municipal sustainability initiative - capital · crowsnest pass, municipality of demolish the...

35
MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL 2014 Accepted Projects Report City Accepted Amount AIRDRIE Construct a library. $18,107,200 Upgrade the Chinook Winds Regional Park, including playground equipment and fencing. $863,900 Replace the Genesis Place Recreation Centre aquatic surfaces. $1,409,800 Upgrade the Nose Creek Park facilities, including the amphitheatre, washrooms and picnic area. $2,006,255 Replace a fire truck. $859,790 BROOKS Rehabilitate Cassils Road, including underground utilities. $786,441 CALGARY Replace the ice rink boards and cooling system in the Father David Bauer Arena. $1,560,000 Install artificial turf on a playing field in the Tom Brooks Athletic Park. $2,630,000 Design and construct the Seton Regional Recreation Facility. $70,000,000 Upgrade the light rail transit vehicles. $73,482,050 Prepare design and engineering plans to construct the southeast light rail transit system. $16,096,961 Design and construct the Westbrook Building to accommodate transit and library services. $9,800,000 CHESTERMERE Purchase firefighting self-contained breathing apparatus, two way radios, and a response vehicle. $491,000 Develop a transportation master plan. $250,000 Rehabilitate the intersection at Marina Road and Chestermere Boulevard, including sidewalks and traffic signals. $586,000 Renovate the council chamber. $205,000 Pave West Merganser Road. $300,000 Purchase a dump truck. $200,000 Rehabilitate the public works yard. $400,000 Expand the public works service area. $250,000 Construct a bike park with a pathway and trail system. $210,000 Construct pathways in several locations. $642,000 Construct a skateboard park. $200,000 Page 1 This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Upload: others

Post on 20-Jun-2020

1 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

City Accepted Amount

AIRDRIE

Construct a library. $18,107,200

Upgrade the Chinook Winds Regional Park, including playground equipment and fencing.

$863,900

Replace the Genesis Place Recreation Centre aquatic surfaces. $1,409,800

Upgrade the Nose Creek Park facilities, including the amphitheatre, washrooms and picnic area.

$2,006,255

Replace a fire truck. $859,790

BROOKS

Rehabilitate Cassils Road, including underground utilities. $786,441

CALGARY

Replace the ice rink boards and cooling system in the Father David Bauer Arena.

$1,560,000

Install artificial turf on a playing field in the Tom Brooks Athletic Park.

$2,630,000

Design and construct the Seton Regional Recreation Facility. $70,000,000

Upgrade the light rail transit vehicles. $73,482,050

Prepare design and engineering plans to construct the southeast light rail transit system.

$16,096,961

Design and construct the Westbrook Building to accommodate transit and library services.

$9,800,000

CHESTERMERE

Purchase firefighting self-contained breathing apparatus, two way radios, and a response vehicle.

$491,000

Develop a transportation master plan. $250,000

Rehabilitate the intersection at Marina Road and Chestermere Boulevard, including sidewalks and traffic signals.

$586,000

Renovate the council chamber. $205,000

Pave West Merganser Road. $300,000

Purchase a dump truck. $200,000

Rehabilitate the public works yard. $400,000

Expand the public works service area. $250,000

Construct a bike park with a pathway and trail system. $210,000

Construct pathways in several locations. $642,000

Construct a skateboard park. $200,000

Page 1This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 2: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

CHESTERMERE

Pave a portion of Rainbow Road. $200,000

COLD LAKE

Improve the airport runway drainage. $400,000

Replace the South Fire Hall. $655,000

Upgrade several service roads along Highway 28. $280,000

Rehabilitate several roads and replace sidewalks. $950,980

Pave 54 Avenue. $1,225,000

EDMONTON

Construct a water play area in William Hawrelak Park. $3,147,000

Rehabilitate light rail transit vehicles. $4,191,000

GRANDE PRAIRIE

Rehabilitate a portion of sidewalks. $1,075,000

Construct a sports field and parking lots at the Community Knowledge Campus.

$2,192,491

Rehabilitate a portion of roads and trails. $6,837,810

Pave 124 Street from Highway 43 to the city limit boundary. $1,300,000

LEDUC

Upgrade a portion of the wastewater line along 49 Street. $350,000

Upgrade and expand several parking lots. $470,000

Upgrade the Leduc Civic Centre, including roof and energy efficiency upgrades.

$812,209

Upgrade the Alexandra Outdoor Pool and Arena. $621,900

Construct roads and underground utilities for the West Campus Fire Station.

$1,400,000

Upgrade several traffic control signals on 50 Street. $500,000

Purchase land for a cemetery. $700,000

LETHBRIDGE

Design and construct a twin ice arena. $23,310,000

LLOYDMINSTER

Rehabilitate several roads and sidewalks, including improvements to the intersection at 48 Street and 51 Avenue.

$1,081,920

MEDICINE HAT

Replace public transit buses. $787,500

Page 2This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 3: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

RED DEER

Widen roads and add turning lanes along the 67 Street corridor. $3,150,000

Improve sidewalk connectivity and pedestrian access. $1,000,000

Reconstruct a portion of roads. $6,300,000

Purchase snow and ice removal equipment. $1,885,000

Assess the condition of the River Bend water intake system and make repairs.

$1,071,000

Automate the bus fare system. $1,000,000

Rehabilitate a portion of roads and sidewalks. $6,838,000

Purchase right-of-way and extend 30 Avenue, including construction of a traffic circle at the 67 Street intersection.

$14,583,000

Rehabilitate and extend 30 Avenue, including curbs, storm water and signage.

$3,031,875

Replace the wastewater line on 55 Street. $1,000,000

Design and reconstruct a portion of Alexander Way, including sidewalks, underground utilities and landscaping.

$4,125,000

Jointly rehabilitate highways with the Province of Alberta. $1,104,538

SPRUCE GROVE

Construct new public works buildings. $490,000

Construct a baseball diamond. $505,000

Purchase and rehabilitate office space to relocate city planning and engineering staff.

$2,569,700

Develop the recreation facility site, including construction of roads, utilities and parking facilities.

$1,233,383

Contribute funding to Parkland County to construct a day use park along the North Saskatchewan River.

$132,600

ST. ALBERT

Upgrade the storm water system. $1,543,250

Rehabilitate the Gate Avenue wastewater lift station. $1,933,900

Renovate and expand the St. Albert 50+ Club Building. $2,346,300

Restore Cunningham House, Hogan House and the Brosseau Granary heritage sites.

$1,525,700

Prepare a realignment study to extend St. Anne Street. $800,000

Extend the Oakmont Trail in Erin Ridge Park. $792,000

Construct a storm water retention pond in Campbell Park. $1,200,000

Enhance the wastewater collection system. $2,200,000

Extend a waterline from Oakmont Drive to Erin Ridge North. $3,400,000

Page 3This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 4: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

ST. ALBERT

Replace sidewalks. $753,505

Specialized Municipality Accepted Amount

CROWSNEST PASS, Municipality of

Demolish the Crowsnest Center and rehabilitate the site. $250,000

Prepare a recreation infrastructure study. $105,500

Construct entrance signs on Highway 3, including landscaping and lighting.

