mw broker.pdf

2
INTERIOR DESIGN . CONSTRUCTION MANAGEMENT . LEASING SERVICES . CERTIFIED MEASUREMENTS . PERMITS WWW.MWID.CA . [email protected] PH: 403-669-9280

Upload: lisa-miller

Post on 10-Apr-2017

79 views

Category:

Documents


3 download

TRANSCRIPT

Page 1: MW BROKER.PDF

INTERIOR DESIGN . CONSTRUCTION MANAGEMENT . LEASING SERVICES . CERTIFIED MEASUREMENTS . PERMITS

WWW.MWID.CA . [email protected]

PH: 403-669-9280

Page 2: MW BROKER.PDF

TENANT REPRESENTATIVE

SERVICES

WWW.MWID.CA [email protected]

PH: 403-669-9280

DESIGN AND CONSTRUCTION DOCUMENTATION: ‐All documents necessary to complete constructionincludingpermitapplicationsCONSTRUCTION MANAGEMENT: ‐Complete project management from tradecoordination,sitereview,budgetandscheduletrackingandleasecompliance.AND MORE: ‐CustomFurnitureDesign‐Ergonomics‐GreenStrategy‐WellnessinDesign

PERMITS: ‐Tenancy change, Development Change of Use andBuildingPermitapplications‐Coordinationwithlocalmunicipalities TEST FIT: ‐Spatial Analysis:determine the typeandsize of spacerequiredbasedonacompany’sneeds‐Preliminaryplanofproposedspace‐Outline requirements for Permit and Building Codeassessment CONSTRUCTION BUDGETS: ‐Our construction process is so stream‐lined andefficient, your client won’t be able to build anywhereelseduetocostsavingsandefficiencies.‐Negotiatedwithlocalsuppliesforconstructionproductsavingsandin‐stockdelivery.‐Recommendations for construction savings including:options for salvaging, restoring or upgrading existingmaterials.CONSTRUCTION REQUIREMENTS: ‐If landlordpaidconstructioncostsis incorporatedintothe lease agreement, our planning will strictly outlineandallocateresponsibilities.‐Ifyourclientwantstogoaboveandbeyondwhat thelandlord is offering towards construction costs, allupgradeswillbereviewedagainstpossessiondatesandbudgets. Ifupgradesdelayconstruction,allpartiesaremadeaware that timelines canbe adjustedwithin theleaseagreement.

BOMA CERTIFIED MEASUREMENT REPORT: ‐GrossBuildingArea‐GrossMeasuredArea‐FloorRentableAreas‐MajorVerticalPenetrationAreas‐UsableAreaTotals‐BasicRentableAreaTotals‐RentableAreaTotals‐FloorRentable/UsableRatio‐BuildingRentable/UsableRatio‐StampedandsignedasBOMAcertified

FLOOR

‐Partition and Demising walls, doors, glazing, millworkandplumbingfixtures

‐Definitionof“CurrentUse”allowedbytheCity‐Outlinesrequirementsforproposed“ChangeofUse”‐BuildingCodeAssessment N O T E : ‐In multi‐tenant buildings, the entire building must be measured to  accurately  determine  a  suites  portion  of  the  buildings common areas in order to calculate rentable area. ‐If  measuring  a  suite  only,  a  letter  will  take  place  of  the measurement  report,  stating  the  suite  as  measured  to  BOMA standard  for usable area.    You  cannot determine  true  rentable area by measuring a suite only.