Energy management of Municipality of Velenje

Peter VirtičFaculty of Energy Technology, University of Maribor

Dresden, October 15th, 2012

Page 2: Municipality of Velenje

Municipality of Velenje• 5th largest Slovenian city • 35.000 inhabitants• In 1959 Velenje became the City• City of Velenje has made tremendous efforts to revitalize ruined landscape because of coal exploitation and to turn that handicap into advantage.• Strong economy with major company "Gorenje“ (domestic appliances) and "Coal mine Velenje" are along with the youth of the city the main reasons for pleasant and healthy living conditions.

Page 3: Municipality of Velenje

Shares of heating

Municipality of Velenje Total

Heat 438.000 MWh

Heat equivalent of fuel oil 931 l heat oil/person a

Share of heating (private):

Wood 12,9 %

Fuel oil 7,9 % District heating from the Coal Thermal Powerplant in the neighboring municipality of Šoštanj 74,0 %

Other (liquified natural gas…) 5,2 %

Main heating system in the

Municipality of Velenje • Private: 56,8 % use of energy• Industry: 30,2 % use of energy

Page 4: Municipality of Velenje

District heating system in Šaleška

Valley

Second largest district heating system in Slovenia: Velenje and Šoštanj, with suburban's: Podkraj, Pesje, Lokovica and Topolšica.

CHARACHERSITICS:- 256 MW installed power,- 144 km od pipelines,

Page 5: Municipality of Velenje

Solving of energy problems

Reducing the impact of Climate Changes:•Rational use of energy •Renewable energy sources•Energy management

Page 6: Municipality of Velenje

Energy management of Municipality of Velenje

• 2004: Energy concept of the Municipality of Velenje;• 2006: Establishing of the Energy Agency KSSENA;• 2007 – 2011:

- Operational plan for energy reconstruction of public lightening in the Municipality of Velenje;

- Energy audits, analyses, energy bookkeeping, energy reports (consumption and costs), etc;

- Action planed for RES and RUE;- Implementation of RES and RUE process.

Page 7: Municipality of Velenje

What is KSSENA?• Established in 2006 within the framework of

Intelligent Energy Europe (IEE)

• Founders: Municipality of Velenje (MOV), Municipality of Celje (MOC), Municipality of Slovenj Gradec (MOSG) and Public utilities company (KPV)

• Number of employees: 6

• Expert organisation specialized in the field of energetics, with the emphasis on RES and RUE, and project management.

• Professional bridge between potential users (emphasis on the public sector) and suppliers of specialized energetic services and products.

Page 8: Municipality of Velenje

Energy Audits

More than 100 energy audits in Velenje (KSSENA):-Energy supply and consumption analyses,-Processing of energy data,-Determination of optimal measures,-Preparation of RES and RUE action plan for each particular building.

Page 9: Municipality of Velenje

Energy Act

- All public buildings with over 500 m2 of netto heat surface

Energy bookkeeping

MAIN FUNCTIONS:- managers recognize their energy consumption;

- invoice management (advanced energy bookkeeping),- energy and financial data management,- analysis,- financial and energy planning,- energy and financial reports,- financial and energetic planning for energy efficient measures,- monitoring,- all buildings connected in one comprehensive energy- informational system.

35 buildings in Velenje

Page 10: Municipality of Velenje

CHP of Primary School Škale

- BeforePreliminary heating: Fuel oil (consumption over 20.000 l)

Obsolete and outdated boilerEnergy number : > 200kWh/m2 (in 2007)

- Reconstruction of the heating systemImplementation of cogeneration of heat and electric power system

2 units (5,5 kWe and 12,5 kWh)

Other Reconstructions:Replacement of windowsReplacement of the doorReplacement of blinds

Page 11: Municipality of Velenje

PV power plant: Municipality of Velenje

Installed Power: 17,4 kWpEstimated annual electrical energy production: 17,4 MWhEstimated annual production in EUR: € 6,600Selected contractor: BISOL, d.o.o.The completion of works: July 2010

