my resume full

26
MOKHTAR FAWZY RESUME PERSONAL DATA Name: Mokhtar Fwazy Mokhtar Nationality: Egyptian. Marital Status: Married. Date of Birth: 14 December 1981 Military Service: Permanent Exempt. Address: Military buildings Block 47G flat 43 - Tosson– Alexandria - Egypt Telephones: Home 002 03 5621728. Mobile 002 01159553304 - +96893913074 Driver's Licenses: Private Egyptian License. Private Qatar License Private Oman License Private Bahrain License Engineers Syndicate ID: 31/00577. E-mail: [email protected] [email protected]. CAREER OBJECTIVE A Challenging Position in a new atmosphere where I can have an opportunity to enhance and utilize my skills and broaden my knowledge about Construction Manager. EDUCATION Alexandria University – Faculty of Engineering B.Sc. in Civil Engineering –2005- With Very good degree in airports and highways engineering project. LANGUAGES Arabic: Mother Tongue English: Good Reading, Writing and Speaking Computer Skills: Microsoft Office Self Study AutoCAD Self Study PERSONAL SKILLS Public relation & Cooperation.

Upload: mokhtar-mohamed

Post on 15-Apr-2017

167 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: My Resume Full

MOKHTAR FAWZY RESUME 

 

PERSONAL DATA Name: Mokhtar Fwazy Mokhtar Nationality: Egyptian. Marital Status: Married. Date of Birth: 14 December 1981 Military Service: Permanent Exempt. Address: Military buildings Block 47G flat 43 - Tosson– Alexandria - Egypt Telephones: Home 002 03 5621728. Mobile 002 01159553304 - +96893913074

Driver's Licenses:

Private Egyptian License. Private Qatar License Private Oman License Private Bahrain License

Engineers Syndicate ID: 31/00577. E-mail: [email protected] [email protected].

CAREER OBJECTIVE A Challenging Position in a new atmosphere where I can have an opportunity to enhance and utilize my skills and broaden my knowledge about Construction Manager.

EDUCATION Alexandria University – Faculty of Engineering B.Sc. in Civil Engineering –2005- With Very good degree in airports and highways engineering project.

LANGUAGES

Arabic: Mother Tongue English: Good Reading, Writing and Speaking

Computer Skills:

Microsoft Office Self Study AutoCAD Self Study

PERSONAL SKILLS

Public relation & Cooperation.

Page 2: My Resume Full

MOKHTAR FAWZY RESUME 

 

Dealing with people & ability to work within a team Self-motivated active work Ready to work anywhere anytime.

TRAINING COURSES

PADI SCUBA Diving [Open Water Diver] PCC AIRFIELED PAVING WORKSHOP [Transportation System Center, Al Musannah AB,

Oman].

Confined Space Entry Course‐Training Institute – Oman

OSHA 30-Hour outreach training for the construction industry – June 2013 – Oman. 

Fire Protection System Training – TREMCO – Bahrain   

CAREER PROFILE & JOB DESCRIPTION

As a Civil Construction

PCC AIRFIELED PAVING (new asphalt/concrete taxi way using slip form paver, connecting it to the run way, And have paved and unpaved shoulders, edge lights and area/security lights. Fuel Tanks, storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.)

Diving Engineer checking placing of (GRP Pipes – Concrete Cubes – Accropodes and Rocks)

in the offshore Projects Placing and installation for GRP pipe lines of Intake and Discharge pipe lines for Elec. Power

Planet.(Offshore works). Driving Piles and Sheet piles (temporary and permanent).(near shore and off shore works). Follow up of all sites work (Earth work - Insulation – Concrete – Repair – Masonry work –

most of finishing activities – Pavements). Flow up & create the method statement for the each activity. (MS) Reporting on construction activities within the framework of Daily / weekly / monthly reporting

by site management. Follow up the inspection test Plan (ITP) for the project activities. coordinating between QC & Technical Office follow up progress of the daily, weekly, monthly,

reports

As a Quality Control & Quality Assurance Engineer – QA/QC

To assist the site engineer to inspect the permanent work, including delivered materials, in order to

verify conformance with the contract quality requirements and the implementation of the company corporate quality system in accordance with ISO 9001:2000.

