mumbai slum improvement board · by the executive engineer (city) division mumbai slum improvement...

18
MUMBAI SLUM IMPROVEMENT BOARD A REGIONAL UNIT OF (MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484 E-mail- [email protected] Ref. No. EE/City/MSIB / e-tender / 28 / 2019-20 e-TENDER NOTICE Digitally Signed & unconditional online Tender in form ``B-1'' (Percentage Rate) are invited by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai 400 051 from the contractors registered with PWD /MHADA /CPWD / CIDCO / MES / MJP / MIDC / Indian Railway / BPT / MCGM / in the corresponding appropriate class of contractor or any Govt. / Semi Govt. organization. Sr. No Name of Works Estimated cost E.M.D. 1% of Estimated cost Security Deposit 2% (1% in the form of FDR and 1% through RA Bills) Registration (Class) of Contractor Tender Price including 12% GST in Rs. Time limit for completio n of work 1 Beautification of Udyan and Seating Arrangement at Kamgar Maidan, Prabhadevi (MMNPSY-Sp-Fund) (Wadala) 2145518.00 21455.00 42910.00 ClassV-A & above 560.00 12 Months (including monsoon) 2 Construction of Drain and Passage at Madona Colony, S. D. Road, Wadala (E) (MMNPSY-Sp-Fund) (Wadala) 2102607.00 21026.00 42052.00 ClassV-A & above 560.00 12 Months (including monsoon) 3 Construction of Drain and Passage at Sarvajanik Navratra Utsav Mandal, Shroff Market, Dadar (W) (MMNPSY-Sp-Fund) (Wadala) 1287311.00 12873.00 25746.00 ClassVI & above 560.00 12 Months (including monsoon) 4 Renovation of Toilet and Construction of Drain and Passage at Bhausaheb Desai Wadi, Senapati Bapat Marg, Dadar (W) (MMNPSY-Sp-Fund) (Wadala) 1544773.00 15448.00 30896.00 ClassV-A & above 560.00 12 Months (including monsoon) 5 Providing and Laying Water Supply Line and Construction of Drain and Passage at Khapridev Mitra Mandal, Prabhadevi (MMNPSY-Sp-Fund) (Wadala) 1458952.00 14590.00 29180.00 ClassVI & above 560.00 12 Months (including monsoon) 6 Asphalting of Road at Bhoiwada Police Station, Parel (MMNPSY-Sp-Fund) (Wadala) 1888055.00 18881.00 37762.00 ClassV-A & above 560.00 12 Months (including monsoon)

Upload: others

Post on 20-Mar-2020

0 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

MUMBAI SLUM IMPROVEMENT BOARD A REGIONAL UNIT OF

(MAHARASHTRA HOUSING AND AREA DEVELOPMENT AUTHORITY) Tel No.022-66405484 E-mail- [email protected]

Ref. No. EE/City/MSIB / e-tender / 28 / 2019-20

e-TENDER NOTICE

Digitally Signed & unconditional online Tender in form ``B-1'' (Percentage Rate) are invited

by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of

MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai 400 051

from the contractors registered with PWD /MHADA /CPWD / CIDCO / MES / MJP / MIDC

/ Indian Railway / BPT / MCGM / in the corresponding appropriate class of contractor or any

Govt. / Semi Govt. organization.

Sr.

No

Name of Works

Estimated cost E.M.D.

1% of

Estimated

cost

Security

Deposit 2%

(1% in the

form of

FDR and

1% through

RA Bills)

Registration

(Class) of

Contractor

Tender

Price

including

12%

GST in

Rs.

Time limit

for

completio

n of work

1 Beautification of Udyan and

Seating Arrangement at Kamgar

Maidan, Prabhadevi

(MMNPSY-Sp-Fund) (Wadala)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

2 Construction of Drain and

Passage at Madona Colony, S. D.

Road, Wadala (E)

(MMNPSY-Sp-Fund) (Wadala)

2102607.00 21026.00 42052.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

3 Construction of Drain and

Passage at Sarvajanik Navratra

Utsav Mandal, Shroff Market,

Dadar (W)

(MMNPSY-Sp-Fund) (Wadala)

1287311.00 12873.00 25746.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

4 Renovation of Toilet and

Construction of Drain and

Passage at Bhausaheb Desai

Wadi, Senapati Bapat Marg,

Dadar (W)

(MMNPSY-Sp-Fund) (Wadala)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

5 Providing and Laying Water

Supply Line and Construction of

Drain and Passage at Khapridev

Mitra Mandal, Prabhadevi

(MMNPSY-Sp-Fund) (Wadala)

1458952.00 14590.00 29180.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

6 Asphalting of Road at Bhoiwada

Police Station, Parel

(MMNPSY-Sp-Fund) (Wadala)

1888055.00 18881.00 37762.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

Page 2: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

7 Renovation of Samaj Mandir

Near Dutta Mandir, G. D.

Ambekar Marg, Naigaon

(MMNPSY-Sp-Fund) (Wadala)

1201490.00 12015.00 24030.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

8 Providing and Laying Water

Supply Line and Concreting

Work at Baithi Chawl No.1 to 6,

Spring Mill Compound, G. D.

Ambekar Marg, Naigaon

(MMNPSY-Sp-Fund) (Wadala)

2102607.00 21026.00 42052.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

9 Construction of Drain and

Passage and Concreting Work at

Sahakar Nagar, Wadala (E)

(MMNPSY-Sp-Fund) (Wadala)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

10 Construction of Open

Sabhagruha and Fixing

Ladikaran at Takshila Budha

Vihar, Gautam Nagar, Dadar (E)

(MMNPSY-Sp-Fund) (Wadala)

1888055.00 18881.00 37762.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

11 Seating Arrangement for Senior

Citizen Various Place at

Naigaon, Dadar (E)

(MMNPSY-Sp-Fund) (Wadala)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

12 Construction of Drain and

Passage Near Sita Sadan, G. D.

Ambekar Marg, Naigaon

(MMNPSY-Sp-Fund) (Wadala)

1287311.00 12873.00 25746.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

13 Providing and Laying Water

Supply Line and Construction of

Passage at Shastri Nagar, Shivdi

Cross Road, Wadala

(MMNPSY-Sp-Fund) (Wadala)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

14 Providing and Laying Water

Supply Line and Construction of

Passage at Ahmed Sailor

Compound, Naigaon

(MMNPSY-Sp-Fund) (Wadala)

1716414.00 17164.00 34328.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

15 Providing and Fixing Tiles and

Checkers Ladi Near Klash

Society, Kakasaheb Gadgil Marg,

Elphinstone

(MMNPSY-Sp-Fund) (Wadala)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

16 Construction of Open

Sabhagruha and Concreting

Work at Dnyaneshwar Nagar,

Jerbai Wadiya Road, Wadala

(MMNPSY-Sp-Fund) (Wadala)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

17 Renovation of Toilet and

Construction of Passage at Dadar

Railway Police Quarters,

Dadar (E)

(MMNPSY-Sp-Fund) (Wadala)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

Page 3: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

18 Construction of Drain and

Passage and Fixing Ladikaran

Near Swami Samartha Math,

Jerbai Wadiya Road, Wadala

(MMNPSY-Sp-Fund) (Wadala)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

19 Construction of Drain and

Passage Near Mahatma Gandhi

Chowk, S. S. Wagh Marg

Naigaon

(MMNPSY-Sp-Fund) (Wadala)

1716414.00 17164.00 34328.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

20 Construction of Drain and

Passage Near Sai Sharda Society,

Bhavani Shankar Road,

Dadar (E)

(MMNPSY-Sp-Fund) (Wadala)

