LEGEND APPLICATION BOUNDARY FLOW DIRECTION PROPOSED STOCKPIPLE LOCATION PROPOSED TEMPORARY SEDIMENT FENCE >> PROPOSED TEMPORARY CATCH DRAIN PROPOSED TEMPORARY SITE WORKS FENCE PROPOSED TEMPORARY SEDIMENT BASIN PROVIDE TEMPORARY SANDBAGS AROUND PITS: 1. AFTER PAVEMENT WORKS ARE COMPLETE IF WORKS ARE ONGOING UPSTREAM 2. TO EXISTING GRATED PITS DOWNSTREAM OF CONSTRUCTION WORKS NOTE: - THIS PLAN IS FOR GUIDANCE ONLY. - SITE MANAGER TO INSTALL SEDIMENT AND EROSION CONTROL MEASURES IN ACCORDANCE WITH LANDCOM - MANAGING URBAN STORMWATER "BLUE BOOK" GUIDANCE, TO COMPLEMENT SELECTED CONSTRUCTION METHODS AND STAGING. STRAW BALE SEDIMENT BARRIER CLIENT Billard Leece Partnership Pty Ltd Architects & Urban Planners E [email protected] www.blp.com.au F +61 3 9656 5050 Studio 201, 50 Holt Street Surry Hills 2010 NSW Australia T +61 2 8096 4066 ARCHITECT CIVIL/STRUCTURAL ELECTRICAL/DRY FIRE/COMMS & IT/SECURITY/VERTICAL TRANSPORT HYDRAULIC/FIRE MECHANICAL SERVICES T +61 2 9320 9320 [email protected] PROJECT MANAGER KEY PLAN IS NOT TO SCALE Level 10, 201 Kent Street Sydney, NSW 2000 Arup Pty Ltd www.arup.com T +61 2 9416 1177 [email protected] 59 Hill Street Roseville, NSW 2069 Donnelley Simpson Cleary Consulting Engineers Pty Ltd www.dsc.com.au T +61 2 8904 1444 [email protected] Level 4, 2 Glen Street Milsons Point, NSW 2061 Enstruct Group Pty Ltd www.enstruct.com.au T +61 2 9437 1000 [email protected] Level 23, 101 Miller Street North Sydney, NSW 2060 JHA Consulting Engineers Pty Ltd www.jhaservices.com T +61 2 8272 9334 [email protected] Level 2, 14 Martin Place Sydney, NSW 2000 Root Partnerships Pty Ltd www.rootpartnerships.com.au T +61 2 9978 5402 Level 14, 77 Pacific Highway North Sydney, NSW 2060 www.hinfra.health.nsw.gov.au Health Infrastructure NSW N KEY PLAN REV AMENDMENT BY DATE 0 N REVISION DATE Scale @A1 10 20 30 40 50m DRAWING NUMBER REV. DRAWING STATUS PROJECT NUMBER 5582 DRAWN BY PROJECT NAME CAMPBELLTOWN HOSPITAL REDEVELOPMENT DESCRIPTION FOR INFORMATION ONLY CHECKED BY ZONE 1 ZONE 2 ZONE 3 ZONE 4 ZONE 5 ZONE 6 CHR-ENS-CV-DWG- 1:500 02 PR MD 21/05/2018 01 ISSUE FOR INFORMATION MD 21/05/18 EROSION AND SEDIMENT CONTROL PLAN FOR ROADS - ZONE 5 02 MD 25/05/18 40% ISSUE FOR INFORMATION -Z05-0411

Upload: others

Post on 27-Dec-2021

2 views

Category:

Documents


0 download

TRANSCRIPT

LEGEND

APPLICATION BOUNDARY

FLOW DIRECTION

PROPOSED STOCKPIPLE

LOCATION

PROPOSED TEMPORARY

SEDIMENT FENCE

>>

PROPOSED TEMPORARY CATCH

DRAIN

PROPOSED TEMPORARY SITE

WORKS FENCE

PROPOSED TEMPORARY

SEDIMENT BASIN

PROVIDE TEMPORARY

SANDBAGS AROUND PITS:

1. AFTER PAVEMENT WORKS

ARE COMPLETE IF WORKS

ARE ONGOING UPSTREAM

2. TO EXISTING GRATED PITS

DOWNSTREAM OF

CONSTRUCTION WORKS

NOTE:

- THIS PLAN IS FOR GUIDANCE ONLY.

- SITE MANAGER TO INSTALL SEDIMENT AND

EROSION CONTROL MEASURES IN

ACCORDANCE WITH LANDCOM - MANAGING

URBAN STORMWATER "BLUE BOOK"

GUIDANCE, TO COMPLEMENT SELECTED

CONSTRUCTION METHODS AND STAGING.

