m/s. welmica laminates pvt. ltd - gpcb.gujarat.gov.in · urea formaldehyde resin: ... for proposed...

58
M/S. WELMICA LAMINATES PVT. LTD (New Proposed Resin Manufacturing Project) (Phenol Formaldehyde Resin: 700 MT/month, Melamine Formaldehyde Resin: 400 MT/month, Urea Formaldehyde Resin: 400 MT/month) Survey No. 98, Opposite 66 KV Substation, Before Millennium Tiles, Old Rafaleshwar Road, at Village: Bhadiyad, Taluka & District: Morbi-363642, Gujarat. DRAFT RAPID ENVIRONMENTAL IMPACT ASSESSMENT REPORT Prepared By: T. R. Associates (NABET Accredited ‘Category –A’ Environmental Consultant) (NABET/EIA/1619/RA0033) Baseline Monitoring Period : October 2017 to December 2017 NABL Accreditation : (NABL Accredited Certificate No. T-3189 valid up to 13-11-2018) Ganesh Meridian, Block No.: C, Office No. 605-A, Opp. Kargil Petrol Pump, Nr. Sola Over Bridge, S. G. Highway, Ahmedabad-380060. Email ID: adm.[email protected] Contact No. 09825371099 FEBRUARY,2018

Upload: dangmien

Post on 10-May-2018

277 views

Category:

Documents


5 download

TRANSCRIPT

M/S. WELMICA LAMINATES PVT. LTD

(New Proposed Resin Manufacturing Project)

(Phenol Formaldehyde Resin: 700 MT/month, Melamine Formaldehyde Resin: 400 MT/month,

Urea Formaldehyde Resin: 400 MT/month)

Survey No. 98, Opposite 66 KV Substation, Before Millennium Tiles, Old Rafaleshwar

Road, at Village: Bhadiyad, Taluka & District: Morbi-363642, Gujarat.

DRAFT RAPID ENVIRONMENTAL IMPACT ASSESSMENT REPORT

Prepared By:

T. R. Associates

(NABET Accredited ‘Category –A’ Environmental Consultant) (NABET/EIA/1619/RA0033)

Baseline Monitoring Period : October 2017 to December 2017

NABL Accreditation : (NABL Accredited Certificate No. T-3189 valid up to 13-11-2018)

Ganesh Meridian, Block No.: C, Office No. 605-A, Opp. Kargil Petrol Pump, Nr. Sola Over Bridge,

S. G. Highway, Ahmedabad-380060.

Email ID: [email protected]

Contact No. 09825371099

FEBRUARY,2018

DECLARATION BY

EXPERTS

TOR

& IT’S

COMPLIANCE

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

1

TERMS OF REFERENCE (TOR) COMPLIANCE

Point wise compliance to the TOR points issued by EAC, MoEF&CC New Delhi vide

their letter no. J TOR wide letter no. J-11011/274/2017-IA.II (I) dated 3rd August,2017

(attached as Annexure -1) for proposed manufacturing of Melamine Formaldehyde

Resin, Phenol Formaldehyde Resin & Urea Formaldehyde Resin at Survey No.: 98,

Village: Bhadiyad, Taluka & District: Morbi, Gujarat.

A tabular chart with index for point wise compliance is as given below:

Sr.

No. TOR Condition Compliance Status

Page

No.

A Additional TOR

1. A plan for implementation of zero liquid discharge system shall be submitted

Details of domestic and industrial effluent is given in Section 2.11.1 of Chapter - 2

2.23

2. No construction activity (other than securing land) shall be started without obtaining prior EC

PP has not started any construction activity related to proposed project.

--

3.

A layout plan earmarking space greenbelt of at least 10m width along the periphery of the plant with three layers of perennial trees, which can control/reduce the pollutant from the project, shall be submitted. At least 33% of the area shall be developed as green belt area with trees. Trees shall be selected as per CPCB norms

Refer Figure 2.6 of Chapter – 2 of the EIA report for detailed Plant Layout of the project.

2.10

4.

At least 2.5% of the total project cost may be earmarked towards Enterprise Social Commitment (ECS). PP shall submit a five year plan for ESC.

Refer Section 8.4 of Chapter – 8 of

the EIA report for requisite details.

8.2

5.

Public hearing to be conducted

and as per the provision of EIA

Notification, 2006.

We have taken note of the same.

Minutes of public consultation along

with commitments made and

budgetary allocation for the same

will be incorporated in EIA report

--

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

2

Sr.

No. TOR Condition Compliance Status

Page

No.

after the public consultation.

ANNEXURE - I : GENERIC TOR WITH RESPECT TO INDUSTRY SECTOR

1 Executive Summary Executive summary of the project in

both English & Gujarati language

has been incorporated in the EIA

report.

--

2 Introduction

i. Details of the EIA Consultant

including NABET

accreditation.

Details of EIA consultant has been

incorporated in Chapter – 12 of the

EIA report. NABET accreditation

certificate is attached as Annexure –

7.

12.1-

12.4

ii. Information about the project

proponent.

Refer Section 1.3 in Chapter - 1 1.2

iii. Importance and benefits of the

project

Refer Section 1.4 in Chapter - 1 1.3

3 Project Description

i. Cost of project & time of

completion

Refer Section 2.4 of Chapter - 2 2.9

ii. Product with capacities for the

proposed project

Refer Section 2.5 of Chapter - 2 2.11

iii. If expansion project, details of

existing products with capacities

and whether adequate land is

available for expansion,

reference of earlier EC if any

Not applicable as this is a proposed

project.

--

iv. List of raw materials required

and their source along with

mode of transportation.

Refer Section 2.5 and 2.7 of Chapter

- 2

2.11 &

2.18

v. Other chemicals & materials Refer Section 2.5 and 2.7 of Chapter 2.11 &

2.18 –

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

3

Sr.

No. TOR Condition Compliance Status

Page

No.

required with quantities and

storage capacities

- 2 2.19

vi. Details of emission, effluents,

hazardous waste generation and

their management.

Details of air emission i.e. process

and flue gas emission is given in

Section 2.11.2 of Chapter - 2

2.28 –

2.32

Details of domestic and industrial

effluent is given in Section 2.11.1 of

Chapter - 2

2.23 –

2.27

Details of hazardous waste

generation & their management is

given in Section 2.11.3 of Chapter - 2

2.33

vii. Requirement of water,

power, with source of supply,

status of approval, water

balance diagram, man-power

requirement (regular and

contract)

Refer Section 2.11.1 of Chapter -2 for

the details of water consumption

and water balance diagram.

It may be noted that we have

already made application to CGWB

for obtaining permission for

groundwater abstraction. Proof of

the same is attached as Annexure –

3.

Refer Section 2.9.1 of Chapter - 2 for

the details of power requirement

and its source.

Refer Section 2.9.2 of Chapter - 2 for

the details of man-power

requirement.

2.23-

2.25

2.20

2.20-

2.21

viii. Process description along

with major equipments and

machineries, process flow sheet

(quantities) from raw material to

products to be provided.

Process description along with

process flow diagram and mass

balance is given in Section 2.6 of

Chapter - 2

2.12 –

2.17

Major equipments & machineries are 2.21-

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

4

Sr.

No. TOR Condition Compliance Status

Page

No.

given in Section 2.9.5 of Chapter - 2 2.22

ix. Hazard identification and

details of proposed safety

systems.

Refer Section 7.3.2 and 7.3.3 of

Chapter - 7.

7.4-

7.11

x. Expansion/modernization

proposals:

a. Copy of all the

Environmental Clearance(s)

including Amendments

thereto obtained for the

project from MOEF/SEIAA

shall be attached as an

Annexure. A certified copy of

the latest Monitoring Report

of the Regional Office of the

Ministry of Environment and

Forest as per circular dated

30th May, 2012 on the status

of compliance of conditions

stipulated in all the existing

environmental clearances

including Amendments shall

be provided. In addition,

status of compliance of

Consent to Operate for the

ongoing/existing operation

of the project from SPCB shall

be attached with the EIA-

EMO report.

b. In case the existing project

has not obtained

environmental clearance,

reasons for not taking EC

under the provisions of the

Not applicable as this is a proposed

project

--

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

5

Sr.

No. TOR Condition Compliance Status

Page

No.

EIA Notification 1994 and/or

EIA Notification 2006 shall be

provided. Copies of Consent

to Establish/No Objection

Certificate and Consent to

Operate (in case of units

operating prior to EIA

Notification 2006, CTE and

CTO of FY 2005-2006)

obtained from the SPCB shall

be submitted. Further,

compliance report to the

conditions of consents form

the SPCB shall be submitted.

4 Site Details

i. Location of the project site

covering village, Taluka/Tehsil,

District and State, Justification

for selecting the site, whether

other sites were considered.

Refer Section 2.2 of Chapter - 2 for

the requisite details.

2.1- 2.6

ii. A toposheet of the study

area of radius of 10km and

site location on

1:50,000/1:25,000scaleonanA3/

A2sheet. (Including all eco-

sensitive areas and

environmentally sensitive

places.