1802235.00 18022.00 36044.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

21 Fixing Ladikaran and

Construction of Drain and

Passage Near Siddhi Bal Pragati

Mandal, Dahivalkar Buva Marg,

Naigaon

(MMNPSY-Sp-Fund) (Wadala)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

22 Construction of Drain and

Passage at Mourya Mitra

Mandal, Dainik Shivner Marg,

Worli

(MMNPSY-Sp-Fund) (Worli)

2141227.00 21412.00 42824.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

23 Providing and Laying Drainage

Line and Construction of Passage

at Saptabandhu Mitra Mandal,

D. S. Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

24 Construction of Drain and

Passage Near Lady Ratan

Complex Building No.2 and 4,

D. S. Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1888055.00 18881.00 37762.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

25 Construction of Drain and

Passage Near Lady Ratan

Complex Building No.11 and 12,

D. S. Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1973876.00 19739.00 39478.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

26 Construction of Drain and

Passage at Arvind Nagar Seva

Sangh, S. S. Wagh Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1501862.00 15019.00 30038.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

27 Construction of Open

Sabhagruha and Drain and

Passage Near Century Quarters,

Building No.3 and 4, P. B. Marg,

Worli

(MMNPSY-Sp-Fund) (Worli)

1115669.00 11157.00 22314.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

Page 4: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

28 Construction of Open

Sabhagruha at Shri. Saibaba Seva

Samiti Near Arthur Road Jail,

Satrasta

(MMNPSY-Sp-Fund) (Worli)

1029848.00 10298.00 20596.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

29 Construction of Open

Sabhagruha and Fixing

Ladikaran at Jay Durgamata

Mitra Mandal, G. M. Bhosale

Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1531900.00 15319.00 30638.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

30 Construction of Open

Sabhagruha and Reconstruction

of Toilet at Suprabhat Krida

Mandal, D. N. Vikrikar Marg,

Worli

(MMNPSY-Sp-Fund) (Worli)

1029848.00 10298.00 20596.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

31 Reconstruction of Samaj Mandir

at Namrata Mitra Mandal, Worli

Koliwada

(MMNPSY-Sp-Fund) (Worli)

1201490.00 12015.00 24030.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

32 Construction of Open

Sabhagruha at Sai Seva Mandal,

Golfadevi Road, Worli Koliwada

(MMNPSY-Sp-Fund) (Worli)

1716414.00 17164.00 34328.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

33 Construction of Sabhagruha and

Otta at Amar Krida Mandal,

G. M. Bhosale Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

34 Providing and Laying Water

Supply Line at Kamgar Nagar,

N. M. Joshi Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1287311.00 12873.00 25746.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

35 Construction of Drain and

Passage Near Tapovan Building

No.A and B, Senapati Bapat

Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1029848.00 10298.00 20596.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

36 Construction of Open

Sabhagruha Near Santoshimata

Mandir, Golfadevi Road, Worli

(MMNPSY-Sp-Fund) (Worli)

1373131.00 13731.00 27462.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

37 Construction of Open

Sabhagruha at Jain Mitra

Mandal, Janta Colony, Worli

Koliwada, Worli

(MMNPSY-Sp-Fund) (Worli)

858207.00 8582.00 17164.00 Class–

VII & above

560.00 9 Months

(including

monsoon)

38 Construction of Drain and

Passage Near Saibaba Mandir,

Golfadevi Road, Worli

Koliwada, Worli

(MMNPSY-Sp-Fund) (Worli)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

Page 5: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

39 Fixing Ladikaran and

Construction of Drain and

Seating Arrangement at Nav

Hans Mitra Mandal, Jay Durga

Mandal, G.M. Bhosale Marg,

Worli

(MMNPSY-Sp-Fund) (Worli)

1373131.00 13731.00 27462.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

40 Laying Drainage Pipe Line and

Fixing Ladikaran Near

Panchratna Society, Dr. A. B.

Road, Worli

(MMNPSY-Sp-Fund) (Worli)

1716414.00 17164.00 34328.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

41 Seating Arrangement for Citizen

and Beautification Work at

Babasaheb Ambedkar Maidan,

S. S. Amrutwar Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1287311.00 12873.00 25746.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

42 Providing and Fixing Ladikaran

and Seating Arrangement Near

Bhogodevi Sports Club Near

Rajhans Mandal, G. M. Bhosale

Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

858207.00 8582.00 17164.00 Class–

VII & above

560.00 9 Months

(including

monsoon)

43 Providing and Laying Water

Supply Line and Fixing

Ladikaran Near Yashwant Krida

Mandal, S. S. Amrutwar Marg,

Worli

(MMNPSY-Sp-Fund) (Worli)

1287311.00 12873.00 25746.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

44 Providing and Laying Water

Supply Line and Fixing

Ladikaran at Prem Nagar, B. G.

Kher Marg, Worli

(MMNPSY-Sp-Fund) (Worli)

1158579.00 11586.00 23172.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

45 Construction of Drain and

Passage and Laying Water

Supply Line at Mahatma Phule

Nagar Behind Nehru Tarangan,

Worli

(MMNPSY-Sp-Fund) (Worli)

875371.00 8754.00 17508.00 Class–

VII & above

560.00 9 Months

(including

monsoon)

46 Renovation of Vachnalay at

Wagheshwari Sangh, Sakharam

Lanjekar Marg, Shivdi

(MMNPSY-Sp-Fund) (Shivdi)

429104.00 4291.00 8582.00 Class–

VIII &

above

560.00 6 Months

(including

monsoon)

47 Reconstruction of Samaj Mandir

at Ambewadi Krida Mandal,

Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

48 Reconstruction of Toilet and

Construction of Drain and

Passage Near Shramik Samaj

Kalyan Sahakari Sanstha,

Jijamata Nagar, Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

Page 6: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

49 Reconstruction of Samaj Mandir

Near Laxmi Narayan Mandir,

Parelgaon, Parel

(MMNPSY-Sp-Fund) (Shivdi)

1716414.00 17164.00 34328.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

50 Construction of Open

Sabhagruha Near Om Roop

Building, Dattaram Lad Marg,

Shivdi

(MMNPSY-Sp-Fund) (Shivdi)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

51 Seating Arrangement for Senior

Citizen at Jijamata Nagar,

Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

52 Seating Arrangement for Senior

Citizen Various Place at Shivdi

Constituency

(MMNPSY-Sp-Fund) (Shivdi)

2145518.00 21455.00 42910.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

53 Reconstruction of Samaj Mandir

and Construction of Drain and

Passage Near Ganesh Krupa

Sahakari Sanstha, Jijamata

Nagar, Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

1802235.00 18022.00 36044.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

54 Reconstruction of Toilet and

Construction of Drain and

Passage Near Gagangiri Sahakari

Sanstha, Jijamata Nagar,

Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

1845145.00 18451.00 36902.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

55 Reconstruction of Samaj Mandir

and Construction of Open

Sabhagruha and Drain and

Passage Near Saiprasad Sahakari

Sanstha, Jijamata Nagar,

Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

1930966.00 19310.00 38620.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

56 Reconstruction of Toilet and

Construction of Drain and

Passage Near Parivartan

Gruhanirman Sanstha, Jijamata

Nagar, Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

1630593.00 16306.00 32612.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

57 Reconstruction of Toilet and

Construction of Drain and

Passage Near Hanuman

Gruhanirman Sanstha, Jijamata

Nagar, Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

1973876.00 19739.00 39478.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

Page 7: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

58 Reconstruction of Toilet and

Construction of Drain and

Passage Near Ekvira

Gruhanirman Sanstha, Jijamata

Nagar, Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

(MMNPSY-Sp-Fund) (Shivdi)

2102607.00 21026.00 42052.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

59 Providing and Laying Water

Supply Line Near Shriram

Darshan Gruhanirman Sanstha,

Fitwala Road, Elphinsotne

(MMNPSY-Sp-Fund) (Shivdi)

1458952.00 14590.00 29180.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

60 Reconstruction of Samaj at

Balvikas Mandal, Lalbaug

Market, Lalbaug

(MMNPSY-Sp-Fund) (Shivdi)

1029848.00 10298.00 20596.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

61 Reconstruction of Samaj at

Parichay Seva Mandal, Dr. B. A.