STRAW BALE SEDIMENT BARRIER

CLIENT

Billard Leece

Partnership Pty Ltd

Architects & Urban Planners

E [email protected]

www.blp.com.au

F +61 3 9656 5050

Studio 201, 50 Holt Street

Surry Hills 2010

NSW Australia

T +61 2 8096 4066

ARCHITECT

CIVIL/STRUCTURAL

ELECTRICAL/DRY FIRE/COMMS & IT/SECURITY/VERTICAL TRANSPORT

HYDRAULIC/FIRE

MECHANICAL SERVICES

T +61 2 9320 9320

[email protected]

PROJECT MANAGER

KEY PLAN IS NOT TO SCALE

Level 10, 201 Kent Street

Sydney, NSW 2000

Arup Pty Ltd

www.arup.com

T +61 2 9416 1177

[email protected]

59 Hill Street

Roseville, NSW 2069

Donnelley Simpson

Cleary Consulting

Engineers Pty Ltd

www.dsc.com.au

T +61 2 8904 1444

[email protected]

Level 4, 2 Glen Street

Milsons Point, NSW 2061

Enstruct Group

Pty Ltd

www.enstruct.com.au

T +61 2 9437 1000

[email protected]

Level 23, 101 Miller Street

North Sydney, NSW 2060

JHA Consulting

Engineers Pty Ltd

www.jhaservices.com

T +61 2 8272 9334

[email protected]

Level 2, 14 Martin Place

Sydney, NSW 2000

Root Partnerships

Pty Ltd

www.rootpartnerships.com.au

T +61 2 9978 5402

Level 14, 77 Pacific Highway

North Sydney, NSW 2060

www.hinfra.health.nsw.gov.au

Health Infrastructure

NSW

N

KEY PLAN

REV AMENDMENT BY DATE

0

N

REVISION DATE

Scale

@A1

10 20 30 40 50m

DRAWING NUMBER REV.

DRAWING STATUS

PROJECT NUMBER

5582

DRAWN BY

PROJECT NAME

CAMPBELLTOWN

HOSPITAL REDEVELOPMENT

DESCRIPTION

FOR INFORMATION ONLY

CHECKED BY

ZONE 1 ZONE 2

ZONE 3 ZONE 4

ZONE 5 ZONE 6

CHR-ENS-CV-DWG-

1:500

02

PRMD

21/05/2018

01 ISSUE FOR INFORMATION MD 21/05/18

EROSION AND SEDIMENT CONTROL

PLAN FOR ROADS - ZONE 5

02 MD 25/05/1840% ISSUE FOR INFORMATION

-Z05-0411

>>

>>

>>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

>

LEGEND

APPLICATION BOUNDARY

FLOW DIRECTION

PROPOSED STOCKPIPLE

LOCATION

PROPOSED TEMPORARY

SEDIMENT FENCE

>>

PROPOSED TEMPORARY CATCH

DRAIN

PROPOSED TEMPORARY SITE

WORKS FENCE

PROPOSED TEMPORARY

SEDIMENT BASIN

PROVIDE TEMPORARY

SANDBAGS AROUND PITS:

1. AFTER PAVEMENT WORKS

ARE COMPLETE IF WORKS

ARE ONGOING UPSTREAM

2. TO EXISTING GRATED PITS

DOWNSTREAM OF

CONSTRUCTION WORKS

NOTE:

- THIS PLAN IS FOR GUIDANCE ONLY.

- SITE MANAGER TO INSTALL SEDIMENT AND

EROSION CONTROL MEASURES IN

ACCORDANCE WITH LANDCOM - MANAGING

URBAN STORMWATER "BLUE BOOK"

GUIDANCE, TO COMPLEMENT SELECTED

CONSTRUCTION METHODS AND STAGING.

STRAW BALE SEDIMENT BARRIER

CLIENT

Billard Leece

Partnership Pty Ltd

Architects & Urban Planners

E [email protected]

www.blp.com.au

F +61 3 9656 5050

Studio 201, 50 Holt Street

Surry Hills 2010

NSW Australia

T +61 2 8096 4066

ARCHITECT

CIVIL/STRUCTURAL

ELECTRICAL/DRY FIRE/COMMS & IT/SECURITY/VERTICAL TRANSPORT

HYDRAULIC/FIRE

MECHANICAL SERVICES

T +61 2 9320 9320

[email protected]

PROJECT MANAGER

KEY PLAN IS NOT TO SCALE

Level 10, 201 Kent Street

Sydney, NSW 2000

Arup Pty Ltd

www.arup.com

T +61 2 9416 1177

[email protected]

59 Hill Street

Roseville, NSW 2069

Donnelley Simpson

Cleary Consulting

Engineers Pty Ltd

www.dsc.com.au

T +61 2 8904 1444

[email protected]

Level 4, 2 Glen Street

Milsons Point, NSW 2061

Enstruct Group

Pty Ltd

www.enstruct.com.au

T +61 2 9437 1000

[email protected]

Level 23, 101 Miller Street

North Sydney, NSW 2060

JHA Consulting

Engineers Pty Ltd

www.jhaservices.com

T +61 2 8272 9334

[email protected]

Level 2, 14 Martin Place

Sydney, NSW 2000

Root Partnerships

Pty Ltd

www.rootpartnerships.com.au

T +61 2 9978 5402

Level 14, 77 Pacific Highway

North Sydney, NSW 2060

www.hinfra.health.nsw.gov.au

Health Infrastructure

NSW

N

KEY PLAN

REV AMENDMENT BY DATE

0

N

REVISION DATE

Scale

@A1

10 20 30 40 50m

DRAWING NUMBER REV.

DRAWING STATUS

PROJECT NUMBER

5582

DRAWN BY

PROJECT NAME

CAMPBELLTOWN

HOSPITAL REDEVELOPMENT

DESCRIPTION

FOR INFORMATION ONLY

CHECKED BY

ZONE 1 ZONE 2

ZONE 3 ZONE 4

ZONE 5 ZONE 6

CHR-ENS-CV-DWG-

1:500

02

PRMD

21/05/2018

01 ISSUE FOR INFORMATION MD 21/05/18

EROSION AND SEDIMENT CONTROL

PLAN FOR ROADS - ZONE 6

02 MD 25/05/1840% ISSUE FOR INFORMATION

-Z06-0411