A toposheet of the 10 km radius

study area along with site location is

incorporated as Figure 2.4 in the EIA

Report.

2.5

iii. Details w.r.t. option analysis for

selection of site.

Refer Section 1.5 of Chapter - 1 as

well as Section 5.3 of Chapter - 5 of

the EIA report for the requisite

details.

1.3 -1.6

5.1-5.2

iv. Co-ordinates (lat-long) of all

four corners of the site.

Refer Figure 1.1 of Chapter - 1 of the

EIA report.

1.4

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

6

Sr.

No. TOR Condition Compliance Status

Page

No.

v. Google map-Earth downloaded

of the project site.

Refer Figure 2.2 of Chapter - 2 of the

EIA report.

2.3

vi. Layout maps indicating

existing unit as well as

proposed unit indicating

storage area, plant area,

greenbelt area, utilities etc. If

located within an Industrial

area/Estate/Complex, layout

of Industrial Area indicating

location of unit within the

Industrial area/Estate.

Refer Figure 2.6 of Chapter – 2 of the

EIA report for detailed Plant Layout

of the project.

2.10

vii. Photographs of the proposed

and existing (if applicable)

plant site. If existing, show

photographs of

plantation/greenbelt, in

particular.

Refer Figure 1.2 of Chapter - 1 of the

EIA report.

1.5

viii. Land use break-up of total

land of the project site

{identified and acquired},

government/private-

agricultural, forest, wasteland,

water bodies, settlements, etc.

shall be included.(not required

for industrial area).

Refer Section 2.3 of Chapter - 2 for

the land use break-up of project site.

Refer Section 2.2.3 of Chapter - 2 for

the salient features of the proposed

project site.

2.8-2.9

2.8

ix. A list of major industries with

name and type within study area

{10km radius} shall be

incorporated. Land use details of

the study area

Refer Section 2.2.2 of Chapter - 2 for

the requisite details.

2.6-2.7

Land use details of the study area is

given in Section 3.7 of Chapter - 3

3.37 -

3.46

x. Geological features and Geo-

hydrological status of the study

Refer Section 3.6 of Chapter – 3 for

the requisite details.

3.32-

3.36

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

7

Sr.

No. TOR Condition Compliance Status

Page

No.

area shall be included.

xi. Details of Drainage of the project

up to 5 km radius of study area.

If the site is within 1 km radius

of any major river, peak and

lean season river discharge as

well as flood occurrence

frequency based on peak

rainfall data of the past 30

years. Details of Flood Level of

the project site and maximum

Flood Level of the river shall

also be provided. (mega green

field projects)

Refer Section 3.6 of Chapter – 3 for

the requisite details.

3.32-

3.36

xii. Status of acquisition of land. If

acquisition is not complete, stage of

the acquisition process and

expected time of complete

possession of the land.

It may be noted that the land is on

lease. NA permission and Lease

Deed copy is attached as Annexure –

2.

--

xiii. R&R details in respect of

land in line with state

Government policy

Not applicable --

5 Forest and Wildlife related Issues (if applicable):

i. Permission and approval for

the use of forest land (forestry

clearance), if any, and

recommendations of the State

Forest Department. (if

applicable)

Not Applicable --

ii. Land use map based on High

resolution satellite imagery

Not Applicable --

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

8

Sr.

No. TOR Condition Compliance Status

Page

No.

(GPS) of the proposed site

delineating the forestland (in

case of projects involving

forest land more than 40 ha)

iii. Status of Application

submitted for obtaining the

stage I forestry clearance along

with latest status shall be

submitted.

Not Applicable --

iv. The projects to be located

within 10 km of the National

Parks, Sanctuaries, Biosphere

Reserves, Migratory Corridors

of Wild Animals, the project

proponent shall submit the

map duly authenticated by

Chief Wildlife Warden

showing these features vis-à-

vis the project location and the

recommendations or

comments of the Chief Wildlife

Warden-thereon

Not applicable as no wild life

sanctuary is located within 10 km

radius of the project site.

--

v. Wildlife Conservation Plan

duly authenticated by the

Chief Wildlife Warden of the

State Government for

conservation of Schedule I

fauna, if any exists in the study

area

Not Applicable --

vi. Copy of application submitted

for clearance under the

Wildlife (Protection) Act, 1972,

to the Standing Committee of

the National Board for Wildlife

Not Applicable --

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

9

Sr.

No. TOR Condition Compliance Status

Page

No.

6 Environmental Status

i. Determination of atmospheric

inversion level at the project site

and site-specific micro-

meteorological data using

temperature, relative humidity,

hourly wind speed and

direction and rainfall.

Site specific micro-meteorological

data are given in Annexure – 4.

Refer Section 3.2.1 of Chapter – 3 for

requisite details.

--

3.2 -

3.7

ii. AAQ data (except monsoon) at 8

locations for PM10, PM2.5, SO2,

NOX, CO and other parameters

relevant to the project shall be

collected. The monitoring

stations shall be based CPCB

guidelines and take into account

the pre-dominant wind

direction, population zone and

sensitive receptors including

reserved forests.

Refer Section 3.2.2 of Chapter – 3 for

requisite AAQ data.

3.8 –

3.13

iii. Raw data of all AAQ

measurement for 12 weeks of all

stations as per frequency given

in the NAQQM Notification of

Nov. 2009 along with – min.,

max., average and 98% values

for each of the AAQ parameters

from data of all AAQ stations

should be provided as an

annexure to the EIA Report.

Refer Table 3.6 of Chapter – 3 for

requisite detail.

Please refer Annexure – 5 for raw

data of all AAQ measurement for 12

weeks for all selected sampling

stations.

3.12-

3.13

--

iv. Surface water quality of

nearby River (100m upstream

and downstream of discharge

point) and other surface drains

at eight locations as per

Refer Table 3.12 of Chapter – 3 for

surface water quality data.

3.25 -

3.27

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

10

Sr.

No. TOR Condition Compliance Status

Page

No.

CPCB/MoEF&CC guidelines.

v. Whether the site falls near to

polluted stretch of river

identified by the CPCB/MoEF &

CC, if yes give details.

Not Applicable --

vi. Ground water monitoring

at minimum at 8 locations shall

be included.

Refer Table 3.11 of Chapter – 3 for

ground water quality data.

3.22 -

3.24

vii. Noise levels monitoring at 8 locations within the study area.

Refer Table 3.9 of Chapter – 3 for

Noise Level Monitoring Data. 3.17

viii. Soil characteristic as per

CPCB guidelines.

Refer Table 3.14 of Chapter – 3 for

Soil Characteristic Data. 3.30

ix.Traffic study of the area, type of

vehicles, frequency of vehicles

for transportation of materials,

additional traffic due to

proposed project, parking

arrangement etc.

Refer Section 3.10 of Chapter 3 for

traffic study data.

3.85-

3.86

x. Detailed description of flora and

fauna (terrestrial and aquatic)

existing in the study area shall

be given with special reference

to rare, endemic and

endangered species. If Schedule-

I fauna are found within the

study area, a Wildlife

Conservation Plan shall be

prepared and furnished.

Refer Section 3.8 of Chapter – 3 for

ecology & biodiversity study data.

3.47-

3.59

xi.Socio-economic status of the

study area.

Refer Section 3.9 of Chapter – 3 for

socio economic status of the study

area.

3.68-

3.84

7 Impact and Environment Management Plan

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

11

Sr.

No. TOR Condition Compliance Status

Page

No.

i. Assessment of ground level

concentration of pollutants from

the stack emission based on site-

specific meteorological features.

In case the project is located on a

hilly terrain, the AQIP

Modelling shall be done using

inputs of the specific terrain

characteristics for determining

the potential impacts of the

project on the AAQ. Cumulative

impact of all sources of

emissions (including

transportation) on the AAQ of

the area shall be assessed.

Details of the model used and

the input data used for

modelling shall also be

provided. The air quality

contours shall be plotted on a

location map showing the

location of project site,

habitation nearby, sensitive

receptors, if any.

Please refer Section 4.8 as well as

Figure 4.1, 4.2 & 4.3 & Table 4.10,

4.11, 4.12 of Chapter – 4 for requisite

details.

4.21 -

4.27

ii. Water Quality modelling – in

case of discharge in water body

Not applicable, as no wastewater

discharge from the industry in any

type of water body.

--

iii. Impact of the transport of

the raw materials and end

products on the surrounding

environment shall be assessed

and provided. In this regard,

options for transport of raw

materials and finished products

Refer Section 4.9 of Chapter – 4 for

requisite data.

4.27-

4.28

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

12

Sr.

No. TOR Condition Compliance Status

Page

No.

and wastes (large quantities) by

rail or rail-cum road transport or

conveyor-cum-rail transport

shall be examined.

iv. A note on treatment of

wastewater from different plant

operations, extent recycled and

reused for different purposes

shall be included. Complete

scheme of effluent treatment.

Characteristics of untreated and

treated effluent to meet the

prescribed standards of

discharge under E (P) Rules.

