Page 1: MTO Philosophy & Guidelines

1

MTO GUIDELINES & PHILOSOPHY

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 2: MTO Philosophy & Guidelines

2

MTO GUIDELINES & PHILOSOPHY

Purpose of this philosophy is to establish guidelines for the material takeoffs

accurately for the project.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 3: MTO Philosophy & Guidelines

3

MTO GUIDELINES & PHILOSOPHY

WHY GUIDELINESREQUIRED ?

As we know in any project many people work together. People may be following different philosophies with different mindset as per their previous organization. � This guideline is required to bring complete task force of the project on the same platform with common conce

pt. � These guidelines are required to save man-hours and

bring quality to the MTO.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 4: MTO Philosophy & Guidelines

4

MTO GUIDELINES & PHILOSOPHY

MTO Preparation Methodology

� It is the responsibility of project LE and Material LE to prepare a proper guideline and methodology with reference to the ITB considering specific client requirements .

� This guideline shall be properly shared and understood among all the task force members.

� It is the task force members responsibility to adhere to the requirement of guidelines and maintain the accuracy.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 5: MTO Philosophy & Guidelines

5

MTO GUIDELINES & PHILOSOPHY

MTO Preparation Methodology

� The methodology of preparation of MTO is different for different type of projects. Therefore the guidelines and method of preparation of MTO shall be defined based on the project requirements.

Project means –Detail engineering projects, FEED as well

as proposals.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 6: MTO Philosophy & Guidelines

6

MTO GUIDELINES & PHILOSOPHY

Philosophy & Guidelines for Proposal work

�Proposal work is a fast track activity having short time duration, hence the approach towards this work should be different. No 3D modeling activity is performed in proposal. The Philosophy of MTO for proposal is as follows:

� 1. Prepare preliminary study to establish the routing ofmain process lines

�2. Prepare sketches for all P&ID lines irrespective of sizes.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 7: MTO Philosophy & Guidelines

7

MTO GUIDELINES & PHILOSOPHY

Philosophy & Guidelines for Proposal work

� 3. Prepare sketches for all Equipment trims� 4. Prepare piping MTO for the below on the basis of

standard sketches:• Safety shower & Eye wash piping• Utility station• Vent & Drain assemblies• Steam Trap assembly• Pump & Compressor auxiliaries • LG/LT Drain & Vent assemblies • Sample Connections

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 8: MTO Philosophy & Guidelines

8

MTO GUIDELINES & PHILOSOPHY

Philosophy & Guidelines for Proposal work

�5. To maintain the quality, MTO sketches for highersizes, rating and material should be checked before key-in.

� 6. It is recommended to prepare a separate valve MTO directly from the P&IDs and establish a comparison with key-in MTO to maintain high accuracy level.

Microsoft Office

Excel Worksheet

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 9: MTO Philosophy & Guidelines

9

MTO GUIDELINES & PHILOSOPHY

Documents required for MTO

I. Scope of WorkII. Plot planIII. P&IDs (Process & Utility)IV. Line ListV. Piping Material SpecificationVI. Equipment Lists and DatasheetsVII. Client technical specification or RequirementsVIII. Piping Item short codesIX. MTO Guidelines

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 10: MTO Philosophy & Guidelines

10

MTO GUIDELINES & PHILOSOPHY

Preparation of MTO for FEED Job

� FEED job requires more detailed study than proposals. The schedule duration of FEED job is normally more than proposal job. Generally 3D modeling is performed for 3” and above lines and MTO sketches are made for below 3” lines.

� PDS dump is used for the preparation of MTO for 3” above lines and manual key-in is used for below 3” lines.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 11: MTO Philosophy & Guidelines

11

MTO GUIDELINES & PHILOSOPHY

Documents required for FEED MTO

I. Scope of WorkII. Plot planIII. P&IDs (Process & Utility)IV. Line ListV. Piping Material SpecificationVI. Equipment Lists and DatasheetsVII. Client technical specification or RequirementsVIII. Piping Item short codesIX. MTO GuidelinesX. PDS dump

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 12: MTO Philosophy & Guidelines

12

MTO GUIDELINES & PHILOSOPHY

Documents required for FEED MTO

I. Scope of WorkII. Plot planIII. P&IDs (Process & Utility)IV. Line ListV. Piping Material SpecificationVI. Equipment Lists and DatasheetsVII. Client technical specification or RequirementsVIII. Piping Item short codesIX. MTO GuidelinesX. PDS dump Adobe Acrobat

Document

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 13: MTO Philosophy & Guidelines

13

MTO GUIDELINES & PHILOSOPHY

DETAIL ENGINEERING JOB

In detail engineering job MTO takeoffs will be done mainly in three steps i.e.

� Preliminary Takeoff or First MTO� Secondary Takeoff or Second MTO� Final Takeoff or Third MTO

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 14: MTO Philosophy & Guidelines

14

MTO GUIDELINES & PHILOSOPHY

PRELIMINARY TAKEOFF

The purpose of the Preliminary takeoff is as follows:

� To identify material requirements for which quotes can be obtained

� To place PO for items requiring lengthy lead times such as manufacturing or extended shipping schedules

� To place orders for bulk quantities of carbon steel and alloy materials.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 15: MTO Philosophy & Guidelines

15

MTO GUIDELINES & PHILOSOPHY

PRELIMINARY TAKEOFF

The First MTO is made in the early stages of the job. The preparation of First MTO normally use the following documents:

I. Plot planII. P&IDsIII. Piping sketchesIV. Piping transpositionsV. Piping drawings

This MTO should identify approximately 65-75% of the final requirements for carbon steel material and 85% of the alloy materials.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 16: MTO Philosophy & Guidelines

16

MTO GUIDELINES & PHILOSOPHY

SECONDARY TAKEOFFThe purpose of Secondary Takeoff or Second MTO is to further identify the piping material requirements. From these requirements, additional bulk materials are consolidated and purchased.

The secondary material takeoff is normally performed after Client review and approval of Piping and Equipment design model.PDS dump will be used for development of Secondary Takeoff. The secondary takeoff should identify more than 90% of material requirements including piping specialties items.

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 17: MTO Philosophy & Guidelines

17

MTO GUIDELINES & PHILOSOPHY

FINAL TAKEOFF

The purpose of Final Takeoff or Third MTO is to completelyidentify the piping material requirements. This bill of material shall be used for material requisition at site.

The Third MTO should include 100% of all known material..

500179/Manish Sharma/Piping Team/2016-04-19 15:43

500179/Manish Sharma/Piping Team/2016-04-19 15:43 보보 문문문문 무무 복복 및 외외 유유유 금금금금

Page 18: MTO Philosophy & Guidelines

Thank You