$200,000

Rehabilitate the Bellevue Hillcrest Lagoon. $690,000

Purchase wheel loaders and attachments. $500,000

Replace the MD McEachern Community Centre roof. $300,000

Prepare a design for a secondary clarifier at the Frank Wastewater Treatment Plant.

$275,000

Upgrade the infrastructure management software and hardware. $200,000

JASPER, Municipality of

Rehabilitate several roads, including underground utilities, drainage, sidewalks and hydrants.

$4,159,000

Replace a grader. $300,000

MACKENZIE COUNTY

Purchase a fire tanker for the Hamlet of Fort Vermilion. $375,000

Purchase a sand and salt shelter, and a cold storage facility for the Hamlet of Fort Vermilion.

$307,250

Rehabilitate several roads in the Hamlet of Fort Vermilion, including replacing water and wastewater systems.

$595,000

Rehabilitate several roads in the Hamlet of La Crete. $1,470,726

Purchase graders. $647,488

Purchase a loader for the Hamlet of La Crete. $182,019

STRATHCONA COUNTY

Construct a sports pavilion in Emerald Hills. $5,346,000

Design and construct a wastewater servicing system for the Hamlet of Ardrossan.

$2,000,000

Replace public transit buses. $1,000,000

Rehabilitate arterial roadways, including the sidewalks and curbs. $1,242,728

Upgrade Strathcona County Hall, including the interior finishes. $2,318,382

Widen Wye Road and extend the walking trail. $1,129,672

Page 4This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 5: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

STRATHCONA COUNTY

Extend Bethel Way. $1,988,648

Expand the Clover Bar Road and Highway 16 intersection, including a turning lane and traffic signal.

$1,262,360

Upgrade the intersection of Township Road 530 and Range Road 224, including the relocation of utilities and purchase of the right-of-way.

$3,136,486

Upgrade the Strathcona County Emergency Services Station 1. $1,515,785

WOOD BUFFALO, Regional Municipality of

Rehabilitate several roads, including underground utilities. $55,500,000

Develop a bike park in the Silin Forest area. $2,000,000

Municipal District Accepted Amount

ACADIA NO. 34, M.D. OF

Construct two physician residences in conjunction with several surrounding municipalities.

$90,000

Rehabilitate roads and sidewalks. $153,223

ATHABASCA COUNTY

Install a rural addressing system, including signage. $550,000

Jointly contribute funding to purchase land and construct the Baptiste Lake Fire Hall with the summer villages of West Baptiste, South Baptiste, Island Lake South, Island Lake, Sunset Beach and Whispering Hills.

$157,000

Purchase a building at the Athabasca Municipal Airport. $525,000

Rehabilitate gravel roads. $1,808,244

Rehabilitate several roads. $1,500,000

Upgrade several bridges, including decking, access points and reinforcement.

$640,000

BARRHEAD NO. 11, COUNTY OF

Regravel sections of several roads. $531,226

Rehabilitate and pave a portion of Range Road 40. $2,500,000

BEAVER COUNTY

Replace graders. $280,000

Regravel roads and restore shoulders. $350,000

Transport gravel for road rehabilitation. $598,558

Purchase a road stabilizer. $247,000

Stabilize the road base and apply sealant. $806,000

Page 5This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 6: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

BIG LAKES COUNTY

Upgrade Hospital Road, including sidewalks and underground utilities.

$1,839,708

Rehabilitate and regrade roads. $375,146

BIRCH HILLS COUNTY

Purchase maintenance vehicles and equipment. $749,525

Purchase a water truck. $199,000

Transport gravel for road rehabilitation. $500,000

Rehabilitate the wastewater line along 52 Street. $122,500

Relocate and upgrade the bulk water filling station. $120,000

BONNYVILLE NO. 87, M.D. OF

Rehabilitate 48 Avenue in the Hamlet of Ardmore, including replacing water and wastewater lines.

$2,394,877

Rehabilitate Range Road 444 between Highway 55 and Crane Lake.

$2,850,000

Rehabilitate a portion of Murphy Road. $687,280

Upgrade several roads and install a storm water system in the Hamlet of Fort Kent.

$72,360

BRAZEAU COUNTY

Pave a portion of Range Road 81 and extend culverts. $1,915,703

Rehabilitate roads for dust control. $412,515

CAMROSE COUNTY

Widen a bridge on Township Road 450. $241,000

Rehabilitate a portion of Dried Meat Lake Road. $1,764,043

Rehabilitate a portion of Aberhart Highway. $1,128,850

Rehabilitate gravel roads. $699,914

Upgrade the water distribution system in the Hamlet of New Norway.

$851,577

CARDSTON COUNTY

Upgrade Moojalsky Road. $75,000

Purchase tractors. $319,000

Rehabilitate Police Lake Road. $534,867

Purchase a grader. $400,000

Crush gravel for road rehabilitation. $406,371

Page 6This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 7: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

CLEAR HILLS COUNTY

Rehabilitate Clear Prairie Road. $3,000,000

CLEARWATER COUNTY

Rehabilitate a portion of roads, including paving overlay. $4,717,530

Resurface several roads. $4,344,047

Install a well and waterline and construct a reservoir. $937,295

Replace bridge culverts. $284,936

CYPRESS COUNTY

Construct a waterline between the hamlets of Dunmore and Irvine. $6,208,458

FLAGSTAFF COUNTY

Contribute funding to the Daysland and District Memorial Arena Society to renovate the dressing rooms and washrooms at the Daysland Arena.

$7,500

Rehabilitate a portion of roads. $640,781

FOOTHILLS NO. 31, M.D. OF

Purchase public works maintenance equipment. $3,005,000

Purchase a fire pumper truck. $600,000

Jointly purchase a fire pumper truck with the Town of Turner Valley.

$300,000

Jointly rehabilitate the shared administration building with the Town of High River.

$300,000

Rehabilitate several roads, including the application of base gravel. $874,198

Repave several roads. $1,034,000

Install signal lights at the intersection of Highway 2A and Dunbow Road.

$375,000

FORTY MILE NO. 8, COUNTY OF

Rehabilitate several roads. $972,088

GRANDE PRAIRIE NO. 1, COUNTY OF

Rehabilitate the curbs and gutters in the Town of Clairmont. $1,100,000

Pave Emerson Trail. $1,962,528

Purchase gravel and rehabilitate several roads. $1,020,976

GREENVIEW NO. 16, M.D. OF

Replace Goodwin Road from Highway 43 to South Township Road 734.