Refer Section 2.11.1 of Chapter - 2 for

the requisite details.

2.23 -

2.27

v. Details of stack emission and

action plan for control of

emissions to meet standards.

Refer Section 2.11.2 of Chapter - 2 for

the requisite details.

2.28 -

2.31

vi. Measures for fugitive emission

control

Refer Section 2.11.2 of Chapter - 2 for

the requisite details.

2.31-

2.32

vii. Details of hazardous waste

generation and their storage,

utilization and management.

Copies of MOU regarding

utilization of solid and

hazardous waste in cement

plant shall also be included.

EMP shall include the concept

of waste-minimization,

recycle/reuse/recover

techniques, Energy

conservation, and natural

resource conservation.

Refer Section 2.11.3 of Chapter - 2 for

the requisite details.

Refer Section 10.10 of Chapter - 10

for the details of cleaner production.

2.33

10.15

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

13

Sr.

No. TOR Condition Compliance Status

Page

No.

viii. Proper utilization of fly ash

shall be ensured as per Fly Ash

Notification, 2009. A detailed

plan of action shall be

provided.

Refer Section 10.5.1 of Chapter - 10

of the EIA report.

10.8

ix. Action plan for the green belt

development plan in 33 % area

i.e. land with not less than 1,500

trees per ha. Giving details of

species, width of plantation,

planning schedule etc. shall be

included. The green belt shall be

around the project boundary

and a scheme for greening of the

roads used for the project shall

also be incorporated.

Refer Section 10.6 of Chapter – 10 for

detailed greenbelt development

plan.

10.11 –

10.12

x. Action plan for rainwater

harvesting measures at plant

site shall be submitted to

harvest rainwater from the roof

tops and storm water drains to

recharge the ground water and

also to use for the various

activities at the project site to

conserve fresh water and reduce

the water requirement from

other sources.

Refer Section 10.7 of Chapter – 10 for

the detail of rain water harvesting

scheme.

10.12-

10.13

xi. Total capital cost and recurring

cost/annum for environmental

pollution control measures

shall be included.

Refer Section 10.11 of Chapter – 10 of

the EIA report.

10.15 –

10.17

xii. Action plan for post-project

environmental monitoring

shall be submitted.

Refer Section 6.2 of Chapter – 6 of

the EIA report.

6.2-6.3

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

14

Sr.

No. TOR Condition Compliance Status

Page

No.

xiii. Onsite and Offsite Disaster

(natural and Man-made)

Preparedness and Emergency

Management Plan including

Risk Assessment and damage

control. Disaster management

plan should be linked with

District Disaster Management

Plan.

Refer Section 7.9.3 & 7.11 of Chapter

– 7 of the details.

7.28 –

7.37

8 Occupational Health

i. Plan and fund allocation to

ensure the occupational health

& safety of all contract and

casual workers

Refer Section 10.11 of Chapter – 10 of

the EIA report.

10.15 –

10.17

ii. Details of exposure specific

health status evaluation of

worker. If the workers’ health is

being evaluated by pre designed

format, chest x rays,

Audiometry, Spirometry, Vision

testing (Far & Near vision,

colour vision and any other

ocular defect) ECG, during pre-

placement and periodical

examinations give the details of

the same. Details regarding last

month analyzed data of above

mentioned parameters as per

age, sex, duration of exposure

and department wise.

Not applicable as this is a proposed

project

--

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

15

Sr.

No. TOR Condition Compliance Status

Page

No.

iii. Details of existing Occupational

& Safety Hazards. What are the

exposure levels of hazards and

whether they are within

Permissible Exposure level

(PEL). If these are not within

PEL, what measures the

company has adopted to keep

them within PEL so that health

of the workers can be preserved

It may be noted that this is a

proposed project. Nevertheless,

measures to be taken by the

company after commissioning of the

project are given in the Section 7.8.1

of Chapter - 7

7.27

iv. Annual report of health status of

workers with special reference

to Occupational Health and

Safety.

Not applicable as this is a proposed

project

--

9 Corporate Environment Policy

i. Does the company have a well

laid down Environment Policy

approved by its Board of

Directors? If so, it may be

detailed in the EIA report.

At present, we have not laid down

environment policy. We will lay

down such a policy once our unit is

in operation.

--

ii. Does the Environment Policy

prescribe for standard operating

process /procedures to bring

into focus any infringement /

deviation / violation of the

environmental or forest norms /

conditions? If so, it may be

detailed in the EIA.

Our unit has yet not started

production. Nevertheless, we shall

see to it that Environmental Policy

that we have frozen will bring things

into focus and any future issues

related to the environment.

--

iii. What is the hierarchical system

or Administrative order of the

company to deal with the

environmental issues and for

ensuring compliance with the

environmental clearance

Not applicable as our proposed

project but environment

management cell will be established

and details for the same is given in

Section 10.4.3 of Chapter – 10 of the

EIA Repot.

10.3

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

16

Sr.

No. TOR Condition Compliance Status

Page

No.

conditions? Details of this

system may be given.

iv. Does the company have

system of reporting of non-

compliances/violations of

environmental norms to the

Board of Directors of the

company and/or shareholders

or stakeholders at large? This

reporting mechanism shall be

detailed in the EIA report

We have not yet started production.

However, we shall definitely set up

a system to report such issues to

partners.

--

10 Details regarding infrastructure

facilities such as sanitation, fuel,

restroom etc. to be provided to the

labour force during construction as

well as to the casual workers

including truck drivers during

operation phase.

Workers including casual workers

such as truck drivers will be

provided with basic amenities like

water supply, sanitation facilities,

first aid, personal protective

equipments, approach roads,

communication etc.

--

11 Enterprise Social Commitment (ESC)

i. Adequate funds (at least 2.5 % of

the project cost) shall be

earmarked towards the

Enterprise Social Commitment

based on Public Hearing issues

and item-wise details along with

time bound action plan shall be

included. Socio-economic

development activities need to be

elaborated upon.

Refer Section 8.4 of Chapter – 8 of

the EIA report for requisite details.

8.2-8.3

12 Any litigation pending against

the project and/or any

direction/order passed by any

Court of Law against the project,

if so, details thereof shall also be

Not applicable as this is a proposed

project

--

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad)

NABET Accredited

TOR Compliance

17

Sr.

No. TOR Condition Compliance Status

Page

No.

included. Has the unit received

any notice under the Section 5 of

Environment (Protection) Act,

1986 or relevant Sections of Air

and Water Acts? If so, details

thereof and compliance/ATR to

the notice(s) and present status of

the case.

13 A tabular chart with index for

point wise compliance of above

TORs.

Complied --

14 The TORs prescribed shall be valid

for a period of three years for

submission of the EIA-EMP

reports.

We have taken note of the same --

INDEX

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 1

INDEX

CHAPTER

NO. CONTENT

PAGE

NO.

1

Executive Summary English & Gujarati

INTRODUCTION

1.1- 1.11

1.1 Preamble 1.1

1.2 Purpose of the EIA report 1.1

1.3 Promoters and their back ground 1.2

1.4 Need of the project and its importance in the country 1.3

1.5 Location of the proposed project and siting criteria 1.3

1.6 Scope of EIA study 1.7

1.7 Regulatory frame work 1.8

2 PROJECT DESCRIPTION 2.1-2.34

2.1 Introduction 2.1

2.2 Project location 2.1

2.2.1. Justification of site selection 2.6

2.2.2. List of major industries within 10 km study area 2.6

2.2.3. Salient features of the proposed project site 2.8

2.3 Details of project land & plant lay-out 2.8

2.4 Capital cost of the proposed project 2.9

2.5 Details of product and raw material consumption 2.11

2.6 Manufacturing Process 2.12

2.6.1. Melamine Formaldehyde Resin 2.12

2.6.2. Phenol Formaldehyde Resin 2.14

2.6.3. Urea Formaldehyde Resin 2.16

2.7 Storage details of raw materials and products 2.18

2.8 Solvent requirement & recovery system 2.19

2.9 Requirement of Resources 2.20

2.9.1. Electricity / Power 2.20

2.9.2. Manpower 2.20

2.9.3. Water 2.21

2.9.4. Fuel 2.21

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 2

CHAPTER

NO. CONTENT

PAGE

NO.

2.9.5. Plant, Machineries & Utilities 2.21

2.10 Energy Balance 2.22

2.11 Pollution Potential & Proposed Control Measures 2.23

2.11.1 Water Pollution 2.23

2.11.2 Air Pollution 2.28

2.11.3 Solid / Hazardous Waste 2.33

2.11.4 Noise & Vibration 2.33

3 DESCRIPTION OF ENVIRONMENT 3.1-3.86

3.1 Introduction 3.1

3.2 Air Environment 3.2

3.2.1 Micrometeorological Data 3.2

3.2.1.1 Meteorological Data from Secondary Sources 3.3

3.2.1.2 Meteorology - Data Generated at the Project Site 3.6

3.2.2 Selection of AAQ Stations 3.8

3.2.2.1 Existing AAQ (Pre-project) Status 3.9

3.2.2.2 Baseline Interpretation of AAQ of Study Area 3.13

3.3 Noise Environment 3.14

3.3.1 Existing Noise Levels 3.15

3.3.2 Baseline Interpretation of Ambient Noise Quality 3.17

3.4 Water Environment 3.18

3.4.1 Water Quality 3.18

3.4.1.1 Sample Collection and Analysis 3.18

3.4.1.2 Baseline Interpretation of Ground Water 3.24

3.4.1.3 Baseline Interpretation of Surface Water 3.27

3.5 Soil Environment 3.28

3.5.1 Methodology of Sample Collection and Analysis 3.28

3.5.2 Baseline Interpretation of Soil Quality 3.31

3.6 Geo-Hydrological Features 3.32

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 3

CHAPTER

NO. CONTENT

PAGE

NO.

