MVCO Test Install. Goals: Locate an appropriate micro and macro location for a new 5 MHz MARCOOS CODAR site New site will provide additional regional coverage New site will increase network resiliency, i.e. Fill coverage gaps when other sites in region are down. - PowerPoint PPT PresentationTRANSCRIPT
MVCO Test InstallMartha’s Vineyard CODAR Site
June 30-July 1, 2009
Goals:
Locate an appropriate micro and macro location for a new 5 MHz MARCOOS CODAR site
New site will provide additional regional coverage
New site will increase network resiliency, i.e. Fill coverage gaps when other sites in region are down
MVCO Test InstallMartha’s Vineyard CODAR Site
June 30-July 1, 2009
MVCO Test InstallMartha’s Vineyard CODAR Site
June 30-July 1, 2009
MVCO Test InstallMartha’s Vineyard CODAR Site
June 30-July 1, 2009
MVCO Test InstallMartha’s Vineyard CODAR Site
June 30-July 1, 2009
Thank You:
-John Varkonda, Correllus State Forest. Provided Accommodations
-Chris Jakubiak, SMAST. Preformed Install
-Ethan Handel, Rutgers. Preformed Install
-Janet Fredericks, WHOI. Logistical Support
-Dennis Arnold, South Beach Staff Director. Site Permissions