$2,700,000

Replace the road along Range Road 203 and Range Road 202. $2,595,993

Page 7This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 8: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

KNEEHILL COUNTY

Crush gravel for road rehabilitation. $539,220

Construct an administration building with a medical centre annex. $2,500,000

LAC STE. ANNE COUNTY

Purchase graders. $625,303

Rehabilitate gravel roads. $689,580

LACOMBE COUNTY

Rehabilitate several roads. $1,171,440

Rehabilitate Range Road 26-4. $519,540

Rehabilitate Township Road 39-4. $550,000

Rehabilitate Sunset Drive, including storm water drainage. $468,270

Construct a road in New Saratoga. $432,184

Rehabilitate a portion of road in New Saratoga. $562,280

Crush gravel for road rehabilitation. $504,400

LAMONT COUNTY

Regravel roads and repair cracks. $500,192

Replace graders. $556,801

Replace a wheel loader. $348,100

LEDUC COUNTY

Rehabilitate gravel roads. $488,594

Replace emergency fire response vehicles, including a pumper truck, mobile command unit and water tanker.

$1,019,000

Rehabilitate a portion of Joe Lake Road. $1,072,764

Rehabilitate a portion of Airport Road. $444,520

Rehabilitate a portion of Range Road 231. $444,520

Rehabilitate a portion of Range Road 232. $831,020

Rehabilitate a portion of Range Road 233. $1,009,324

Rehabilitate a portion of 11 Avenue. $418,643

Rehabilitate the lagoon inlet piping in the Hamlet of New Sarepta. $15,000

Rehabilitate the lift station in the Hamlet of New Sarepta, including installation of emergency lighting.

$11,246

Rehabilitate the water outlet driveway in the Hamlet of New Sarepta.

$18,596

Install an exhaust handling system in the Hamlet of New Sarepta fire hall.

$80,000

Page 8This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 9: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

LEDUC COUNTY

Rehabilitate a portion of wastewater lines in the Hamlet of New Sarepta.

$63,441

Rehabilitate 2 Avenue South, including sidewalks in the Hamlet of New Sarepta.

$172,800

LESSER SLAVE RIVER NO. 124, M.D. OF

Expand the water treatment plant in the Hamlet of Canyon Creek. $245,000

Upgrade the Old Smith Highway. $5,364,575

Survey and prepare Poplar Lane for paving. $3,963,807

Resurface East Mitsue Road. $376,796

Replace the water pipe intakes at Canyon Creek. $218,785

LETHBRIDGE COUNTY

Replace a grader shed. $160,000

Purchase a grader. $245,500

Rehabilitate several roads. $547,421

Resurface a portion of Township Road 10-2. $481,114

MINBURN NO. 27, COUNTY OF

Rehabilitate a portion of gravel roads. $532,480

Purchase crushed gravel for road maintenance. $3,247,673

MOUNTAIN VIEW COUNTY

Prepare an engineering study to upgrade roads. $350,000

Rehabilitate several roads. $700,000

Crush gravel for road rehabilitation. $520,723

NEWELL, COUNTY OF

Upgrade the water and wastewater systems in the former Village of Tilley.

$639,668

Reconstruct Township Road 152. $520,583

NORTHERN LIGHTS, COUNTY OF

Install waterlines in the areas of Hotchkiss and North Manning. $400,000

Construct a portion of Ed Schmidt Road. $102,456

Rehabilitate a portion of Lovelin Road. $212,500

Upgrade the airport, including parking lot repairs and global positioning system technology purchase.

$103,000

Install waterlines near the Hamlet of Dixonville. $240,000

Rehabilitate Sunny Valley Road. $2,528,500

Page 9This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 10: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

NORTHERN SUNRISE COUNTY

Rehabilitate and expand the Saint Isidore Cultural Centre. $1,739,054

PAINTEARTH NO. 18, COUNTY OF

Purchase graders. $470,000

Rehabilitate several bridges. $367,534

Rehabilitate several roads. $400,000

PARKLAND COUNTY

Rehabilitate several roads. $1,016,327

Construct broadband internet towers. $680,000

Purchase land and examine opportunities to increase lagoon capacity in the Hamlet of Duffield.

$908,200

Purchase land for construction of broadband internet towers. $425,000

Purchase a right-of-way and reconstruct Range Road 51 from Township Road 503A to Township Road 505.

$700,000

PEACE NO. 135, M.D. OF

Regravel several roads. $160,000

Replace bridge culverts. $270,000

PINCHER CREEK NO. 9, M.D. OF

Contribute funding to the Pincher Creek Seed Cleaning Plant Cooperative to expand the plant and purchase ancillary grain equipment.

$200,000

PONOKA COUNTY

Rehabilitate a portion of Range Road 254. $3,266,562

PROVOST NO. 52, M.D. OF

Rehabilitate Range Road 11 from Highway 13 to Township Road 410.

$752,846

Rehabilitate Township Road 404 from Secondary Highway 884 to Range Road 91.

$1,500,000

RANCHLAND NO. 66, M.D. OF

Crush gravel for road rehabilitation. $66,270

Rehabilitate a portion of Forestry Trunk Road at Vicary Hill. $599,000

RED DEER COUNTY

Widen and repave roads. $6,731,329

Purchase a protective services building. $1,503,341

Widen and pave several roads. $6,000,000

Page 10This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 11: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

ROCKY VIEW COUNTY

Rehabilitate a portion of Township Road 234 and Township Road 280.

$650,749

SMOKY LAKE COUNTY

Apply fibermat coating to Range Road 181 and Township Roads 165A and 584.

$524,000

Rehabilitate, stabilize and oil roads. $478,000

Replace a grader. $250,000

Rehabilitate roads and apply gravel. $427,727

SMOKY RIVER NO. 130, M.D. OF

Rehabilitate roads, bridges and culverts. $757,318

Install a back-up power supply for water and wastewater services in the hamlets of Guy and Jean Cote.

$100,000

Rehabilitate a portion of Cuthbertson Road, including drainage improvements.

$120,000

Gravel a portion of Range Road 203. $228,880

Rehabilitate a portion of Kimlake Road. $300,000

Improve the ski hill water supply. $100,000

Rehabilitate a portion of Range Road 221. $250,000

Construct a road. $136,000

Rehabilitate a portion of Township Road 750. $90,000

Rehabilitate a portion of Range Road 200. $126,120

Rehabilitate several roads. $200,000

SPIRIT RIVER NO. 133, M.D. OF

Rehabilitate the storm water ditches. $325,000

Rehabilitate the storm water system surrounding the Village of Rycroft.

$228,000

Purchase tractors. $260,000

Replace a gravel loader. $300,000

Expand the water filling station. $60,000

Replace the public works maintenance vehicle. $45,000

ST. PAUL NO. 19, COUNTY OF

Purchase graders and plows. $1,563,000

Replace a gravel crusher trailer, tower and generator. $258,167

Regrade a portion of Malo Road and replace culverts. $610,619

Page 11This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 12: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

STARLAND COUNTY

Extend a culvert on Township Road 31-4. $276,000

Replace a bridge on Range Road 18-2. $214,000

Purchase land and prepare a design to replace the fire hall. $100,000

Upgrade and expand the regional waterline and booster station. $250,000

STURGEON COUNTY

Apply sealant to Lilly Lake Road from Highway 28 to Township Road 570.