3.7 Land Use Status 3.37

(A) Data Used 3.38

(B) Methodology 3.38

(C) Interpretation of Remote Sensing Data 3.38

3.7.1 Topography 3.44

3.8 Ecology 3.47

3.8.1 Baseline Data Collection 3.47

3.8.2 Detail of Methodology

3.8.3 Detail Sampling Method & Literature of Review

3.48

3.49

3.8.4 Biodiversity Status

3.8.5 Study Habitats

3.8.6 Status of Flora

3.8.7 Status of Fauna

3.50

3.50

3.51

3.53

3.8.8 Conclusion & Recommendation 3.58

3.9 Socio Economic Environment 3.68

3.9.1 Introduction 3.68

3.9.2 Socioeconomics 3.68

3.9.3 Households 3.69

3.9.4 Population 3.69

3.9.5 Occupational Structure 3.71

3.9.6 Literacy 3.75

3.9.7 Amenities 3.76

3.9.8 Site Specific Studies 3.83

3.10 Traffic Survey 3.85

4 ANTICIPATED IMPACTS & MITIGATION

MAESURES

4.1- 4.28

4.1 Preamble 4.1

4.2 Prediction and Evaluation of Impacts 4.2

4.3 Impact Identification 4.3

4.4 Assessment of Impacts 4.7

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 4

CHAPTER

NO. CONTENT

PAGE

NO.

4.5 Quantification of Impacts 4.10

4.5.1 Environmental Attributes & Relative Importance 4.10

4.5.2 Magnitude Criteria 4.11

4.5.3 Matrix Development 4.12

4.6 Mitigation Measures for Impacts on environment during

Construction Phase

4.15

4.7 Mitigation Measures for Impacts on Environment during

Operational Phase

4.18

4.8 Impact on Air Quality 4.21

4.9 Existing Traffic & Vehicular Pollution 4.27

5 ANALYSIS OF ALTERNATIVES 5.1-5.2

5.1 Introduction 5.1

5.2 Project Details 5.1

5.3 Site Alternatives 5.1

5.4 Alternative for Technologies 5.2

6 ENVIRONMENT MONITORING PROGRAM 6.1-6.4

6.1 Introduction 6.1

6.2 Environment Monitoring Program 6.2

6.3 Budget for Implementation of Environmental Monitoring

Plan

6.3

7 ADDITIONAL STUDIES 7.1-7.37

A Public Consultation 7.1

B Risk Assessment Study 7.1

C Social Impact Assessment, R & R Action Plan 7.1

7.1 Introduction 7.2

7.2 Surrounding Area 7.2

7.2.1 Objective and Scope 7.2

7.2.2 Risk Analysis Methodology 7.3

7.3 Hazard Identification and Risk Analysis 7.3

7.3.1 Hazard Identification Methods 7.3

7.3.2 Identification of Hazardous Chemicals used within 7.4

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 5

CHAPTER

NO. CONTENT

PAGE

NO.

Premises

7.3.3 Storage Details of Raw Material and Products 7.5

7.3.4 Hazard Indices 7.12

7.3.5 Credible Accident Sources/Worst Case Scenarios 7.13

7.4 Consequence Modeling 7.14

7.4.1 Damage Criteria 7.14

7.4.2 Details of Model Used for Consequence Analysis 7.17

7.5 Failure Frequency 7.23

7.6 Estimation of Effect of Damage / Impact Identification 7.23

7.7 Proposed Risk Reduction Measures 7.24

7.8 Occupational Health Surveillance Program 7.26

7.8.1 Treatment Facilities Provided to Workers affected by

accidental Spillage of Chemicals

7.27

7.8.2 Minimization of the manual handling of hazardous

substance

7.28

7.9 Disaster Management Plan 7.28

7.9.1 Disaster 7.28

7.9.2 Statutory Provisions 7.28

7.9.3 On-Site Emergency Plan 7.28

7.9.4 Site Plan of the Factory and Surrounding 7.29

7.9.5 Types of Overall Emergencies 7.29

7.9.6 Assessment of In-plant Hazards 7.30

7.9.7 Emergency Control System 7.30

7.9.8 General Procedures and responsibilities 7.33

7.10 Offsite Emergency Preparedness Plan 7.34

8 PROJECT BENEFITS 8.1-8.3

8.1 Introduction 8.1

8.2 Employment Potential 8.1

8.3 Direct & Indirect Benefits 8.1

8.4 Corporate Social Responsibility (CSR) 8.2

9 ENVIRONMENTAL COST BENEFIT ANALYSIS 9.1

9.1 Environmental cost benefit analysis 9.1

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 6

CHAPTER

NO. CONTENT

PAGE

NO.

10 ENVIRONMENTAL MANAGEMENT PLAN 10.1-10.17

10.1 Introduction 10.1

10.2 Environmental Management Plan for Construction phase 10.1

10.3

10.4

Environmental Management Plan for Operation phase

Component of EMP

10.2

10.2

10.4.1 Environment Management System (EMS) 10.2

10.4.2 Environmental Health & Safety (EHS) 10.2

10.4.3 Environmental Management Cell (EMC) 10.3

10.5 Environmental Management Plan for Proposed Project 10.4

10.5.1 Environmental Management during Operational

Phase

10.4

10.6 Greenbelt Development Plan 10.11

10.7 Conservation of Water - Rain Water Harvesting Scheme 10.12

10.8 Occupational Health Management Plan 10.14

10.9 Fire & Safety Management Plan 10.14

10.10 Cleaner Production Technologies 10.15

10.11 Budget for Environment Protection Measures 10.15

11 SUMMARY & CONCLUSION 11.1–11.4

11.1 Introduction 11.1

11.2 Air Environment 11.1

11.3 Water Environment 11.1

11.4 Noise Environment 11.2

11.5 Land/Soil Environment 11.2

11.6 Ecology & Biodiversity 11.3

11.7 Socio-Economic Environment 11.3

11.8 Conclusion 11.3

12 DISCLOSURE OF CONSULTANT ORGANIZATION 12.1-12.4

12.1 Declaration for Involvement in EIA study 12.1

12.2 Company Profile 12.3

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 7

LIST OF TABLES

TABLE

NO. LIST OF TABLES

PAGE

NO.

1.1 Details of Proposed Product 1.1

1.2 Promoters and their Background 1.2

1.3 General Siting Criteria 1.5

1.4 Scope of the study 1.7

1.5 Regulatory Frame Work 1.9

2.1 Salient Features of the Proposed Project Site 2.8

2.2 Area Break-up of Project Site 2.9

2.3 Break-up of capital cost for Proposed Resin Project 2.9

2.4 Details of Product 2.11

2.5 Details of Raw Material Consumption 2.11

2.6 Details of Proposed Raw Materials 2.18

2.7 Details of Storage of Proposed Products 2.19

2.8 Manpower Requirement 2.21

2.9 Fuel Requirement 2.21

2.10 List of Plant, Machineries and Utilities 2.22

2.11 Energy Balance 2.22

2.12 Stream-wise Water Requirement & Wastewater Generation 2.24

2.13 Stream-wise Quality of Effluent 2.27

2.14 Details of Flue Gas Emissions 2.28

2.15 Details of Air Pollution Control System 2.28

2.16 Details of Process Gas Emissions 2.31

2.17 Details of Hazardous Waste Management 2.33

3.1 Period of Meteorological Data Collection 3.3

3.2 Monthly Mean values of Meteorological Data (Secondary Data) 3.3

3.3 Ambient Air Monitoring Locations 3.9

3.4 Air – Parameters Analyzed and Sampling Duration 3.10

3.5 Ambient Air Quality – Methodology 3.10

3.6 Ambient Air Monitoring Results 3.12

3.7 Baseline Status of Ambient Air Quality 3.13

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 8

TABLE

NO. LIST OF TABLES

PAGE

NO.

