my cv (oshevire samuel olabode eduvie) 10-20-2015

5

Click here to load reader

Upload: eduvie-samuel-o-oshevire-beng-mnse-cpm-pmp

Post on 28-Jan-2018

259 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MY CV (Oshevire Samuel Olabode Eduvie) 10-20-2015

CONTACT INFORMATION OSHEVIRE SAMUEL OLABODE EDUVIE 08107398345, 08108401107 Email: [email protected]

PERSONAL INFORMATION Date of Birth: 3rd of May 1985

Citizenship: Nigerian Sex: Male

SUMMARY A sound Engineering/Surveying/Procurement and management background, with 7 years industry experience, about 8 years cumulative engineering experience, and over 10 million Man-hours of professional expertise in

the construction industry. Overseeing Design, Construction management, planning, execution, and monitoring and control activities. Proficient in applying technical, management, administration and Engineering principles and philosophies at all levels. Optimising principles and processes in personnel management and service

delivery to the overall success of organisational goals/targets.

PERSONAL PROFILE Confident, Energetic, Clean, Committed, Assertive, Loyal and a Team player, who is Resourceful, Observant, Punctual, Open minded, apt and can work independently with/without instructions. Cognizance for social, industrial and societal trends, Professionalism, Efficiency and good work Ethics. Strong planner and problem solver, who readily adapts to change, versatile management skills and proficiency

in engineering Designs. Can work independently and exceed expectations. Ability to meet tight schedules and deadlines, without compromising quality.

EDUCATION B (Eng) University of Benin, Civil Engineering

Graduated May 2009 Mpmi International Project management professionals, Certified project manager (Cpm) May 2011 Vistas and Partners incorporated (Staad Pro V8i Training) May 2014

Page 2: MY CV (Oshevire Samuel Olabode Eduvie) 10-20-2015

KEY SKILLS

Computer Skills: MS Word MS Excel MS Outlook MS Access MS Project Adobe Acrobat Pro

Auto Cad (Auto Desk Computer Aided Design) Structural Analysis and Design pro (STAAD. Pro)

Civil Cad (Computer Aided Design for Bridges and Civil Structures) ArchiCad Chief Architect Prima Vera Google Earth Professional skills: Competent use of Electronic total station (ETS), Theodolite and Levelling instrument for

carrying out surveying purposes as well as using Auto Cad for Drafting, Detailing, road profiling and design.

Using Specialised Computer programs/software to design, model, analyse and detail complex engineering problems, with a view to achieving practical and applicable solutions. Competent Ability to Create, Analyse and manage schedules for project work using critical path analysis (CPA). Ability to draft up a functional WBS ( work breakdown structure ), To define and group a projects discrete work

elements in a way that helps organise and define the total work scope of the project . Production Planning, organisation, Resource control, CPM Scheduling, Business Planning, Budget Monitoring, Quantity Surveying, Material Take-offs, Bill of Materials, Bill of Quantities CAD ENGINEER, Making and interpreting Engineering Drawings, Geographic information systems (GIS).

Formwork Engineering and familiarity with Trio framax (Peri systems, Doka Systems, Acrow systems), in formwork design and construction. Design of Reinforced concrete Structures.

Office management, Spread sheets/reports, Records management, Events management, scheduling.

EXPERIENCE

Project Civil Engineer (Coordinator) Daewoo Engineering & Construction Nigeria Ltd October 2014-Present DN-65, Gbaran-Ubie Integrated oil and Gas infill Project Client: Shell Petroleum Development Company of Nigeria.

The Gbaran Ubie Integrated Oil and Gas Project, aims to develop gas reserves for supply to NLNG and the local domestic gas market in order to meet SPDC’s commitments to these stakeholders. The first phase of the project

has installed a Central Processing Facility (CPF) with a gas dehydration capacity of 1050 MMscf/d, an oil/condensate delivery capacity of 120,000 bpd and associated gas compression capacity of 180 MMscf/d. The CPF is linked by a network of pipelines and flowlines to several remote manifolds and well sites. The Gbaran-Ubie Infill Project is primarily aimed at sustaining gas supplies to NLNG and support future domestic

gas markets from the Gbaran Node. In order to meet this objective, the Gbaran Infill Project will construct facilities to develop additional reserves through nine (9) new NAG wells (1 well in the Gbaran field, five (5) wells in the Koroama field and three (3) wells in Epu) and completion/hook-up of the Koroama-002 well. Work activities include, but not limited to, Carrying out multifaceted civil engineering construction works e.g,

