Page 1: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

This project has received funding from the European Union’s Horizon 2020 research and innovation programme under grant agreement No 649829.

M&V why, what, and how? M&V platform SMIV

Mia Dragović, Energy Institute Hrvoje Požar

July 21, 2016

Page 2: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

•  Intro to MultEE project and useful resources •  Lessons learned from Croatian case

o  Data collection o  SMIV

•  Problems, misconceptions •  Conclusions

Further feedback à [email protected]

Content

7/21/2016 www.multEE.eu/  

How?

What?

M&V why, what and how?

Page 3: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

Why - the point?

7/21/2016 www.multEE.eu/  M&V why, what and how?

Monitoring, measurement and verification!

M&VM&  

Monitoring is crucial and it pays off!

1.  Zero step 2.  Mind the Footprint 3.  Limited financing

Page 4: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

What do me monitor? •  Bottom-up vs. top-down •  Scope – national vs. local / double-counting •  Actual or factual measurement:

1.  Deemed or ex-ante à consistency! 2.  Metered or ex-post à benefits beyond energy savings (e.g. sensitivity

towards en. poverty) 3.  Scaled 4.  Surveyed

What is the purpose? •  EU Directives, legislative requirements •  Actual savings as incentive for savings •  ESCOs and EPCs

What is the cost? •  Accuracy vs. cost

Misconseptions, work in progress…

7/21/2016 www.multEE.eu/  M&V why, what and how?

Page 5: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

Aims to improve the consistency and quality of energy efficiency policy planning and implementation through:

•  Innovative monitoring and verification schemes

•  Improved coordination between different administrative levels

Deliverables:

1.  European best practices for M&V schemes and coordination mechanisms - Why do countries without an established centralized structure implement more efficient M&V schemes? Which countries have introduced more efficient coordination mechanisms, and what are their functioning structures?

2.  Report on General Formulae of Bottom-Up Methods - a comprehensive report with a variety of methods to calculate energy savings from single energy efficiency measures.

3.  Synthesis report on M&V schemes and coordination mechanisms in EU countries - results of the mapping of the existing M&V schemes and coordination mechanism in the 28 Member States plus the FYR of Macedonia.

4.  Analytical framework for mapping and analysis

MultEE H2020 project 2015 - 2017

7/21/2016 www.multEE.eu/  M&V why, what and how?

Page 6: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

Partners adopting M&V platform (localized): •  Lithuania, Latvia, Sovakia, Macedonia, Greece Partners with already implemented M&V platform: •  Austria, Croatia Partners and beneficiaries who did not opt for M&V platform: •  Germany – has local implementation and TD approach •  Denmark – has developed system for monitoring EEOs Others through GIZ: Ukraine, Moldova

MultEE partner-countries’ status:

7/21/2016 www.multEE.eu/  M&V why, what and how?

Page 7: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

•  List of BU measures suggested by country‘s official Methodology

•  Translation of all terms and expression used in MVP •  Check and input of reference values in MVP code-table

according to country‘s recommendation

•  Transfer to local server

•  MVP administrator training

If your country is interested… ask!

Adaptation for countries‘ specific requirements

7/21/2016 www.multEE.eu/  M&V why, what and how?

Page 8: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

•  Croatia still struggles with EE, but…

Example from Croatia

7/21/2016 www.multEE.eu/  M&V why, what and how?

Measured  TD  11,96  PJ  

Le#  to  be  achieved  to  2016.                7,81  PJ  

 

Croa:a’s  EE  target  a=er  2nd  NEEAP  

2nd NEEAP: 38% of savings or 23% of our target measured BU!

2015: Ar. 5 200% 40% of our target measured BU!

Page 9: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

•  In line with the Croatian NEEAP •  Measures targets under EED (bootom-up):

Article 3 ü Article 5 ü Article 7 targets ü Avoided double counting ? Manageable number of obligated parties

•  M&V started as a project in cooperation with GIZ in 2008 •  Has become an official Croatian M&V tool through the new

EE Act (OG 127/2014)

How? SMIV - System for Monitoring, Measurement and Verification of Energy Savings

7/21/2016 www.multEE.eu/  M&V why, what and how?

Page 10: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

Public sector •  Planning •  SMIV •  EMIS

Distributors

•  Planning

Including all sectors

7/21/2016 www.multEE.eu/  M&V why, what and how?

Large companies, industry

•  Energy audits

SMEs •  Eco Fund

Financial Institutions

•  Planning

Residential •  Eco Fund

Page 11: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

Carrots •  Eco fund –34% •  Operational Programme

Competitiveness and Cohesion

Sticks •  Obligatory data monitoring

and delivery: Companies providing energy service contracts Public sector Subsidy providers

•  Fines for physical person responsible (e.g. mayor, prefect, minister) and the public body

~ 1000 – 80.000 €

Motivation mechanisms

7/21/2016 www.multEE.eu/  M&V why, what and how?

When planning EE measures, funding needs to be ensured in the local budget!

•  Competition among local governments

Page 12: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

•  ~ 7000 measures registered so far, 5000 are insulation •  30 local EE plans entered into SMIV •  Savings verified in 2015.: cca 0,61 PJ •  80 educated users

SMIV - status

7/21/2016 www.multEE.eu/  M&V why, what and how?

LocationEnergy  savings

CO2  savings  (t)

Measure  cost

subvention  (kn) Sector Group

Splitsko-­‐dalmatinska 9.438.889 2.520 68.140.514 23.018.658 ZGRADARSTVO USLUŽNI  JAVNIGrad  Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVAGrad  ZagrebZagreb-­‐Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI  JAVNIKrapinsko-­‐zagorskaKrapina 1.311.855 265 2.698.973 729.865 ZGRADARSTVO KUĆANSTVAGrad  ZagrebZagreb-­‐Maksimir1.216.532 333 2.526.603 1.010.641 ZGRADARSTVO USLUŽNI  JAVNIZagrebačkaZagreb-­‐Maksimir1.121.828 227 2.850.618 760.185 ZGRADARSTVO KUĆANSTVAKoprivničko-­‐križevačkaKoprivnica 1.016.830 205 1.533.374 613.350 ZGRADARSTVO USLUŽNI  JAVNIKoprivničko-­‐križevačkaKoprivnica 904.045 183 2.190.287 876.115 ZGRADARSTVO USLUŽNI  JAVNISisačko-­‐moslavačka 807.796 221 609.897 243.959 ZGRADARSTVO KUĆANSTVAKarlovačkaKarlovac 761.097 203 2.268.031 907.212 ZGRADARSTVO KUĆANSTVA

No double-counting!

Page 13: M&V why, what, and how?...Grad-Zagreb 1.947.450 456 62.478.120 15.736.404 ZGRADARSTVO KUĆANSTVA Grad-ZagrebZagreb=Maksimir1.478.701 405 3.526.493 1.410.597 ZGRADARSTVO USLUŽNI-JAVNI

Additional information:

7/21/2016 www.multEE.eu/  M&V why, what and how?

More about SMIV: http://cei.hr/en/smiv-system-measuring-and-verifying-energy-savings/

More about MultEE M&V platform:

GIZ & Open regional funds for South-East Europe – Energy Efficiency https://www.giz.de/en/worldwide/31746.html

Please, ask!

[email protected]