3.8 Noise Monitoring Locations 3.16

3.9 Noise Level Monitoring Data 3.17

3.10 Water Monitoring Locations 3.21

3.11 Water Quality - Physico-Chemical Analysis of Ground Water 3.22

3.12 Water Quality - Physico-chemical Analysis of Surface Water 3.25

3.13 Soil Sampling Locations 3.30

3.14 Physico-Chemical Characteristic of Soil 3.30

3.15 Rainfall Data of the Region 3.33

3.16 Land Use / Land Cover Classification 3.39

3.17

3.18

Information of Field Survey

Taxonomic Status of Plant Species

3.47

3.51

3.19 Life Form Status of Plant Species 3.52

3.20 List of Agriculture and Commercial Crop Species Recorded 3.53

3.21 Taxonomical Status of Herpetofauna 3.54

3.22 Overall Status of Terrestrial and Aquatic Birds 3.55

3.23 Overall Status of Mammals 3.57

3.24 List of Villages covered in 10 km Radius Area 3.68

3.25 Population Distribution in the Study Area 3.70

3.26 Occupational Structure in the Study Area 3.73

3.27 Literacy Status in the Study Area 3.75

3.28 Basic amenities detail for study villages covered in 10 km radius 3.77

3.29 Traffic Count Data 3.86

4.1 Impact Identification Matrix 4.5

4.2 Assessment of Impacts 4.8

4.3 Environmental Attributes 4.10

4.4 The Activity – Impact Evaluation Matrix 4.12

4.5 Cumulative Impact Matrix 4.14

4.6 Construction Phase: Impacts & its Mitigation Measures 4.15

4.7 Operation Phase: Impacts & its Mitigation Measures 4.18

4.8 Details of Flue Gas Stacks 4.21

4.9 Expected Pollutants and its Emission Rate 4.22

4.10 Predicted 24 Hourly Short term incremental concentration of PM10 4.26

4.11 Predicted 24 hourly short term incremental Concentrations of SO2 4.26

4.12 Predicted 24 hourly short term incremental Concentrations of NO2 4.27

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 9

TABLE

NO. LIST OF TABLES

PAGE

NO.

4.13 Assessment of Proposed Traffic Load 4.28

5.1 Proposed Technology Alternatives 5.2

6.1 Environmental Monitoring Program 6.2

6.2 Budget for Implementation of Environmental Monitoring Plan 6.3

7.1 Chemical Properties of Hazardous Chemicals 7.4

7.2 Storage Details of Raw Material 7.5

7.2 (A) Storage Details of Products 7.6

7.3 Identification Hazard Associated with Storage of Raw Materials 7.6

7.4 Fire & Explosion Index 7.12

7.5 Scenarios Considered for MCA Analysis 7.13

7.6 Damage Due to Incident Radiation Intensities 7.14

7.7 Damage Due to Peak Over Pressure 7.16

7.8 Consequence analysis and Damage Distance (Failure of raw

material storage tanks) 7.18

7.9 Estimation of Fatality 7.23

7.10 Types of Emergencies 7.29

7.11 Details of Fire Extinguishers 7.33

7.12 Offsite Action Plan 7.36

8.1 Action Plan for Socio-Economic Development Activities 8.3

10.1 Details of Plant Species in Greenbelt 10.11

10.2

10.3

Details of Rain Water Harvesting

Budgetary allocation towards Environmental Management

10.13

10.16

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 10

LIST OF FIGURES

FIGURE

NO. LIST OF FIGURES

PAGE

NO.

1.1 Location of the project site 1.4

1.2 Photograph of the project site 1.5

2.1 Index Map 2.2

2.2

2.3

Google Image showing surrounding 1,5,10 km radius area from

the project site

Google map showing surrounding 500 meter radius area from

the project site

2.3

2.4

2.4 Toposheet showing surrounding 10 km radius area from the

project site

2.5

2.5 Google Map showing nearby Industries 2.7

2.6 Plant Lay-out 2.10

2.7 Methanol Recovery System 2.20

2.8 Water Balance Diagram 2.25

2.9 Schematic Flow Diagram of Effluent Treatment Plant 2.26

3.1 Wind Rose Diagram of Entire Year (Secondary Source) 3.5

3.2 Photograph showing Automatic Weather Station installed near

project site

3.6

3.3 Wind Rose Diagram based on Primary Meteorological Data 3.7

3.4 Map showing Ambient Air Quality Locations 3.8

3.5 Photograph showing Ambient Air Monitoring 3.10

3.6 Map Showing Noise Sampling Locations 3.15

3.7 Photograph showing Noise Measurement 3.16

3.8 Photograph showing Ground & Surface Water Sample

Collection

3.20

3.9 Map showing Surface & Ground Water Quality Locations 3.21

3.10 Photograph showing Soil Sample Collection 3.29

3.11 Map showing Soil Sampling Locations 3.29

3.12 Ground Water Prospect Map 3.36

3.13 Land use and Land cover map of the 10 km radius study area 3.41

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 11

FIGURE

NO. LIST OF FIGURES

PAGE

NO.

3.14 Imagery view map of the 10 km radius study area 3.42

3.15 Infrastructure Map of the 10 km radius study area 3.43

3.16 Topography Map of the 10 km radius study area 3.46

3.17

3.18

Photographs showing Surrounding Habitat

Land use/Land cover Map

3.47

3.48

3.19 Percentage of Total Population Distribution 3.71

3.20 Percentage Distribution of Workers 3.75

3.21 Percentage Distribution of Literacy Levels 3.76

3.22 Photograph showing Socio-Economic Data Collection 3.82

3.23 Image showing Traffic Surveying Location 3.85

4.1 Ground Level Concentration of PM10 4.23

4.2 Ground Level Concentration of SO2 4.24

4.3 Ground Level Concentration of NO2 4.25

7.1 Methanol Pool Fire (Threat Zone) 7.19

7.2 Methanol BLEVE Worst Case Scenario (Threat Zone) 7.20

7.3 Methanol Toxic Dispersion 7.21

7.4 Phenol Toxic Dispersion 7.22

7.5 Off-Site Emergency Plan 7.35

10.1 Environmental Management Cell 10.3

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

INDEX 12

LIST OF ANNEXURES

ANNEXURE

NO.

LIST OF ANNEXURES

1 TOR Letter issued by MoEFCC, New Delhi

2 NA permission

3 Proof of CGWB Application

4 Site Specific Primary Meteorological Data

5 Raw data of all AAQ measurement for all Sampling Locations

6 Material Safety Data Sheets of Raw Materials

7 Copy of NABET Accreditation Certificate

8 Copy of NABL Accreditation Certificate

EXECUTIVE SUMMARY

EXECUTIVE SUMMARY IN ENGLISH

OF

M/s. Welmica Laminates Pvt. Ltd.

(New Proposed Resin Manufacturing Project)

(Phenol Formaldehyde Resin - 700 MT/month

Melamine Formaldehyde Resin - 400 MT/month Urea Formaldehyde Resin - 400 MT/month)

Address:

Survey No. 98, Opposite 66 KV Substation, Before Millennium

Tiles, Old RafaleshwarRoad, at Village: Bhadiyad, Taluka & District:

Morbi-363642, Gujarat.

Prepared by:

T.R. ASSOCIATES

Ganesh Meridian, Block No – C, Office No-605 A, Opp. Kargil Petrol Pump,

Nr. Sola Over Bridge, S.G.Highway, Ahmedabad – 380060.

M – 9825371099

Email – [email protected] [email protected]

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 1

EXECUTIVE SUMMARY – ENGLISH & GUJARATI

Executive Summary – ENGLISH

1. INTRODUCTION

M/s. Welmica Laminates Pvt. Ltd. is proposing to manufacture Melamine

Formaldehyde Resin, Phenol Formaldehyde Resin & Urea Formaldehyde Resin

at Survey No. 98, Opposite 66 KV Substation, Before Millennium Tiles, Old

Rafaleshwar Road, At Village: Bhadiyad, Taluka & District: Morbi 363642,

Gujarat. Details of proposed products are as given below:

Details of Proposed Products

Sr. No. Name of Product Production Capacity

1. Phenol Formaldehyde Resin 700 MT/Month

2. Melamine Formaldehyde Resin 400 MT/Month

3. Urea Formaldehyde Resin 400 MT/Month

Note: Please note that above said Resin products will be used in captive consumption in manufacturing of laminated sheets as well as for sale purpose.

M/s. Welmica Laminates Pvt. Ltd. has a total land area of 13,456m2. Out of the

stated 13,456m2 of land area approximately 4,470m2 is green belt area (approx.

33.22% of the total land area). Non Agriculture (NA) permission has been

already obtained from the concerned authority.

Proposed manufacturing unit is a Small Scale Unit having total investment of

about Rs. 1.3 Crores. Approximately Rs. 45 Lakhs will be allocated towards

environmental management facilities.

M/s. T. R. Associates (NABET Accredited EIA Consultant) was appointed by

M/s. Welmica Laminates Pvt. Ltd. to carry out the Environmental Impact

Assessment study for their proposed project.

The proposed products like Melamine Formaldehyde Resin, Phenol

Formaldehyde Resin & Urea Formaldehyde Resin (being synthetic organic

chemicals) falls under Category 5(f) as stated in Environment Impact

Assessment Notification Published on 14th September, 2006. Further, the

location of proposed project is outside the notified industrial estate and not fall

in Small Scale Industrial Unit criteria as per the Notification dated 25th June

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 2

2014. Hence, project proponent has to obtain the Environmental Clearance from

the Ministry of Environment, Forests & Climate Change (MoEF&CC), New

Delhi. As a part of this procedure, Public Hearing is required to be carried out

as per the notification as well as the TOR granted to the unit by the Expert

Appraisal Committee (Industry-2).

