ID Task Name Duration 0 MURITALA MOHAMMED AIRPORT HYDRANT PIPELINE SYSTEM 4 mons 1 1 Project Kickoff Meeting 1 day 2 2 Personnel Mobilization 1 day 3 3 PROJECT MANAGEMENT 2.35 mons 4 3.1 Review of FEED documents and data gathering 3 days 5 3.2 Site Visit 4 days 6 3.3 Work Breadown Structure and Execution Plan 5 days 7 3.4 Development of Master Document Register 10 days 8 3.5 Man Power Planing 5 days 9 3.6 Engineering Design Basis 7 days 10 3.7 Issue of Long Lead Items 30 days 11 3.8 Review of acquired data / Mark-up of As-Built document form Site 7 days 12 3.9 Site Visit Report 7 days 13 4 Project Control and Quality Assurance 3.96 mons 94 5 Project Monthly Review Meeting 3.27 mons 99 6 Daily Interdiscilinary Check 3.96 mons 180 7 Mobilization to Site 2 days 181 8 DETAILED ENGINEERING 3.85 mons 182 8.1 SURVEY (Detailed Topographical, Geotechnical and Geophysical Survey Data) 0.9 mons 183 8.1.1 Geophysical / Geotechnical Survey of Pipeline Route ROW From Sahara Depot to Airport Terminals 6 days 184 8.1.2 Geophysical / Geotechnical Survey of Sahara Aviation Depot Facilities and Airport Fuel Hydrant Station 6 days 185 8.1.3 Geotechnical / Geophysical Soil Investigation and Report 7 days 186 8.1.4 Soil Resistivity (Field Work) 8 days 187 8.1.5 Soil Resistivity Lab & Report 7 days 188 8.1.6 Survey Report and CADD 7 days 189 8.2 PROCESS 1.5 mons 190 8.2.1 Prepare Process Flow Diagram (PFD), Piping & Instrumentation Diagram (P&ID), Utility Flow Diagram ( UFD) 30 days 191 8.2.2 Sizing Calculations (Piping, Valves Tanks, Hydrant system) 10 days 192 8.2.3 Data Sheets 10 days 193 8.2.4 Detailed Pipeline Hydraulic Studies & Report 5 days 194 8.3 HSSE 0.4 mons 195 8.3.1 HAZOP 3 days 196 8.3.2 HAZOP Closeout Report 5 days 197 8.4 PIPING / MECHANICAL 2.8 mons 198 8.4.1 Piping Specifications 15 days 199 8.4.2 Data Sheets 15 days 200 8.4.3 Sizing Calculations (Piping & Valves) 10 days 201 8.4.4 Wall Thickness Calculation / Stress reports 25 days 202 8.4.5 Piping General Arrangment Layout 25 days 203 8.4.6 Tie-In Details 10 days 204 8.4.7 Piping MTO 10 days 205 8.4.8 Piping Isometrics Drawings 25 days 206 8.5 PIPELINE 1.7 mons 207 8.5.1 Pipeline Specifications 15 days 208 8.5.2 Data Sheets 15 days 209 8.5.3 Typical Drawings 12 days 210 8.5.4 Pipeline MTO 10 days 211 8.5.5 Pipeline Stress Analysis / Modelling 15 days 212 8.5.6 Pipeline Alignment Sheet 25 days 213 8.6 CIVIL / STRUCTURAL 2 mons 214 8.6.1 Plot Plan General Arrangement Drawings 15 days 215 8.6.2 Civil Specification 15 days 216 8.6.3 Support and Foundation Sizing Calculations 25 days 217 8.6.4 Civil Structural Drawings & Details 25 days 218 8.7 INSTRUMENTATION & CONTROL 1.95 mons 219 8.7.1 Instrument Operating Philosophy 10 days 220 8.7.2 Instrumentation Specifications 25 days 221 8.7.3 Instrument Data Sheets / Control valve sizing calculations 25 days 222 8.7.4 Leak Detection Design 20 days 223 8.7.5 Instrument Equipment Layout Drawings 15 days 224 8.7.6 SCADA Concept / Logic 25 days 225 8.7.7 Instrument Drawings / Block diagrams 20 days 226 8.7.8 Instrument MTO 10 days 227 8.8 ELECTRICAL 2.5 mons 228 8.8.1 Specifications & Data Sheets for Electrical Equipments 10 days 229 8.8.2 Electrical Cable, Power Requirement Calculations & Sizing Reports 20 days 230 8.8.3 Electrical Equipment Layout & Drawings 25 days 231 8.8.4 Electrical Schedule / Single Line Diagram 20 days 232 8.8.5 Earthing, Lightning & Perimeter Lighting Details 20 days 233 8.8.6 Hazardous Area Clasifications 20 days 234 8.8.7 Electrical MTOs 10 days 235 8.9 GENERAL 0.25 mons 236 8.9.1 Project Closout Report 5 days 237 8.9.2 General Operation and Maintenance Manual 5 days 238 8.10 Engineering Close-Out Report 4 days W-2 W-1 W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17 Month 1 Month 2 Month 3 Month 4 Task Split Milestone Summary Project Summary External Tasks External Milestone Inactive Task Inactive Milestone Inactive Summary Manual Task Duration-only Manual Summary Rollup Manual Summary Start-only Finish-only Progress Deadline MURITALA MOHAMMED AIRPORT HYDRANT PIPELINE SYSTEM FRAZIMEX ENGINEERING LIMITED Page 1 of 1 Project: MURITALA MOHAMMED AIR Date: Wed 5/20/15

Upload: nwabukingz

Post on 17-Dec-2015

6 views

Category:

Documents


1 download

DESCRIPTION

Schedule

TRANSCRIPT

  • ID Task Name Duration

    0 MURITALA MOHAMMED AIRPORT HYDRANT PIPELINE SYSTEM 4 mons1 1 Project Kickoff Meeting 1 day2 2 Personnel Mobilization 1 day3 3 PROJECT MANAGEMENT 2.35 mons4 3.1 Review of FEED documents and data gathering 3 days5 3.2 Site Visit 4 days6 3.3 Work Breadown Structure and Execution Plan 5 days7 3.4 Development of Master Document Register 10 days8 3.5 Man Power Planing 5 days9 3.6 Engineering Design Basis 7 days10 3.7 Issue of Long Lead Items 30 days11 3.8 Review of acquired data / Mark-up of As-Built document form Site 7 days12 3.9 Site Visit Report 7 days13 4 Project Control and Quality Assurance 3.96 mons94 5 Project Monthly Review Meeting 3.27 mons99 6 Daily Interdiscilinary Check 3.96 mons

    180 7 Mobilization to Site 2 days181 8 DETAILED ENGINEERING 3.85 mons182 8.1 SURVEY (Detailed Topographical, Geotechnical and Geophysical Survey

    Data)0.9 mons

    183 8.1.1 Geophysical / Geotechnical Survey of Pipeline Route ROW From SaharaDepot to Airport Terminals

    6 days

    184 8.1.2 Geophysical / Geotechnical Survey of Sahara Aviation Depot Facilities and Airport Fuel Hydrant Station

    6 days

    185 8.1.3 Geotechnical / Geophysical Soil Investigation and Report 7 days186 8.1.4 Soil Resistivity (Field Work) 8 days187 8.1.5 Soil Resistivity Lab & Report 7 days188 8.1.6 Survey Report and CADD 7 days189 8.2 PROCESS 1.5 mons190 8.2.1 Prepare Process Flow Diagram (PFD), Piping & Instrumentation Diagram

    (P&ID), Utility Flow Diagram ( UFD)30 days

    191 8.2.2 Sizing Calculations (Piping, Valves Tanks, Hydrant system) 10 days192 8.2.3 Data Sheets 10 days193 8.2.4 Detailed Pipeline Hydraulic Studies & Report 5 days194 8.3 HSSE 0.4 mons195 8.3.1 HAZOP 3 days196 8.3.2 HAZOP Closeout Report 5 days197 8.4 PIPING / MECHANICAL 2.8 mons198 8.4.1 Piping Specifications 15 days199 8.4.2 Data Sheets 15 days200 8.4.3 Sizing Calculations (Piping & Valves) 10 days201 8.4.4 Wall Thickness Calculation / Stress reports 25 days202 8.4.5 Piping General Arrangment Layout 25 days203 8.4.6 Tie-In Details 10 days204 8.4.7 Piping MTO 10 days205 8.4.8 Piping Isometrics Drawings 25 days206 8.5 PIPELINE 1.7 mons207 8.5.1 Pipeline Specifications 15 days208 8.5.2 Data Sheets 15 days209 8.5.3 Typical Drawings 12 days210 8.5.4 Pipeline MTO 10 days211 8.5.5 Pipeline Stress Analysis / Modelling 15 days212 8.5.6 Pipeline Alignment Sheet 25 days213 8.6 CIVIL / STRUCTURAL 2 mons214 8.6.1 Plot Plan General Arrangement Drawings 15 days215 8.6.2 Civil Specification 15 days216 8.6.3 Support and Foundation Sizing Calculations 25 days217 8.6.4 Civil Structural Drawings & Details 25 days218 8.7 INSTRUMENTATION & CONTROL 1.95 mons219 8.7.1 Instrument Operating Philosophy 10 days220 8.7.2 Instrumentation Specifications 25 days221 8.7.3 Instrument Data Sheets / Control valve sizing calculations 25 days222 8.7.4 Leak Detection Design 20 days223 8.7.5 Instrument Equipment Layout Drawings 15 days224 8.7.6 SCADA Concept / Logic 25 days225 8.7.7 Instrument Drawings / Block diagrams 20 days226 8.7.8 Instrument MTO 10 days227 8.8 ELECTRICAL 2.5 mons228 8.8.1 Specifications & Data Sheets for Electrical Equipments 10 days229 8.8.2 Electrical Cable, Power Requirement Calculations & Sizing Reports 20 days230 8.8.3 Electrical Equipment Layout & Drawings 25 days231 8.8.4 Electrical Schedule / Single Line Diagram 20 days232 8.8.5 Earthing, Lightning & Perimeter Lighting Details 20 days233 8.8.6 Hazardous Area Clasifications 20 days234 8.8.7 Electrical MTOs 10 days235 8.9 GENERAL 0.25 mons236 8.9.1 Project Closout Report 5 days237 8.9.2 General Operation and Maintenance Manual 5 days238 8.10 Engineering Close-Out Report 4 days

    W-2 W-1 W1 W2 W3 W4 W5 W6 W7 W8 W9 W10 W11 W12 W13 W14 W15 W16 W17Month 1 Month 2 Month 3 Month 4

    Task

    SplitMilestone

    SummaryProject SummaryExternal Tasks

    External Milestone

    Inactive Task

    Inactive Milestone

    Inactive SummaryManual Task

    Duration-only

    Manual Summary RollupManual SummaryStart-only

    Finish-onlyProgressDeadline

    MURITALA MOHAMMED AIRPORT HYDRANT PIPELINE SYSTEM

    FRAZIMEX ENGINEERING LIMITED Page 1 of 1

    Project: MURITALA MOHAMMED AIRDate: Wed 5/20/15