mudgee hospital redevelopment

43
MUDGEE HOSPITAL REDEVELOPMENT GOVERNMENT ARCHITECT NSW PRESENTATION 30 MAY 2018

Upload: others

Post on 03-May-2022

6 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MUDGEE HOSPITAL REDEVELOPMENT

MUDGEE HOSPITAL REDEVELOPMENT

GOVERNMENT ARCHITECT NSW PRESENTATION

30 MAY 2018

Page 2: MUDGEE HOSPITAL REDEVELOPMENT

LOCALITY CONTEXT

MAIN APPROACHSITE

CASTLEREAGH HWY

MEARES STREET

LEW

ISST

REET

CHUR

CHST

REET

ROBE

RTSO

NST

REET

CHUR

CHST

REET

MADEIRA ROAD

MADEIRA ROAD LEW

ISST

REET

MEARES STREET

ABANDONED RAILWAY LINE

ABANDONED RAILWAY LINE

4 VICTORIA PARK

5 MUDGEE HIGHSCHOOL

6CUDGEGONGVALLEY PUBLICSCHOOL

7 MUDGEE GOLFCOURSE

SITE

MUDGEE

CASTLEREAGHHWY

8 TO MUDGEETOWN CENTRE

N

Scale @ A0 Sheet Size

DATE:

Drawing Number:DateProject Number

14/07/2017 5:18:33 PM

MUDGEE HOSPITAL RE-DEVELOPMENT - MASTER PLAN 2017 A00-00611/07/201710320

LOCALITY PLAN06

1:2000

2

3

1

6

7

Map data ©2017 Google

CASTLEREAGH HWYMAIN ARTERIAL ROAD

T -JUNCTION AT THE SOUTH END OF CHURCH ST

LOCAL CATCHMENT ONLY

HOSPITAL SITE

Page 3: MUDGEE HOSPITAL REDEVELOPMENT

03

LOCALITY CONTEXT

EXISTING SITE PLAN

4. URBAN CONTEXT

EXISTING SITE PLAN

5

7

6

9

8

3

2

4

1

38092 m²

MUDGEE HOSPITAL

MEARES STREET

CHUR

CH S

TREE

T

LEW

IS S

TREE

T

10

11

1

2

3

4

5

6

7

8

9

10

11

EXISTING ASSETS

POINTS OF INTEREST

MAIN HOSPITAL

MUDGEE MEDICAL CENTINCORPORATING BLOOMTHE CHEMIST

MUDGEE RAILWAY STAT

OVERPASS

CRICKET GROUND & RUFIELD

COMMUNITY HEALTH CENTRE (CHC)

BOILERHOUSE, WORKSH

STORE BUILDING

3 BEDROOM RESIDENCE

HELIPAD

WELLNESS CENTRE

1

2

3

4

5

6

7

8

9

10

11

EXISTING ASSETS

POINTS OF INTEREST

MAIN HOSPITAL

MUDGEE MEDICAL CENTRE, INCORPORATING BLOOMS THE CHEMIST

MUDGEE RAILWAY STATION

OVERPASS

CRICKET GROUND & RUGBY FIELD

COMMUNITY HEALTH CENTRE (CHC)

BOILERHOUSE, WORKSHOPS

STORE BUILDING

3 BEDROOM RESIDENCE

HELIPAD

WELLNESS CENTRE

MAIN HOSPITAL

EXISTING ASSETS

COMMUNITY HEALTH CENTRE (CHC)

WELLNESS CENTRE

BOILERHOUSE & WORKSHOPS

STORE BUILDING

KEY WORKERS ACCOMMODATION

HELIPAD

MUDGEE RAILWAY STATION

OVERPASS

CRICKET GROUND & RUGBY FIELD

MUDGEE MEDICAL CENTRE, INCORPORATING BLOOMS THE CHEMIST

POINTS OF INTEREST

Page 4: MUDGEE HOSPITAL REDEVELOPMENT

04

LOCALITY CONTEXT

SITE ANALYSIS

5. EXISTING SITE INVESTIGATIONS

SITE ANALYSIS

EXISTINGRESIDENTIALZONE

SW

EXISTINGRESIDENTIALZONE

EXISTINGRESIDENTIALZONE

EXISTINGRESIDENTIALZONE

FALLS

FALLS

TO MUDGEETOWNCENTRE

2

3

14

56

9

8

7

FALLS IN TOPOGRAPHY

WIND

VIEWS

MAIN ENTRY POINTS TO HOSPITAL

MAIN HOSPITAL

COMMUNITY HEALTH CENTRE (CHC)

WELLNESS CENTRE

BOILERHOUSE, WORKSHOPS

EMPTY BUILDING

3 BEDROOM RESIDENCE

HELIPAD

MUDGEE RAILWAY STATION

MUDGEE MEDICAL CENTRE INCORPORATING BLOOMS CHEMIST

HELIPAD

LIMIT NOISE TO NEIGHBOURING PROPERTIES

MAIN TRAFFIC NOISE SOURCE FROM CHURCH STREET

SUMMER SOLSTICE SUN

WINTER SOLSTICE SUN

FALLS IN TOPOGRAPHY

WIND

VIEWS

MAIN ENTRY POINTS TO HOSPITAL

COMMUNITY HEALTH CENTRE (CHC)

WELLNESS CENTRE

BOILERHOUSE & WORKSHOPS

STORE BUILDING

KEY WORKERS ACCOMODATION

HELIPAD

MUDGEE RAILWAY STATION

MUDGEE MEDICAL CENTRE (MMC)

LIMIT NOISE TO NEIGHBOURING PROPERTIES

MAIN TRAFFIC NOISE SOURCE FROM CHURCH STREET

SUMMER SOLSTICE SUN

WINTER SOLSTICE SUN

MAIN HOSPITAL

Page 5: MUDGEE HOSPITAL REDEVELOPMENT

05

LOCALITY CONTEXT

VIEWS FROM THE DEVELOPMENT

CHURCH STREET VIEW SOUTH AND SOUTH-WEST

PANORAMIC VIEW WEST FROM SITE - CHURCH STREET

Page 6: MUDGEE HOSPITAL REDEVELOPMENT

06

MASTERPLAN DEVELOPMENT

MASTERPLAN PRINCIPLES

• Aggregate all services into one facility

• 24 hour zone must be co-located on one level

• All consumer presentations, including ambulant emergency presentations and visitors will be managed through one point of Entry and Reception

