mt category 7 enhancements...

25
MT Category 7 Enhancements Overview March 17, 2017 Robert Marchal Where business and standardisation meet

Upload: hoangminh

Post on 18-Mar-2018

236 views

Category:

Documents


4 download

TRANSCRIPT

Page 1: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

MT Category 7

Enhancements Overview

March 17, 2017

Robert Marchal

Where business and standardisation meet

Page 2: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Overall Project

• The Trade Finance Maintenance Working Group (TFMWG) launched a

significant revamp of the cat 7 MTs (Letters of credit, guarantees and standby

L/Cs) in 2013, taking into account change requests from previous years.

• The drivers are:

- requests from the community over the last 10 years

- straight-through-processing

- to fill some gaps in transaction flows

• It is a significant upgrade to the functionality and format of the 700 (L/C)

series and 760 (guarantees/standby L/Cs) series of messages, including 8

new MTs

• The go-live dates are in November 2018 for L/Cs and November 2019 for

guarantees/standby L/Cs.

• The detailed implementation and documentation time line is as follows:

2

Page 3: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

2015

2016

2017

2018

L/C

2019

Guarantees/standbys

Aug

Mar Sep

May Jul Nov

Dec May Jul Nov

34 CRs submitted by WG

BPC Rejected 4 CRs

Advance Documentation

Dec

LIVE VTB UHB Documentation

SRG Documentation

SRG Documentation

LIVE UHB Documentation

Jun

Annual Deadline for CR

Feb

Advance Documentation

March-April

BPC Approved 30 CRs

2014

2013

WG created Meeting in BE

Oct

Mar

Meeting in BE

(Vendor Test bed) (Test & Training)

VTB

Testing facility

Documentation Milestone

T&T

T&T

Readiness Portal My Standards

Page 4: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

4

Page 5: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Testing Facilities

As usual, the Vendor Test Bed (VTB) will be available in May of the SR.

And Test and Training (T&T), in July of the SR.

An additional Testing Facility, integrated as a Readiness Portal in

MyStandards is available since 2016. The new MT’s can be tested, with some

limitations

- not all NVR (Network Validated Rules) implemented

- not for volume testing

5

Page 6: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

MT Category 7 Update

New messages

MT 708 Amendment to a Documentary Credit

MT 744 Notice of Non-Conforming Reimbursement Claim

MT 761 Issue of a Demand Guarantee/Standby Letter of Credit

MT 765 Guarantee/Standby Letter of Credit Demand

MT 775 Amendment to a Demand Guarantee/Standby Letter of Credit

MT 785 Guarantee/Standby Letter of Credit Non Extension Notification

MT 786 Guarantee/Standby Letter of Credit Demand Refusal

MT 787 Guarantee/Standby Letter of Credit Amendment Response

MT 759 Ancillary Trade Structured Message

6

Documentary

Credits

Guarantees

Standbys

All Cat 7

Page 7: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

MT Category 7 Working Group

General – L/C and Guarantees/Standbys

• Creation of a message MT 759 (Ancillary Trade Structured Message) similar to

MT 799 using a limited number of coded and structured fields

• Addition of a field to refer to a document sent by another channel (e.g. FileAct)

• Adoption of extended “Z”

character set for long

fields (e.g. 45A, 46A, 47A,

71, 72, 73, 77)

7

X

Z

Page 8: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Documentary Credits

Status in electronic communication standards

Applicant Beneficiary Issuing Bank Advising Bank

well structured C2B and B2C messages (SCORE MT 798)

- using the Bank-to-Bank MTs as the ‘backbone“ of the messages

- additional fields for communication Customer-to-Bank and vice versa

well structured B2B messages (MT 700, MT 710, MT 707, etc.)

- however, some messages are not structured enough (e.g. Amendment)

8

Page 9: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Documentary Credits

Overview of work items and topics - 1 • AMENDMENT: Re-design of MT 707 + new continuation MT 708

– Structured fields for any modification

– Use of codes ADD, DELETE, REPLACE ALL for the long narrative fields

– Specific tag for amendment charges

• Addition of 2 fields to indicate the Special Instructions for Payment (to be

conveyed to the Beneficiary or for the Advising Bank only)

• Addition of the Bank that is requested to add confirmation or may add its

confirmation

• NEW MSG: Advice of non-conforming claim (MT 744) Message sent by the reimbursing bank to the bank claiming reimbursement as notification that the

claim, on the face of it, as not to be in accordance with the instruction in the Reimbursement

Authorisation for the reason(s) as stated in this message.