Road, Lalbaug

(MMNPSY-Sp-Fund) (Shivdi)

1888055.00 18881.00 37762.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

62 Construction of Open

Sabhagruha and Fixing

Ladikaran at Sarvajanik

Ganeshotsav Mandal, Sakharam

Balaji Pawar Marg Near Ganesh

Darshan Society, N. M. Joshi

Marg, Curry Road

(MMNPSY-Sp-Fund) (Shivdi)

1373131.00 13731.00 27462.00 Class–

VI & above

560.00 12

Months

(including

monsoon)

63 Providing and Laying Water

Supply Line Near Old Post

Society, Shivdi Corss Road Near

Chawl No.26

(MMNPSY-Sp-Fund) (Shivdi)

1888055.00 18881.00 37762.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

64 Construction of Open

Sabhagruha at Sarvajanik

Ganeshotsav Mandal Premises

Hafkit, Dr. Borjes Marg, Parel

(MMNPSY-Sp-Fund) (Shivdi)

1201490.00 12015.00 24030.00 Class–

VI & above

560.00 9 Months

(including

monsoon)

65 Reconstruction of Vyayamshala

at Vijay Prakash Saravjanik

Ganeshotsav Mandal, Badani

Bohari Chawl, Gas Company

Lane, Lalbaug

(MMNPSY-Sp-Fund) (Shivdi)

1888055.00 18881.00 37762.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

66 Construction of Compound Wall

and Open Sabhagruha Near

Bharat Niwas, Sarvajanik

Navratroutsav Mandal Vibhag,

Mauli Chawl, Parmar Guruji

Marg, Parel

(MMNPSY-Sp-Fund) (Shivdi)

1587683.00 15877.00 31754.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

Page 8: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

67 Construction of Open

Sabhagruha and Asphalting of

Road at Sita Sadan, Bhadekaru

Sangh, Dattaram Lad Marg,

Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

1544773.00 15448.00 30896.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

68 Asphalting of Road Near

Zhaveri Bunglow, Kalachowky,

Mumbai-33

(MMNPSY-Sp-Fund) (Shivdi)

1458952.00 14590.00 29180.00 Class–

VI & above

560.00 9 Months

(including

monsoon)

69 Reconstruction of Samaj and

Laying Water Supply Line at

Sainath Sevan Mandal,

Parshuram Nagar, Gagangiri

Maharaj Chawl Committee,

Jijamata Nagar, Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

1630593.00 16306.00 32612.00 Class–

V-A &

above

560.00 12

Months

(including

monsoon)

70 Reconstruction of Abhyasika at

Sarvajanik Ganeshotsav Mandal,

East Ward, Jiajamata Nagar,

G. D. Ambekar Marg,

Kalachowky

(MMNPSY-Sp-Fund) (Shivdi)

858207.00 8582.00 17164.00 Class–

VII & above

560.00 9 Months

(including

monsoon)

Sr.

No

Stage Desc.

Date of Time period

1 Publishing Date 01.11.2019, 10.00

2 Document sale start 01.11.2019, 10.05

3 Document sale end 14.11.2019, 17.35

4 Bid Submission start 01.11.2019, 10.05

5 Bid Submission end 14.11.2019, 17.35

6 Technical Bid Opening 15.11.2019, 17.35 onward

7 Price Bid Opening 18.11.2019, 10.05 onward

1. The Complete bidding process will be online (e-Tendering) in two bid system. All the

notifications and detailed terms and conditions regarding this tender notice hereafter will be

published on line on website https://mahatenders.gov.in

MHADA Website –https://mhada.maharashtra.gov.in

2. Bidding documents can be loaded on the website https://mahatenders.gov.in from

Date 01.11.2019 at 10.05 to Date 14.11.2019 up to 17.35

3. The payment for Tender Form Fee and Earnest Money Deposit (EMD) must be made online

4. Technical Bids will be opened on dt.15.11.2019 from 17.35 onwards & Price bids

will be opened on dt.18.11.2019 from 10.05 onwards at the office of the

Executive Engineer (City) / M S I B Room no. 539 4th Floor MHADA Kalanagar Bandra (East)

Mumbai – 400 051 on web site http://mahatenders.gov.in

5. e-Tenderers should submit original documents (those were uploaded during bid preparation) for

verification at the time of Technical Bid opening.

6. e-Tenderer should submit information and scanned copies in pdf format in Technical Envelope

as mentioned in Technical Offer.

7. e-Tenderer should have valid class II/ III Digital Signature certificate (DSC) obtained from any

certifying authority.

Page 9: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

8. The Executive Engineer (City) / M.S.I. Board MHADA Kalanagar Bandra (East) Mumbai – 51

reserves the right to accept or reject any or all tenders without assigning any reason.

9. e-Tenderer shall refer detailed tender notice regarding Performance Security & other documents

to be submitted.

10. e-Tender should upload GST Registration Certificate.

11. Tender Called is based on SSR rate year 2017-18 without GST. GST will be paid on accepted

contract value.

12. Guidelines regarding e-tendering system and submission of bids can be download from website

http://mahatenders.gov.in, Help support: 1800-307-02232 E-Mail – [email protected]

13. In case of the rates quoted by lowest bidder less than estimated cost & L1 bidder failed to submit

Additional Performance Security Deposit within 8 days, then L-2 (2nd Lowest) bidder will be

asked and if L-2 is agree to carryout the work below % than L-1 quoted rate then his offer will be

accepted. For more information please refer detail Tender notice.

Sd/-

(D.N. Suryawanshi)

Executive Engineer (City)

M. S I B Board

Page 10: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

½ãìâºãƒÃ ¢ããñ¹ã¡¹ã›á›ãè Ôãì£ããÀ ½ãâ¡ß

½ãÖãÀãÓ›È ØãðÖãä¶ã½ããÃ¥ã àãñ¨ããäÌã‡ãŠãÔã Ìã ¹ãÆããä£ã‡ãŠÀ¥ããÞãñ Ü㛇㊠½ãâ¡ß

ãä¶ããäÌãªã ÔãìÞã¶ãã ‰ãŠ.:- ‡ãŠã. ‚ã. ÎãÖÀ) / ½ãìâ.¢ããñ.Ôãì.½ãâ¡ß/ ƒÃ-ãä¶ããäÌãªã/ 28 / 2019-20

ƒÃ-ãä¶ããäÌãªã

‡ãŠã¾ãÇãŠãÀãè ‚ããä¼ã¾ãâ¦ãã [ÎãÖÀ] ãäÌã¼ããØã ½ãìâºãƒÃ ¢ããñ¹ã¡¹ã›á›ãè Ôãì£ããÀ ½ãâ¡ß ½ãÖãÀãÓ›È ØãðÖãä¶ã½ããÃ¥ã Ìã àãñ¨ããäÌã‡ãŠãÔã ¹ãÆããä£ã‡ãŠÀ¥ããÞãã

Ü㛇ãŠ) ŒããñË ‰ãŠ. 539 Þããõ©ãã ½ã•ãËã ØãðÖãä¶ã½ããå㠼ãÌã¶ã Ìããâ³ñ ¹ãîÌãÃ) ½ãìâºãƒÃ-400 051 ¾ããâ¶ããè ŒããËãè ªÎãÃãäÌãËñʾãã ‡ãŠã½ãã‡ãŠÀãè¦ãã

½ãÖãÀãÓ›È ØãðÖãä¶ã½ããÃ¥ã Ìã àãñ¨ããäÌã‡ãŠãÔã ¹ãÆããä£ã‡ãŠÀ¥ãã‡ãŠ¡ñ/ ÔããÌãÕããä¶ã‡ãŠ ºããâ£ã‡ãŠã½ã ãäÌã¼ããØã ½ãÖãÀãÓ›È ÎããÔã¶ã/ãäÔã¹ãã衺Ëî¡ãè/†½ãƒÃ†Ôã/½ãìâºãƒÃ

½ã¶ãÖã¶ãØãÀ¹ãããäˇãŠã / ãäÔ㡇ãŠãñ/ ºããè¹ããè›ãè/†½ã‚ãã¾ã¡ãèÔããè /†½ã.•ãñ.¹ããè. ¾ããâÞãñ‡ãŠ¡ñ ¶ããòª¥ããè‡ãðŠ¦ã Ÿñ‡ãñŠªãÀã‡ãŠ¡î¶ã ºããè-1 ›‡ã‹‡ãñŠÌããÀãè ¶ã½ã춾ãã¦ã)

‚ããù¶ãËãƒÃ¶ã ƒÃ ãä¶ããäÌãªã ½ããØããäÌ㥾ãã¦ã ¾ãñ¦ã ‚ããÖñ¦ã.