Certifying all Quality Control Submittals and assure that they comply with the Contract Documents and Specifications

Flow up & create Quality Control plan. (QCP) Flow up & create [Inspection Test Plan "ITP" for work complying with project specifications]. Follow up calibrations certificates & reports.

Page 3: My Resume Full

MOKHTAR FAWZY RESUME 

 

COMPANIES PROFILE American International Contractors INC. AICI www.AICI.org August 2016 – up to present..

Project : Airlift Apron – Alumsanah Air Base – Oman Profession: Construction Manager. Owner: Royal Air Force at Oman RAFO. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $24.4 million Dollars). Summary of work: The Project consists of the construction of an aircraft parking apron of approximately

164,000 square meters along with miscellaneous upgrades to the surrounding airfield and taxiways.

The civil works of the project are construction of: Mobilization and De-mobilization including, Laydown Area, Batch Plant, material and

equipment storage area, and all temporary facilities, structures, and utilities. Construction of the complete Airlift Apron (56000m3 of paving concrete). Construction of the Apron Access Road

Archirodon Construction (overseas) CO. S.A. www.Archirodon.net 

July 2015 – July206.

Project : Salehia Airport development- 2000 pound capacity shelter - Salehia Air Base- EGYPT Profession: Construction Manager. Owner: EGYPTIAN AIR FORCES. Budget: (Total value of the project 100 million L.E). Summary of work:

Construct of 2000 pond capacity of reinforced concrete shelters (30 Pcs) 4800m3 of RC Concrete 4500 m3 of PC laying concrete each, with 3600m3 of sand backfilling each, Taxi way paving concrete connected to the main Run way, industrial and technical building ( 24 PCs), admin building (49 Pcs ). Underground site utilities (elec., communication). American International Contractors INC. AICI www.AICI.org December 2014 – June 2015..

Project : United Kingdom Maritime Component Command ( UKMCC ), Mina Salman Navy Base, Bahrain

Page 4: My Resume Full

MOKHTAR FAWZY RESUME 

 

Profession: Construction Manager. Owner: UK Navy. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $9.75 million Dollars). Summary of work: The base bid includes the construction of the FSU facility, Headquarter facility and all utility

connection, Vehicle sunshade, entrance canopy, Gray water collection system, irrigation system and landscaping.

The civil works of the project are construction of: Concrete foundation, Steel Structure, Roof and walls sandwich panels, Rollup doors, S.O.G. for all 

levels, Gypsum and cement board walls, CMU walls, Ceramic tiles, fire rated and blast windows, fire 

rated and blast doors, Cambridge doors, wooden doors, Acoustical Ceiling, plaster and painting 

system, Roof membrane and insulation system, sound insulation walls, fire rated walls, Mechanical 

and electrical systems serving building and vehicles maintenance operation.  

American International Contractors INC. AICI www.AICI.org December 2013 – December 2014.

Project : FY11 Tactical Ramp/ Vehicle Maintenance Facility Al Udeid, Qatar Profession: Construction Manager. Owner: US Air Force USAF. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $42 million Dollars). The civil works of the project are construction of:

Vehicle maintenance facility is a 2 stories building consist of refueling area, offices area, 

workshop areas and store area, works in this building summarized as below: 

1. Concrete foundation. 

2. Steel structure. 

3. Roof and walls sandwich panels. 

4. Rollup doors. 

5. S.O.G. for all levels. 

6. Oil changing pit. 

7. Overhead crane. 

8. Mechanical and electrical systems serving building and vehicles maintenance operation. 

9. Roads & parking lot. 

10. Paving sidewalk. 

11. CMU walls 

12. Insulation for fire resistance areas. 

13. Plastering and painting. 

14. Acoustical ceiling system. 

15. Electrical substation building and mechanical chiller yard.  

16. Underground utilities (mechanical and electrical). 

Page 5: My Resume Full

MOKHTAR FAWZY RESUME 

 

Tactical Ramp is 50,000 M3 of concrete for Concrete pavement parking apron with 

compression sealant and pavement marking. 

