my path
DESCRIPTION
Please download and see the animation in some slidesTRANSCRIPT
Yingge ZHANG
MY PATH
The people who get on in this world are the people who get up and look for circumstances they want, and if they cannot find them, make them. -- Bernara Shaw
OBJECTIVES & AGENDATo record my life, study and work
experience and help other people get
to know me. This is also a
supplementary for my resume and
cover letter.
In this collected portfolio, it shows what I’ve done
and the experiences I’ve been through. Feel free
to feedback and welcome any discussion.
• Life Path Summary
• Education Background
• Internship Experience
• Projects Experiences
• Research Abilities
• Volunteer Activities
• Recreational Activities
• Required Skills Conclusion
• Self Evaluation
Born in
Hanzhong,
China, 1990
High school in Xi’an, China 2006-2009
Undergraduate
school in
Shanghai, China,
2009-2013
Graduate school in
Atlanta, 2013-2014
LIFE PATH SUMMARY
• Ability to adapt to any new environment independently
• Passionate problem solver and quick learner with a can-do mindset
• Strong knowledge and good savvy in fields of industries related to strategies & operations
• Multi-international-team-working experiences with great communication & presentation skills
EDUCATION BACKGROUND
Yingge (Shirley) ZHANG
Tel: (404)820-5640
Email: [email protected]
LinkedIn: www.linkedin.com/pub/
yingge-zhang/7a/b48/922/
• Top 3 university in China
• Bachelor of Science in Industrial Engineering
• GPA: 3.7/4.0
• Academy Excellence Scholarship
• Excellent Leader, Department of Public
Relations, Youth Volunteer Service Team
• Master of Science in Supply Chain Engineering
• GPA: 3.5/4.0
• Member, Georgia Tech Student Alumni
Association
INTERNSHIP EXPERIENCE
Outlet Group Supply Chain Group Central Kitchen Group
A listed bakery based in Singapore that was founded in July 2000. It operates a chin of retail outlets through its subsidiary BreadTalk Pte Ltd, selling a wide variety of bread, cakes, buns and pastries.A chain of 38 retail outlets island-wide in Singapore, with presence in 15 countries
A Hong Kong based, Asia focused consulting company, mainly focuses on management changing, productivity effectiveness, and business process re-engineering
INTERNSHIP EXPERIENCEForecast 预测 Execute 实行 Evaluate & Report 评估及报告Planning & Scheduling 计划及排程
Bread talk To-Be Recruitment MOS 招聘运营管理系统
Recruitment process招聘流程
New outlet feasibility
report
新店可行性报告
Rolling recruitment
schedule
滚动招聘计划
KPI
核心指标 Review on
KPI
核心指标回顾
Update
recruitment
schedule
更新招聘计划
Recruitment report
招聘情况汇报
Career
development plan
人才发展计划
Talent pool
建设人才库
Training plan
制定培训计划
Recruitment
channels
招聘渠道
Positioning
requirement
职位要求
Adjust recruitment
channels
调整招聘渠道
Staff package
comparison with
competitors
同行待遇比较
Resigning meeting
离职面谈Training
培训
Effectiveness
review on
recruitment channels
招聘渠道有效性回顾
Positioning
requirement review
职位要求回顾
Career
development
plan review
职业发展规划回顾
Effectiveness on
training review
培训效果回顾
On-job training
在职培训
On- job coaching
在职辅导
New outlet
feasibility report
新店可行性报告
Annual new outlet
opening schedule
with rightsizing
年度新店开张计划及編制
Rolling recruitment
schedule
制定滚动招聘计划
KPI
设定核心指标
Recruitment process招聘流程
KPI review
核心指标回顾
Annual new outlet
opening schedule
with rightsizing
年度新店开张计划及編制
To-Be recruitment MOS
Trial run audit Man-hour control
Boston matrix analysis
INTERNSHIP EXPERIENCE
What did I do as a full time consultant intern at
LMM Consultants with our client BreadTalk?
• Learnt about current processes and find problems & possible improvements
• Collected all improvement points and select most valuable and achievable ones
• Proposed practical suggestions on solving problems and driving savings
• Carried out trial run of proposed methods and did evaluation
• Got workforce schedule from Parris Baguette (the biggest competitor)
The biggest obstruction
of changing comes from
internal resistance instead
of outer difficulties
Cooperation dept.: Basket manufacturing
Team locations: USA + Singapore
Role: Project consultant
Gas Turbine
PROJECTS EXPERIENCESSiemens Energy Inc.
Basket (2 kinds)
PROJECTS EXPERIENCESSiemens Energy Inc.
