mumbai skywalks

11
MUMBAI SKYWALKS by KUSHA GUPTA RAJBIR BHATIA BINDU CHOUDHARY

Upload: binduchoudhary

Post on 05-Mar-2015

77 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: Mumbai Skywalks

MUMBAI SKYWALKS

by

KUSHA GUPTA RAJBIR BHATIA

BINDU CHOUDHARY

Page 2: Mumbai Skywalks

MUMBAI SKYWALKS

Page 3: Mumbai Skywalks

INTRODUCTION

Mumbai Skywalks are a series of

skyways dedicated to pedestrians, connecting Mumbai Suburban Railway stations and high-concentration commercial areas with various heavily targeted destinations.

Page 4: Mumbai Skywalks

FIRST SKYWALK From Bandra station to Kalanagar

JunctionLENGTH:1300 mWIDTH : 400m Period of construction: 27 DEC 2007 to 24 JUNE 2008 Cost of this skywalk: 13.36 crores

Page 5: Mumbai Skywalks

ISSUES OCCURRED WITH THE SKYWALKS

In the early skywalks, there were some complaints of vibrations

Metro to trim new skywalksNo space for the handicapped

people

Page 6: Mumbai Skywalks

ADVANTAGES

Reduced Traffic CongestionTime savingReduced risks of accidentsHealth BenefitsFuel savingPollution controlChanging People perspective

Page 7: Mumbai Skywalks

DISADVANTAGESSkywalks threaten the small

commercial shops Privacy issues Security concerns

Page 8: Mumbai Skywalks

WHY SKYWALK ?

The technology didn’t prove itself

Unfortunate accident

on 25th sep,2004 ,due to technical failure.

Is extremely resourse intensive

Requires 103 crores per km

SKYBUS METRO

Page 9: Mumbai Skywalks

RECOMMENDATIONSo Advertisements should be placed

on the wallso Security must be increased o Ramps should be provided for the

handicapped people

Page 10: Mumbai Skywalks

THANK YOU

Page 11: Mumbai Skywalks

QUESTION HOUR