• The public car park must be located adjacent to the Main Entry

• Segregate ambulance and service vehicles from public vehicles

• Establish a medical precinct that co-locates the Hospital with Mudgee Medical Centre

Page 7: MUDGEE HOSPITAL REDEVELOPMENT

07

MASTERPLAN DEVELOPMENT

PROPOSED DEVEOPLEMT ZONE OPTION D

7. MASTERPLAN PLANNING DEVELOPMENT

MASTERPLAN SITE OPTIONS DEVELOPMENT

FUTUREEXPANSION

STREETFRONTAGES

STREETFRONTAGES

FUTUREEXPANSION

SITEUTILISATION

COMMERCIALLINKAGES

1

2

SITE DEVELOPMENTZONE - OPTION 310,000m²

ASSET MANAGEMENTEXISTING HOSPITAL AND ACCESS CAN BE RETAINED DURING CONSTRUCTION OF NEW HOSPITAL, DEPARTMENTS TO

STREET FRONTAGESTWO MAJOR STREET FRONTAGES; CHURCH STTREET AND MEARES STREET

BUS STOPBUS TO MUDGEE TOWN CENTRE

HELIPAD

SOUTH-WEST SITE DEVELOPMENT ZONE - 10,000m ²

OPTION D - PREFERRED OPTIONDEVELOPMENT ZONE OPTION SOUTH-WEST SECTOR OF EXISTING SITESUMMARY:This option would involve the development in the south-west sector of the site. The existing Community Health Centre and Wellness Centre is to be demolished. The existing Hospital and access can be retained during construction of the new Hospital.

OPPORTUNITIES:• Good street presentation on the corner of Meares

Street and Church Street

• Staging & decanting is reduced, existing main hospital can continue to operate while new hospital is under construction

• Supports linkages with Mudgee Medical Centre

• Preserves the current helipad location

• Supports further future expansion of LHD clinical services to the east and the north-east.

• Maximises the opportunities for further development of the site along the Lewis Street frontage for alternate/commercial/allied services

CHALLENGES:• Will require decanting of the Community Health

Centre and Wellness Centre functions to facilitate construction

OPTION D - PREFERRED OPTIONDEVELOPMENT ZONE OPTION SOUTH-WEST SECTOR OF EXISTING SITESUMMARY:This option would involve the development in the south-west sector of the site. The existing Community Health Centre and Wellness Centre is to be demolished. The existing Hospital and access can be retained during construction of the new Hospital.

OPPORTUNITIES:• Good street presentation on the corner of Meares Street and Church Street

• Staging & decanting is reduced, existing main hospital can continue to operate while new hospital is under construction

• Supports linkages with Mudgee Medical Centre• Preserves the current helipad location• Supports further future expansion of LHD clinical services to the east and the north-east.

• Maximises the opportunities for further development of the site along the Lewis Street frontage for alternate/commercial/allied services

CHALLENGES:• Will require decanting of the Community Health Centre and Wellness Centre functions to facilitate construction

032PROJECT NAME: MUDGEE HOSPITAL RE-DEVELOPMENT JOB NUMBER: 10320

CLIENT: HEALTH INFRASTRUCTUREPHASE: MASTERPLAN

DATE: 31.08.17SCALE: NTS @ A3

G FUTUREEXPANSION

STREETFRONTAGES

STREETFRONTAGES

FUTUREEXPANSION

SITEUTILISATION

COMMERCIALLINKAGES

1

2

SITE DEVELOPMENTZONE - OPTION 310,000m²

ASSET MANAGEMENTEXISTING HOSPITAL AND ACCESS CAN BE RETAINED DURING CONSTRUCTION OF NEW HOSPITAL, DEPARTMENTS TO BE DECANTED ONCE NEW HOSPITAL HAS BEEN COMMISSIONED• AT GRADE CAR PARKING• FUTURE EXPANSION

