mt tabor central yard and nursery

Upload: kharden

Post on 31-May-2018

217 views

Category:

Documents


0 download

TRANSCRIPT

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    1/29

    Mt. Tabor Central Yard &Nursery

    Transportation StudyFinal presentation

    May 19, 2008

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    2/29

    Transportation Group WHPacific scope

    How much land will need to be set aside in

    order to connect SE 64 th Ave. to Division.

    The work will also address implications foradjacent properties, access to the park, andcost.

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    3/29

    Transportation Group WIKI Question

    Questions from WIKI Transportation SiteHow much ROW (land) do we need to set aside?Would the alignment follow the property line, whichis curved, or something else?

    What would get included in a street profile, such asplanting strip, trees, ADA ramps, bike lanes,parking?Is a full street really needed? Can we meet theconnectivity policy with other options, such asbike/ped pathway?

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    4/29

    Transportation Group - WIKIQuestions from WIKI Transportation Site

    Can the street be one way?Can public access be limited to the Lincoln end toreach community gardens, horticultural services,

    etc., and a maintenance access be limited to theDivision end. (technically connected but blockedoff with a swinging gate?)

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    5/29

    Initial ResearchObtained copy of Plat

    Minor Land Division Case File LUR 96-00 748 MPCreated accurate drawing of property lineMt. Tabor Park Master Plan Jan. 2000Standard street widths for local streetBike path standards & design guide

    Green Street Standards BESSouth Tabor Neighborhood Plan

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    6/29

    Plat

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    7/29

    Plat

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    8/29

    Minor Land Division Final DecisionLUR 96-00 748 MP

    No construction is allowed on Parcel 2 within50 of the west property line (to accommodate

    the future street and setback) as attached.

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    9/29

    Taxmap (plat)

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    10/29

    Administrative Decision, Administrative Findingsand Decision, Minor Land Division LUR 96-00 748 MP

    The plat shall include a future street reserve.Any future land division of parcel 2 shallinclude the dedication of SE 64th. IV.3

    There is nothing in the plat or the conditions of

    approval that require dedication of right-of-way atthis time. If Parcel 2 is redeveloped withoutfurther division of the land, then dedication of ROW for a road is not required. Only if the propertyis divided will dedication be required.

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    11/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    12/29

    Transportation Group Bullets here

    Bullets here Bullets here

    View looking south down SE 64th

    Ave.

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    13/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    14/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    15/29

    No Build Option

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    16/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    17/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    18/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    19/29

    Combination Path & Driveway

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    20/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    21/29

    Multi-Use Path,Driveway, & Full Street

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    22/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    23/29

    Full City Street w/ Water Quality &Traffic Control

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    24/29

    Mt. Tabor Master Plan - 2000Improvements of SE 64 th Ave. is noted as a

    future connection. (As recommended by PDOT)The access sub-committee favored creatingaccess from SE Division Street, if it did not

    negatively impact adjoining neighbors, andinvestigation of one-way traffic to solvecirculation and parking issues.

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    25/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    26/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    27/29

    Traffic Control Bulb-out example @ SE Clinton St.

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    28/29

  • 8/14/2019 Mt Tabor Central Yard and Nursery

    29/29

    Mt. Tabor Central Yard &Nursery

    Transportation Study