$298,750

Pave a portion of Township Road 554. $921,000

Reconstruct Starkey Road and develop a multi-use trail system. $3,084,258

Rehabilitate gravel roads. $550,354

TABER, M.D. OF

Extend the taxiway at Taber Airport. $376,990

Stabilize several roads. $1,342,941

Regravel several roads. $647,791

Rehabilitate a portion of Range Road 16. $454,516

Upgrade the water distribution system in the Hamlet of Hays. $421,550

Pave roads in the Hamlet of Grassy Lake. $722,204

THORHILD COUNTY

Purchase public works maintenance equipment. $544,310

TWO HILLS NO. 21, COUNTY OF

Purchase gravel trucks and replace graders. $1,388,954

Rehabilitate a portion of roads. $578,597

VERMILION RIVER, COUNTY OF

Rehabilitate several gravel roads. $903,137

Upgrade the rural addressing system and signs. $400,000

Rehabilitate a bridge. $857,953

Rehabilitate a portion of Township Road 532 and Range Road 55. $770,000

Rehabilitate a portion of Township Road 534 and Range Road 60. $602,000

VULCAN COUNTY

Upgrade the information technology equipment, including network hardware, fiber cable, firewall, and alarm system.

$127,000

Replace graders. $469,450

Purchase a motor scraper. $125,174

Page 12This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 13: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

VULCAN COUNTY

Replace a tandem tractor. $125,725

Replace the Buffalo Hills communication tower. $130,000

Rehabilitate bridges and bridge culverts. $708,337

WAINWRIGHT NO. 61, M.D. OF

Pave a portion of roads. $2,799,226

WARNER NO. 5, COUNTY OF

Rehabilitate several roads. $200,000

Purchase a grader. $480,000

Rehabilitate several roads, including crushing gravel and dust abatement.

$823,000

WESTLOCK COUNTY

Rehabilitate gravel roads. $1,578,156

WETASKIWIN NO. 10, COUNTY OF

Rehabilitate gravel roads. $558,370

Regrade a portion of Battle Lake Trail. $1,000,000

Rehabilitate roads in the Lansdowne Park subdivision. $465,000

Contribute funding to the Alder Flats Community Agricultural Society to upgrade the curling rink.

$90,000

Contribute funding to the Buck Lake Agricultural Society to upgrade the community hall kitchen.

$4,500

Contribute funding to the Buck Lake Senior Citizens Drop In Centre to construct a patio.

$10,800

Contribute funding to the Covenant Bay Bible Camp to upgrade the wastewater system and facility washrooms.

$7,000

Contribute funding to the Lakedell Agricultural Society to upgrade the riding arena, hall, and curling rink.

$70,000

Contribute funding to the Winfield Minor Hockey Association to purchase an ice resurfacer.

$35,175

Upgrade the mechanical and refrigeration system for the Winfield Agriplex.

$222,334

Rehabilitate a portion of Township Road 470. $1,200,000

Purchase gravel for road rehabilitation. $470,000

WHEATLAND COUNTY

Purchase graders with attachments. $1,060,000

Pave a portion of Cluny East Access Road. $634,632

Page 13This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 14: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

WILLOW CREEK NO. 26, M.D. OF

Re-oil several roads. $678,575

Purchase an excavator, loader, and graders. $1,320,000

Replace municipal welcome signs. $135,000

YELLOWHEAD COUNTY

Pave a portion of Evansburg North Road. $12,377,716

Town Accepted Amount

ATHABASCA

Purchase a grader. $244,315

Purchase a fire pumper truck. $520,000

Replace waterline at 51 Street between 48 and 49 Avenue, and along 58 Street.

$200,000

BASHAW

Construct a septage receiving station, including flow meter reader, lighting, and cardlock system.

$138,000

BASSANO

Purchase a backhoe loader. $80,000

Rehabilitate the Homecoming Campground Building. $25,000

Replace a grader. $150,000

Upgrade the storm water lines at several intersections and repave roads.

$30,000

Replace a fire hydrant and isolation valve. $29,530

BEAUMONT

Purchase and remediate land for park development. $740,900

Upgrade the Ken Nichol Regional Recreation Centre parking lot. $311,800

Rehabilitate the intersection at Highway 625 and Range Road 243. $212,400

Expand the Dansereau Community Park, including soccer fields, hockey rink, playground, and trails.

$309,000

Rehabilitate several roads and sidewalks. $465,300

Upgrade capacity at Caradon storm water retention pond. $720,000

BEAVERLODGE

Enhance the aquatic building grounds. $476,208

BLACK DIAMOND

Purchase and install a sand and salt storage building. $55,000

Page 14This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 15: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

BLACK DIAMOND

Upgrade the Oilfields Regional Arena roof. $53,353

Purchase land and construct a parking lot. $190,000

BON ACCORD

Rehabilitate a portion of 51 Street. $514,127

BONNYVILLE

Rehabilitate a portion of 51 Avenue, including sidewalks and underground utilities.

$1,778,047

BOW ISLAND

Rehabilitate a lift station and wastewater line. $120,074

BOWDEN

Rehabilitate portions of 21, 22, and 23 Avenue, including installing sidewalks, and replacing water and wastewater lines.

$1,193,094

Replace water reservoir pump and controller and upgrade electrical systems.

$20,204

BRUDERHEIM

Install water and wastewater lines at the municipal campground. $25,000

Rehabilitate a lift station and purchase a generator. $40,000

Replace several underground utilities. $50,000

Rehabilitate a sports track. $20,000

Replace the roof on the Metro Kalyn Community Library and administration building.

$30,000

CANMORE

Repurpose a building as a community arts centre. $1,400,000

CARDSTON

Purchase a mower. $68,000

Construct a wastewater line along 5 Avenue West. $100,000

Replace a portion of road at 4 Avenue West and sections of sidewalk at 9 Avenue West.

$283,782

CARSTAIRS

Conduct geotechnical investigations and prepare a detailed water plant design.

$220,000

Purchase a combined water and wastewater service truck. $47,000

Replace the fire department command unit. $47,000

Complete water quality monitoring for wastewater lagoon expansion.

$48,565

Page 15This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 16: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

CARSTAIRS

Rehabilitate portions of MacIntosh Drive, 10 Avenue North and 9 Avenue South.

$196,840

CASTOR

Replace breathing apparatus and other specialized firefighting equipment.

$35,000

Upgrade a water system including waterlines, water meters and water shut off valves.

$55,187

Upgrade the swimming pool, including the filtration system. $75,000

Purchase leak detection equipment, meters and a new line heater for a natural gas system.

$80,000

Rehabilitate several roads. $55,680

CLARESHOLM

Replace a portion of road and wastewater line along the east side of Highway 2.

$52,000

Replace a portion of waterlines and sidewalks, and repave road. $320,000

COALDALE

Prepare design and engineering plans for the Northeast Industrial Park, including underground utilities and roads.

$250,000

Purchase a lawn mower and line painter. $90,000

Purchase a tandem dump truck. $150,000

Upgrade the storm water drainage system. $568,000

Prepare an infrastructure planning study. $135,000

Rehabilitate several roads, including underground utilities and sidewalks.

$786,132

COALHURST

Purchase a skid steer and attachments. $40,335

Purchase an emergency generator. $38,000

Construct a playground at Sundance Park. $31,000

COCHRANE

Jointly construct an aquatic centre and curling rink with Rocky View County.