ƒÃ

ãä¶ããäÌãªã

‰ãŠ

‡ãŠã½ããÞãñ ¶ããÌã ãä¶ããäÌãªñÞãñ

‚ãâªã•ã¹ã¨ã‡ãŠãè¾ã À‡ã‹‡ãŠ½ã

ƒÔããÀã À‡ã‹‡ãŠ½ã

‚ãâªã•ã¹ã¨ã‡ãŠãè¾ã

À‡ã‹‡ãŠ½ãñÞ¾ãã )

ÔãìÀàãã ‚ã¶ãã½ã¦ã

À‡ã‹‡ãŠ½ã

‚ãâªã•ã¹ã¨ã‡ãŠãè¾ã

À‡ã‹‡ãŠ½ãñÞ¾ãã 2%)

‡ãŠ¨ãã⛪ãÀ

¶ããòª¥ããè

ÌãØãÃÌããÀãè

ãä¶ããäÌãªã

À‡ã‹‡ãŠ½ã

12%

ÌÖù›ÔãÖãè¦ã)

‡ãŠã½ããÞãã

‡ãŠãËãÌã£ããè

1 ‡ãŠã½ãØããÀ ½ãõªã¶ã, ¹ãƼããªñÌããè ¾ãñ©ãñ „²ãã¶ããÞãñ

Ôããöª¾ããê‡ãŠÀ¥ã ‡ãŠÀ¥ãñ Ìã ‚ããÔã¶ã ̾ãÌãÔã©ãã

‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

2 ½ãù¡ãñ¶ãã ‡ãŠãù˶ããè, †Ôã.¡ãè.Àãñ¡, Ìã¡ãßã

(¹ãîÌãÃ) ¾ãñ©ãñ Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

2102607.00 21026.00 42052.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

3 ÔããÌãÕããä¶ã‡ãŠ ¶ãÌãÀã¨ã „¦ÔãÌã ½ãâ¡ß, Ñããù¹ãŠ

½ãã‡ãóŠ›, ªãªÀ (¹ã) ¾ãñ©ãñ Øã›ãÀñ Ìã

¹ãã¾ãÌãã›ã ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1287311.00 12873.00 25746.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

4 ¼ãã…ÔããÖñºã ªñÔããƒÃ Ìãã¡ãè, Ôãñ¶ãã¹ã¦ããè ºãã¹ã›

½ããØãÃ, ªãªÀ (¹ã) ¾ãñ©ãñ ÎããõÞãã˾ããÞãñ

¶ãì¦ã¶ããè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã

ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

5 Œãã¹ãÀãèªñÌã ãä½ã¨ã ½ãâ¡ß, ¹ãƼããªñÌããè ¾ãñ©ãñ

¹ã㥾ããÞããè ËãƒÃ¶ã ›ã‡ãŠ¥ãñ Ìã Øã›ãÀñ Ìã

¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1458952.00 14590.00 29180.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

6 ¼ããñƒÃÌãã¡ã ¹ããñãäËÔã Ô›ñÎã¶ã, ¹ãÀñË ¾ãñ©ãñ

¡ãâºãÀãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1888055.00 18881.00 37762.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

Page 11: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

7 ª¦¦ã ½ãâãäªÀã•ãÌãß, Øã.ª.‚ããâºãñ‡ãŠÀ ½ããØãÃ,

¶ãã¾ãØããâÌã ¾ãñ©ãñ Ôã½ãã•ã ½ãâãäªÀãÞãñ

¶ãì¦ã¶ããè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1201490.00 12015.00 24030.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

8 ºãõŸãè Þããß ‰ãŠ.1 ¦ãñ 6, ãäÔ¹ãÆâØã ãä½ãË

‡ã⊹ãã…â¡, Øã.ª.‚ããâºãñ‡ãŠÀ ½ããØãÃ, ¶ãã¾ãØããâÌã

¾ãñ©ãñ •ãËÌãããäÖ¶ããè ›ã‡ãŠ¥ãñ Ìã

‡ãŠãúãä‰ãŠ›ãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

2102607.00 21026.00 42052.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

9 ÔãÖ‡ãŠãÀ ¶ãØãÀ, Ìã¡ãßã (¹ãîÌãÃ) ¾ãñ©ãñ Øã›ãÀñ

Ìã ¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ Ìã ‡ãŠãúãä‰ãŠ›ãè‡ãŠÀ¥ã

‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

10 ¦ãàããäÎãËã ºã죪 ãäÌãÖãÀ, Øããõ¦ã½ã ¶ãØãÀ,

ªãªÀ (¹ãîÌãÃ) ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ ºããâ£ã¥ãñ Ìã

Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1888055.00 18881.00 37762.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

11 ¶ãã¾ãØããâÌã, ªãªÀ (¹ãîÌãÃ) ¾ãñ©ãñ ãäÌããäÌã£ã

ã䟇ãŠã¥ããè •¾ãñÓŸ ¶ããØãÀãè‡ãŠãâÔããŸãè ‚ããÔã¶ã

̾ãÌãÔ©ãã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

12 ãäÔã¦ãã Ô㪶㠕ãÌãß, Øã.ª.‚ããâºãñ‡ãŠÀ ½ããØãÃ,

¶ãã¾ãØããâÌã ¾ãñ©ãñ Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1287311.00 12873.00 25746.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

13 ÎããÔ¨ããè ¶ãØãÀ, ãäÎãÌã¡ãè ‰ãŠãùÔã Àãñ¡, Ìã¡ãßã

¾ãñ©ãñ •ãËÌãããäÖ¶ããè ›ã‡ãŠ¥ãñ Ìã ¹ãã¾ãÌãã›ã

‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

14 ‚ãֽ㪠ÔãñËÀ ‡ã⊹ãã…â¡, ¶ãã¾ãØããâÌã ¾ãñ©ãñ

•ãËÌãããäÖ¶ããè ›ã‡ãŠ¥ãñ Ìã ¹ãã¾ãÌãã›ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1716414.00 17164.00 34328.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

15 ‡ã‹ËÎã ÔããñÔãã¾ã›ãè •ãÌãß, ‡ãŠã‡ãŠãÔããÖñºã

Øãã¡Øããèß ½ããØãÃ, †Ëãä¹ãŠ¶Ô›¶ã ¾ãñ©ãñ

›ãƒÃÊÔã ºãÔããäÌã¥ãñ Ìã Þãñ‡ãŠÔãà Ëãªãè

ºãÔããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

16 —ãã¶ãñÑÌãÀ ¶ãØãÀ, •ãñÀºããƒÃ Ìãã¡ãè¾ãã Àãñ¡,

Ìã¡ãßã ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ ºããâ£ã¥ãñ Ìã

‡ãŠãúãä‰ãŠ›ãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

Page 12: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

17 ªãªÀ ÀñÊÌãñ ¹ããñãäËÔã ‡ã‹Ìãã›ÔãÃ, ªãªÀ (¹ãîÌãÃ)