STREET FRONTAGESTWO MAJOR STREET FRONTAGES; CHURCH STTREET AND MEARES STREET

COMMERCIAL FRONTAGESESTABLISHING LINKS TO MUDGEE MEDICAL CENTRE

BUS STOPBUS TO MUDGEE TOWN CENTRE

HELIPADEXISTING HELIPAD CAN BE RETAINED FOR USE DURING AND AFTER DEVELOPMENT

MUDGEE MEDICAL CENTRE

TO MUDGEE TOWN CENTRE

SOUTH-WEST SITE DEVELOPMENT ZONE - 10,000m ²

-

nt

032ENT CLIENT: HEALTH INFRASTRUCTUREPHASE: MASTERPLAN

DATE: 31.08.17SCALE: NTS @ A3

FUTUREEXPANSION

STREETFRONTAGES

STREETFRONTAGES

FUTUREEXPANSION

SITEUTILISATION

STREET FRONTAGESTWO MAJOR STREET FRONTAGES; CHURCH STTREET AND MEARES STREET

COMMERCIAL FRONTAGESESTABLISHING LINKS TO MUDGEE MEDICAL CENTRE

BUS STOPBUS TO MUDGEE TOWN CENTRE

HELIPADEXISTING HELIPAD CAN BE RETAINED FOR USE DURING AND AFTER DEVELOPMENT

MUDGEE MEDICAL CENTRE

TO MUDGEE TOWN CENTRE 032ENT CLIENT: HEALTH INFRASTRUCTUREPHASE: MASTERPLAN

DATE: 31.08.17SCALE: NTS @ A3

FUTUREEXPANSION

STREETFRONTAGES

STREETFRONTAGES

FUTUREEXPANSION

SITEUTILISATION

STREET FRONTAGESTWO MAJOR STREET FRONTAGES; CHURCH STTREET AND MEARES STREET

COMMERCIAL FRONTAGESESTABLISHING LINKS TO MUDGEE MEDICAL CENTRE

BUS STOPBUS TO MUDGEE TOWN CENTRE

HELIPADEXISTING HELIPAD CAN BE RETAINED FOR USE DURING AND AFTER DEVELOPMENT

MUDGEE MEDICAL CENTRE

TO MUDGEE TOWN CENTRE

032DATE: 31.08.17SCALE: NTS @ A3

STREETFRONTAGES

FUTUREEXPANSION

ATION

BUS STOPBUS TO MUDGEE TOWN CENTRE

HELIPADEXISTING HELIPAD CAN BE RETAINED FOR USE DURING AND AFTER DEVELOPMENT

MUDGEE MEDICAL CENTRE

TO MUDGEE TOWN CENTRE

Page 8: MUDGEE HOSPITAL REDEVELOPMENT

08

MASTERPLAN DEVELOPMENT

STRATEGIC LAND USE

SITE MASTERPLAN - STRATEGIC LAND USE

EXISTING MAIN HOSPITAL

HOSPITAL ZONE

HEALTH PRECINCT

PROPOSED GREEN SPACE

EXISTING GREEN SPACE

CAR PARK

CIVIC SPACE

TITLE BOUNDARY

HELICOPTER ACCESS

HELICOPTER FLY PATH

MAIN SITE ACCESS

Page 9: MUDGEE HOSPITAL REDEVELOPMENT

09

MASTERPLAN DEVELOPMENT

CHURCH ST ENTRY STUDIES

• COMPETING ENTRIES WITH MUDGEE MEDICAL CENTRE

• MAIN ENTRY COURT WITH PUBLIC PARKING IS PUSHING THE BUILT FORM FURTHER INTO THE SITE

• SMALLER PARCEL FOR FUTURE DEVELOPMENT, NON-CAMPUS APPEARANCE

• FUNCTIONAL ISSUES WITH EMERGENCY LOCATED ON GROUND LEVEL

• PUBLIC CAR PARK ON DIFFERENT LEVEL TO MAIN ENTRY.

STUDY 4 STUDY 5

Page 10: MUDGEE HOSPITAL REDEVELOPMENT

010

MASTERPLAN DEVELOPMENT

CAMPUS-STYLE DEVELOPMENT

MUDGEE MEDICAL CENTRE

MAIN APPROACH TO HOSPITAL

POTENTIAL FUTURE DEVELOPMENT

• HOSPITAL AS CAMPUS STYLE DEVELOPMENT

• PROVISION FOR FUTURE DEVELOPMENT OPPORTUNITIES

• MUDGEE MEDICAL CENTRE AS URGENT CARE AND FIRST PRESENTATION

CH

UR

CH

S

TR

EE

T

M E A R E S S T R E E T

LE

WIS

S

TR

EE

T

Page 11: MUDGEE HOSPITAL REDEVELOPMENT

011

DESIGN RESPONSE

CHURCH STREET ADDRESS

CH

UR

CH

S

TR

EE

T

M E A R E S S T R E E T

• STREET SETBACK APPROPRIATE TO THE 2 STOREY BUILT FROM

• MEDICAL PRECINCT URBAN OVERLAY - MAKING CONNECTIONS

• CREATION OF CIVIC ADDRESS ALONG CHURCH ST AND MEARES ST

EXISTING AVERAGE STREET SETBACK IS 10M

CREATE STREET SETBACK APPROPRIATE FOR 2 STOREY BUILT

FORM

CREATE VISUAL CONNECTIVITY OF THE URBAN EDGE

CONCISER URBAN ADDRESS TO THE MEDICAL PRECINCT

LE

WIS

S

TR

EE

T

Page 12: MUDGEE HOSPITAL REDEVELOPMENT

012

DESIGN RESPONSE

PEDESTRIAN AMENITY AND STREET CORNER TREATMENT

CH

UR

CH

S

TR

EE

T

M E A R E S S T R E E T

• CREATION OF CIVIC ZONE ALONG CHURCH STREET

• EXTENDING THE CIVIC GENEROSITY ALONG MEARES STREET

• AUGMENTATION OF PUBLIC DOMAIN

• POSSIBLE INTRODUCTION OF PUBLIC ART AS WAYFINDING MARKER

CIVIC SPACEIMPROVED PEDESTRIAN AMENITY

EXTENDING GEOMETRIES OF MMCTO PROVIDE VISUAL CONNECTIVITY

PUBLIC ARTWAYFINDING ELEMENT

IMPROVED PEDESTRIAN AMENITYBOULEVARD OF TREES

PROVISION OF LANDSCAPED AREAS AROUND THE PROPOSED BUILT FORM

LE

WIS

S

TR

EE

T

Page 13: MUDGEE HOSPITAL REDEVELOPMENT

013

DESIGN RESPONSE

WAYFINDING MARKERS AND MAIN ENTRY VISIBILITY

CH

UR

CH

S

TR

EE

T

M E A R E S S T R E E T

PUBLIC ARTWAYFINDING ELEMENT

MAIN ENTRYEMERGENCY

HOSPITAL CAMPUS ENTRY

LE

WIS

S

TR

EE

T

Page 14: MUDGEE HOSPITAL REDEVELOPMENT

014

DESIGN RESPONSE

SITE PLAN

• MEDICAL PRECINCT PRESENTATION

• BUILDING SCALE AND SETBACKS

• EXISTING VEGETATION (STREET TREES)

• TOPOGRAPHY

Page 15: MUDGEE HOSPITAL REDEVELOPMENT

01504

DEVELOPMENT OF DESIGN RESPONSE

SITE PLAN (CONTEXT)

• BUILDING SCALE

• EXISTING VEGETATION (STREET TREES)