$19,769,720

CORONATION

Rehabilitate a wastewater line. $15,400

Repave portions of Victoria and Railway Avenue. $15,495

Purchase a skid steer loader and planer attachment. $41,325

Page 16This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 17: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

CROSSFIELD

Rehabilitate several roads. $86,464

DAYSLAND

Prepare an infrastructure study. $30,000

Prepare a flood mitigation plan. $196,604

Rehabilitate a wastewater lift station. $30,000

Purchase a snow loader blade. $21,000

Purchase a public works maintenance vehicle. $20,000

DEVON

Upgrade the Devon Community Centre. $145,000

Install street lights along Michigan Street. $130,000

Improve crosswalks, intersections and access to Highway 60. $189,000

Prepare a parks, trails, recreation and culture master plan and a River Valley trail master plan.

$89,000

Upgrade the Devon Community Pool. $82,000

Purchase a fire rescue truck. $300,000

Rehabilitate trails with asphalt overlay. $85,000

DIDSBURY

Rehabilitate 10 Avenue. $84,737

Jointly replace the Didsbury Fire Hall with Mountain View County. $1,968,494

Replace the Didsbury Aquatic Centre roof. $335,500

DRAYTON VALLEY

Extend Beckett Road including sidewalks, water, wastewater and storm water lines.

$860,000

Stabilize a portion of Coulee Road. $100,000

DRUMHELLER

Purchase a street sweeper. $245,000

Prepare an infrastructure study. $250,000

Rehabilitate several roads. $481,740

ECKVILLE

Purchase a dump truck and plow attachment. $225,000

Rehabilitate several sidewalks. $80,000

Rehabilitate several municipal buildings in Memorial Park. $107,632

Purchase a grader. $225,000

Page 17This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 18: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

ECKVILLE

Purchase an electronic community announcement sign and update the phone system.

$29,708

Pave 49 Avenue. $150,672

EDSON

Rehabilitate a portion of 5 Avenue and 42 Street, including underground utilities.

$697,777

Rehabilitate a portion of the Tiffin North Trail. $200,000

ELK POINT

Upgrade the wastewater lagoon. $684,527

FAIRVIEW

Upgrade the arena, including the rehabilitation of the foyer and washroom facilities.

$62,080

Prepare design and engineering plans for the rehabilitation of 102 Avenue between 110 and 113 Street, including roads, sidewalks, and underground utilities.

$216,000

Replace water meters. $150,000

Replace water and wastewater lines from 100 to 108 Avenue and install storm water catch basins along 113 Street.

$602,740

Replace several sidewalks. $169,255

FALHER

Install a storm water line along 7 Avenue. $160,700

Pave 7 Avenue from Main Street to 2 Street. $352,924

Rehabilitate a portion of 1 Avenue, including curb and gutter. $180,100

GIBBONS

Install a water main and hydrants along 52 Street. $128,666

Purchase a skid steer with a cab. $66,245

Replace a portion of the water main on 49 Street. $167,238

GRANUM

Upgrade the water treatment plant and purchase water meters. $20,000

Renovate the municipal office and public works yard. $37,575

Upgrade the municipal cemetery. $8,400

GRIMSHAW

Replace the hydrants and water valves. $436,000

Pave 55 Street and 47 Avenue. $540,416

Page 18This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 19: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

HANNA

Purchase a tandem gravel truck. $132,000

Prepare an infrastructure management study. $63,000

HIGH LEVEL

Replace a portion of sidewalk along Rainbow Boulevard. $121,248

Purchase a sanding truck. $160,000

Pave a portion of 106 Street. $89,243

Jointly upgrade the facilities and trails at Centennial Park with MacKenzie County.

$288,000

HIGH RIVER

Construct a parking lot at the field house and recreation complex. $500,000

Replace water meters. $1,000,000

Rehabilitate a portion of sidewalks and curbs. $165,000

Purchase a generator. $175,000

Upgrade the water collection system. $1,000,000

HINTON

Construct a lift station. $4,648,997

IRRICANA

Construct a cenotaph. $22,000

Purchase a sander and associated equipment. $25,000

Expand and upgrade a campground, including electrical and accessibility.

$20,000

Replace a skid steer loader. $35,000

Rehabilitate the public works building. $65,000

Upgrade hardware and software for utility readings. $20,000

Purchase land and a building for community services programs, including the relocation of the library.

$300,000

KILLAM

Pave a multi-use trail from 46 Street to 57 Street. $161,460

Purchase gravel and rehabilitate roads. $58,000

Replace the swimming pool filtration system. $20,000

Replace the administration building roof. $42,000

Replace several sidewalks. $26,000

Page 19This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 20: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

LEGAL

Prepare a transportation study. $35,000

MAGRATH

Pave a portion of 2 Avenue. $216,832

Pave a portion of Centre Street. $110,898

Pave a portion of 1 Avenue. $56,415

Purchase an ice resurfacer and ice chiller. $186,000

Purchase a garbage truck and bins. $126,875

MANNING

Purchase a street sweeper. $228,000

MAYERTHORPE

Purchase a gravel truck. $32,500

Purchase a maintenance truck. $25,237

Purchase self-contained breathing apparatus for the fire department.

$19,750

Rehabilitate and pave 45 Street. $196,692

Rehabilitate and pave a portion of 47 Avenue and 47 Street. $45,625

Rehabilitate and pave a portion of 50 Avenue. $83,880

MCLENNAN

Replace decorative street lighting. $16,000

MILLET

Extend 54 Street. $127,250

Replace several sidewalks. $240,000

Replace and enhance a portion of the storm water drainage system.

$388,971

Install a treated water supply line. $800,000

Rehabilitate the wastewater treatment lagoon and berm. $213,825

MORINVILLE

Purchase public works maintenance equipment and vehicles. $431,300

Purchase land and construct a recreation centre. $8,900,000

MUNDARE

Rehabilitate wastewater lines. $215,000

Purchase a grader. $112,000

Page 20This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 21: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

NANTON

Construct public washrooms in Centennial Park. $100,000

Replace the arena chiller. $80,000

Replace the ice resurfacer. $35,000

Replace mowers. $41,411

Rehabilitate the swimming pool deck and liner. $90,000

Rehabilitate the wastewater treatment plant. $500,000

Upgrade the water treatment plant. $92,000

Replace water valves and fire hydrants. $220,000

OKOTOKS

Construct a pathway in Wylie Park. $800,000

OLDS

Rehabilitate roads and underground utilities. $1,402,926

Repair north pump station valves. $120,000

Rehabilitate and expand the trail system. $350,000

Replace the Sportsplex furnace and exterior doors. $120,000

Pave a portion of the Sportsplex parking lot. $124,000

ONOWAY

Upgrade the municipal building. $53,000

Rehabilitate Industrial Street, including drainage. $50,000

Replace the main water valves. $55,000

Pave Industrial Avenue. $110,000

Purchase an articulating loader. $50,000

Upgrade the lagoon, including bank stabilization. $25,000

Upgrade the Onoway Community Hall, including fire exits and drainage.