¾ãñ©ãñ ÎããõÞãã˾ããÞãñ ¶ãì¦ã¶ããè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ Ìã

¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

18 ÔÌãã½ããè Ôã½ã©ãà ½ãŸã•ãÌãß, •ãñÀºããƒÃ

Ìãã¡ãè¾ãã Àãñ¡, Ìã¡ãßã ¾ãñ©ãñ Øã›ãÀñ Ìã

¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ Ìã Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

19 ½ãÖ㦽ãã Øããâ£ããè Þããõ‡ãŠã•ãÌãß, †Ôã.†Ôã.ÌããÜã

½ããØãÃ, ¶ãã¾ãØããâÌã ¾ãñ©ãñ Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã

ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1716414.00 17164.00 34328.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

20 ÔããƒÃ ÎããÀªã ÔããñÔãã¾ã›ãè •ãÌãß, ¼ãÌãã¶ããè

Îãâ‡ãŠÀ Àãñ¡, ªãªÀ (¹ãîÌãÃ) ¾ãñ©ãñ Øã›ãÀñ Ìã

¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

1802235.00 18022.00 36044.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

21 ãäÔ㣪ãè ºããË ¹ãÆØã¦ããè ½ãâ¡ßã•ãÌãß,

ªÖãèÌãˇãŠÀ ºãìÌãã ½ããØãÃ, ¶ãã¾ãØããâÌã ¾ãñ©ãñ

Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã

ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (Ìã¡ãßã)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

22 ½ããõ¾ããà ãä½ã¨ã ½ãâ¡ß, ªõãä¶ã‡ãŠ ãäÎãÌã¶ãñÀ ½ããØãÃ,

ÌãÀßãè ¾ãñ©ãñ Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

2141227.00 21412.00 42824.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

23 Ô㹦ãºãâ£ãì ãä½ã¨ã ½ãâ¡ß, ¡ãè.†Ôã.½ããØãÃ,

ÌãÀßãè ¾ãñ©ãñ ¡Èñ¶ãñ•ã ËãƒÃ¶ã ›ã‡ãŠ¥ãñ Ìã

¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

24 Ëñ¡ãè À¦ã¶ã ‡ãŠãù½¹ãËñ‡ã‹Ôã ƒ½ããÀ¦ã ‰ãŠ.2 Ìã

4 •ãÌãß, ¡ãè.†Ôã.½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ

Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1888055.00 18881.00 37762.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

25 Ëñ¡ãè À¦ã¶ã ‡ãŠãù½¹ãËñ‡ã‹Ôã ƒ½ããÀ¦ã ‰ãŠ.11 Ìã

12 •ãÌãß, ¡ãè.†Ôã.½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ

Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1973876.00 19739.00 39478.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

26 ‚ãÀãäÌã⪠¶ãØãÀ ÔãñÌãã ÔãâÜã, †Ôã.†Ôã.ÌããÜã

½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã

ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1501862.00 15019.00 30038.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

Page 13: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

27 ÔãòÞãîÀãè ‡ãŠãù›ÔãÃ, ƒ½ããÀ¦ã ‰ãŠ.3 Ìã 4

•ãÌãß, ¹ããè.ºããè.½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ ŒãìËñ

Ôã¼ããØãðÖ ºããâ£ã¥ã ñÌã Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã

ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1115669.00 11157.00 22314.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

28 Ñããè.ÔããƒÃºããºãã ÔãñÌãã Ôããä½ã¦ããè, ‚ãã©ãÃÀ Àãñ¡

•ãË •ãÌãß Ôãã¦ãÀÔ¦ãã ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ

ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1029848.00 10298.00 20596.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

29 •ã¾ã ªìØããà ½ãã¦ãã ãä½ã¨ã ½ãâ¡ß,

•ããè.†½ã.¼ããñÔãËñ ½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ ŒãìËñ

Ôã¼ããØãðÖ ºããâ£ã¥ãñ Ìã Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1531900.00 15319.00 30638.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

30 Ôãì¹ãƼãã¦ã ãä‰ãŠ¡ã ½ãâ¡ß, ¡ãè.†¶ã.ãäÌã‰ãŠãè‡ãŠÀ

½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ ºããâ£ã¥ãñ

Ìã ÎããõÞãã˾ããÞããè ¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1029848.00 10298.00 20596.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

31 ¶ã½ãƦãã ãä½ã¨ã ½ãâ¡ß, ÌãÀßãè ‡ãŠãñßãèÌãã¡ã

¾ãñ©ãñ Ôã½ãã•ã ½ãâãäªÀãÞããè ¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1201490.00 12015.00 24030.0ì0 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

32 ÔããƒÃ ÔãñÌãã ½ãâ¡ß, ØããñʹãŠãªñÌããè Àãñ¡,

ÌãÀßãè ‡ãŠãñßãèÌãã¡ã ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ

ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1716414.00 17164.00 34328.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

33 ‚ã½ãÀ ãä‰ãŠ¡ã ½ãâ¡ß, •ããè.†½ã.¼ããñÔãËñ

½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ ºã¶ããäÌã¥ãñ

Ìã ‚ããñ›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

34 ‡ãŠã½ãØããÀ ¶ãØãÀ, ¶ãã.½ã.•ããñÎããè ½ããØãÃ, ÌãÀßãè

¾ãñ©ãñ •ãËÌãããäÖ¶ããè ›ã‡ãŠ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1287311.00 12873.00 25746.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

35 ¦ã¹ããñÌã¶ã ƒ½ããÀ¦ã ‰ãŠ. ‚ã Ì㠺㠕ãÌãß,

Ôãñ¶ãã¹ã¦ããè ºãã¹ã› ½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ Øã›ãÀñ

Ìã ¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1029848.00 10298.00 20596.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

36 Ôãâ¦ããñÓããè ½ãã¦ãã ½ãâãäªÀã•ãÌãß, ØããùʹãŠãªñÌããè

Àãñ¡, ÌãÀßãè ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1373131.00 13731.00 27462.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

Page 14: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

37 •ãõ¶ã ãä½ã¨ã ½ãâ¡ß, •ã¶ã¦ãã ‡ãŠãù˶ããè, ÌãÀßãè

‡ãŠãñßãèÌãã¡ã, ÌãÀßãè ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ

ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

858207.00 8582.00 17164.00 ÌãØã7 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

38 ÔããƒÃºããºãã ½ãâãäªÀã•ãÌãß ØããñʹãŠãªñÌããè Àãñ¡,

ÌãÀßãè ‡ãŠãñßãèÌãã¡ã, ÌãÀßãè ¾ãñ©ãñ Øã›ãÀñ Ìã

¹ãã¾ãÌãã›ã ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

39 ¶ãÌã ÖâÔã ãä½ã¨ã ½ãâ¡ß, •ã¾ã ªìØããà ½ãâ¡ß,

•ããè.†½ã.¼ããñÔãËñ ½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ

Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ ºã¶ããäÌã¥ãñ Ìã

‚ããÔã¶ã ̾ãÌãÔ©ãã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1373131.00 13731.00 27462.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

40 ¹ãâÞãÀ¦¶ã ÔããñÔãã¾ã›ãè •ãÌãß ¡ãù.†.ºããè.Àãñ¡,

ÌãÀßãè ¾ãñ©ãñ ¡Èñ¶ã•ã ¹ããƒÃ¹ãËãƒÃ¶ã ›ã‡ãŠ¥ãñ Ìã

Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1716414.00 17164.00 34328.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