This study of Environment Impact Assessment (EIA) is based on studies

carried out during the month of October 2017 to December 2017. The

environmental parameters (ambient air, water, soil, noise, flora and fauna)

selected for study are those, which are likely to be most affected by the project.

The study area is defined as an area within 10 km radius from centre of the

project site.

Salient Features of the surrounding area is as follows:

Sr.

No. Important Features Description

1 Location Survey No. 98, Village: Bhadiyad, Taluka &

District: Morbi, Gujarat

2 Project Site Co-ordinates Latitude: 22°47'42.61"N

Longitude: 70°52'18.91"E

3 Temperature Range

(average)

18˚C to 43˚C

4 Mean Sea Level 15 m

5 Annual Rain Fall (average) 551 mm

6 Ground Water Depth 30 to 60 m (Source: CGWB)

7 Soil Type Medium black soils, Red Sandy soils and Silty

soils

8 Nearest Railway Station Nazarbag railway station – 0.35 km NE

9 Nearest Airport Rajkot airport – 53.6 km in south direction

10 Nearest Village Bhadiyad – 1.1 km in NW direction

11 Nearest State Highway SH 22 – 4.6 km in WNW direction.

12 Nearest National Highway NH 8A – 1.3 km in NE direction.

13 Nearest River/Water body Machhu River – 1.8 km in West direction

14 National Parks / Sanctuary/

Eco Sensitive Zone/

Reserved Forest

Reserved Forest – Paneli: 4 kms East direction

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 3

2. AIR ENVIRONMENT

The base line Ambient Air Quality (AAQ) status within 10 km study area has

been assessed through a monitoring network of 8 AAQ sampling stations

during October 2017 to December 2017. Map showing 10 km radius area is

shown here. Design of network for Ambient Air Quality monitoring locations

were decided on meteorology & available infrastructure facilities. The baseline

Ambient Air Quality of the study area was monitored for Particulate Matter

(PM10 & PM2.5), Sulphur Dioxide (SO2) and Nitrogen Dioxide (NO2), CO &

VOC. The result for the same is given as below:

Location Results (98th Percentile)

PM2.5 PM10 SO2 NO2

Project Site 56.4 80.13 18.41 20.98

Lalpar 60.13 72.34 11.91 12.13

JodhparNadi 56.49 62.95 20.47 25.76

Lilapar 50.42 66.59 17.56 19.60

Ravapar 46.90 65.03 12.64 17.82

Trajpar 35.61 55.07 10.34 10.44

Paneli 40.97 60.06 17.39 22.17

Kalikanagar 55.04 70.35 13.21 15.45

Permissible limit

[NAAQ standards-

2009]

60 µg/m3 100 µg/m3 80 µg/m3 80 µg/m3

Note: CO: Not Detected; VOC: Not Detected

Analysis of ambient air samples revealed that the Air quality is found well

within the prescribed limits of National Ambient Air Quality standards.

The main source of gaseous emission is flue gas emission from stack attached

to Steam boiler, TFH and D. G. set.

Agro-waste/ Briquettes will be used as a fuel & the requirement shall be 7.9

MT/Day. Adequate stack height will be provided for proper atmosphere

dispersion of pollutant. The probable emitted pollutants will be PM, SO2 &

NO2. Cyclone separator followed by Bag Filter will be provided as Air

Pollution Control Measures. Since Diesel will be used as a fuel for D. G. Set

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 4

(back–up system) the flue gas emission will also be well within prescribed

norms and there is no need of any air pollution control measures for D. G. Set.

3. WATER ENVIRONMENT

Analysis of ground water and surface water samples revealed that it is suitable for domestic activity including agricultural activity. Ground water and surface water quality in the area meets the Water Quality Standards (IS 10500) for drinking water except for Turbidity, E. Coli. and Coliforms at some locations.

Water Requirement

The total water requirement for the proposed project will be 33.7 kl/day. Out

of this said fresh water quantity 11.3 kl/day will be used for domestic purpose,

21.7 kl/day will be used for industrial activities and 0.7 kl/day will be used for

greenbelt development purpose. The required water will be obtained through

Borewell.

Wastewater Generation and its Disposal

The total generation of domestic wastewater will be 10.3 kl/day from the

proposed project activity. The domestic wastewater generated will be treated

in STP and treated sewage will be used for gardening purpose.

The total industrial effluent generation from proposed project activity will be

15 kl/day, which will be from resin manufacturing (1.8 Kl/day) & Washing

(0.2 Kl/day). Effluent generated from utilities which will be from cooling tower

(1.5 Kl/day), boiler blow down (1 Kl/day), and RO-1 reject (10.5 Kl/day) and It

will be collected in collection tank and treated with oxidation treatment and

send it to holding tank. After that it will be evaporated in evaporator system.

Condensate water will be reuse in the industrial process. This maintains Zero

Discharge.

4. LAND / SOIL ENVIRONMENT

During operation activity the impact of air, water and solid waste pollution on

soil causes direct / indirect effect on soil.

As all necessary air pollution control steps will be provided and based on the

results of the dispersion model for the Ground Level Concentrations of various

pollutants after commissioning of the proposed project, there will not be any

adverse impact of air pollution on soil.

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 5

It may be noted that there will be no disposal of untreated effluent on land. So,

there will be no adverse effect on land / soil due to water.

All necessary control steps will be provided for handling, storage and disposal

of solid/hazardous waste generated from the plant. Thus, there will not be any

significant impact of solid/hazardous waste on the soil environment.

5. NOISE ENVIRONMENT

Noise level was recorded at 8 locations within the study area to provide the

baseline data to describe the existing situations.

Sr.

No. Location

Noise Level (Leq) in dBA (Day Time)

Noise Level (Leq) in dBA (Night Time)

Measured Permissible

Limit Measured

Permissible

Limit

1 Project Site 42.01 75 25.06 70

2 Lalpar 45.02 55 22.11 45

3 Jodhpar Nadi 40.01 55 32.01 45

4 Lilapar 41.02 55 33.02 45

5 Ravapar 44.02 55 38.01 45

6 Trajpar 46.06 55 23.05 45

7 Kalikanagar 43.02 55 29.07 45

8 Paneli 48.05 55 41.01 45

6. SOCIO-ECONOMIC ENVIRONMENT

An assessment of socio-economic environment forms an integral part of an EIA

study. Socio-economic environment – demographic & related socio-economic

data was collected from District Census Handbook to assess socio-economic

status of the study area.

For proposed project activity, total 100 nos. of skilled and unskilled

employees/ workers will be required. The indirect employment will be

generated by way of transportation, shopkeepers and other casual employment

for many people.

Local people will be given preference wherever found suitable for all the jobs in

the plant. Economic status of the local people will improve due to the increased

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 6

business opportunities, thereby, making a positive impact. Educational,

medical and housing facilities in the study area will considerably improve.

7. ECOLOGY & BIODIVERSITY

The study area was dominated by agriculture landscape. The floral and faunal

diversity was very less.

Domestic tree species found in the study area are Baval, Neem, Gulmohar,

Karanj, Kesudo, Khijado and Asopalav. Major crops in the study area are

Cotton, Sesame, Rice, Wheat, Millet, and Sorghum.

The commonly spotted bird species of this area were Drongo, Green Bee eater,

Houses wift, Kingfisher, Common Myna, Lapwing, Rosering Parakeet.

The wild mammals found other than domesticated ones from study area were Nilgai, Golden Jackal, Grey Mongoose, Hare and Wild Boar.

8. SOLID WASTE MANAGEMENT

The main hazardous waste generation will be ETP Sludge + Evaporation

Residue, Used Oil, and Discarded Plastic Bags/Drums.

ETP Sludge + Evaporation Residue will be disposed off at approved TSDF site.

Used Oil will be reused within premises as a lubricant or sold to registered

recycler. Discarded Plastic Bags/Drums will be sold to authorized vendor.

Unit will provide storage area for hazardous wastes having roof, pucca flooring

with leachate collection system. Leachate, if any will be collected and treated in

effluent treatment plant. Unit will take membership of TSDF site after

commencement of proposed project.

9. ENVIRONMENTAL MANAGEMENT PLAN

An Environmental Management Plan has been prepared for mitigation of the

adverse impacts.

The Environmental Management Plan describes in brief, the management’s

plan for proper and adequate implementation of treatment and control system

for pollutants and for maintaining the environment. It also includes

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 7

development of green belt, proper safety of workers, environmental

monitoring plan, rain water harvesting, fire protection system and measures

etc.

An Environmental Management Cell will be formed for effective

implementation of Environmental Management Plan.

10. ENVIRONMENT MONITORING PROGRAME

Monitoring of environmental factors will enable us to identify the changes in

the environmental impacts at various locations and their mitigative measures.