American International Contractors INC. AICI www.AICI.org September 2012 – November 2013.

Projects : (Airlift Ramp & Fuel Facilities) & ( Parallel Taxiway Extension) Al Musannah Air Base, Oman

Profession: Construction Section Head. Owner: Royal Air Force at Oman RAFO. Consultant: US Army Corps of Engineer. Budget:(Total value of the project US $57 million Dollars).

Archirodon Construction (overseas) CO. S.A. www.Archirodon.net 

January 2012 – September 2012

Project: Banha Power Station, 750 MW Combined Cycle Project, Kaluobya, Egypt. (CP 102 ) Profession: Construction Section Head. Intake and Discharge Structure ( Offshore Work ) Owner: “West Delta Electricity Production” Consultant: " Power Generation Engineering and Services Company – PGESCO” Budget: (Total value of the project US $50 million Dollars). The civil works of the project are construction of:

The work for this Contract Package is subdivided: Site development, Underground Utilities, Power Generation Facilities, Auxiliary Facilities, Ancillary Facilities, Electrical and Mechanical Work. American International Contractors INC. AICI www.AICI.org June 2010 – November 2011

Project: Construction of a Close Air Support CAS Parking Apron DOHA – QATAR Profession: Senior Site Engineer. Owner: United States Army - Air Force - Al Udeid Air Base. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $50 million Dollars). The civil works of the project are construction of:

(new asphalt/concrete taxi way using slip form paver, connecting it to the run way, and have paved and unpaved shoulders, edge lights and area/security lights. One fuel storage tank, Electrical Building, Filter Building, Transformer Building, and Fuel Hydrant Pits with appropriate cathode protection.)

Archirodon Construction (overseas) CO. S.A. www.Archirodon.net 

December 2009 – June 2010

Page 6: My Resume Full

MOKHTAR FAWZY RESUME 

 

Project: Tripoli Harbor Libya Break Water Reconstruction TRIPOLI – LIBYA Profession: Marine Site Engineer. Owner: “Libyan Maritime and Port Authority” Consultant: "Royal Haskoning – Consultant Engineering” Budget: (Total value of the project US $300 million Dollars). The civil works of the project are construction of:

(Pre-Cast Concrete Works for cubes “10t, 15t,20t & 30t” – Pre-Cast Concrete Work for Accropodes 6.3m3 & 9.00m3 – Concrete Repair for parapet breakwater- Placing of rocks class (2-4t),(3-5),(5-8),Cubes & Accropodes for break water along with 4700m.)

Archirodon Construction (Overseas) CO. S.A.  

www.Archirodon.net 

October 2008 - November 2009.

Project: SidiKrir Power Plant 750 MW Combined Cycle Project – Offshore Works - ALEXANDRIA–EGYPT

Profession: Marine Site Engineer. Owner: “West Delta Electricity Production” Consultant: "Power Generation Engineering and Services Company – PGESCO” Budget: (Total value of the project US $85 million Dollars). The civil works of the project are construction of:

(Earth Work – Dredging Works – Installation of onshore and offshore “FRP” Fiber glasses Reinforced Plastic Pipes – Pre-Cast Concrete Works for mattresses – Sheet Piles for Temporary Jetty.)