Piling (Continuous Flight Auger (CFA) Method>>>This was specifically used in the live plant area, and in brown field areas where vibration and disturbance of sensitive equipment and equipment foundations were a major concern and worry for the client, as this method best eliminate the hazard/threat of any resulting destruction or

risk arising from such vibration or heavy stress transfer to surrounding soil materials. Also Hammered pile method was carried out in green field areas and other areas were the risk of explosion or destruction due to vibration or transfer of heavy stresses were minimal or inconsequential. Other activates carried out include but not limited to-:

Central Processing Facility Area (CPF, Live Plant & Extension)-: Construction of Booster Compressors foundation, Pig receiver foundation, Slug catchers (2), manifold oily bunded area foundation, emergency diesel generator

Page 3: MY CV (Oshevire Samuel Olabode Eduvie) 10-20-2015

foundation, Piperack foundation, Road works, Drains, Manholes, Culverts, Underground facilities, Interphase works, piping, and other miscellaneous foundation works.

Remote Areas & Manifolds-:Construction of Pig Launcher foundations, Pig receiver foundations, valve platforms, vent stack, Open drain saver pits, Pipe supports, Sleepers, Well head platforms, chemical injection skids, manholes, surface water drainage, pipe tracks and supports, MEG injection package foundation and other specialised miscellaneous equipment foundations.

Coordinating Manpower, inspection of executed work, raising permits, material inspection, reporting etc.

Project Engineer (Civil Coordinator) Daewoo Engineering & Construction Nigeria Ltd November 2012 – April 2014

DN-64 IEFCL Fertilizer plant project, Port Harcourt, Rivers State Client: Indorama Eleme Petrochemicals Company Limited.

Construction of a 2300 Metric tonne per day Ammonia and 4000 Metric tonne per day Urea Fertilizer plant facility complete with offsite facilities and storage and bagging area facilities. Work activities include, but not limited to, Carrying out multifaceted civil engineering construction works e.g, Piling (Using pretensioned high strength concrete piles & steel piles) by hammering method, Equipment

foundation design checks & construction work supervision- Ammonia & Offsite Plant Facilities: (Examples including specialised equipment foundation such as Primary reformer (radiant & convection sections), Primary reformer combustion air preheater, Primary reformer stack foundation Secondary reformer foundation, Ammonia refrigerant compressor, Pipe rack foundation, Ammonia plant feed

gas compressor foundation, Construction of cooling towers, construction of 2300MTPD ammonia tank foundation, CO2 Stripper foundation, CO2 Absorber Foundation, Ammonia Distillation column, Process condensate stripper foundation, HP Flash column foundation, Dehydrogen column foundation,

Secondary reformer waste heat boiler foundation, Refrigerant condenser foundation, Methanol effluent cooler foundation, oily water pit, drains, sump pits and many other specialised machine and equipment foundation. . Construction work supervision-Urea Plant: (Examples including but not limited to urea Hydrolyzer, Vent Stack

and flare stack foundation, urea solution recovery pit, Effluent water pit, Effluent water urea hydrolyzer foundation, Reactor foundation, HP & LP Decomposer foundation, Urea solution tank foundation, carbonate solution tank foundation and other specialised miscellanous equipment foundation).

Underground and interphase works coordination, Manhole, drains, sewers and piping installation and other ancillary activities such as transporting materials and precast members to and from site, whichever may apply. Working laterally with the project control, procurement, QA/QC & civil department. Attending Client meetings, Inspection of executed work, Ensuring proper documentation is completed to start work (locates & permits),

Making & Coordinating RFI (Request for Inspection), Preparing detailed & Comprehensive Method Statement (MS) & Job Safety Analysis (JSA), Quantity Surveying & Surveying (CAD), Job planning/Scheduling, Preparation of comprehensive & detailed project execution plan, Bill of quantities, Bill of materials, Material take-off orders & progress tracking.

Summary of Responsibilities

1. Manpower requisition & control 2. Material requisition & coordination 3. Reporting (Daily & Construction progress report) 4. Ensuring smooth operations of construction activities.