To ensure the effective implementation of the EMP, monitoring of ambient air

quality, stack emissions, analysis & monitoring of water environment and noise

level will be carried out as required / specified by statutory authority.

11. RISK ASSESSMENT

Risk analysis and study have been carried out for identification of hazards,

selection of maximum credible scenarios, risk mitigation measures etc. All the

hazardous chemicals will be stored and handled as per MSDS guidelines.

12. GREEN BELT DEVELOPMENT

Total land area of 4470 m2 (33.22%) has been allotted for greenbelt

development. This will contains common tree species found in study area

which is tolerant to pollutants, acts as noise absorbers. This will not only

mitigate the ecological problem but also enhance the beauty of project area that

will attract avifauna, small mammals & insect species, and by this way

ecological balance can be maintained to great extent.

13. PROJECT BENEFITS:

The proposed project will become beneficial to the surrounding area or

community in terms of infrastructural development, social development,

employment and other benefits.

The proposed project has a potential for employment of skilled, semi-skilled

and unskilled employees during construction phase as well as operation phase.

A total 100 nos. of person is likely to get employment due to the proposed

Environmental Impact Assessment Report

M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.

T. R. Associates (Ahmedabad) NABET Accredited

Executive Summary - English 8

project. The project will earmark 2.5 % of project cost for socio-economic

development activities in surrounding villages.

14. CONCLUSION:

Negligible impacts will occur on air quality. However, all the necessary air

pollution control measures will be provided.

No ecological damage will occur.

No adverse impacts will occur on water environment.

Local employment opportunities will increase.

Various other environment parameters like Forest/ National Park/

Sanctuary and Religious / Historical Places will not be affected.

Environment Management Plan has been formulated to control all the

pollutant parameters and Environment Management Cell has been set-up

to ensure that these parameters do not exceed the norms set out by the

concerned authorities.

After commissioning of the proposed project the Environmental

Management Cell will take care of all the pollution control measures.

It can be concluded on a positive note that after the implementation of the

mitigation measures and environmental management plan during the

construction & operational phase, there will be negligible impact on the

environment.

સકં્ષીપ્ત અહવેાલ

મેસસસ ળેમાઇકા ેમીનેટ્સ પ્રા. ી. (નવો રેઝીન ઉત્પાદન એકમ)

(ફીનો ફોમાસલ્ડીહાઈડ રેઝીન – ૭૦૦ મ.ેટન/માસ

મેેમાઈન ફોમાસલ્ડીહાઈડ રેઝીન – ૪૦૦ મ.ેટન/માસ

યરુીયા ફોમાસલ્ડીહાઈડ રેઝીન – ૪૦૦ મ.ેટન/માસ)

સળે ન.ં-૯૮, ૬૬ કેળી સબસ્ટેનની સામ,ે મીેનીયમ ટાઈલ્સ પહેા, જુના રફાલેશ્વર

રોડ, ગામ:-ભડીયાદ, તાલકુો અને જીલ્ો:- મોરબી, ગજુરાત

Prepared by:

T.R. ASSOCIATES

Ganesh Meridian, Block No – C, Office No-605 A, Opp. Kargil Petrol Pump,

Nr. Sola Over Bridge, S.G.Highway, Ahmedabad – 380060.

M – 9825371099

Email – [email protected] [email protected]

Environ

 

 

૧.

મેસસર્ વે

૯૮, ૬૬

ભડીયાદ

િફનોલ

દરખા ત

મ ં૧૨૩

 

ન ધ: ઉપ

માટે થશે

પ્ર તાિવ

માથંી

આવશે.

છે.

પ્ર તાિવ

યવ થ

મેસસર્

એકમનો

nmental Impa

T. R. AssoNABET A

તાવના:-

વેલમાઈકા

૬ કેવી સબ

દ, તાલકુો અ

ફોમાર્ ડીહાઈ

ત કરેલ છે.

ાકં મે

પરોક્ત રેઝીન

.

િવત વેલમાઈ

૪,૪૭૦ ચો

બીનખેતી

િવત એકમને

થાપન પ ધિ

વેલમાઈકા

નો પયાર્વરણી

act Assessmen

ociates (AhmeAccredited

EXECU

લેમીને સ પ્ર

બ ટેશનની

અને જી લો:

ઈડ રેઝીન

ોડિફનોલ ફોમ

મેલેમાઈન ફોયરુીયા ફોમ

નનો ઉપયોગ

ઈકા લેમીને

ો.મી. (આશ ે

માટેની મજૂં

ને પ્ર થાિપત

િત માટે આશ

લેમીને સ

ણીય પ ૃ થકર

nt Report

edabad)

UTIVE SU

સં ી

પ્રા. િલ. એ

સામે, મીલે

- મોરબી, ગ

અને યરુી

તાિવત ોડ

ડ ટ ુ ંનામ માર્ ડીહાઈડ ેોમાર્ ડીહાઈડમાર્ ડીહાઈડ ે

કે ટીવ વપરા

સ પ્રા. િલ.

રે કુલ િવ ત

જૂરી અગાઉથી

ત કરવાની

શરે િપયા ૪

પ્રા. િલ.

રણ અસર અ

UMMAR

ી ત અહ

પ્ર તાિવત

લનીયમ ટાઈ

ગજુરાત રાજ

ીયા ફોમાર્ ડી

ડ ટ (ઉ પાદ

રેઝીન ડ રેઝીન રેઝીન

ાશ માટે (લેમી

એકમનો કુ

તારના ૩૩.૨

થી સબંિધત

િકંમત િપ

૪૫ લાખ ફ

ારા મેસસ

અ યાસ (E

RY – GU

વાલ

એકમ છે.

ઈ સ પહલેા

જય ખાતે મે

ડીહાઈડ રેઝી

દન) ની િવગ

૭૪૪

મીનેટેડ શીટના

લ િવ તાર

૨૨%) જમી

સ ા પાસેથ

િપયા ૧.૩

ાળવવામા ંઆ

સર્ ટી. આર

EIA) કરવા

M/s. WelmSurvey no

Taluka & D

Execut

JARATI

આ પ્ર તાિવ

, જુના રફા

મલેમાઈન ફો

ઝીનનુ ં ઉ પા

ગત

મત૭૦૦ મેટ્રીક ૪૦૦ મેટ્રીક ૪૦૦ મેટ્રીક

ા ઉ પાદન મા

આશરે ૧૩,

ીન ગ્રીન બે

થી જમીન મ

કરોડ થશે

આવશે.

ર. એસોસીએ

માટે િનમણ ૂ

mica Laminateo. 98, Village: District: Morb

tive Summary

િવત એકમે સ

ાળે ર રોડ,

ોમાર્ ડીહાઈડ

ાદન કરવા

તા ટન/માસ ટન/માસ ટન/માસ

ાટે) તેમ જ વે

,૪૫૬ ચો. મ

ટ માટે ફાળ

માિલક ારા

તથા પયાર્

એ સની પ્ર

ણ ૂકં કરવામાં

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 1

સવેર્ ન.ં-

, ગામ:-

ડ રેઝીન,

માટેની

વેચાણ હતે ુ

મીટર છે.

ળવવામા ં

મેળવેલ

ાર્વરણીય

પ્ર તાિવત

ા આવેલ

Environ

 

 

છે.

અતે્ર ન

યરુીયા

નોટીફીકે

ઓ ોિગ

પ્રમાણે

Environ

(Enviro

પયાર્વર

એ યિુન

પયાર્વર

૨૦૧૭

(આસપ

અસર પ

૧૦ િકમ

આસપા

માં૧

૩ ૪ ૫ ૬

nmental Impa

T. R. AssoNABET A

ન ધનીય છે

ફોમાર્ ડીહા

કેશન-૨૦૦૬

િગક િવ તારન

નાના પાયા

nment, Fo

onmental C

રણીય લોકસુ

નટને આપેલ

રણ ૃ થકર

થી િડસે બ

પાસ ની હવા

પામી શકે તે

મી. િત્ર યાન

સના ૧૦ ક

ક ુપ્ર તાિવ

અક્ષાશં તાપમાસમદુ્રી વાિષર્ક ભગૂભર્ જ

act Assessmen

ociates (AhmeAccredited

કે મેલામા

ઈડ રેઝીન

૬ ના િવભા

ની બહાર

ાના ઓ ોિગ

rest & C

Clearance)

સનુાવણી એ

ા TOR પ્રમ

ણ અસર અ

બર ૨૦૧૭

ા, પાણી, જ

તેમ છે, તેનો

ના વતુર્ળાકાર

કમી િ યાન

ુ ય લા ણિવત એકમનુ ં

– રેખાશં

ન તરના સરેરવરસાદ જળની ઉડાઈં

nt Report

edabad)

ાઇન ફોમાર્

(સી થેટીક

ાગ-૫ (એફ

છે અને સિૂ

િગક એકમ અં

Climate Ch

મેળવવાન

જાહરેનામા

ાણે કરવામાં

અ યાસ (En

દરિમયાન

જમીન, વિન

ો અ યાસ ક

ર િવ તારને

ના િવ તારન

ણ તાઓ થાન

રાશ

ડીહાઈડ રેઝ

ક ઓગેર્નીક

ફ) મા ંઆવે

િૂચત પરીયો

અંતગર્ત આ

hange), ન

ની જ રીયા

ા પ્રમાણે તથ

ા ંઆવશે.

nvironmenta

કરવામા ં

િન, વન પિત

કરવામા ંઆ

અ યાિસત

ની ુ ય લા

સવેર્ નમીલેનીરોડ, ગમોરબીઅક્ષાશંરેખાશં:૧૮.૦°સ૧૫ મી૫૫૧.૦૩૦ મી

ઝીન, િફનો

ક કેિમકલ)

વે છે. તદ્ઉ

યોજના ૨૫

વતો નથી

નવી િદ હી

ાત રહલે

થા એ પટર્ એ

al Impact A

આવેલ છે.