• TOPOGRAPHY

• FLAGS RELOCATIONTHEME - NATIVE WITH SEASONAL HIGHLIGHTSDESIGN RESPONSE

LANDSCAPE THEAME - NATIVE WITH SEASONAL HIGHLIGHTS

Page 16: MUDGEE HOSPITAL REDEVELOPMENT

016

DESIGN RESPONSE

LANDSCAPE PLAN

STRENGTHEN AND LAYER STREET ADDRESS

EXISTING TREES

SHELTERED SEATING OPPORTUNITIES WITH INTERPRETIVE PANELS

ICONIC SIGNAGE ELEMENT

CONTINUATION OF URBAN TREE FORM TO MEARES STREET

MEARES STREET

CHUR

CH

STRE

ET

PEDESTRIAN FORECOURTTO STREET ENTRY WITH FEATURE TREES, FLAGPOLES AND SEATING TO ASSIST IN WAYFINDING

FLAGPOLES

LAYERED PLANTING PROVIDING SHADE, SHELTER AND SCALE

Page 17: MUDGEE HOSPITAL REDEVELOPMENT

017

DESIGN RESPONSE

CHURCH STREET CHARACTER

04

DEVELOPMENT OF DESIGN RESPONSE

SITE PLAN (CONTEXT)

• BUILDING SCALE

• EXISTING VEGETATION (STREET TREES)

• TOPOGRAPHY

• FLAGS RELOCATIONCHURCH STREET FRONTAGE

DECIDUOUS TREE FORM HERITAGE INTERPRETATION

EXISTING HISTORIC ELEMENT

LOW GROUNDCOVERS

CHUR

CH S

TREE

T

LEW

IS S

TREE

T

MEARES STREET

CHUR

CH

STRE

ET• CONNECT TO URBAN SETBACK WITHIN MEDICAL PRECINCT

• PROVISION OF SHADE, SHELTER AND SCALE TO URBAN FORM

• INTEGRATION OF ART AND HISTORIC ELEMENTS THROUGHOUT

DECIDUOUS TREE FORM UTILISE HISTORIC ELEMENTS FROM SITELOW GROUNDCOVERS HARDWEARING PAVEMENT

Page 18: MUDGEE HOSPITAL REDEVELOPMENT

018

DESIGN RESPONSE

MEARES STREET CHARACTER AND MAIN ENTRY

04

DEVELOPMENT OF DESIGN RESPONSE

SITE PLAN (CONTEXT)

• BUILDING SCALE

• EXISTING VEGETATION (STREET TREES)

• TOPOGRAPHY

• FLAGS RELOCATION MEARES STREET ENTRY

CHUR

CH S

TREE

T

LEW

IS S

TREE

T

MEARES STREET

DECIDUOUS TREE FORMMEARES STREET HERITAGE INTERPRETATION

EXISTING HISTORIC ELEMENT

HEDGE PLANTING

• CONNECT TO URBAN SETBACK WITHIN MEDICAL PRECINCT

• PROVISION OF SHADE, SHELTER AND SCALE TO URBAN FORM

• INTEGRATION OF ART AND HISTORIC ELEMENTS THROUGHOUT

DECIDUOUS TREE FORM UTILISE HISTORIC ELEMENTS FROM SITELOW GROUNDCOVERS HARDWEARING PAVEMENT

Page 19: MUDGEE HOSPITAL REDEVELOPMENT

019

04LE

WIS

STR

E

EARES STREET

DESIGN RESPONSE

PUBLIC CAR PARK

Page 20: MUDGEE HOSPITAL REDEVELOPMENT

020

DESIGN RESPONSE

ARCHITECTURAL CONCEPT

FACADE RHYTHM, ARTICULATION AND ARCHITECTURAL ELEMENTS

BALCONIES AND EXTENDED ROOF EAVES

HIGHLIGHT DETAILS ON PUNCH OPENINGS

FACE BRICK

THE PARKVIEW HOTEL

PROPORTION AND RHYTHM IN FACADE BREAK UP

COLONNADE/EXTERNAL WALK-WAYS

HIGHLIGHT DETAILS FEATURE FACE BRICKWORK

HISTORICAL REFERENCES

LAWSON PARK HOTEL

Page 21: MUDGEE HOSPITAL REDEVELOPMENT

021

• AN ABSTRACT COMBINATION OF LOCAL LANDSCAPES FACADE DEVELOPMENT

COLOUR PALETTE

Page 22: MUDGEE HOSPITAL REDEVELOPMENT

022

DESIGN RESPONSE

ARCHITECTURAL CONCEPT

ARTIST’S SKETCHES

SOUTH-WEST VIEW (CHURCH AND MEARES ST CORNER)

• 2 STOREY BUILT FORM ON CHURCH AND MEARES ST

• BUILT FORM AT THE ENTRY RISING WITH THE NATURAL TERRAIN TO ACCENTUATE THE ENTRY POINT

• FACADE RHYTHM AND ARTICULATION (ARCHITECTURAL ELEMENTS AND MASSING)

Page 23: MUDGEE HOSPITAL REDEVELOPMENT

023

DESIGN RESPONSE

MEARES STREET AND MAIN ENTRY

ARCHITECTURE

MAIN ENTRY / EMERGENCY

MEARES STREET ELEVATION

CHURCH STREET VIEW NORTH (MEARES ST ELEVATION)

