mti engineering

26
MTI ENGINEERING ORGANISATIONAL PROFILE 1 2020/02/19 Revision 01 (Template Revision Date: 2017/12/01) Address: 16 & 18 Kleim street, Carletonville, South Africa, 2500 Tel: +27 (0)18 786 1210 Email: [email protected] GPS co-ordinates: SOUTH 26º 20, 917 EAST 27º 24, 975 Vat.No.: 4200105429 Reg.No.: 1988/05995/07

Upload: others

Post on 24-Oct-2021

17 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MTI ENGINEERING

MTI

ENGINEERING ORGANISATIONAL

PROFILE

12020/02/19 Revision 01 (Template Revision Date: 2017/12/01)

Address:

16 & 18 Kleim street,

Carletonville,

South Africa, 2500

Tel: +27 (0)18 786 1210

Email: [email protected]

GPS co-ordinates:

SOUTH 26º 20, 917

EAST 27º 24, 975

Vat.No.: 4200105429

Reg.No.: 1988/05995/07

Page 2: MTI ENGINEERING

Our Vision:To be the preferred partner of choice for turnkey projects in the mining and

construction industry through the provision of world class metal and engineering services.

Our Mission:

We will achieve our vision through continuous interaction with our customers providing safe and high quality products and services.

Values:

• Honesty

• Trustworthiness

• Commitment

• Customer satisfaction

• Teamwork

• Employee wellbeing

2

VISION & MISSION

Page 3: MTI ENGINEERING

MTI Engineering, trading as Mine-Tech Industries was established in 1988 to offer its clients

reliable, high quality and cost effective mechanical, electrical and civil products and services.

Over the years MTI Engineering has established itself as the preferred supplier of structural and

civil engineering services to the mining industry.

MTI Engineering offers its clients structural and civil design services and detailing, steel

fabrication, site erection and project management.

MTI Engineering is devoted to the continuous development and growth of its employees,

products and services and a culture of quality, is engendered through leadership, training and

communication.

Company Overview

3

Page 4: MTI ENGINEERING

4

Management Structure

Operations Director

Johan SchoemanCorporate Services

Director

Jacel Visagie

HR &

Training

Director

Jonas Maxolo (& Workers Trustee)

Health

& Safety

& Quality

Area Manager

Tommy Palmer

Site

Manager

Ettiene

Fourie

Financial

Supervisor

Elisme

Schoeman

Site

Manager

Kobus

Oberholzer

Workshop ,

Procurement

Estimating &

Quality

Control

Page 7: MTI ENGINEERING

MTI Engineering is a Level 4 Empowering Supplier in terms of the

government gazetted code of good practice on B-BBEE.

The Company is committed to the empowerment of HDI and is

committed to all the elements of the B-BBEE Act. MTI Engineering

has a 26% HDI employee trust.

BBBEE certificate available on request.

7

BEE

Page 9: MTI ENGINEERING

9

Photo Gallery

AngloGold Ashanti – Ice Plant Structure

Anglo Platinum – Vent Ducting

Page 10: MTI ENGINEERING

10

Photo Gallery

South Deep – Backfill Plant South Deep – Backfill Plant

Page 11: MTI ENGINEERING

11

Photo Gallery

Ekurhuleni Municipality – Pedestrian Bridge Letseng Diamonds – Conveyor System

South Deep – Cip Tank Gold Fields – 800nb Pipe Line

Page 12: MTI ENGINEERING

12

Photo Gallery

Xstrata Rhovan – 3CR12 Barren Tank

Technicrete – Brick Plant (Witbank)

Sibanye Gold Kloof - Overland Conveyor Head

Pulleys

Page 13: MTI ENGINEERING

13

Photo GalleryXstrata Rhoven - MC7 Conveyor and Feed Chute

System

Sibanye Gold Kloof - Overland Conveyor

Page 14: MTI ENGINEERING

14

Photo Gallery

Driefontein – 1.5 Megaliter Water Tank Driefontein - CSP Project.

Page 15: MTI ENGINEERING

15

Photo GallerySibanye Gold Kloof -

Growth Project & Growth Plant Upgrade for Gold Recovery from Rock Dump

Page 16: MTI ENGINEERING

16

Photo Gallery

Growth Project & Growth

Plant Upgrade for Gold

Recovery from Rock Dump

Sibanye Gold Kloof -

Page 17: MTI ENGINEERING

17

Photo Gallery

Piping - various

Page 18: MTI ENGINEERING

18

Photo Gallery

Rhovan mine - Ducting

Page 19: MTI ENGINEERING

19

Photo GalleryStorm Mountain Diamonds – Kao Mine Plant Upgrade Project

Page 20: MTI ENGINEERING

20

Photo GalleryRhovan mine – Cable Gantry & Launder

Page 21: MTI ENGINEERING

21

Photo GallerySteel Services & Allied Industries Pty Ltd – Slimes Holding Tank

Page 22: MTI ENGINEERING

22

Photo Gallery

Vehicle Fleet

Vehicle Fleet:

MTI Engineering’s fleet

consist of one JCB Loadall

540-170, a Toyota HINO 13-

237F truck, Maxus V80,

Datsun Go & Go+ and five

Toyota Hilux bakkies.

