myanmar telecoms project

2
MYANMAR TELECOMS PROJECT Locations Yangon, Myanmar Thilawar, Myanmar Volume 5,800 Towers 50,000 Steel bundles Duration 1 - 3 Years Contract Value 3,000,000 USD SCOPE CEA Project Logistics Myanmar were recently awarded three separate telecommunication contracts to provide full project logistics for the installation of over 5,800 telecom towers. The towers are an integral part of Myanmar’s future development and will enhance their role within the ASEAN region and beyond. CEA PROVIDE Import permits Customs clearance Incoming transportation Inventory Warehousing and storage Dispatch Outgoing transportation CASE STUDY CS011 Myanmar Telecoms Project 1/2 MYANMAR TELECOMS PROJECT The Myanmar goverment have pledged to install over 17,000 telecom towers throughout the country, CEA Myanmar will be responsible for 34% of these

Upload: cea-project-logistics

Post on 06-Apr-2016

232 views

Category:

Documents


1 download

DESCRIPTION

Case study on our multi-million USD telecoms projects...

TRANSCRIPT

MYA

NM

AR TELECO

MS PRO

JECT

Locations Yangon, Myanmar Thilawar, Myanmar

Volume 5,800 Towers 50,000 Steel bundles

Duration 1 - 3 Years

Contract Value 3,000,000 USD

SCOPECEA Project Logistics Myanmar were recently awarded three separate telecommunication contracts to provide full project logistics for the installation of over 5,800 telecom towers. The towers are an integral part of Myanmar’s future development and will enhance their role within the ASEAN region and beyond.

CEA PROVIDE• Import permits

• Customs clearance

• Incoming transportation

• Inventory

• Warehousing and storage

• Dispatch

• Outgoing transportation

CASE STUDY CS011Myanmar Telecoms Project 1/2

MYANMAR TELECOMS PROJECT

The Myanmar goverment have pledged to install over 17,000 telecom towers throughout the country, CEA Myanmar will be responsible for 34% of these

CEA PROJECT LOGISTICS

G-18 PEARL CONDO

KABAR AYE PAGODA ROAD

BAHAN TOWNSHIP

YANGON

MYANMAR

+959 421 031 286

www.ceaprojects.com

MYA

NM

AR

TELE

COM

S PR

OJE

CT

CASE STUDY CS011Myanmar Telecoms Project 2/2

MANITOU EQUIPMENT USED THROUGHOUT

LADDER BRACKETS IN STORAGE

PARTS STORED IN COLOURED SECTIONS

EACH PART IS NUMBERED AND COLOURED

ANGULAR TOWER SECTIONS UNLOADED

TOWER GENERATOR UNITS FOUNDATION ANCHOR BOLTS

A COMPLETED TOWER IN MYANMARTOWER LEGS GOING INTO OUTSIDE STORAGE

OVER 4,000 PARTS STORED IN OUR THILAWAR WAREHOUSE

LADDER PARTS AT OUR YANGON FACILITY