$17,000

Rehabilitate the lagoon. $225,000

OYEN

Replace front cutting lawn mowers. $36,100

Develop an infrastructure master plan. $100,000

PEACE RIVER

Rehabilitate the culvert at Pat's Creek. $143,300

Upgrade the fire barrier and alarms at the town office. $110,000

Page 21This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 22: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

PEACE RIVER

Upgrade a lift station. $275,503

Rehabilitate several roads. $757,800

Replace the waterlines and fire hydrants in Bridgeview Industrial Park.

$145,000

PINCHER CREEK

Replace several sidewalks. $20,000

Rehabilitate a portion of roads. $50,000

PONOKA

Upgrade the Kinsmen Community Centre and the Ponoka Drop In Centre.

$85,000

Replace a fire rescue truck. $125,000

Upgrade the Ponoka Aquaplex and arena. $131,000

PROVOST

Purchase a grader. $122,460

RAINBOW LAKE

Replace wheelchair access ramps at the town office and airport. $78,500

Replace tractor attachments. $20,000

Rehabilitate a portion of the drainage ditch network. $200,000

REDCLIFF

Rehabilitate the storm water outfall and dry pond at Toboggan Hill. $105,523

Rehabilitate a portion of the Old Trans-Canada Highway, including installation of a lift station and culverts.

$267,634

Rehabilitate a portion of South Highway Drive. $165,810

REDWATER

Replace a tandem gravel truck. $110,000

Pave a portion of 53A Avenue. $146,420

Replace several sidewalks. $75,000

Rehabilitate wastewater lines. $150,000

Pave a portion of Ochre Park Road. $34,484

RIMBEY

Replace sidewalks. $250,000

Purchase a loader. $187,000

Replace the heating, ventilation, and cooling systems in the Peter Lougheed Community Centre.

$308,000

Page 22This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 23: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

ROCKY MOUNTAIN HOUSE

Rehabilitate roads and install sidewalks at several locations. $435,800

SEXSMITH

Rehabilitate and widen 104 Street. $548,296

Extend a walking trail along 100 Avenue. $81,801

SLAVE LAKE

Build new baseball diamonds and rehabilitate existing fields. $498,079

Pave the multi-recreational centre parking lot and improve access. $1,795,000

Jointly construct a cemetery with the Municipal District of Lesser Slave River.

$1,146,255

Enhance the downtown core, including installation of welcome banners, signage, and parks and playground equipment.

$231,097

Design and construct a public works building. $324,691

Restore landscaping around the Slave Lake Government Centre and Library.

$150,000

SMOKY LAKE

Install a wastewater line on the southside. $40,000

Replace a waterline main. $130,000

SPIRIT RIVER

Rehabilitate a portion of 44 Avenue. $245,332

Replace water and wastewater lines along a portion of 46 Street. $417,833

ST. PAUL

Purchase a snow blower and loader. $364,683

Expand the bulk water dispenser station and software. $96,000

Pave several roads. $350,640

STAVELY

Rehabilitate several roads. $16,000

Upgrade the water plant equipment, including the chlorine analyzer and flow meter boards.

$15,000

STONY PLAIN

Improve traffic movement along South Park Drive and construct a pedestrian corridor along 43 Avenue.

$1,753,967

Install insulated siding on the Glenn Hall Arena. $210,000

Replace the outer membrane of the arena roof. $252,000

Construct a secondary access road on Briarwood Way. $380,000

Page 23This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 24: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

STONY PLAIN

Construct a community centre. $1,187,164

STRATHMORE

Upgrade the Kinsmen Park, including playground, trails and connecting bridge.

$386,000

Rehabilitate a portion of water and wastewater lines. $1,850,000

SUNDRE

Install a secondary natural gas line. $200,000

Upgrade 10 Street, including water and wastewater lines. $999,000

SWAN HILLS

Install a water main from Main Street to Highway Avenue. $467,667

SYLVAN LAKE

Upgrade a portion of 50 Street, including sidewalks, storm water and turning lane.

$3,900,000

Rehabilitate Lakeshore Drive, including roads and sidewalks. $1,300,000

Rehabilitate and construct sidewalks. $513,000

Install traffic signals at 50 Street and 45 Avenue. $400,000

Reconstruct the parking lot at Four Seasons Park. $475,000

Rehabilitate roads, including sidewalks, water and wastewater lines in the Cottage Area neighbourhood.

$1,400,000

Rehabilitate roads, including sidewalks, water and wastewater lines in the West Village neighbourhood.

$1,000,000

Upgrade 33 Street, including sidewalk, curb, and gutter. $1,500,000

Renovate the Sylvan Lake Municipal Library. $348,000

THREE HILLS

Replace the arena cooling system. $45,000

Upgrade the administration building, including lighting and office furniture.

$101,000

Purchase a dump truck with plow attachment. $78,500

Design and install a storm water ditch. $194,880

Replace the water meters. $50,000

Purchase a landfill compactor. $450,000

TOFIELD

Pave roads and replace sidewalks. $300,000

Purchase a mower. $81,000

Page 24This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 25: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

TOFIELD

Replace playground equipment. $130,000

Contribute funding to Tofield Agricultural Society to replace the rodeo arena bucking chutes.

$60,000

Purchase a backhoe loader. $145,000

Purchase a community welcome sign. $30,000

TROCHU

Expand the wastewater lagoon. $1,043,117

Demolish an abandoned building and develop a community park. $250,000

Prepare an engineering plan to rehabilitate Railway Avenue. $25,000

Rehabilitate several roads. $25,000

Construct a storm water system, including catch basins on 102 Ekenfelder Street.

$40,000

TWO HILLS

Replace the administration building roof. $40,000

Purchase a dump truck. $114,607

Replace a wastewater manhole. $45,553

Purchase a roller packer. $21,735

Rehabilitate several roads. $80,000

Replace water and wastewater lines. $153,816

VALLEYVIEW

Construct a new subdivision road and install underground utilities. $300,000

Replace sidewalks along 50 Avenue and 50 Street, and the southside of 54 Avenue.

$248,541

VAUXHALL

Purchase a garbage truck and carts. $213,525

VEGREVILLE

Purchase a gravel truck. $125,000

Purchase a crawler loader. $335,000

Purchase a front mount deck mower. $75,000

Rehabilitate a portion of Highway Avenue, including replacing wastewater lines and installing a storm water system.

$1,087,200

Complete phase 1 of the Cemetery Master Plan at the Riverview Cemetery.

$194,000

Page 25This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 26: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

VEGREVILLE

Rehabilitate a portion of 55 Avenue between 50 Avenue and 60 Street, including replacing asphalt, curbs and gutters, water valves, and hydrants.

$581,230

VERMILION

Pave the Vermilion Stadium and Arena parking lot. $400,000

Rehabilitate the airport runway. $65,000

Jointly purchase an ice resurfacer with the Vermilion Stadium Board.

$63,400

Upgrade Town Hall Park and Cenotaph, including landscaping and a pergola.