5. Inspection of work executed by foremen, supervisors & workers 6. Quantity surveying & budgeting for materials 7. Scheduling/Planning for construction activities (civil) 8. Preparing CAD drawings and survey reports.

Page 4: MY CV (Oshevire Samuel Olabode Eduvie) 10-20-2015

9. Requesting for Permits & locates before or during construction activities. 10. Carry out technical Bid evaluation for Tenders by subcontractors for certain aspects of Civil Works.

11. Coordinating subcontractors. 12. Writing comprehensive Method statements, Project execution plan, reviewing procedure & preparing Job Hazard Analysis for specialised tasks. 13. Develop calculation notes, foundation Design Basis, Specifications, & structural Details for Piles & other

foundation Structures 14. Structural Analysis & Design check of static & dynamic foundation & other structures e.g pipe racks, primary reformer, compressor shed etc. Using STAAD Pro. 15. Acquisition & interpretation of satellite imagery for planning/design purpose (Google Earth)

16. Interface management coordination. 17. Preparing Rebar Bending Schedules.

Quality Assurance Engineer (Site) Cobel Contracting January 2012 – November 2012 Took part in the construction of a 28 floor & one basement mega structure in the heart of Victoria Island Lagos. I

was actively involved with the Execution, monitoring, quality assurance and quality control aspect of the project. Management/coordination of Materials, labour and workmen to accomplish delegated tasks, Quality assurance/Quality control inspection for concrete and steel works( Slump test for supplied concrete, Concrete

cube test for samples taken from supplied batch and yield test for steel provided by clients ( Eko Hotel ). ), Interpretation of working drawings and ensuring that design projections/specifications are followed religiously, checks on the quality of work done by the sub-contractors, and effecting corrections when and where necessary.

Ensuring that safety ( EHS ) laws and checks are implemented and adhered to. Summary of Responsibilities

1. Execution and inspection of construction activities. 2. Manpower control and coordination on site. 3. Coordinating sub-contractors on site. 4. Interpreting engineering drawings to work men and checking that jobs are done to specifications.

5. Foundation construction (End bearing piles and Raft foundation). 6. Planning, execution, monitoring & inspection of construction activities of Structural elements such as Piles, raft, columns, beams, slabs, reinforced concrete walls etc.

7. On site Quality control checks to ensure specifications are vigorously adhered to. 8. Conducting Client inspectors around site for checks and inspection of work done.

China Civil Engineering Construction Company Surveyor/Engineering Assistant August 2009 – August 2010 (1 year 1 month) cele okota overhead bridge project, Isolo Lagos State

One year pre NYSC work experience. I worked as a Surveyor/Engineering assistant on the cele okota overhead bridge project, while waiting for deployment for the National Youth Service Scheme.

China civil engineering construction company (C.C.E.C.C) Industrial Attache (Assistant Surveyor)

May 2007 – January 2008 (9 months) Lasu Isheri Road/Bridge project, Ojo Lagos state.

Page 5: MY CV (Oshevire Samuel Olabode Eduvie) 10-20-2015

Industrial Training experience. (SIWES) Programme. Was actively involved in the construction of an 18 kilometer dual carriage road project with an insert of a 600m

bridge. Worked as a Surveyor, constantly on the road capturing co-ordinates and taking levels for points to be used for road profiling (CAD), planning and design. Giving Survey information/measurements for bridge construction activities (Coordinates & Level).

Setting out form positions before commencement of concrete pouring activities (Structural elements for bridge, culverts, drains, Kerbs etc).

Courses Attended 1 IEFCL Permit to work Training (PTW)

2 SEPCIN (Shell Exploration and Production Companies In Nigeria) Permit to work Training (Permit Holder and Coordinator) 3 Mpmi Project management professionals (CPM) 4 Vistas and Partners incorporated (Staad Pro V8i Training)

5 Environment Health and Safety training and induction, EHS (Daewoo Engineering and Construct ion, Cobel Contracting) 6 Gas Tester Training (Authorised gas tester)

Linkedin Profile link: http://ng.linkedin.com/pub/eduvie-samuel-o-oshevire-b-eng-mnse-cpm-pmp/86/251/1a6/