9

Page 10: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Documentary Credits

Overview of work items and topics - 2

• Addition of additional narrative field 79Z to MT 730 and MT 752

Field changes applicable to 700, 710, 720, etc

• Renamed field 42P (Deferred Payment Details to Negotiation/Deferred Payment Details)

• Deletion of some codes from 40A (Form of Documentary Credit)

• Change field 43P (Partial Shipment) and 43T (Transshipment) to code ALLOWED

CONDITIONAL

NOT ALLOWED

• Renamed and structured field 48 (Period for Presentation to Period for Presentation in days)

3n[/35x] - (Days)(Narrative)

• Changed field 49 (Confirmation Instructions) definition

• Changed usage rules for fields 45, 46 and 47 to support more extension, from 3

to 8 extension messages, for MT 701, MT 711 and MT 721

10

Page 11: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Guarantees and Standby Letters of Credit

Current situation

Applicant Beneficiary Issuing Bank Advising Bank

well structured Customer-to-Bank messages (SCORE MT 798)

unstructured Bank-to-Bank messages (MT 760, MT 767, etc.)

less structured Bank-to-Customer messages (SCORE MT 798)

11

Page 12: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Guarantees and Standby Letters of Credit

Overview of work items and topics

• ISSUANCE: Enforcement of use of MT 760 (and MT 767) for Demand Guarantees /

Standby Letters of Credit

• Significant re-design of MT 760 + new continuation message (MT 761)

• AMENDMENT: Significant re-design of MT 767 + new continuation message (MT 775)

• NEW MT: Guarantee/SBLC Demand (incorporating Extend or Pay) (MT 765)

• NEW MT: Guarantee/SBLC Non-Extension Notification (MT 785)

• NEW MT: Guarantee/SBLC Demand Refusal (MT 786)

• NEW MT: Guarantee/SBLC Amendment Response (MT 787)

• Addition of new field 23X (File Identification) to all messages

12

Page 13: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Guarantees and Standby Letters of Credit

General overview revised message structure of MT760

Sequence A

General Information

Sequence B

Undertaking Details

MT 760 MT 761

Wording of

Undertaking or

Counter-Undertaking

---------------------------- Requested wording

for Local Undertaking

MT 761

MT 761

1 2 3

The revised MT 760 message consists primarily of structured fields and fields with coded options (e.g. amount, parties,

expiry details, etc.) The message has been designed with three blocks:

Sequence A: General information

Sequence B: indicates the details of the undertaking or counter-undertaking

Sequence C: (optional) indicates the details of the requested local undertaking

1

The extension message MT 761 message consists primarily of a big free text block in order to specify the wording of

the undertaking/counter-undertaking as well as the requested wording for the local undertaking – if applicable 2

Up to a maximum of 8 MT 761 messages could accompany the MT 760 message 3

Sequence C

Local Undertaking Details

13

Page 14: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Thank you

14

Your SWIFT Standards contacts

Robert Marchal

Belgium

[email protected]

David Dobbing

Australia

[email protected]

Angeline Tan

Singapore

[email protected]

Page 15: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

www.swift.com

15

Page 16: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

MT Category 7 Update

Changed messages MT 700 Issue of a Documentary Credit

MT 701 Issue of a Documentary Credit

MT 705 Pre-Advice of a Documentary Credit

MT 707 Amendment to a Documentary Credit

MT 710 Advice of a Third Bank's or a Non-Bank's Documentary Credit

MT 711 Advice of a Third Bank's or a Non-Bank's Documentary Credit

MT 720 Transfer of a Documentary Credit

MT 721 Transfer of a Documentary Credit

MT 730 Acknowledgement

MT 732 Advice of Discharge

MT 734 Advice of Refusal

MT 740 Authorisation to Reimburse

MT 742 Reimbursement Claim

MT 747 Amendment to an Authorisation to Reimburse

MT 750 Advice of Discrepancy

MT 752 Authorisation to Pay, Accept or Negotiate

MT 754 Advice of Payment/Acceptance/Negotiation

MT 756 Advice of Reimbursement or Payment

MT 760 Issue of a Demand Guarantee/Standby Letter of Credit

MT 767 Amendment to a Demand Guarantee/Standby Letter of Credit Amendment

MT 768 Acknowledgement of a Guarantee/Standby Message

MT 769 Advice of Reduction or Release 16

Documentary

Credits

Guarantees

Standbys

Page 17: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

MT 759 Ancillary Trade Structured Message

17

Page 18: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Field 23H: Function

18

Page 19: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

MT 760 Format Specifications

19

Page 20: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Sequence B Undertaking Details

20

Page 21: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Sequence C Local Undertaking Details

21

Page 22: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Sequence C Local Undertaking Details

22

Page 23: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

MT 767 Format Specifications

23

Page 24: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

24

Page 25: MT Category 7 Enhancements Overviewiiblp.org/wp-content/uploads/2017/06/2017-IIBLP-Survey-SWIFT-MT... · MT Category 7 Enhancements Overview March 17, ... 1 • AMENDMENT: Re

Use of codes ADD, DELETE, REPLACE ALL for the long narrative fields

25