$72,050

Install entrance and directional signage. $55,835

Contribute funding to Alberta Central East Water Corporation to design and construct a water transfer and pump station, fill stations and waterlines.

$1,955,930

Rehabilitate the intersection at Railway Avenue and 41 Street. $40,997

VULCAN

Reclaim the wastewater lagoon site and construct a storm water retention pond.

$655,360

WEMBLEY

Upgrade a portion of roads including curbs, sidewalks, and gutters. $79,252

Purchase a tractor with attachments. $210,000

WESTLOCK

Prepare a municipal infrastructure assessment study. $75,000

Upgrade the Westlock Rotary Spirit Centre. $100,000

Install fencing around the public works yard and construct a salt storage shed.

$223,000

WHITECOURT

Jointly construct the Whitecourt and Woodlands Winter Recreation Park with Woodlands County.

$600,000

Extend 33 Avenue, including water and storm water lines. $634,440

Village Accepted Amount

ALIX

Prepare an infrastructure study on Railway Avenue. $60,000

Prepare a lift station study. $50,000

Rehabilitate a portion of 47 Street. $80,000

Page 26This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 27: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

ALLIANCE

Pave 1 Avenue and repair other roads. $43,721

Replace sidewalks on Main Street. $116,201

Purchase a mower and multi-purpose equipment. $16,500

Install streetlights and power lines in the west end subdivision. $71,000

Replace several sidewalks. $13,799

Rehabilitate the storm water drainage and culverts. $15,000

BARONS

Install siding on a fire hall and purchase breathing apparatus and other specialized firefighting equipment.

$40,000

Replace street lighting with energy efficient fixtures. $29,700

Construct a playground fence. $30,000

Relocate the tennis and basketball court. $20,000

Rehabilitate a portion of roads. $30,300

BAWLF

Upgrade the water treatment plant. $553,125

BEISEKER

Replace several sidewalks. $50,000

BERWYN

Upgrade the fire hall washroom and install shelving. $10,750

Purchase playground equipment. $10,600

Regravel several roads. $11,000

BIG VALLEY

Rehabilitate a wastewater line along 3 Avenue. $90,000

BOYLE

Construct roads and install underground utilities in a new subdivision.

$1,486,909

BRETON

Rehabilitate 50 Avenue and 50 Street. $381,600

CARMANGAY

Replace water and wastewater lines along Elmore Street. $424,000

CAROLINE

Upgrade the water treatment plant, including water control system, pump and back-up generator.

$185,871

Page 27This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 28: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

CHAUVIN

Upgrade a portion of Queen Street, including underground utilities. $70,000

Replace a water pump. $35,000

CHIPMAN

Extend the waterline to the end of Main Street and install a hydrant. $47,630

Replace the sidewalk along 49 Avenue. $55,000

CLYDE

Upgrade the water treatment plant. $320,000

COUTTS

Construct a sand storage shed. $36,000

Construct an addition to the public works shop. $210,000

CZAR

Repave several roads. $294,564

Purchase a lawn mower. $15,734

Replace a portion of sidewalks on 50 Street and 52 Street. $32,203

DELBURNE

Conduct a wastewater line replacement study. $97,000

Rehabilitate 21 Avenue, including underground utilities. $465,000

DONALDA

Inspect wastewater lines. $70,000

Purchase and install water meters. $110,000

Rehabilitate the fuel holding compound. $30,223

Rehabilitate Bond Street west for dust control. $16,632

DONNELLY

Purchase a tractor with attachments. $49,500

Replace a wastewater lift station pump. $10,660

Upgrade the administration building. $8,757

Haul gravel for road rehabilitation. $8,911

Replace the administration building sidewalks. $14,500

DUCHESS

Construct a recreation centre. $456,292

EDBERG

Replace a portion of the water main. $33,475

Page 28This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 29: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

EDBERG

Reline the water tower. $32,000

ELNORA

Purchase a public works truck. $16,506

EMPRESS

Upgrade utilities at Peter Fidler recreational vehicle park, including water and wastewater.

$50,000

Purchase protective firefighting equipment. $10,125

Upgrade the administration building, including the floor, lighting and windows.

$23,022

Construct a splash park at Centennial Park. $128,538

Replace water and wastewater lines. $15,000

Rehabilitate several roads. $8,665

FERINTOSH

Upgrade the water treatment plant, including main pump, pressure tanks, alarm system and fence.

$55,435

Upgrade the washrooms at Ferintosh campground, including the installation of water, lights and heat.

$45,000

FOREMOST

Rehabilitate several roads. $94,765

FORESTBURG

Replace water lines. $55,000

Rebuild 56 Street. $198,972

GALAHAD

Rehabilitate roads and sidewalks. $120,000

GLENDON

Purchase mowers and a grader. $48,937

Install a water and wastewater station. $18,350

Upgrade Rainbow Park, including street lights and speed bumps. $10,991

Replace a backhoe with bucket attachment. $11,594

GLENWOOD

Replace curb stops. $23,100

Upgrade the Pioneer Parlour and Cheese Factory Museum, including electrical, roof and cabinets.

$12,285

Page 29This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 30: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

HEISLER

Replace playground equipment. $25,000

Repave Main Street. $125,389

Replace the pumps in the west end wastewater lift station. $50,000

HILL SPRING

Replace a portion of a storm water line. $12,500

Upgrade the Community Centre, including the furniture, electrical and landscaping.

$85,900

Rehabilitate roads east of Highway 800 for dust control. $58,798

HOLDEN

Install and rehabilitate community signs. $9,270

HUGHENDEN

Replace the makeup air unit at the water treatment plant and purchase a water distribution pump.

$50,000

Replace the administration building insulation, exterior siding, and eaves.

$25,000

Replace a portion of the main waterline. $50,000

INNISFREE

Purchase a lawn mower and utility vehicle. $16,000

Purchase a loader. $40,000

Purchase a lift station pump. $9,195

Replace the roof of the administration office. $25,000

Repave a portion of 51 Street and 53 Street. $10,500

Replace a portion of road and waterline on 53 Street. $17,675

IRMA

Jointly rehabilitate the gravel Golf Course Road with the Municipal District of Wainwright.

$80,606

Rehabilitate the wastewater lagoon. $27,900

Replace a portion of sidewalk along 50 Street. $17,000

Upgrade the water treatment plant. $13,588

LINDEN

Rehabilitate several roads, including the storm water infrastructure. $569,281

MINBURN

Purchase a compressor and a tractor with attachments. $31,500

Rehabilitate the lagoon. $65,000

Page 30This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 31: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

MORRIN

Replace wastewater lines and road on Block 6 north. $323,834

MUNSON

Rehabilitate roads. $68,095

MYRNAM

Replace the fire rescue unit. $66,667

Replace the ice resurfacer. $25,714

ROSEMARY

Extend the waterline along Centre Street. $22,800

Rehabilitate the wastewater line along Iris and Rose Street. $65,000

Pave Cottonwood Crescent. $100,240

Rehabilitate the wastewater line along Railway Avenue. $140,000

RYCROFT

Upgrade a wastewater line. $187,365

RYLEY

Rehabilitate the public work buildings. $45,000

Upgrade a wastewater lift station. $120,000

Replace the roof of the Ryley Curling Club. $15,000

SPRING LAKE

Purchase a skid steer with attachments. $70,000

Install a water cistern. $25,000

Construct a multi-functional outdoor park. $380,000

STANDARD

Replace lawn tractors. $17,000

Upgrade the washrooms and signs at the campground. $9,627

STIRLING

Realign Kipp Coulee Creek and construct a berm. $115,000

Rehabilitate the Michelsen Farmstead historic site, including roof replacement and painting.