41 ºããºããÔããÖñºã ‚ããâºãñ¡‡ãŠÀ ½ãõªã¶ã,

†Ôã.†Ôã.‚ã½ãð¦ãÌããÀ ½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ

¶ããØãÀãè‡ãŠãâÔããŸãè ºãõŸ‡ãŠ ̾ãÌãÔ©ãã ‡ãŠÀ¥ãñ Ìã

Ôããöª¾ããê‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1287311.00 12873.00 25746ì.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

42 ¼ããñØããñªñÌããè Ô¹ããñ›Ôãà ‡ã‹Ëºã •ãÌãß, Àã•ãÖâÔã

½ãâ¡ßã•ãÌãß, •ããè.†½ã.¼ããÔãñËñ ½ããØãÃ,

ÌãÀßãè ¾ãñ©ãñ Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ Ìã ºãõŸ‡ãŠ

̾ãÌãÔ©ãã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

858207.00 8582.00 17164.00 ÌãØãà 7 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

43 ¾ãÎãÌãâ¦ã ãä‰ãŠ¡ã ½ãâ¡ßã•ãÌãß,

†Ôã.†Ôã.‚ãð½ã¦ãÌããÀ ½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ

•ãËÌãããäÖ¶ããè ›ã‡ãŠ¥ãñ Ìã Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1287311.00 12873.00 25746.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

44 ¹ãÆñ½ã ¶ãØãÀ, ºããè.•ããè.ŒãñÀ ½ããØãÃ, ÌãÀßãè ¾ãñ©ãñ

•ãËÌãããäÖ¶ããè ›ã‡ãŠ¥ãñ Ìã Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

1158579.00 11586.00 23172.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

45 ½ãÖ㦽ãã ¹ãìŠËñ ¶ãØãÀ, ¶ãñÖÁ ¦ããÀãâØã¥ã ½ããØãÃ,

ÌãÀßãè ¾ãñ©ãñ Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã ºã¶ããäÌã¥ãñ Ìã

•ãËÌãããäÖ¶ããè ›ã‡ãŠ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ÌãÀßãè)

875371.00 8754.00 17508.00 ÌãØãà 7 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

46 ÌããÜãñÑÌãÀãè ÔãâÜã, ÔãŒããÀã½ã Ëãâ•ãñ‡ãŠÀ ½ããØãÃ,

ãäÎãÌã¡ãè ¾ãñ©ãñ ÌããÞã¶ãã˾ããÞãñ ¶ãì¦ã¶ããè‡ãŠÀ¥ã

‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

429104.00 4291.00 8582.00 ÌãØãà 8 Ìã

ÌãÀãèË

560.00 6 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

Page 15: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

47 ‚ããâºãñÌãã¡ãè ãä‰ãŠ¡ã ½ãâ¡ß, ‡ãŠãßãÞããõ‡ãŠãè

¾ãñ©ãñ Ôã½ãã•ã ½ãâãäªÀãÞããè ¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

48 Ñããä½ã‡ãŠ Ôã½ãã•ã ‡ãŠÊ¾ãã¥ã ÔãÖ‡ãŠãÀãè

ÔãâÔ©ãñ•ãÌãß, ãä•ã•ãã½ãã¦ãã ¶ãØãÀ,

‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ ÎããõÞãã˾ããÞããè

¹ãì¶ãĺããâ£ã¥ããè ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã

ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

49 Ëà½ããè ¶ããÀã¾ã¥ã ½ãâãäªÀã•ãÌãß, ¹ãÀñËØããâÌã,

¹ãÀñË ¾ãñ©ãñ Ôã½ãã•ã ½ãâãäªÀãÞããè ¹ãì¶ãúããâ£ã¥ããè

‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1716414.00 17164.00 34328.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

50 ‚ããñ½ã Á¹ã ƒ½ããÀ¦ããè•ãÌãß, ª¦¦ããÀã½ã Ëã¡

½ããØãÃ, ãäÎãÌã¡ãè ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

51 ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ •¾ãñÓŸ

¶ããØãÀãè‡ãŠãâÔããŸãè ‚ããÔã¶ã ̾ãÌãÔ©ãã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

52 ãäÎãÌã¡ãè ½ã¦ãªãÀ ÔãâÜãã¦ã ãäÌããäÌã£ã ã䟇ãŠã¥ããè

•¾ãñÓŸ ¶ããØãÀãè‡ãŠãâÔããŸãè ‚ããÔã¶ã ̾ãÌãÔ©ãã

‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

2145518.00 21455.00 42910.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

53 Øã¥ãñÎã ‡ãðŠ¹ãã ÔãÖ‡ãŠãÀãè ÔãâÔ©ãñ•ãÌãß,

ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ Ôã½ãã•ã

½ãâãäªÀãÞããè ¹ãì¶ãúãã â£ã¥ããè ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ Ìã

¹ãã¾ãÌãã›ã ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1802235.00 18022.00 36044.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

54 ØãØã¶ããäØãÀãè ÔãÖ‡ãŠãÀãè ÔãâÔ©ãñ•ãÌãß,

ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ

ÎããõÞãã˾ããÞããè ¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ

Ìã ¹ãã¾ãÌãã›ã ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1845145.00 18451.00 36902.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

55 ÔããƒÃ¹ãÆÔã㪠ÔãÖ‡ãŠãÀãè ÔãâÔ©ãñ•ãÌãß,

ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ Ôã½ãã•ã

½ãâãäªÀãÞããè ¹ãì¶ãúãã â£ã¥ããè ‡ãŠÀ¥ãñ Ìã ŒãìËñ

Ôã¼ããØãðÖ Ìã Øã›ãÀñ Ìã ¹ãã¾ãÌãã›ã ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1930966.00 19310.00 38620.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

Page 16: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

56 ¹ããäÀÌã¦ãöã ØãðÖãä¶ã½ããÃ¥ã ÔãâÔ©ãñ•ãÌãß,

ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ

ÎããõÞãã˾ããÞããè ¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ

Ìã ¹ãã¾ãÌãã›ã ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1630593.00 16306.00 32612.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

57 Ö¶ãì½ãã¶ã ØãðÖãä¶ã½ããÃ¥ã ÔãâÔ©ãñ•ãÌãß,

ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ

ÎããõÞãã˾ããÞããè ¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ

Ìã ¹ãã¾ãÌãã›ã ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1973876.00 19739.00 39478.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

58 †‡ãŠÌããèÀã ØãðÖãä¶ã½ããÃ¥ã ÔãâÔ©ãñ•ãÌãß,

ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ

ÎããõÞãã˾ããÞããè ¹ã¶ãìúããâ£ã¥ããè ‡ãŠÀ¥ãñ Ìã Øã›ãÀñ

Ìã ¹ãã¾ãÌãã›ã ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

2102607.00 21026.00 42052.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

59 ÑããèÀã½ã ªÎãöã ØãðÖãä¶ã½ããÃ¥ã ÔãâÔ©ãñ•ãÌãß,

ãä¹ãŠ¦ãÌããËã Àãñ¡, †Ëãä¹ãŠ¶Ô›¶ã ¾ãñ©ãñ

•ãËÌãããäÖ¶ããè ›ã‡ãŠ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1458952.00 14590.00 29180.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

60 ºããËãäÌã‡ãŠãÔã ½ãâ¡ß, Ëã˺ããØã ½ãã‡ãóŠ›,

Ëã˺ããØã ¾ãñ©ãñ Ôã½ãã•ã ¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1029848.00 10298.00 20596.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

61 ¹ãÀãèÞã¾ã ÔãñÌãã ½ãâ¡ß, ¡ãù.ºããè.†.Àãñ¡,

Ëã˺ããØã ¾ãñ©ãñ Ôã½ãã•ã ¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1888055.00 18881.00 37762.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