Page 24: MUDGEE HOSPITAL REDEVELOPMENT

024

• HONEST EXPRESSION OF BUILDING ELEMENTS

• CREATION OF PROPORTION AND RHYTHM BY THE BUILDING

ELEMENTS

• LAYERING OF THE BUILDING ELEMENTS TO CREATE

RICHNESS OF EXPRESSION

FACADE DEVELOPMENT

ARCHITECTURAL CONCEPT - ELEMENTS

Page 25: MUDGEE HOSPITAL REDEVELOPMENT

025

• HIGHLIGHTING MATERIALS

• DIFFUSING THE LIGHTFACADE DEVELOPMENT

ARCHITECTURAL CONCEPT - ELEMENTS

Page 26: MUDGEE HOSPITAL REDEVELOPMENT

026

FACADE DEVELOPMENT

3D VIEW MAIN ENTRY

VEHICULAR ENTRY FROM MEARES STREET

Page 27: MUDGEE HOSPITAL REDEVELOPMENT

027

FACADE DEVELOPMENT

MATERIALS AND COLOURS

• FACE BRICK

• LAYERED ELEMENTS: GUTTERS, DOWNPIPES, SLAB EDGES,

WINDOW OPENINGS

• DIFFUSED LIGHT GLAZING FOR THE MAIN ENTRY

• EXPRESSED MATERIAL FOR MAIN ENTRY CANOPY

CHURCH AND MEARES STREETS CORNER - PREVIOUS

CHURCH AND MEARES STREETS CORNER

Page 28: MUDGEE HOSPITAL REDEVELOPMENT

028

FACADE DEVELOPMENT

CHURCH STREET ADDRESS

CHURCH STREET ELEVATION - PREVIOUS

CHURCH STREET ELEVATION

Page 29: MUDGEE HOSPITAL REDEVELOPMENT

029

MEARES STREET ELEVATION - PREVIOUS

FACADE DEVELOPMENT

MEARES STREET AND MAIN ENTRY

MEARES STREET ELEVATION

Page 30: MUDGEE HOSPITAL REDEVELOPMENT

030

FACADE DEVELOPMENT

3D VIEW NORTH-WEST CORNER

CHURCH STREETS VIEW SOUTH

Page 31: MUDGEE HOSPITAL REDEVELOPMENT

031

INTRODUCTION OF INTERIOR CONCEPTS

EXTERIOR - INTERIOR

CONCEPT INSPIRATIONS

• ARCHITECTURE

• LOCAL LANDSCAPE

Page 32: MUDGEE HOSPITAL REDEVELOPMENT

032

DESIGN RESPONSE

ROUND FLOOR PLAN

Page 33: MUDGEE HOSPITAL REDEVELOPMENT

033

DESIGN RESPONSE

OWER GROUND FLOOR PLAN

Page 34: MUDGEE HOSPITAL REDEVELOPMENT

034

WAITING

CONSULT/ INTERVIEW

CLINICAL

STAFF BASE

PUBLIC FOH

INTRODUCTION OF INTERIOR CONCEPTS

INTERIOR HIERARCHY PLAN - GROUND FLOOR

Page 35: MUDGEE HOSPITAL REDEVELOPMENT

035

WAITING

CONSULT/ INTERVIEW

CLINICAL

STAFF BASE

PUBLIC FOH

INTRODUCTION OF INTERIOR CONCEPTS

INTERIOR HIERARCHY PLAN - LOWER GROUND FLOOR

Page 36: MUDGEE HOSPITAL REDEVELOPMENT

036

GRAPHICS

CEILING DISTRACTIONSTAFF BASE GRAPHIC

GALLERY WALK/ ART

INTRODUCTION OF INTERIOR CONCEPTS

INTERIOR ART & GRAPHICS STRATEGY - GROUND FLOOR

Page 37: MUDGEE HOSPITAL REDEVELOPMENT

037

GRAPHICS

CEILING DISTRACTIONSTAFF BASE GRAPHIC

GALLERY WALK/ ART

INTRODUCTION OF INTERIOR CONCEPTS

INTERIOR ART & GRAPHICS STRATEGY - LOWER GROUND FLOOR

Page 38: MUDGEE HOSPITAL REDEVELOPMENT

038

2 6 7 111 10

A

B

C

D

E

H

I

F

G

3 4 5 8 9 12

VOIDVOID

PUBLIC TERRACE

LIFT LIFT

AMBULANCES

PUBLIC CAR PARK

ROOF

2P BEDROOM2P BEDROOM2P BEDROOM2P BEDROOM2P BEDROOM

1P BEDROOMMATERNITY

1P BEDROOMMATERNITY

1P BEDROOMMATERNITY

BIRTHING RM

BIRTHING RM

1P BEDROOMPAEDIATRIC

1P BEDROOMPAEDIATRIC

1P BEDROOM HIGHOBS

1P BEDROOM HIGHOBS

1P BEDROOM

1P BEDROOM

1P BEDROOM

1P BEDROOM

1P BEDROOMSPECIAL