Strojnica

56 sq m

Zidak

1 sq m

Zidak

1 sq m

Zidak

1 sq m

zidaki

1 sq m

27

00

0,0

0

14800,00

Page 12: Municipality of Velenje

PV power plant: Primary school Livada

Installed power: 49,68 kWpEstimated annual electricity production: 50 MWhEstimated annual production in EUR: € 19,000Selected contractor: Antim, d.o.o.Completed: December 2010

Page 13: Municipality of Velenje

Small PV power plant on Primary school Gustava Šiliha• Installed power: 46 kWp• Estimated annual electricity production: 46 MWh• Estimated annual production in EUR: € 18,000• Selected contractor: Antim, d.o.o.• The completion of works: December 2010

Page 14: Municipality of Velenje

Free public transportationLokalc

Free public transport has a direct impact on the environmental burden through the exhaust and noise. We assume the potential saving of CO2 emissions of at least 169 tones of CO2 per month, at the annual level this means of 2034 tones of CO2 emissions. (Source: ‚‘Lokalc‘‘ Survey in 2009 conducted by the Municipality of Velenje and the Energy

Agency KSSENA among the users on the bus and the local population).

Page 15: Municipality of Velenje

• In 2008 the Municipality of Velenje, Utility Company of Velenje and the Institute of District Energy established the first district cooling system in Slovenia

• The installed power of cooling is 970 kW

• The system is designed in three phases - it is expected to be completed by 2012

• The advantage of cooling

• Utilization of excess heat from the thermal power plant

• Reduced energy use for cooling by 16% (comparing to the individual cooling units)

District cooling system in Velenje

Legenda

TRASA OPUŠČENE KINETE NOVA TRASA

TPP 324

MO VELENJE

Page 16: Municipality of Velenje

• District cooling in Velenje

Number of building:

Building Surface [m2]

Required power for cooling [kW]

HO 1-1. PHASE Municipality of Velenje

3.933 150

HO 1-2. PHASE Administartive unit of Velenje

3.080 118

HO 1-2. PHASE Gallery of Velenje 960 37

HO 1-2. PHASE Cultural centre of Velenje

2.756 106

HO 1-2. PHASE Restaurant DK 1.568 60

HO 1-2. PHASE Court House of Velenje

3.498 135

HO 1-2. PHASE New bus station 2.000 78

HO 1-2. PHASE Sport hallRed hall

3.600 200*

HO 1-2. PHASE Steklena direkcijaPV

1.500 59

HO 1-2. PHASE Local swimming poool

650 25

Total ADH-GO Velenje:

  23.495 967

Page 17: Municipality of Velenje

Street lighting :PV lights

Illumination of the pavement, where the power is supplied by the photovoltaic panelsLength of pavement: 450 mNumber of lamps: 13Lamp: LED LSL 30Pillar height h = 7 mRechargeable Batteries: 2x40 AhPhotovoltaic Panel: 85 WpInverter power: 75 W

Page 18: Municipality of Velenje

Street lighting:PILOT PROJECT „Energy self-sufficient STREET

LIGHTING”

2 energetically independent street lamps

2 different RES: wind turbine and thin film PV module on pillar:

Velenje Lake

Page 19: Municipality of Velenje

Technical specifications

PV panel:•136 W,•dimensions: 5,49 m x 0,39 m x 0,004 m

Vertical wind turbine:•rotor diameter of wind turbine: 1,25 m•height of the rotor: 1,1 m•mass of wind turbine: 25,5 kg

35 W LED lamp

Page 20: Municipality of Velenje

Municipality of Velenje and Covenant of Mayors

• March 2010: presentation of Action plan to the Mayor of Velenje

• April 2010: presentation of the Action plan to Velenje City Council and the Covenant of Mayors

• May 2010: Signature of the Covenant of Mayors in Brussels