American International Contractors INC. AICI www.AICI.org April 2007-Jullay 2008

Project: King Abdalla II Special Operation Training Center (KASOTC) - AMMAN – JORDAN Profession: Site Engineer. Owner: Jordanian Army. Consultant: US Army Corps of Engineer. Budget: (Total value of the project US $90 million Dollars). The civil works of the project are construction of:

Dormitory Buildings, Administration Buildings, Tactical Buildings, Workshop, Warehouse, Ordinance Storage Buildings, Shooting Range (300m & 100m), Pump House, Water Tanks, 11Kv Electrical Sub Station, Retaining Walls, Earth works including 930,000m3 Cut, 483,000m3 Fill, 9,0Km Asphalt Roads,2.8Km Drain Channel Box and Pipe Culverts, All related utilities including Potable Water Pipe Lines, Sewer Pipe Lines and Electrical works.

Archirodon Construction (Overseas) CO. S.A.

Page 7: My Resume Full

MOKHTAR FAWZY RESUME 

 

www.Archirodon.net 

January 2007 – April 2007

Projects: Mooring dolphin Repair Works –Offshore Works- MIDTAP Jetty – Dekhela Port ALEXANDRIAEGYPT

Profession: QC Civil engineer Owner & Consultant: Middle East Oil Tankage & Pipe Lines (MIDTAP). Budget: (Total value of the project $5 million Dollars). The civil works of the project are construction of: Cut and Remove all damaged piles, Driving

New Piles, Construction of Dolphin and Walk way, Supports Located extend of MIDTAP Jetty, Pre-Cast Concrete Units.

American International Contractors INC. AICI www.AICI.org January 2006 – January 2007

Projects: Live Fire Fighting and Damage Control Trainer Complex Abo Qir – ALEXANDRIA -EGYPT Profession: QC Civil Engineer. Owner: Egyptian Naval Forces –Abo Qir Navy Base Consultant: Booz Allen Hamilton. Designer: Booz Allen Hamilton. Budget: (Total value of the project 12 million L.E) Time Schedule for the Project: 1 year (12 months) The civil works of the project are construction of: Concrete Activities, Interior and Exterior

Finishing Activities, All related utilities including Potable Water Pipe Lines, Sewer Pipe Lines and Electrical works. Asphalt Roads, Water Tank, Full Repair for Building{Cracks Injection, Shootcrete}, Concrete Helicopter Pad, Steel Skelton works.

Alexandria Construction Company (ACC), TallatMoustafa August 2005 – December 2005

Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA – EGYPT

Profession: Site Engineer. Client: Four Seasons and San Stefano for Real Estate Investment Consultant: Dar Al-Handasa engineering’s Office. Budget: (Total value of the project US $95 million Dollars). Time Project Description :Project consists of four stories basement, five commercial mall, Two

towers {31 & 29 Repeated floors},Twenty Five Stories Four Seasons Five Stars Hotel, Three Floors underground Parking, Landscapes, All Finishing activities, the project was over an 28,000m2

Murray & Roberts Contractors International Limited

Page 8: My Resume Full

MOKHTAR FAWZY RESUME 

 

January 2005 – July 2005

Project: San Stefano Grand Plaza TP2 Supper Structure - ALEXANDRIA – EGYPT Profession: Site Engineer (Training Period). Client: Four Seasons and San Stefano for Real Estate Investment Consultant: Dar Al-Handasa engineering’s Office. Budget: (Total value of the project US $95 million Dollars).

REFERENCES

Recommendation & Certificates: Recommendation letters & certifications of graduation and all software are available upon requisition.

YEARS OF EXPERIENCES 10 years in Construction Field

Page 9: My Resume Full
Page 10: My Resume Full
Page 11: My Resume Full
Page 12: My Resume Full
Page 13: My Resume Full
Page 14: My Resume Full
Page 15: My Resume Full
Page 16: My Resume Full
Page 17: My Resume Full
Page 18: My Resume Full
Page 19: My Resume Full
Page 20: My Resume Full
Page 21: My Resume Full
Page 22: My Resume Full
Page 23: My Resume Full
Page 24: My Resume Full
Page 25: My Resume Full
Page 26: My Resume Full