1P BEDROOMSPECIAL

1P BEDROOMBARIATRIC

STAF

F STA

TION

ENS-ISO

ANTE RM

ANTENATALASSESSMENT

ANTENATALASSESSMENT

WAITING/LOUNGE

PROCEDURE ROOM

DIRTY UTILITY

CLEAN UTILITY

OFFICE MUM

ENS

ENS

ENS

ENSENS ENS ENS

ENSENSENS

ENS-BAR

ENS

ENS

ENS

ENS

ENS-ACC

ENS-ACC

ASSESSMENT RM

BAY-B

EV

BAY-H

B

LOUNGEOFFICE NUM

ENS

SAFE ASSESSMENTRM

STORE GEN

ENS

DIRTY UTILITY

OFF WKST

OFFICE 1P

DECON SHR

AIRLOCK

1P BEDROOMISOLATION

ENS

INTERVIEW RM

TRIAGE CUBICLE TRIAGE WRITE-UP

TREATMENT RM

STOREPHOTOCOPY

OFF ADMISSIONS

GENERAL X-RAY RM

STOR

E GEN

OPG

ULTRASOUND

CH. ACC

CH. PT

CH. PT

CT CTRL RM

CT SCANNING RM

STAFF PROP

WAITING

BAY-PATH

BAY-M

OB

BAY-HOLDING

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-R

ESBA

Y-LINE

N

AIRLOCK

PLAY AREA

WAITING

RECEPTIONCLERICAL

STAFF RMSTORE PROP

WC-STAFF

FRONT OF HOUSE

IN-PATIENT UNIT

MATERNITY

EMERGENCY DEPARTMENT

MEDICAL IMAGING

CONCOURSE

BAY-HB

HOSPITALAUXILLARY

MAIN LOBBY

BAY-V

M

WC-ACC

WC-PUWC-PU

BAY-LINENBAY-BBW

BAY-HB

BAY-BEV

OR 2

BAY-HOLDING

OR 1

BAY-HOLDING

BAY-S

CRUB

CLEAN UP

STORE GENBAY-PAT PACU 1BAY-PAT PACU 2BAY-PAT PACU 3BAY-PAT PACU 4

CLEAN UTILITY

DIRTY

UTILI

TY

STOR

E ANA

ES

CONTROL RM CONSULT RM

RECEPTIONCLERICAL

MEETING RMSUB WAIT

BAY-PAT REC 1BAY-PAT REC 2

BAY-PAT REC 3

STAFF STATION

STORE EQUIP

BAY-EXIT

BAY-EXIT

ADL KITCHEN

ENS

ENS

STAFF RM/MEETING

CLEAN UTILITY DIRTY UTILITYALLIED HEALTH

TREATMENT

INTERVIEW RM

STORE EQUIP

BAY-HB

PERIOPERATIVE

STAFF STATION

STAFF RM

STAGE 2PACU

SET

DOW

N

ENS

ENS

ENS

ENS BOH LIFT LOBBY

1

2

3

1

2

3

OFF SECURITYBASE

RECEPTION

CLNR RM

WC-PAT

CH. ACCOFFICE 1P CH. PT

BAY-PAT REC 8 BAY-PAT REC 6

BAY-PAT REC 4

BAY-BBWBAY-LINEN

2P BEDROOM

STAGE 3

WC-PAT

BAY-C

LEAN

UP

BAY-MOB

1P BEDROOMISOLATION

PLAY AREA - PAED

OFFICE CLINICALWK RM

STORE COPY/STA

WOF (DISPOSAL)

ADL BATHROOM

ACTIVITY/DINING

BAY-MOB

BAY-HB

BAY-L

INEN

BAY-RES

BAY-BEV

MEETING RM

BAY-M

OB

WC-PAT

BAY-BBWBAY-LINEN

BAY-MOB BAY-RES

BAY-HB

BAY-HB

BAY-MEAL TRBAY-MEAL TR

1P BEDROOM

1P BEDROOM

1P BEDROOM 1P BEDROOM

WAITING

WALL RECESSED TELE-CONFERENCING SYSTEM

WC-ACC

WC-PAT

BAY-M

OB

BAY-EQUIP

BAY-RES

PARENTS RM

COFFEE CART

BAY-HB

BAY-W

HCHR

REFLECTION RM

BAY-W

FT

CLNR RM

STAIR

BAY-MOB

BAY-MOBBAY-LINEN

OFFICE 1PSTAFF WK RM

STORE GEN

WC-STAFF

RESUSCITATIONBAY

AMB WRITE UP

BAY-RESBAY-CONS

STAFF STATION

GUN SAFE

CLEAN UTILITY

WC-STAFF

(FLEX) (FLEX)

OFFICE SHAREDWKSTN

WAITING

WINDOW TREATMENTFOR PRIVACY

WINDOW TREATMENTFOR PRIVACY

STORE EQUIP

STAIR

WC-STAFF

STAF

F STA

TION

FH

FHR/FH

EDB EDB

FHR/FH

FHR/FH

EDB

FHR/FHFH

FHR

FHR/FH

EDB

EDB

FIP FHR/FH

EDB

FHR/FHEDB

STORE STERILE

SCOPESPASS THRU

STERILISINGSERVICES

CLNR RM

BAY-HBBAY-PAT REC 5BAY-PAT REC 7

CLEAN UP (ENDO)