62 ÔããÌãÕããä¶ã‡ãŠ Øã¥ãñÎããñ¦ÔãÌã ½ãâ¡ß, ÔãŒããÀã½ã

ºããËã•ããè ¹ãÌããÀ ½ããØãÃ, Ñããè.Øã¥ãñÎã ªÎãöã

ÔããñÔãã¾ã›ãè •ãÌãß, ¶ãã.½ã.•ããñÎããè ½ããØãÃ,

‡ãŠÀãè Àãñ¡ ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ ºããâ£ã¥ãñ Ìã

Ëãªãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1373131.00 13731.00 27462.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

63 ‚ããñÊ¡ ¹ããñÔ› ÔããñÔãã¾ã›ãè •ãÌãß, ãäÎãÌã¡ãè

‰ãŠãùÔã Àãñ¡, Þããß ‰ãŠ.26 •ãÌãß, ãäÎãÌã¡ãè

¾ãñ©ãñ ¹ã㥾ããÞããè ËãƒÃ¶ã ›ã‡ãŠ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1888055.00 18881.00 37762.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

64 ÔããÌãÕããä¶ã‡ãŠ Øã¥ãñÎããñ¦ÔãÌã ½ãâ¡ß,

Öã¹ãŠ‡ãŠãè¶ã ¹ããäÀÔãÀ, ¡ãù.ºããñ•ãóÔã ½ããØãÃ, ¹ãÀñË

¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1201490.00 12015.00 24030.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

Page 17: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

65 ãäÌã•ã¾ã ¹ãƇãŠãÎã ÔããÌãÕããä¶ã‡ãŠ Øã¥ãñÎããñ¦ÔãÌã

½ãâ¡ß, ºãªã¶ããè ºããñÀãè Þããß, ØãùÔã ‡ã⊹ã¶ããè

Ëñ¶ã, Ëã˺ããØã ¾ãñ©ãñ ̾ãã¾ãã½ãÎããßñÞããè

¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1888055.00 18881.00 37762.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

66 ¼ããÀ¦ã ãä¶ãÌããÔã •ãÌãß ÔããÌãÕããä¶ã‡ãŠ

¶ãÌãÀã¨ããñ¦ÔãÌã ½ãâ¡ß ãäÌã¼ããØã, ½ãã…Ëãè

Þããß ¹ãÀ½ããÀ ØãìÁ•ããè ½ããØãÃ, ¹ãÀñË ¾ãñ©ãñ

‡ã⊹ãã…â¡ ãä¼ãâ¦ã ºããâ£ã¥ãñ Ìã ŒãìËñ Ôã¼ããØãðÖ

ºããâ£ã¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1587683.00 15877.00 31754.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

67 ãäÔã¦ãã Ô㪶ã, ¼ãã¡ñ‡ãŠÁ ÔãâÜã ª¦¦ããÀã½ã Ëã¡

½ããØãÃ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ ŒãìËñ Ôã¼ããØãðÖ

ºããâ£ã¥ãñ Ìã ¡ãâºãÀãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1544773.00 15448.00 30896.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

68 ¢ãÌãñÀãè ºãâØËãñ•ãÌãß, ‡ãŠãßãÞããõ‡ãŠãè, ½ãìâºãƒÃ-

33 ¾ãñ©ãñ ¡ãâºãÀãè‡ãŠÀ¥ã ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1458952.00 14590.00 29180.00 ÌãØãà 6 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

69 ÔããƒÃ¶ãã©ã ÔãñÌãã ½ãâ¡ß, ¹ãÀÎãìÀã½ã ¶ãØãÀ,

ØãØã¶ããäØãÀãè ½ãÖãÀã•ã Þããß ‡ãŠãä½ã›ãè,

ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ Ôã½ãã•ã

¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ Ìã •ãËÌãããäÖ¶ããè ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

1630593.00 16306.00 32612.00 ÌãØãà 5-‚ã

Ìã ÌãÀãèË

560.00 12 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

70 ÔããÌãÕããä¶ã‡ãŠ Øã¥ãñÎããñ¦ÔãÌã ½ãâ¡ß, ¹ãîÌãÃ

ãäÌã¼ããØãã, ãä•ã•ãã½ãã¦ãã ¶ãØãÀ, Øã.ª.‚ããâºãñ‡ãŠÀ

½ããØãÃ, ‡ãŠãßãÞããõ‡ãŠãè ¾ãñ©ãñ ‚ã¼¾ãããäÔã‡ãŠãÞããè

¹ãì¶ãúããâ£ã¥ããè ‡ãŠÀ¥ãñ.

(½ã¶ã¹ããàãñ¨ã-Ôãì¾ããèÔãìãäÌã£ãã) (ãäÎãÌã¡ãè)

858207.00 8582.00 17164.00 ÌãØãà 7 Ìã

ÌãÀãèË

560.00 9 ½ããäÖ¶ãñ

(¹ããÌãÔãã-

ß¿ããÔããäÖ¦ã)

‚ã.‰ãŠ. ›¹¹ãã ‡ãŠãËãÌã£ããè

1 •ãããäÖÀã¦ã ã䪶ããâ‡ãŠ 01.11.2019 Ôã‡ãŠãßãè 10.00 Ìãã.

2 ãä¶ããäÌãªã ãäÌã‰ãŠãè Ôãì 01.11.2019 Ôã‡ãŠãßãè 10.05 Ìãã.

3 ãä¶ããäÌãªã ãäÌã‰ãŠãè ºã⪠14.11.2019 Ôãã¾ãâ‡ãŠãßãè 5.35 Ìãã.

4 ãä¶ããäÌãªã ãäÔÌã‡ãðŠ¦ããè Ôãì 01.11.2019 Ôã‡ãŠãßãè 10.05 Ìãã.

5 ãä¶ããäÌãªã ãäÔÌã‡ãðŠ¦ããè ‚ãâãä¦ã½ã ã䪶ããâ‡ãŠ 14.11.2019 Ôãã¾ãâ‡ãŠãßãè 5.35 Ìãã.

6 ¦ããâãä¨ã‡ãŠ ºããñËãè „Üã¡¥¾ããÞãã ã䪶ããâ‡ãŠ 15.11.2019 Ôãã¾ãâ‡ãŠãßãè 5.35 Ìãã.

7 ‚ãããä©ãÇ㊠ºããñËãè „Ü㥾ããÞãã ã䪶ããâ‡ãŠ 18.11.2019 Ôã‡ãŠãßãè 10.05 Ìãã.

1) Ôãâ¹ãî¥ãà ãä¶ããäÌãªã ¹ã£ª¦ããè Öãè ‚ããù¶ãËãƒÃ¶ã ÔÌã¹ããÞããè ÀãÖãèË. ¦¾ããºããºã¦ãÞ¾ãã ÔãÌãà ÔãìÞã¶ãã ‚ã›ãè Ìã Îã©ããê

http://mahatenders.gov.nÌã ½Öã¡ãÞ¾ãã MHADA Webste http://mhada.maharashtra.

gov.n ¾ãã Ôãâ‡ãñŠ¦ãÔ©ãßãâÌãÀ ¹ãÆãäÔ㣪 ‡ãñŠÊ¾ãã •ãã¦ããèË.

Page 18: MUMBAI SLUM IMPROVEMENT BOARD · by the Executive Engineer (City) Division Mumbai Slum Improvement Board (Unit of MHADA) Room No. 539 4th floor Griha Nirman Bhavan Bandra (East) Mumbai

2) ãä¶ããäÌãªã ãäÌãÓã¾ããèÞããè ‡ãŠãØ㪹ã¨ãñ ãäª.01.11.2019 Ôã‡ãŠãßãè 10.05 Ìãã. ¹ããÔãì¶ã ¡ã…¶ãÊããñ¡ ‡ãŠÀ¦ãã ¾ãñ¦ããèÊã Ìã

ãäª.14.11.2019 Ôãã¾ãâ‡ãŠãß 17.35 Ìãã. Ìãã•ãñ¹ã¾ãĦã http://mahatenders.gov.n ¾ãã Ôãâ‡ãñŠ¦ãÔ©ãßãÌãÀ ‚ã¹ãËãñ¡

‡ãŠÂ Îã‡ãŠ¦ãã ¾ãñ¦ããèË.

