAD NORTH A ? N © Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 1 0.25 Kilometres Figure A13.1.4a Legend A96 Dualling Inverness to Nairn (including Nairn Bypass) Scheme Proposals 500m Study Area Watercourses Culvert Crossing D SuDS Outfall Locations 0.5 % AEP 200yr +CC Modelled Flood Depth (m) 0 - 0.25 0.25 - 0.5 0.5 - 0.75 0.75 - 1 1 - 2 Client Project A9/A96 Inshes to Smithton 95 Bothwell Street, Glasgow, G2 7HX, UK. Tel: +44(0)141 243 8000 www.jacobs.com Rev Drawing title Scale Drawing number Jacobs No. DO NOT SCALE @ A3 © Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party. B2103501 BIM No. Figure A13.1.4a DMRB Stage 3 EIAR Modelled Fluvial Flood Depth with Proposed Scheme (No Mitigation) C00 Drawing Status A APPROVED AS STAGE COMPLETE Sheet 1 of 5 1:12,500 Rev. Rev. Date Purpose of revision Apprv'd Rev'd Checkd Orig/Dwn A9-A96IS-JAC-EGN-XXX-FG-EN-1322 Proposed Scheme (DMRB Stage 3 design) CS SEPT 2019 C00 MU EIAR Publication KL DGC Note: Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.

Upload: others

Post on 07-Jul-2020

2 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: N Figure A13.1 - Transport Scotland · A9-A96IS-JAC-EGN-XXX-FG-EN-1322 Proposed Scheme (DMRB Stage 3 design) EPT 20 19 EIAR Public ati onS MU KL DG Note: Refer to Section 3.1.74 of

D

D

D

D

D

D

D

D

SW F04 (Sc reta n Burn)

SW F03 (Beec hwo o d Burn) SW F05

SW F04 (Sc reta n Burn)

SW F02 (Inshes Burn)

SW F10 (T o wer Burn)

SW F09

SW F08 (Ca irnla w Burn)

SW F02 (Inshes Burn)

SW F04 (Sc reta n Burn)

C08

SW F07

SW F06

SW F01 (Mill Burn)

SW F08 (Ca irnla w Burn)

SW F11

SW F12

C09

C04

C07

C03

C02

C05

C06

C01C10

SW F02 (Inshes Burn)

Cra dleha ll Business Pa rk

SW F05

SW F03 (Beec hwo o d Burn)

A9

INVERNESS

HIGHLAND MAIN

LINE RAILW AY

SMIT HT ON

CU LLODEN

A96

INSHES

INVERNESS CAMPU S

ABERDEEN T O INVERNESSRAILW AY LINE

MORAY FIRT H

CRADLEHALL

RESAU RIE

ST RAT T ON

C1032 BARN CHU RCH ROAD

B9006 CU LLODENROAD

RAIGMOREINT ERCHANGE

U 1124 CAU LFIELDROAD

INVERNESS RET AILAND BU SINESS PARK

U 1058 CAU LFIELDROAD NORT H

A

?

N

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres

Figure A13.1.4a

Legend

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing

D SuDS Outfall Locations0.5 % AEP 200yr +CC Mo delled Flo o dDepth (m )

0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2

Client

ProjectA9/A96 Inshes to Sm ithto n

95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000

www.jacobs.com

Rev

Drawing title

Scale

Drawing number

Jacobs No.DO NOT SCALE@ A3

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.

B2103501BIM No.

Figure A13.1.4a

DMRB Sta ge 3 EIARMo delled Fluvia l Flo o d Depth

with Pro po sed Sc hem e (No Mitiga tio n)

C00

Drawing Status A – APPROVED AS STAGE COMPLET ESheet 1 o f 5

1:12,500

Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn

A9-A96IS-JAC-EGN-X X X -FG-EN-1322

Proposed Scheme(DMRB Stage 3 design)

CSSEPT 2019C00 MUEIAR Publication K L DGC

Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.

Page 2: N Figure A13.1 - Transport Scotland · A9-A96IS-JAC-EGN-XXX-FG-EN-1322 Proposed Scheme (DMRB Stage 3 design) EPT 20 19 EIAR Public ati onS MU KL DG Note: Refer to Section 3.1.74 of

D

D

D

D

D

D

D

D

A9

INV ERNESS

HIGHL AND MAIN

L INE RAIL WAY

SMITHTON

CU L L ODEN

A96

INSHES

INV ERNESS CAMPU S

ABERDEEN TO INV ERNESSRAIL WAY L INE

MORAY FIRTH

CRADL EHAL L

RESAU RIE

STRATTON

C1032 BARN CHU RCH ROAD

B9006 CU L L ODENROAD

RAIGMOREINTERCHANGE

U 1124 CAU L FIEL DROAD

INV ERNESS RETAILAND BU SINESS PARK

U 1058 CAU L FIEL DROAD NORTH

SWF04 (Sc reta n Burn)

SWF03 (Beec hwo o d Burn) SWF05

SWF04 (Sc reta n Burn)

SWF02 (Inshes Burn)

SWF10 (To wer Burn)

SWF09

SWF08 (Ca irnla w Burn)

SWF02 (Inshes Burn)

SWF04 (Sc reta n Burn)

C08

SWF07

SWF06

SWF01 (Mill Burn)

SWF08 (Ca irnla w Burn)

SWF11

SWF12

C09

C04

C07

C03

C02

C05

C06

C01C10

SWF02 (Inshes Burn)

Cra dleha ll Business Park

SWF05

SWF03 (Beec hwo o d Burn)

B

?