SET UP ROOM

ENS ENS

COMMS DIST RM

WOF

DEBOX

CLNR RM

RECEIVING

DISPATCH

BAY-PROP

CHANGE - FCHANGE - M

ENS

BAY-M

OB

BAY-HB

WC-STAFF ACC WC

SHRSHRWC

BAY-PAT PROP

BAY-RES

BAY-HB FHR/FH

BAY-HB

SCOPE PROCESS

A100-052

1

A100-052

1A100-052

2

A100-052

2

MAIN. ST

EDB

A100-051

1A100-051

1

A100-051

2A100-051

2WOF

LOBBY AND RECEPTION

INTRODUCTION OF INTERIOR CONCEPTS

MAIN ENTRY ZONE

Page 39: MUDGEE HOSPITAL REDEVELOPMENT

039

INTRODUCTION OF INTERIOR CONCEPTS

MAIN ENTRY ZONE - LOBBY & RECEPTION

• FEATURE CEILING CONTINUES INSIDE

• EARTH-TONE MATERIAL PALETTE

• ARBOUR ELEMENT OVER WAITING AREAS

Page 40: MUDGEE HOSPITAL REDEVELOPMENT

040

INTRODUCTION OF INTERIOR CONCEPTS

MAIN ENTRY ZONE - LOBBY & RECEPTION

Page 41: MUDGEE HOSPITAL REDEVELOPMENT

041

2 6 7 111 10

A

B

C

D

E

H

I

F

G

3 4 5 8 9 12

VOIDVOID

PUBLIC TERRACE

LIFT LIFT

AMBULANCES

PUBLIC CAR PARK

ROOF

2P BEDROOM2P BEDROOM2P BEDROOM2P BEDROOM2P BEDROOM

1P BEDROOMMATERNITY

1P BEDROOMMATERNITY

1P BEDROOMMATERNITY

BIRTHING RM

BIRTHING RM

1P BEDROOMPAEDIATRIC

1P BEDROOMPAEDIATRIC

1P BEDROOM HIGHOBS

1P BEDROOM HIGHOBS

1P BEDROOM

1P BEDROOM

1P BEDROOM

1P BEDROOM

1P BEDROOMSPECIAL

1P BEDROOMSPECIAL

1P BEDROOMBARIATRIC

STAF

F STA

TION

ENS-ISO

ANTE RM

ANTENATALASSESSMENT

ANTENATALASSESSMENT

WAITING/LOUNGE

PROCEDURE ROOM

DIRTY UTILITY

CLEAN UTILITY

OFFICE MUM

ENS

ENS

ENS

ENSENS ENS ENS

ENSENSENS

ENS-BAR

ENS

ENS

ENS

ENS

ENS-ACC

ENS-ACC

ASSESSMENT RM

BAY-B

EV

BAY-H

B

LOUNGEOFFICE NUM

ENS

SAFE ASSESSMENTRM

STORE GEN

ENS

DIRTY UTILITY

OFF WKST

OFFICE 1P

DECON SHR

AIRLOCK

1P BEDROOMISOLATION

ENS

INTERVIEW RM

TRIAGE CUBICLE TRIAGE WRITE-UP

TREATMENT RM

STOREPHOTOCOPY

OFF ADMISSIONS

GENERAL X-RAY RM

STOR

E GEN

OPG

ULTRASOUND

CH. ACC

CH. PT

CH. PT

CT CTRL RM

CT SCANNING RM

STAFF PROP

WAITING

BAY-PATH

BAY-M

OB

BAY-HOLDING

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-R

ESBA

Y-LINE

N

AIRLOCK

PLAY AREA

WAITING

RECEPTIONCLERICAL

STAFF RMSTORE PROP

WC-STAFF

FRONT OF HOUSE

IN-PATIENT UNIT

MATERNITY

EMERGENCY DEPARTMENT

MEDICAL IMAGING

CONCOURSE

BAY-HB

HOSPITALAUXILLARY

MAIN LOBBY

BAY-V

M

WC-ACC

WC-PUWC-PU

BAY-LINENBAY-BBW

BAY-HB

BAY-BEV

OR 2

BAY-HOLDING

OR 1

BAY-HOLDING

BAY-S

CRUB

CLEAN UP

STORE GENBAY-PAT PACU 1BAY-PAT PACU 2BAY-PAT PACU 3BAY-PAT PACU 4

CLEAN UTILITY

DIRTY

UTILI

TY

STOR

E ANA

ES

CONTROL RM CONSULT RM

RECEPTIONCLERICAL

MEETING RMSUB WAIT

BAY-PAT REC 1BAY-PAT REC 2

BAY-PAT REC 3

STAFF STATION

STORE EQUIP

BAY-EXIT

BAY-EXIT

ADL KITCHEN

ENS

ENS

STAFF RM/MEETING

CLEAN UTILITY DIRTY UTILITYALLIED HEALTH

TREATMENT

INTERVIEW RM

STORE EQUIP

BAY-HB

PERIOPERATIVE

STAFF STATION

STAFF RM

STAGE 2PACU

SET

DOW

N

ENS

ENS

ENS

ENS BOH LIFT LOBBY

1

2

3

1

2

3

OFF SECURITYBASE

RECEPTION

CLNR RM

WC-PAT

CH. ACCOFFICE 1P CH. PT

BAY-PAT REC 8 BAY-PAT REC 6

BAY-PAT REC 4

BAY-BBWBAY-LINEN

2P BEDROOM

STAGE 3

WC-PAT

BAY-C

LEAN

UP

BAY-MOB

1P BEDROOMISOLATION

PLAY AREA - PAED

OFFICE CLINICALWK RM

STORE COPY/STA

WOF (DISPOSAL)

ADL BATHROOM

ACTIVITY/DINING

BAY-MOB

BAY-HB

BAY-L

INEN

BAY-RES

BAY-BEV

MEETING RM

BAY-M

OB

WC-PAT

BAY-BBWBAY-LINEN

BAY-MOB BAY-RES

BAY-HB

BAY-HB

BAY-MEAL TRBAY-MEAL TR

1P BEDROOM

1P BEDROOM

1P BEDROOM 1P BEDROOM

WAITING

WALL RECESSED TELE-CONFERENCING SYSTEM

WC-ACC

WC-PAT

BAY-M

OB

BAY-EQUIP

BAY-RES

PARENTS RM

COFFEE CART

BAY-HB

BAY-W

HCHR

REFLECTION RM

BAY-W

FT

CLNR RM

STAIR

BAY-MOB

BAY-MOBBAY-LINEN

OFFICE 1PSTAFF WK RM

STORE GEN

WC-STAFF

RESUSCITATIONBAY

AMB WRITE UP

BAY-RESBAY-CONS

STAFF STATION

GUN SAFE

CLEAN UTILITY

WC-STAFF

(FLEX) (FLEX)

OFFICE SHAREDWKSTN

WAITING

WINDOW TREATMENTFOR PRIVACY

WINDOW TREATMENTFOR PRIVACY

STORE EQUIP

STAIR

WC-STAFF

STAF

F STA

TION

FH

FHR/FH

EDB EDB

FHR/FH

FHR/FH

EDB

FHR/FHFH

FHR

FHR/FH

EDB

EDB

FIP FHR/FH

EDB

FHR/FHEDB

STORE STERILE

SCOPESPASS THRU

STERILISINGSERVICES

CLNR RM

BAY-HBBAY-PAT REC 5BAY-PAT REC 7

CLEAN UP (ENDO)