3) ãä¶ããäÌãªã ‚ã•ããÃÞããè À‡ã‹‡ãŠ½ã ¦ãÔãñÞã ƒÔããÀã À‡ã‹‡ãŠ½ã ‚ããù¶ãËãƒÃ¶ã ¼ãÀ¥ãñ ‚ããÌãξã‡ãŠ ÀãÖãèË.

4) „¹ãÀãñ‡ã‹¦ã ‡ãŠã½ããâÞããè ¦ããâãä¨ã‡ãŠ ºããñÊããè ãäª. 15.11.2019 Àãñ•ããè Ôãã¾ãâ‡ãŠãß 17.35 Ìãã. ¶ãâ¦ãÀ Ìã ‚ãããä©ãÇ㊠ºããñÊããè

ãäª.18.11.2019 Àãñ•ããè Ôã‡ãŠãßãè 10.05 Ìãã. ¶ãâ¦ãÀ ‡ãŠã¾ãÇãŠãÀãè ‚ããä¼ã¾ãâ¦ãã ÍãÖÀ) ½ãìâ.¢ããñ.Ôãì.½ãâ¡ß ¾ããâÞãñ

‡ãŠã¾ããÃÊã¾ã Á½ã ¶ãâ.539 Þããõ©ãã ½ã•ãÊãã ½Öã¡ã ‡ãŠÊãã¶ãØãÀ ºããâ³ã ¹ãìÌãÃ) ½ãìâºãƒÃ-400051 ¾ãñ©ãñ „Üã¡¥¾ãã¦ã ¾ãñ¦ããèÊã.

5) ãä¶ããäÌãªã‡ãŠãÀãâ¶ããè ƒÃ ãä¶ããäÌãªñ´ãÀñ ‚ã¹ãËãñ¡ ‡ãñŠÊãñʾãã ‡ãŠãØ㪹ã¨ããâÞ¾ãã ½ãìß ¹ãƦããè ¦ããâãä¨ã‡ãŠ ºããñËãè „Ü㥾ããÞ¾ãã ÌãñßñÔã

Œãã¦ãÀ•ã½ãã ‡ãŠÀ¥¾ãã‡ãŠÀãè¦ãã ÔããªÀ ‡ãŠÀ¥ãñ ‚ããÌãξã‡ãŠ ÀãÖãèË.

6) ãä¶ããäÌãªã‡ãŠãÀãâ¶ããè ¦ããâãä¨ã‡ãŠ ºããñËãè ½ã£¾ãñ ¶ã½ãîª ‡ãŠãØ㪹ã¨ãñ ¹ããè¡ã膹㊠¹ãŠãù½ãó› ½ã£¾ãñ ¦ããâãä¨ã‡ãŠ ºããñËãèʾãã ãä˹ãŠã¹ã‹¾ãã¦ã

ÔããªÀ ‡ãŠÀãÌããè¦ã.

7) ãä¶ããäÌãªã‡ãŠãÀãâ‡ãŠ¡ñ ÌãØãà 2 Ìã 3 ¦¾ããÌãÀãèË ½ã㶾ã¦ãã¹ãÆ㹦㠹ãÆããä£ã‡ãŠãÀ¥ãã‡ãŠ¡î¶ã ãä½ãßãäÌãËñËãè ¡ãè•ããè›Ë ãäÔãضãñÞãÀ

¹ãƽãã¥ã¹ã¨ãñ ‚ãÔã¥ãñ ‚ããÌãξã‡ãŠ ÀãÖãèË.

8) ‡ãŠãñ¥ã¦ãñÖãè ‡ãŠãÀ¥ã ¶ã ªñ¦ãã ãä¶ããäÌãªã ãäÔÌã‡ãŠãÀ¥¾ããÞãã ‚ã©ãÌãã ‚ããËñʾãã ÔãÌãà ãä¶ããäÌãªã ¶ãã‡ãŠãÀ¥¾ããÞãã ‚ããä£ã‡ãŠãÀ

‡ãŠã¾ãÇãŠãÀãè ‚ããä¼ã¾ãâ¦ãã ÍãÖÀ)/½ãìâ.¢ããñ.Ôãì.½ãâ¡ß ¾ããâÞãñ‡ãŠ¡ñ ÀãÖãèÊã.

9) ãä¶ããäÌãªã‡ãŠãÀãâ¶ããè ‚ããä¦ããäÀ‡ã‹¦ã ÔãìÀàãã ‚ã¶ãã½ã¦ã ‚ãããä¥ã ƒ¦ãÀ ‡ãŠãØ㪹ã¨ãñ ÔããªÀ ‡ãŠÀ¥ãñºããºã¦ã ÔããäÌãÔ¦ãÀ ãä¶ããäÌãªã ÔãìÞã¶ãã

¹ããÖãÌããè.

10) ãä¶ããäÌãªã‡ãŠãÀãâ¶ããè ÍããÔã¶ã ãä¶ã¥ãþ㠉ãŠ.Ôãã膛ãè-01/2015/¹ãÆ.‰ãŠ.20/ƒÃ½ãã.2 ãäª.24.4.2015 Þãñ ¹ããÊã¶ã ‡ãŠÀãÌãñ.

11) ãä¶ããäÌãªã ¡ã…¶ãÊããñ¡ ‡ãŠÀ¥ãñ Ìã ‚ããù¶ãÊããƒÃ¶ã ÔããªÀ ‡ãŠÀ¥ãñºããºã¦ãÞããè ½ãããäÖ¦ããè http://mahatenders.gov.in ¾ãã

Ôãâ‡ãñŠ¦ãÔ©ãßãÌãÀ ‚ããÖñ. ½ãª¦ããèÔããŸãè ‰ãŠ½ããâ‡ãŠ: 1800-233-7315 E-mail eproc.support@ mahatenders. gov.in.

12) ¹ãÆ©ã½ã ¶¾ãî¶ã¦ã½ã ªñ‡ãŠãÀãÞ¾ãã (L-1) ãä¶ããäÌãªã‡ãŠãÀã¶ãñ ãäÌããä֦㠽ã쪦ããè¦ã Addtonal Performance Securty Depost Þãã

¼ãÀ¥ãã 8 ãäªÌãÔãã¦ã ‡ãñŠËã ¶ããÖãè ¦ãÀ ãä´¦ããè¾ã ¶¾ãî¶ã¦ã½ã ªñ‡ãŠãÀãÞ¾ãã (L-2) ãä¶ããäÌãªã‡ãŠãÀãÔã ËñŒããè ãäÌãÞããÀ¥ãã

‡ãŠÀ¥¾ãã¦ã ¾ãñƒÃË Ìã L-2 ãä¶ããäÌãªã‡ãŠãÀ L-1 ¹ãñàã㠇㊽ããè ªÀã¶ãñ ‡ãŠã½ã ‡ãŠÀ¥¾ããÔã ¦ã¾ããÀ ‚ãÔã¦ããèË ¦ãÀ ¦¾ããâÞããè ãä¶ããäÌãªã

½ãâ•ãîÀ ‡ãŠÀ¥¾ãã¦ã ¾ãñƒÃË.

ÔÌããàãÀãè¦ã/-

(ªã.¶ãã.Ôãì¾ãÃÌãâÎããè)

‡ãŠã¾ãÇãŠãÀãè ‚ããä¼ã¾ãâ¦ãã ÎãÖÀ)

½ãìâ.¢ããñ. Ôãì.½ãâ¡ß ½ãìâºãƒÃ