n figure a13.1...figure a13.1.7a dmrb stage 3 eiar modelled fluvial flood depth impact map with...

1
D D D D D D D D SWF04 (Scretan Burn) SWF03 (Beechwood Burn) SWF05 SWF04 (Scretan Burn) SWF02 (Inshes Burn) SWF10 (Tower Burn) SWF09 SWF08 (Cairnlaw Burn) SWF02 (Inshes Burn) SWF04 (Scretan Burn) C08 SWF07 SWF06 SWF01 (Mill Burn) SWF08 (Cairnlaw Burn) SWF11 SWF12 C09 C04 C07 C03 C02 C05 C06 C01 C10 SWF02 (Inshes Burn) Cradlehall Business Park SWF05 SWF03 (Beechwood Burn) A9 INVERNESS HIGHLAND MAIN LINE RAILWAY SMITHTON CULLODEN A96 INSHES INVERNESS CAMPUS ABERDEEN TO INVERNESS RAILWAY LINE MORAY FIRTH CRADLEHALL RESAURIE STRATTON C1032 BARN CHURCH ROAD B9006 CULLODEN ROAD RAIGMORE INTERCHANGE U1124 CAULFIELD ROAD INVERNESS RETAIL AND BUSINESS PARK U1058 CAULFIELD ROAD NORTH A ? N © Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 1 0.25 Kilometres Figure A13.1.7a Legend A96 Dualling Inverness to Nairn (including Nairn Bypass) Scheme Proposals 500m Study Area Watercourses Culvert Crossing D SuDS Outfall Locations Modelled Flood Level Difference (m) during the 0.5% AEP (200-year) plus CC event > -0.1 Major Beneficial -0.1 to -0.05 Moderate Beneficial -0.05 to -0.01 Minor Beneficial -0.01 to 0.01 Negligible 0.01 to 0.05 Minor Adverse 0.05 to 0.1 Moderate Adverse > 0.1 Major Adverse Client Project A9/A96 Inshes to Smithton 95 Bothwell Street, Glasgow, G2 7HX, UK. Tel: +44(0)141 243 8000 www.jacobs.com Rev Drawing title Scale Drawing number Jacobs No. DO NOT SCALE @ A3 © Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party. B2103501 BIM No. Figure A13.1.7a DMRB Stage 3 EIAR Modelled Fluvial Flood Depth Impact Map with Proposed Scheme (With Mitigation) C00 Drawing Status A APPROVED AS STAGE COMPLETE Sheet 1 of 4 1:12,500 Rev. Rev. Date Purpose of revision Apprv'd Rev'd Checkd Orig/Dwn DGC KL EIAR Publication MU C00 SEPT 2019 CS A9-A96IS-JAC-EGN-XXX-FG-EN-1339 Proposed Scheme (DMRB Stage 3 design) Note: Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.

Upload: others

Post on 30-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

D

D

D

D

D

D

D

D

SWF04 (Sc reta n Burn)

SWF03 (Beec hwood Burn) SWF05

SWF04 (Sc reta n Burn)

SWF02 (Inshes Burn)

SWF10 (Tower Burn)

SWF09

SWF08 (Ca irnla w Burn)

SWF02 (Inshes Burn)

SWF04 (Sc reta n Burn)

C08

SWF07

SWF06

SWF01 (Mill Burn)

SWF08 (Ca irnla w Burn)

SWF11

SWF12

C09

C04

C07

C03

C02

C05

C06

C01C10

SWF02 (Inshes Burn)

Cra d leha ll Business Park

SWF05

SWF03 (Beec hwood Burn)

A9

INV ERNESS

HIGHL AND MAIN

L INE RAIL WAY

SMITHTON

CU L L ODEN

A96

INSHES

INV ERNESS CAMPU S

ABERDEEN TO INV ERNESSRAIL WAY L INE

MORAY FIRTH

CRADL EHAL L

RESAU RIE

STRATTON

C1032 BARN CHU RCH ROAD

B9006 CU L L ODENROAD

RAIGMOREINTERCHANGE

U 1124 CAU L FIEL DROAD

INV ERNESS RETAILAND BU SINESS PARK

U 1058 CAU L FIEL DROAD NORTH

A

?

N

© Crown copyright and database right 2019. All rights reserved. Ordnance Survey Licence number 100046668. 0 0.5 10.25 Kilometres

Figure A13.1.7a

L egend

A96 Dualling Inverness to Nairn (includingNairn Bypass) Scheme Proposals500m Study AreaWatercoursesCulvert Crossing

D SuDS Outfall LocationsMod elled Flood L evel Differenc e (m )d uring the 0.5% AEP (200-year) p lus CCevent

> -0.1 Major Beneficial-0.1 to -0.05 Moderate Beneficial-0.05 to -0.01 Minor Beneficial-0.01 to 0.01 Negligible0.01 to 0.05 Minor Adverse0.05 to 0.1 Moderate Adverse> 0.1 Major Adverse

Client

ProjectA9/A96 Inshes to Sm ithton

95 Bothwell Street, Glasgow, G2 7HX, UK.Tel: +44(0)141 243 8000

www.jacobs.com

Rev

Drawing title

Scale

Drawing number

Jacobs No.DO NOT SCAL E@ A3

© Copyright 2019 Jacobs U.K. Limited. The concepts and information contained in this document are the property of Jacobs. Use or copying of this document in whole or in part without the written permission of Jacobs constitutes an infringement of copyright. Limitation: This drawing has been prepared on behalf of, and for the exclusive use of Jacobs' Client, and is subject to, and issued in accordance with, the provisions of the contract between Jacobs and the Client. Jacobs accepts no liability or responsibility whatsoever for, or in respect of, any use of, or reliance upon, this drawing by any third party.

B2103501BIM No.

Figure A13.1.7a

DMRB Sta ge 3 EIARMod elled Fluvia l Flood Dep th Im p a c t Ma pwith Prop osed Sc hem e (With Mitigation)

C00

Drawing Status A – APPROV ED AS STAGE COMPL ETESheet 1 of 4

1:12,500

Rev. Rev. Date Purpose of revision Apprv'dRev'dCheckdOrig/DwnDGCKLEIAR Publication MUC00 SEPT 2019 CS

A9-A96IS-JAC-EGN-XXX-FG-EN-1339

Proposed Scheme(DMRB Stage 3 design)

Note:Refer to Section 3.1.74 of Appendix A13.1 (Flood Risk Assessment) and Section 7.1 of Appendix A13.7 (Hydraulic Modelling Report) for modelling interpretation.