SET UP ROOM

ENS ENS

COMMS DIST RM

WOF

DEBOX

CLNR RM

RECEIVING

DISPATCH

BAY-PROP

CHANGE - FCHANGE - M

ENS

BAY-M

OB

BAY-HB

WC-STAFF ACC WC

SHRSHRWC

BAY-PAT PROP

BAY-RES

BAY-HB FHR/FH

BAY-HB

SCOPE PROCESS

A100-052

1

A100-052

1A100-052

2

A100-052

2

MAIN. ST

EDB

A100-051

1A100-051

1

A100-051

2A100-051

2WOF

CONCOURSE

INTRODUCTION OF INTERIOR CONCEPTS

MAIN ENTRY ZONE - CONCOURSE

Page 42: MUDGEE HOSPITAL REDEVELOPMENT

042

INTRODUCTION OF INTERIOR CONCEPTS

MAIN ENTRY ZONE - CONCOURSE

• PANELLISED WALL CLADDING TO FOH VOLUME

• TRANSLUCENT GLAZING TO AUXILIARY AND REFLECTION

ROOM VOLUME

• ARBOUR ELEMENT OVER CAFE

Page 43: MUDGEE HOSPITAL REDEVELOPMENT

043

2 6 7 111 10

A

B

C

D

E

H

I

F

G

3 4 5 8 9 12

VOIDVOID

PUBLIC TERRACE

LIFT LIFT

AMBULANCES

PUBLIC CAR PARK

ROOF

2P BEDROOM2P BEDROOM2P BEDROOM2P BEDROOM2P BEDROOM

1P BEDROOMMATERNITY

1P BEDROOMMATERNITY

1P BEDROOMMATERNITY

BIRTHING RM

BIRTHING RM

1P BEDROOMPAEDIATRIC

1P BEDROOMPAEDIATRIC

1P BEDROOM HIGHOBS

1P BEDROOM HIGHOBS

1P BEDROOM

1P BEDROOM

1P BEDROOM

1P BEDROOM

1P BEDROOMSPECIAL

1P BEDROOMSPECIAL

1P BEDROOMBARIATRIC

STAF

F STA

TION

ENS-ISO

ANTE RM

ANTENATALASSESSMENT

ANTENATALASSESSMENT

WAITING/LOUNGE

PROCEDURE ROOM

DIRTY UTILITY

CLEAN UTILITY

OFFICE MUM

ENS

ENS

ENS

ENSENS ENS ENS

ENSENSENS

ENS-BAR

ENS

ENS

ENS

ENS

ENS-ACC

ENS-ACC

ASSESSMENT RM

BAY-B

EV

BAY-H

B

LOUNGEOFFICE NUM

ENS

SAFE ASSESSMENTRM

STORE GEN

ENS

DIRTY UTILITY

OFF WKST

OFFICE 1P

DECON SHR

AIRLOCK

1P BEDROOMISOLATION

ENS

INTERVIEW RM

TRIAGE CUBICLE TRIAGE WRITE-UP

TREATMENT RM

STOREPHOTOCOPY

OFF ADMISSIONS

GENERAL X-RAY RM

STOR

E GEN

OPG

ULTRASOUND

CH. ACC

CH. PT

CH. PT

CT CTRL RM

CT SCANNING RM

STAFF PROP

WAITING

BAY-PATH

BAY-M

OB

BAY-HOLDING

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-PATIENTACUTE

BAY-R

ESBA

Y-LINE

N

AIRLOCK

PLAY AREA

WAITING

RECEPTIONCLERICAL

STAFF RMSTORE PROP

WC-STAFF

FRONT OF HOUSE

IN-PATIENT UNIT

MATERNITY

EMERGENCY DEPARTMENT

MEDICAL IMAGING

CONCOURSE

BAY-HB

HOSPITALAUXILLARY

MAIN LOBBY

BAY-V

M

WC-ACC

WC-PUWC-PU

BAY-LINENBAY-BBW

BAY-HB

BAY-BEV

OR 2

BAY-HOLDING

OR 1

BAY-HOLDING

BAY-S

CRUB

CLEAN UP

STORE GENBAY-PAT PACU 1BAY-PAT PACU 2BAY-PAT PACU 3BAY-PAT PACU 4

CLEAN UTILITY

DIRTY

UTILI

TY

STOR

E ANA

ES

CONTROL RM CONSULT RM

RECEPTIONCLERICAL

MEETING RMSUB WAIT

BAY-PAT REC 1BAY-PAT REC 2

BAY-PAT REC 3

STAFF STATION

STORE EQUIP

BAY-EXIT

BAY-EXIT

ADL KITCHEN

ENS

ENS

STAFF RM/MEETING

CLEAN UTILITY DIRTY UTILITYALLIED HEALTH

TREATMENT

INTERVIEW RM

STORE EQUIP

BAY-HB

PERIOPERATIVE

STAFF STATION

STAFF RM

STAGE 2PACU

SET

DOW

N

ENS

ENS

ENS

ENS BOH LIFT LOBBY

1

2

3

1

2

3

OFF SECURITYBASE

RECEPTION

CLNR RM

WC-PAT

CH. ACCOFFICE 1P CH. PT

BAY-PAT REC 8 BAY-PAT REC 6

BAY-PAT REC 4

BAY-BBWBAY-LINEN

2P BEDROOM

STAGE 3

WC-PAT

BAY-C

LEAN

UP

BAY-MOB

1P BEDROOMISOLATION

PLAY AREA - PAED

OFFICE CLINICALWK RM

STORE COPY/STA

WOF (DISPOSAL)

ADL BATHROOM

ACTIVITY/DINING

BAY-MOB

BAY-HB

BAY-L

INEN

BAY-RES

BAY-BEV

MEETING RM

BAY-M

OB

WC-PAT

BAY-BBWBAY-LINEN

BAY-MOB BAY-RES

BAY-HB

BAY-HB

BAY-MEAL TRBAY-MEAL TR

1P BEDROOM

1P BEDROOM

1P BEDROOM 1P BEDROOM

WAITING

WALL RECESSED TELE-CONFERENCING SYSTEM

WC-ACC

WC-PAT

BAY-M

OB

BAY-EQUIP

BAY-RES

PARENTS RM

COFFEE CART

BAY-HB

BAY-W

HCHR

REFLECTION RM

BAY-W

FT

CLNR RM

STAIR

BAY-MOB

BAY-MOBBAY-LINEN

OFFICE 1PSTAFF WK RM

STORE GEN

WC-STAFF

RESUSCITATIONBAY

AMB WRITE UP

BAY-RESBAY-CONS

STAFF STATION

GUN SAFE

CLEAN UTILITY

WC-STAFF

(FLEX) (FLEX)

OFFICE SHAREDWKSTN

WAITING

WINDOW TREATMENTFOR PRIVACY

WINDOW TREATMENTFOR PRIVACY

STORE EQUIP

STAIR

WC-STAFF

STAF

F STA

TION

FH

FHR/FH

EDB EDB

FHR/FH

FHR/FH

EDB

FHR/FHFH

FHR

FHR/FH

EDB

EDB

FIP FHR/FH

EDB

FHR/FHEDB

STORE STERILE

SCOPESPASS THRU

STERILISINGSERVICES

CLNR RM

BAY-HBBAY-PAT REC 5BAY-PAT REC 7

CLEAN UP (ENDO)

SET UP ROOM

ENS ENS

COMMS DIST RM

WOF

DEBOX

CLNR RM

RECEIVING

DISPATCH

BAY-PROP

CHANGE - FCHANGE - M

ENS

BAY-M

OB

BAY-HB

WC-STAFF ACC WC

SHRSHRWC

BAY-PAT PROP

BAY-RES

BAY-HB FHR/FH

BAY-HB

SCOPE PROCESS

A100-052

1

A100-052

1A100-052

2

A100-052

2

MAIN. ST

EDB

A100-051

1A100-051

1

A100-051

2A100-051

2WOF

WAITING

INTRODUCTION OF INTERIOR CONCEPTS

GROUND LEVEL WAITING ZONE