multicluster box 12-3-20 - files.sma.defiles.sma.de/dl/26784/mc-box-12-3-20_iaa-en-14w.pdf ·...

2
MC-BOX-12-3-20_IAA-en-14 | Version 1.4 ENGLISH MULTICLUSTER-BOX 12.3-20 Installation – Circuitry Overview LEGEND Fuse Fuse type Application Supply line from F101 NH1 200 A Generator - F102 NH1 200 A Loads - F104.x Circuit breaker C40 Sunny Island - The Grid-Connect-Box is always sup- plied with an all-pole disconnection function. The all-pole disconnection function must be deactivated on the Grid-Connect-Box if, according to the technical connection conditions of the grid operator and the locally applicable standards and directives, all-pole disconnection is not permitted. Line conductor Neutral conductor Grounding conductor Control and measurement signal cable Data cable for in- ternal communica- tion of the clusters Data cable for multicluster communication WAN Speedwire Terminator Sunny Island Comment: Extension cluster circuitry: see page 2 Bridge DigIn- and BatVtg- on the master of the main cluster. Data cable length max. 30 m * Ground the Multicluster system at the grid-connection point in accordance with the local standards and directives. SCHEMATIC DIAGRAM FOR MULTICLUSTER-BOX SMA Solar Technology AG Niestetal SMA Online Service Center: www.SMA-Service.com International SMA Service Line 00800 SMA SERVICE (+800 762 7378423) COMMUNICATION PRINCIPLE CIRCUITRY OF NA BOX WITH MULTICLUSTER BOX AND MAIN CLUSTER CIRCUITRY OF GRID CONNECT BOX WITH MULTICLUSTER-BOX AND MAIN CLUSTER UTILITY GRID UTILITY GRID SUNNY PORTAL SMA DATA MANAGER M PV INVERTER ROUTER SWITCH/ HUB MC BOX with NA Box or GRID-CONNECT-BOX

Upload: trandien

Post on 16-Aug-2018

214 views

Category:

Documents


0 download

TRANSCRIPT

MC-BOX-12-3-20_IAA-en-14 | Version 1.4 ENGLISH

MULTICLUSTER-BOX 12.3-20Installation – Circuitry Overview

LEGEND

Fuse Fuse type Application Supply line fromF101 NH1 200 A Generator -F102 NH1 200 A Loads -F104.x Circuit breaker C40 Sunny Island -

The Grid-Connect-Box is always sup-plied with an all-pole disconnection function. The all-pole disconnection function must be deactivated on the Grid-Connect-Box if, according to the technical connection conditions of the grid operator and the locally applicable standards and directives, all-pole disconnection is not permitted.

Line conductor

Neutral conductor

Grounding conductorControl and measurement signal cableData cable for in-ternal communica-tion of the clustersData cable for multicluster communication

WAN

Speedwire

Terminator

Sunny Island

Comment:Extension cluster circuitry: see page 2

Bridge DigIn- and BatVtg- on the master of the main cluster.

Data cable length max. 30 m

* Ground the Multicluster system at the grid-connection point in accordance with the local standards and directives.

SCHEMATIC DIAGRAM FOR MULTICLUSTER-BOX

SMA Solar Technology AGNiestetalSMA Online Service Center:www.SMA-Service.com

International SMA Service Line 00800 SMA SERVICE (+800 762 7378423)

COMMUNICATION PRINCIPLE

CIRCUITRY OF NA BOX WITH MULTICLUSTER BOX AND MAIN CLUSTER

CIRCUITRY OF GRID CONNECT BOX WITH MULTICLUSTER-BOX AND MAIN CLUSTER

UTILITY GRID

UTILITY GRID

SUNNYPORTAL

SMADATA MANAGER M

PVINVERTERROUTER

SWITCH/HUB

MC BOX withNA Box or

GRID-CONNECT-BOX

If the utility grid is connected directly to the Multicluster Box as the external energy source instead of the electricity generator, the locally applicable standards and directives must be adhered to. Further more, the utility grid must be connected to the generator input of the Multicluster-Box in this case. When connecting the utility grid directly to the Multicluster-Box, proceed as described below for the generator .

If the Multicluster-Box is installed without Grid-Connect-Box and NA-Box, the following jumper wires must be set:- Terminals X110:1 and X110:2- Terminals X111:6 and X111:7

Line conductor Control and measurement signal cableNeutral conductor Data cable for internal communication

of the clustersGrounding conductor Data cable for multicluster communica-

tionDC+ cable WANDC− cable SpeedwireBattery temperature sensor Terminator

Sunny Island Battery fuse

PV inverters Battery

Comment: Bridge DigIn- and BatVtg- on the master of the main cluster.Data cable length max. 30 m

*1 Ground the Multicluster system at the grid-connection point in accordance with the local standards and directives.

*2 If a generator is used, ground the multicluster system at the generator.*3 If no lithium-ion batteries are connected, the terminator must be plugged in.

DATA AND CONTROL CABLE CIRCUITRY - For systems with electricity generator or utility grid connected directly to the Multicluster-Box

POWER CABLE CIRCUITRY FOR SYSTEMS WITH MULTICLUSTER-BOX

PV SYSTEM

PV main distribution board

GENERATOR

LOADS

LEGEND

Main distribution board for the loads

UTILITY GRID

Optional for Gen-Grid

GRID-CONNECT-BOX