  • 7/31/2019 Munro Examples

    1/20

    Month 200X

    Use menu "View - Header & Footer" for Presentation title - Siglum - Reference

    Presented by

    John Hobday / Gareth SaundersLean Engineering Team

    Design ExcellenceMunro - Lean Design Examples

  • 7/31/2019 Munro Examples

    2/20

  • 7/31/2019 Munro Examples

    3/20

    AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 3

    FAT DESIGN

    What's wrong with this design ?

  • 7/31/2019 Munro Examples

    4/20

  • 7/31/2019 Munro Examples

    5/20

  • 7/31/2019 Munro Examples

    6/20

    AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 6

    BOEING Waste Pipe Bracket & Wire HarnessDesign Comparison

    No. of Assembly Ops.

    Parts

    Assembly Time

    Labor Cost($)

    Material Cost($)

    Tooling Cost($)

    Total Cost($)

    Mass

    FAT

    210

    15

    46 min.

    $35.27

    $28.74

    --

    $64.01

    2.1 oz.

    .

  • 7/31/2019 Munro Examples

    7/20

    AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 7

    LEAN DESIGN

  • 7/31/2019 Munro Examples

    8/20

    AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 8

    BOEING Waste Pipe Bracket & Wire harnessDesign Comparison

    No. of Assembly Ops.

    Parts

    Assembly Time

    Labor Cost($)

    Material Cost($)

    Tooling Cost($)

    Total Cost($)

    Mass

    FAT

    210

    15

    46 min.

    $35.27

    $28.74

    --

    $64.01

    2.1 oz.

    LEAN

    8

    3

    1.5 min.

    $1.15

    $2.44

    $14,522

    $3.59

    0.8 oz.

  • 7/31/2019 Munro Examples

    9/20

    LEAN DESIGN

  • 7/31/2019 Munro Examples

    10/20AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 10

  • 7/31/2019 Munro Examples

    11/20AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 11

    Change Programs

    Do we really need budget and headcount reduction, to reduce costand maximise profit and quality performance ?

    Or is there a different way ?

    Is there plenty of profit in A/C manufacture which we are unable toexploit?

    Design optimisation (simplified designs, part count, assemblytimes etc)

    Zero Defects

    Right first time design (more rigour in the early design phases,deeper trades and across wider aspects of the design not justweight and performance)

  • 7/31/2019 Munro Examples

    12/20AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 12

    System Overview

    Door Arm

    Spring

    Anchor Brkt & Bolt Assembly

    Upper Mounting

    Brkt & Hinge BoltAssembly

    Door Plate

    Inboard Rib-2

    Outboard Rib-2

    Datum Surface Rib-2Rib-2

    Bay 1-2Bay 2-3

    Direction ofingress for

    maintenance

  • 7/31/2019 Munro Examples

    13/20AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietaryd

    ocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 13

    Door Arm

    Spring

    Anchor Brkt & Bolt Assembly

    Upper MountingBrkt & Hinge Bolt

    Assembly

    Door Plate

    BASELINE

    Total Build

  • 7/31/2019 Munro Examples

    14/20AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 14

    Idea 46 - Torsion spring around hinge bolt/shaft of door arm

    Spring to be sleeved on the bolt/shaft thatmounts the door arm in the upper clevisbracket. The long side of the spring is

    seated in a feature machined into the doorarm. The short side can react the forceagainst the mounting bracket of the door.Both ends of the spring could require asacrificial boot to prevent component wareor fretting.

    DeletedItems

    Torsion springmounted on hingebolt between the

    bracket arms

  • 7/31/2019 Munro Examples

    15/20AIRBUSU

    KLTD.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 15

    Concept Visualisation

  • 7/31/2019 Munro Examples

    16/20

  • 7/31/2019 Munro Examples

    17/20

    AIRBUSUKLTD.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    Month 200XUse menu "View - Header & Footer" for Presentation title - Siglum - Reference Page 17

    New Door

    Pressed or superplastic formed doorplate made from 5083 (Al-Mg-Mn) alloyfriction spot welded to the door arms

    Reinforcementfeatures pressedonto door surface

    Spot Welds, numberas required.Alternative MIG orTIG weld.

    (if not feasible returnto bolted assembly)

    Assumed 3500 Engineering Hours to introduce change

  • 7/31/2019 Munro Examples

    18/20

  • 7/31/2019 Munro Examples

    19/20

  • 7/31/2019 Munro Examples

    20/20

    AIRBUSUKLTD.

    Allrightsreserved.

    Confidentialandproprietarydocument.

    AIRBUS UK LTD. All rights reserved. Confidential andproprietary document.

    This document and all information contained herein is the soleproperty of AIRBUS UK LTD. No intellectual property rightsare granted by the delivery of this document or the disclosureof its content. This document shall not be reproduced ordisclosed to a third party without the express written consentof AIRBUS UK LTD. This document and its content shall notbe used for any purpose other than that for which it issupplied.

    The statements made herein do not constitute an offer. Theyare based on the mentioned assumptions and are expressedin good faith. Where the supporting grounds for these

    statements are not shown, AIRBUS UK LTD will be pleased toexplain the basis thereof.

    AIRBUS, its logo, A300, A310, A318, A319, A320, A321,A330, A340, A350, A380, A400M are registered trademarks.