Workshop Facilities:

Combined workspace in excess of

1790m² equipped with a 10 ton, 5

ton and 2 ton overhead crane and

two 3 ton electric crawls. Other

equipment includes plate rollers,

bending brake, punch and shears,

magnetic base drill, milling

machines, vertical boring mill,

pedestal drill and grinder, plasma

cutter etc.

Page 23: MTI ENGINEERING

23

Project History-Milestones

Project: Underground Workshop Facilities

Client: South Deep mine – Gold Fields

Project Value: R 8 008 762,22 (Eight million rand)

Execution Date: August 2019 – Current

Project: Kiln Off Gas System & Ducting

Client: Rhovan Vanadium mine

Project Value: R 4 823 437,25 (Four million rand)

Execution Date: July 2019 – Current

Project: Belt Filter Replacement Project

Client: LogiProc

Project Value: R 2 453 206,70 (Two million rand)

Execution Date: August 2019 – February 2020

Project: Supply, Manufacture & Erecting of Workshop Building

Client: Santana Crane Hire

Project Value: R 2 567 776,24 (Two million rand)

Execution Date: February 2019 – May 2019

Page 24: MTI ENGINEERING

24

Project History-Milestones

Project: Leach Vats Stainless Steel Plate Lining

Client: Rhovan Vanadium mine

Project Value: R 10 834 030.74 (Ten million rand)

Execution Date: September 2018 – February 2020

Project: New Tailings Storage Tanks (SMPP)

Client: South Deep mine – Gold Fields

Project Value: R 11 562 302.64 (Eleven million rand)

Execution Date: October 2018 – February 2020

Project: XRT Project

Client: Venetia Mine – De Beers

Project Value: R 5 705 465.24 (Five million rand)

Execution Date: June 2018 - October 2018

Project: Kao Mine Plant Upgrade Project

Client: Storm Mountain Diamonds - Lesotho

Project Value: R 46 595 124.87 (Forty six million rand)

Execution Date: 2016

Project: New Coarse Final Recovery Plant

Client: Letseng Diamonds - Lesotho

Project Value: R 7 000 000.00 (Seven million rand)

Execution Date: March 2015 – September 2015

Project: Refrigeration Plant

Client: BBE Projects - Driefontein

Project Value: R 6 000 000.00 (Six million rand)

Execution Date: April 2015 – October 2015

Project: 1.5 Megaliter Water Tank

Client: Sibanye Gold - Driefontein

Project Value: R 4000 000.00 (Four million rand)

Execution Date: March 2015 – Sept 2015

Project: Brick Plant

Client: Technicrete - Witbank

Project Value: R2 000 000.00 (Two million rand)

Execution Date: January 2014 – March 2014

Page 25: MTI ENGINEERING

2020/02/19 25

Project History-Milestones

Project: Overland Conveyor – Manufacturing & installation

Client: Sibanye Gold - Kloof

Project Value: R20 000 000.00 (Twenty million rand)

Execution Date: October 2012 – March 2014

Project: Solid Ice Plant

Client: Mponeng – Anglo Gold

Project Value: R 7 000 000.00 (Seven million rand)

Execution Date: April 2013 – January 2014

Project: Merensky Upgrade – Structural steel, tanks and

pipework

Client: Impala - Rustenburg

Project Value: R10 000 000.00 (Ten million rand)

Execution Date: February 2013 – July 2013

Project: MC7 Conveyor – Conveyor and feed chute system

Client: Xstrata - Rhovan Rustenburg

Project Value: R10 000 000.00 (Ten million rand)

Execution Date: November 2012 – August 2013

Project: Growth Plant Upgrade (“upstage” gold recovery

from rock dump)

Client: Sibanye Gold - Kloof

Project Value: R10 000 000.00 (Ten million rand)

Execution Date: February 2012 – Jun 2012

Project: Growth Project (gold recovery from rock dump)

Client: Sibanye Gold - Kloof

Project Value: R5 000 000.00 (Five million rand)

Execution Date: September 2011 – January 2012

Project: Conveyor System – Conveyor and feed chute

system

Client: Letseng Diamonds - Lesotho

Project Value: R7 000 000.00 (Seven million rand)

Execution Date: December 2009 – October 2010

Project: Filter Building – Structural steel and sheeting

Client: Vametco - Brits

Project Value: R4 000 000.00 (Four million rand)

Execution Date: February 2009 – August 2009

Project: Waste Loading Station–Conveyor, feed chute &

pumping system

Client: Harmony Mine - Randfontein

Project Value: R15 000 000.00 (Fifteen million rand)

Execution Date: March 2008 – February 2009

Page 26: MTI ENGINEERING

MTI Engineering Contact Details

PO BOX 306 Tel: (018) 786-1210

Carletonville, Email: [email protected]

2500

16 Kleim Street,

Industrial Area,

Carletonville

Work done for:

• Sibanye Stillwater Xstrata Rhovan

• ADP Projects (Pty) Ltd Thyssenkrupp/ Polysius

• Corobrick Aveng Grinaker

• Concor Technicrete MDM Engineering

• Impala Platinum Evraz Vametco

• Howden Process Compressor Lonmin Platinum

• Nola De Beers

• Anglogold Zinc Corp – Kumba Resources

• Harmony Master Drilling

• Pilanesberg Platinum Mines Gold Fields

• LogiProc

2020/02/19 26

Contact Us / List of Vendors