mw broker.pdf
TRANSCRIPT
INTERIOR DESIGN . CONSTRUCTION MANAGEMENT . LEASING SERVICES . CERTIFIED MEASUREMENTS . PERMITS
WWW.MWID.CA . [email protected]
PH: 403-669-9280
TENANT REPRESENTATIVE
SERVICES
WWW.MWID.CA [email protected]
PH: 403-669-9280
DESIGN AND CONSTRUCTION DOCUMENTATION: ‐All documents necessary to complete constructionincludingpermitapplicationsCONSTRUCTION MANAGEMENT: ‐Complete project management from tradecoordination,sitereview,budgetandscheduletrackingandleasecompliance.AND MORE: ‐CustomFurnitureDesign‐Ergonomics‐GreenStrategy‐WellnessinDesign
PERMITS: ‐Tenancy change, Development Change of Use andBuildingPermitapplications‐Coordinationwithlocalmunicipalities TEST FIT: ‐Spatial Analysis:determine the typeandsize of spacerequiredbasedonacompany’sneeds‐Preliminaryplanofproposedspace‐Outline requirements for Permit and Building Codeassessment CONSTRUCTION BUDGETS: ‐Our construction process is so stream‐lined andefficient, your client won’t be able to build anywhereelseduetocostsavingsandefficiencies.‐Negotiatedwithlocalsuppliesforconstructionproductsavingsandin‐stockdelivery.‐Recommendations for construction savings including:options for salvaging, restoring or upgrading existingmaterials.CONSTRUCTION REQUIREMENTS: ‐If landlordpaidconstructioncostsis incorporatedintothe lease agreement, our planning will strictly outlineandallocateresponsibilities.‐Ifyourclientwantstogoaboveandbeyondwhat thelandlord is offering towards construction costs, allupgradeswillbereviewedagainstpossessiondatesandbudgets. Ifupgradesdelayconstruction,allpartiesaremadeaware that timelines canbe adjustedwithin theleaseagreement.
BOMA CERTIFIED MEASUREMENT REPORT: ‐GrossBuildingArea‐GrossMeasuredArea‐FloorRentableAreas‐MajorVerticalPenetrationAreas‐UsableAreaTotals‐BasicRentableAreaTotals‐RentableAreaTotals‐FloorRentable/UsableRatio‐BuildingRentable/UsableRatio‐StampedandsignedasBOMAcertified
FLOOR
‐Partition and Demising walls, doors, glazing, millworkandplumbingfixtures
‐Definitionof“CurrentUse”allowedbytheCity‐Outlinesrequirementsforproposed“ChangeofUse”‐BuildingCodeAssessment N O T E : ‐In multi‐tenant buildings, the entire building must be measured to accurately determine a suites portion of the buildings common areas in order to calculate rentable area. ‐If measuring a suite only, a letter will take place of the measurement report, stating the suite as measured to BOMA standard for usable area. You cannot determine true rentable area by measuring a suite only.