$25,465

Purchase a skid steer. $39,916

Install a storm water conduit along a portion of 6 Avenue. $22,960

Extend the wastewater line along 6 Street. $34,000

Rehabilitate the Family and Community Support Services Centre. $100,000

Page 31This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 32: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

STIRLING

Construct an equipment storage facility. $90,000

Purchase a fire rescue vehicle and pumper truck. $51,500

Pave a portion of 5 Avenue and 2 Street. $180,000

Construct a portion of a road. $65,000

STROME

Conduct a system wide review of water and wastewater lines. $50,000

Prepare a road assessment study for 48 Street. $16,728

VETERAN

Reline the wastewater main on Lucknow Street. $60,000

Construct a municipal building. $35,000

Purchase a gravel truck. $8,000

Reline several wastewater lines. $32,000

Upgrade the water pump system. $19,806

VILNA

Replace water well pump and casing. $8,890

Replace the wastewater lift station pumps and controls. $200,000

WARBURG

Complete upgrades to the water treatment plant. $74,121

WARNER

Upgrade Main Street, including curbs and gutters. $247,408

Purchase and rehabilitate distribution pumps for the water treatment plant.

$30,985

WASKATENAU

Rehabilitate several roads. $209,784

WILLINGDON

Pave 49 Street between 51 Avenue and 53 Avenue. $41,439

Purchase various pieces of maintenance equipment and public works vehicles.

$328,584

Rehabilitate the wastewater lagoon. $200,000

Summer Village Accepted Amount

HALF MOON BAY

Construct a multi-use trail. $90,000

Page 32This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 33: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

HORSESHOE BAY

Upgrade the Martin Recreation Park, including the community hall and playground.

$53,000

ISLAND LAKE

Jointly contribute funding to purchase land and construct the Baptiste Lake Fire Hall with the summer villages of West Baptiste, South Batiste, Island Lake South, Island Lake, Sunset Beach and Whispering Hills.

$87,605

ISLAND LAKE SOUTH

Pave a portion of Shank Drive and Kirby Place. $79,205

JARVIS BAY

Purchase land and develop a public works storage yard. $300,000

Replace the picnic tables and waste bins at Petro Beach. $8,389

KAPASIWIN

Replace the Village Hall deck and construct a fire pit. $35,000

Pave a portion of Railway Avenue. $102,729

LAKEVIEW

Upgrade the storm water drainage system, including installation of culverts, re-shaping swale, and replacing pavement on Bayview Drive.

$59,110

MA-ME-O BEACH

Rehabilitate a playground. $10,314

Contribute funding to the County of Wetaskiwin for the construction of the Pigeon Lake regional wastewater collection system.

$200,000

Resurface 1 Avenue between 6 and 7 Street. $103,620

NORGLENWOLD

Design and construct access stairs to the beach and docks. $170,115

Prepare a wastewater capacity study. $27,494

PARKLAND BEACH

Design and rehabilitate the storm water system. $25,458

Rehabilitate several roads $93,500

Purchase a tractor. $25,000

SANDY BEACH

Rehabilitate Lakeshore Drive. $35,060

SEBA BEACH

Rehabilitate the Seba Beach Heritage Pavilion. $45,000

Page 33This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 34: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

SEBA BEACH

Replace a portion of 1 Avenue including culverts, bridge railings, and swale.

$235,000

SOUTH VIEW

Evaluate and upgrade the drainage system for the recreational park area.

$24,000

Upgrade the boat launch ramp. $20,000

SUNBREAKER COVE

Stabilize a portion of the shoreline. $138,982

Prepare a storm water study. $37,500

Rehabilitate pathways. $138,750

SUNRISE BEACH

Upgrade Victory Road and Shedden Drive. $238,818

WAIPAROUS

Pave a portion of road. $193,000

WEST COVE

Rehabilitate the community hall and purchase kitchen equipment. $35,850

Construct a municipal maintenance building. $50,000

YELLOWSTONE

Upgrade the video surveillance monitoring system on the main road.

$12,000

Improvement District Accepted Amount

I.D. NO. 12 (JASPER NATIONAL PARK)

Contribute funding to the Municipality of Jasper to purchase a fire pumper truck.

$320,000

I.D. NO. 13 (ELK ISLAND)

Contribute funding to Parks Canada to upgrade water and wastewater lines, and a wastewater lagoon.

$304,549

I.D. NO. 24 (WOOD BUFFALO)

Purchase a loader. $150,000

IMPROVEMENT DISTRICT NO. 349

Contribute funding to the City of Cold Lake to upgrade the wastewater system.

$400,000

Contribute funding to the City of Cold Lake to expand the salt storage building.

$165,000

Page 34This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.

Page 35: MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL · CROWSNEST PASS, Municipality of Demolish the Crowsnest Center and rehabilitate the site. $250,000 Prepare a recreation infrastructure

MUNICIPAL SUSTAINABILITY INITIATIVE - CAPITAL

2014 Accepted Projects Report

KANANASKIS IMPROVEMENT DISTRICT

Purchase an emergency services water tender truck. $297,899

Special Area Accepted Amount

SPECIAL AREAS BOARD

Purchase graders. $1,466,668

Purchase gravel for road rehabilitation. $10,600,000

Metis Settlement Accepted Amount

BUFFALO LAKE METIS SETTLEMENT

Purchase a rubber tire backhoe. $137,000

Gravel several roads. $83,366

Purchase a fire response vehicle. $35,000

Purchase a mower. $35,000

ELIZABETH METIS SETTLEMENT

Rehabilitate several roads. $155,656

Purchase water distribution trucks. $229,677

Purchase a sanding truck. $15,000

Purchase a garbage truck. $60,000

Purchase a vacuum truck. $45,000

Purchase public works equipment including a pickup truck and a utility trailer.

$42,000

PADDLE PRAIRIE METIS SETTLEMENT

Upgrade the Paddle Prairie Communiplex. $115,528

Rehabilitate the water treatment building. $33,887

Purchase tractors. $75,000

PEAVINE METIS SETTLEMENT

Purchase a water truck. $350,000

Construct the Peavine Arena. $148,418

Other Accepted Amount

TOWNSITE OF REDWOOD MEADOWS ADMIN SOC

Enhance and extend the flood berm. $175,000

Purchase a public works maintenance vehicle. $50,000

Rehabilitate the waterlines. $47,134

Page 35This report reflects the name and status in effect for each municipality at the time the report was produced. Project descriptions and amounts include accepted amendments as of May 20, 2015.