N

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres

Figure A13.1.4b

L egend

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing

D SuDS Outfall Locations3.33% AEP 30yr Mo delled Flo o d Depth(m )

0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2

Client

ProjectA9/A96 Inshes to Sm ithto n

95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000

www.jacobs.com

Rev

Drawing title

Scale

Drawing number

Jacobs No.DO NOT SCAL E@ A3

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.

B2103501BIM No.

Figure A13.1.4b

DMRB Sta ge 3 EIARMo delled Fluvia l Flo o d Depth

with Pro po sed Sc hem e (No Mitigatio n)

C00

Drawing Status A – APPROV ED AS STAGE COMPL ETESheet 2 o f 5

1:12,500

Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn

A9-A96IS-JAC-EGN-XXX-FG-EN-1323

Proposed Scheme(DMRB Stage 3 design)

CSSEPT 2019C00 MUEIAR Publication DGCKL

Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.

Page 3: N Figure A13.1 - Transport Scotland · A9-A96IS-JAC-EGN-XXX-FG-EN-1322 Proposed Scheme (DMRB Stage 3 design) EPT 20 19 EIAR Public ati onS MU KL DG Note: Refer to Section 3.1.74 of

D

D

D

D

D

SW F03 (Be e c hwood Burn) SW F05

SW F04 (Sc re tan Burn)

SW F09

SW F08 (Cairnlaw Burn)

SW F04 (Sc re tan Burn)

SW F06

C08

C09

C04C03

C02

C05

C06

C01

Crad le hall Bus ine s sPark

SW F05

SW F03 (Be e c hwood Burn)

C

?

N

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.25 0.50.125 Kilometres

Figure A13.1.4c

Le ge nd

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing

D SuDS Outfall Locations0.5 % AEP 200yr +CC M od e lle d FloodDe pth (m )

0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2

Client

ProjectA9/A96 Ins he s to Sm ithton

95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000

www.jacobs.com

Rev

Drawing title

Scale

Drawing number

Jacobs No.DO NOT SCALE@ A3

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.

B2103501BIM No.

Figure A13.1.4c

DM RB Stage 3 EIARM od e lle d Fluvial Flood De pth

with Propos e d Sc he m e (No M itigation)

C00

Drawing Status A – APPROV ED AS STAGE COM PLETEShe e t 3 of 5

1:5,000

Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn

A9-A96IS-JAC-EGN-XXX-FG-EN-1324

Proposed Scheme(DMRB Stage 3 design)

CSSEPT 2019C00 M UEIAR Publication KL DGC

Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.

Page 4: N Figure A13.1 - Transport Scotland · A9-A96IS-JAC-EGN-XXX-FG-EN-1322 Proposed Scheme (DMRB Stage 3 design) EPT 20 19 EIAR Public ati onS MU KL DG Note: Refer to Section 3.1.74 of

D

D

D

SWF04 (Sc re ta n Burn)

SWF03 (Be e c hwood Burn) SWF05

SWF04 (Sc re ta n Burn)

SWF10 (Towe r Burn)

SWF09

SWF08 (Ca irnla w Burn)

SWF07

SWF06

C08

C04

C07

C03

C02

C06

SWF05

SWF08 (Ca irnla w Burn)

SWF10(Towe r Burn)

D

?

N

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.25 0.50.125 Kilometres

Figure A13.1.4d

L e ge nd

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing

D SuDS Outfall Locations0.5 % AEP 200yr +CC Mod e lle d FloodDe pth (m )

0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2

Client

ProjectA9/A96 Ins he s to Sm ithton

95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000

www.jacobs.com

Rev

Drawing title

Scale

Drawing number

Jacobs No.DO NOT SCAL E@ A3

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.

B2103501BIM No.

Figure A13.1.4d

DMRB Sta ge 3 EIARMod e lle d Fluvia l Flood De pth

with Propos e d Sc he m e (No Mitiga tion)

C00

Drawing Status A – APPROV ED AS STAGE COMPL ETEShe e t 4 of 5

1:5,000

Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn

A9-A96IS-JAC-EGN-XXX-FG-EN-1325

Proposed Scheme(DMRB Stage 3 design)

CSSEPT 2019C00 MUEIAR Publication KL DGC

Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.

Page 5: N Figure A13.1 - Transport Scotland · A9-A96IS-JAC-EGN-XXX-FG-EN-1322 Proposed Scheme (DMRB Stage 3 design) EPT 20 19 EIAR Public ati onS MU KL DG Note: Refer to Section 3.1.74 of

D

D

D

SWF04 (Sc re ta n Burn)

SWF03 (Be e c hwood Burn) SWF05

SWF04 (Sc re ta n Burn)

SWF02 (Ins he s Burn)

SWF07

SWF06

C08

C04

C07

C03

C05

C06

SWF08 (Ca irnla w Burn)

SWF10(Towe r Burn)

E

?

N

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.25 0.50.125 Kilometres

Figure A13.1.4e

L e ge nd

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing

D SuDS Outfall Locations0.5 % AEP 200yr +CC Mod e lle d FloodDe pth (m )

0 - 0.250.25 - 0.50.5 - 0.750.75 - 11 - 2

Client

ProjectA9/A96 Ins he s to Sm ithton

95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000

www.jacobs.com

Rev

Drawing title

Scale

Drawing number

Jacobs No.DO NOT SCAL E@ A3

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.

B2103501BIM No.

Figure A13.1.4e

DMRB Sta ge 3 EIARMod e lle d Fluvia l Flood De pth

with Propos e d Sc he m e (No Mitiga tion)

C00

Drawing Status A – APPROV ED AS STAGE COMPL ETEShe e t 5 of 5

1:5,000

Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/Dwn

A9-A96IS-JAC-EGN-XXX-FG-EN-1326

Proposed Scheme(DMRB Stage 3 design)

CSSEPT 2019C00 MUEIAR Publication KL DGC

Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.