Goals
Methods
Addressed Problems
Project Goals:
Recommendations on point of use, location of material
deliveries, mode of delivery of material supporting three of the
5R methodology – right place, right time, and right quantity
Project Methods:
Simulation based on Rockwell Arena
What I did:
• Mix-product input plan design based on 2016 production
blueprint.
• Demand and constraint analysis for recommendation of
production pattern.
• Input order priority research
• Root cause analysis for throughput, WIPs and resource
utilization.
• Cross-functional mechanism impact study (e.g.
Component request frequency between MFG and WH) simulation interface (model + layout)
PROJECTS EXPERIENCESSiemens Energy Inc.
Scenario Combination
Plan A: Dedicated Period Plan B: Dedicated Booth
KPI Review
Throughput Resource Utilization WIP
PROJECTS EXPERIENCESUnited States Postal Service
Rec
eivi
ng
Iden
tifi
cati
on
So
rtin
g
Sh
ipp
ing
Cooperation dept.: PD&C Operations
Team locations: USA + Singapore
Role: Project leader
Processing & Distribution Center (PD&C) Function
PROJECTS EXPERIENCESUnited States Postal Service
AGENDA
Avg. 15 min of containerization
Avg. 15 min of containerization Shipping DockShipping Dock
End of SortingRun
End of SortingRun
PlusTransmission+
Not machineableMails
PlusTransmission+
Not machineableMails
Information gap
Forecast
based on
Regression
In pieces
In containers
variation
Last record for machineable mailsCannot reflect actual condition at the shipping dock
exacerbatevariationProblem
SolutionIn containers
PROJECTS EXPERIENCESUnited States Postal Service
-5 -4 -3 -2 -1 0 1 2 3 4 5 OTHERS
0
200
400
600
800
1000
1200 Error frequency (Estimate - Actual)
Error
Data structure
Regression result
Forecast accuracy
PROJECTS EXPERIENCESUnited States Postal Service
Responsibilities:
• Communication bridge among
students, professor and client
• Data and method analysis
• Progress control
• Unity maintenance
• Appropriate coordination
• Presentation
Cooperation is a
balance between
efficiency and client
relationship
PROJECTS EXPERIENCESSED International Holdings, Inc.
Wal-Mart’s biggest supplier. A multinational,
preferred distributor of leading computer
technology and consumer electronics to channel
partners throughout the United States and Latin
America. Team locations: USA + Singapore + Panama
Goal: Warehouse improvement Role: Project consultant
New Product
s
• Found behavior of new products and sorted them according to order quantities and sale quantities and allocated proper locations
Batching
• Analyzed the size of different batches for the picking list, and tried to find the best batch-size by using the order data, the position of the items, and the distance of each location from the starting point of the picking to arrive
Cycle
Time
• Used ABC analysis to determine what to count and how frequent based on cost of sales and/or flow
PROJECTS EXPERIENCESSED International Holdings, Inc.
Batching size explorationABC analysis
PROJECTS EXPERIENCESAcademic Projects
Redesigned layout according to flow in corresponding time
Improved cashiers efficiency by therbligs analysis
Used heuristic algorithm to solve the problem of passenger flow in hospital in a certain day
Stimulated the hospital bus routine by LINGO
Simulated material distribution system of ARJ21 airplane assembly workshop using Arena
Improved level of key factors by orthogonal experiment
Fundamental
Industrial
Engineering
Logistics &
Supply Chain
Comprehensive
Experiment
RESEARCH ABILITIES
The Improvement of System Efficiency Made by Collaboration among Employees, Industrial Engineering & Management.
Designing Software of Non-excavation Pipeline Construction Production Service System, Conferred by Copyright Administration of the People's Republic of China, Registration Number: 2012SR093856
VOLUNTEER ACTIVITIES
Campaign manager
organized 500 volunteers
inShanghai InternationalM
arathon (twice)
Group Leader
Led 15 students to QiYin
deaf and dumb school
Roots buried in the
ground so that the
branches produce fruit,
but it does not require
any remuneration
RECREATIONAL ACTIVITIES
School of Mechanical Engineering, Shanghai Jiao Tong
University
• Freshman initiation party program planner
• Graduation party host
REQUIRED SKILLS CONCLUSION
# Events TasksAnalytical
SkillsBehavioral Skills
Communication Skills
Leadership TeamworkManagement
SkillsLanguage
Skills
1 internship consulting
2
projects
Siemens
3 USPS
4 SED International
5 others
6research
paper
7 computer copyright
8activities
volunteer
9 recreation
SELF EVALUATION
Leadership Efficiency Positive Creative thinking
Senior Manager will be my long-term career goal. However, I am not confined to any particular specialization. The knowledge I gained from my previous experiences will strengthen my engineering and management skills, which of course could be applied practically to aid in the development of the company that I work at in the future.