તઓ અને પ્ર

આ યો છે. પ્ર

કે્ષત્ર તરીકે

ા ણકતાઓ

ન.ં-૯૮, ૬૬ીયમ ટાઈગામ:-ભડીય, ગજુરાત રશ:- ૨૨0૪૭’૪- ૭૦0૫૨’૧સે. થી ૪૩.૦ીટર ૦૦ મી.મી (સીટર થી ૬૦

M/s. WelmSurvey no

Taluka & D

Execut

લ ફોમાર્ ડી

નુ ં પ્ર તાિવ

પરાતં એક

જૂન ૨૦૧

તેથી MoEF

પાસેથી પ

છે. આ પ્ર

એપ્રાઈઝલ

Assessment

પયાર્વરણી

પ્રાણીઓ)

તાિવત એક

નક્કી કરવ

ઓ નીચે મા

વણન કેવી સબસ પહલેા, યાદ, તાલકુોરાજય. ૪૨.૬૧”N ૧૮.૯૧”E ૦°સે. (સરેર

સરેરાશ)

મીટર

mica Laminateo. 98, Village: District: Morb

tive Summary

ીહાઈડ રેઝી

િવત ઉ પાદ

મની જગ્યા

૪ ના નોટી

F&CC (Min

પયાર્વરણીય

પ્રકીયાના ભ

કમીટી (ઇ

t Study) ઓ

ણીય ઘટકો

પ્ર તાિવત

કમને કે દ્રમ

વામા ંઆવેલ

ાણે છે.

બ ટેશનની જુના રફાો અને જી

રાશ)

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 2

ીન અને

દન EIA

ા સિૂચત

ટીફીકેશન

nistry Of

ય મજૂંરી

ભાગ પે

ડ ટ્રી-૨)

ઓકટોબર

વા કે

એકમથી

મા ંલઈને

લ છે.

સામે, ળે ર લો:-

Environ

 

 

માં૭ ૮ ૯ ૧૦ ૧૧

૧૨ ૧૩

૧૪

૨. હવ

પ્રવતર્મ

થળથી

થી ડીસે

ગણુવ

પ્રા ત સ

(PM10&

ની ચકા

ના પિ

ોલાલજોધલીલ

nmental Impa

T. R. AssoNABET A

ક ુજમીન નજીક નનજીક નનજીક નનજીકનો

નજીકનોનજીકનોત

રા ટ્રીયપ્રાણીઓ

વા ુ ંપયાવ

માન આસપા

ી ૧૦ િકમી

સે બર ૨૦૧

ા નક્કી કર

સિુવધાઓના

& PM2.5), સ

ાસણી કરવા

િરણામો નીચે

થળ

ટ સાઈટ લપર ધપર નદ લાપર

act Assessmen

ociates (AhmeAccredited

ુ ય લા ણપ્રકાર નુ ંરે વે ટેશનુ ંએરપોટર્ નુ ંગામ નો રા ય ધો

નો રા ટ્રીય ધોના જમીન પ

ય ઉઓ માટેનુ ંઅ

વરણ (Air

ાસની હવાન

િત્ર યાના વ

૧૭ દરિમયા

વા માટેના

ા આધારે ન

સ ફર ડાયોક

ામા ંઆવી હ

ચેના ટેબલમ

PM૫૬

૬૦.

૫૬.

૫૦.

nt Report

edabad)

ણ તાઓ

શન

રીમાગર્

ધોરીમાગર્ પરના પાણીન

પવન-જગંલયાર ય

Environm

ની (Ambie

વતુર્ળાકાર િવ

ાન નમનૂા

થળની પસ

ક્કી કરેલ હ

કસાઈડ (SO

હતી.

મા ંદશાર્ યા

M2.5 ૬.૪

.૧૩

.૪૯ 

.૪૨ 

કાળી જનઝરબરાજકોટભડીયાટેટ હપિ મનેશનલ

ના મ ન

લી પાનેલી

ment) :-

nt Air) ગણુ

િવ તારમા ં૮

લઈને તેની

સદંગી વાયશુ

હતી. હવાની

O2), નાઈટ્રો

મજુબ છે.

પ રણામPM10 ૮૦.૧૩

૭૨.૩૪

૬૨.૯૫

૬૬.૫૯

જમીન, લાલબાગ રે વે ટેટ એરપોટર્–દ –૧.૧ િકમહાઈવે ૨૨

લ હાઈવે ૮ નદી –૧.૮ િ

ી રીઝવર્ ફોરે

ણવ ા જાણ

૮ અલગ અલ

ની ચકાસણી

શા , CPCB

ગણુવ ા ન

ોજન ડાયોક

મ (98th ટકાવ

M/s. WelmSurvey no

Taluka & D

Execut

વણન લ રેતાળ, કાંટેશન–૦.૩૫૫૩.૬ િકમીમી ઉ ર પિ– ૪.૬ િકમ

એ – ૧.૩ િિકમી પિ મ

ર ટ -૪.૦ િક

ણવા માટે પ્ર

લગ થળેથી

કરવામા ંઆ

B ની માગર્દ

નક્કી કરવા

સાઈડ (NO

વાર ) SO2 ૧૮.૪૧ 

૧૧.૯૧ 

૨૦.૪૭ 

૧૭.૫૬ 

mica Laminateo. 98, Village: District: Morb

tive Summary

ાપવાળી જમ૫ િકમી ઉ રી દક્ષીણ િ મ મી પિ મ

િકમી ઉ ર પમ

િકમી પવૂર્

પ્ર તાિવત

થી ઓક્ટોબર

આવી હતી.

દિશર્કા અને

માટે પાિટર્ક

O2), CO અ

NO2 ૨૦.૯૮

૧૨.૧૩

૨૫.૭૬

૧૯.૬૦

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 3

મીન રપવૂર્

ઉ ર

પવૂર્

એકમના

ર ૨૦૧૭

હવાની

નજીકની

કલ મેટર

અને VOC

૮ 

૩ 

૬ 

૦ 

Environ

 

 

રવાપાજ

પાનેકાલીવી

 

ન ધ: CO 

આસપા

એર ક્વો

હવાના

અને થિ

એગ્રો વે

રહશેે. સ

માટે ચી

તરીકે સ

પાવરક

ઉ સ ન

નથી.

૩. જળ

ભગૂભર્ જ

શકાય

થાિનક

nmental Impa

T. R. AssoNABET A

થળ

પર જપર નલી ીકાનગર કાય મયાદા

O: Below  De

સની હવાન

વોલીટીના ધ

પ્રદૂષણનો

િમર્ક યડુ હ

વે ટ/િબ્રકેટસ

સભંિવત બહ

ીમની ની પ

સાયક્લોન

ટ વખતે વ

ન પણ િનય

ળ પયાવર

જળ તેમજ

કે અ યાિસ

પ્રવિૃ મા

act Assessmen

ociates (AhmeAccredited

PM૪૬.

૩૫.

૪૦.

૫૫.

ા ૬૦µg

tectable  Lim

ના પિરણામ

ધારાધોરણ મુ

મખુ્ય ોત

હીટર, D.G.

સ બળતણ

હાર િનકળત

પયાર્ ત ઉંચા

સેપરેટર અ

વપરાશે તેમ

ત ધારાધોર

ણ (Water

જમીન પર

સત િવ તાર

ાટે યોગ્ય છે

nt Report

edabad)

M2.5 .૯૦ 

.૬૧ 

.૯૭ 

.૦૪ 

g/m3

mit; VOC: Bel

પરથી તાર

મજુબ છે.

ચીમની મ

Set માથંી િ

તરીકે વાપ

તા પ્રદૂષકો P

ાઈ રાખવામ

અને બેગ-િફ

મા ં બળતણ

ણો મજુબ ર

r Environ

ના પાણીન

નુ ંભગૂભર્

છે. કેટલાક

પ રણામPM10 ૬૫.૦૩

૫૫.૦૭

૬૦.૦૬

૭૦.૩૫

૧૦૦ µg/m

low  Detecta

ણ કાઢી શક

માથંી નીકળત

િનકળતો ધમુ

પરવામા ંઆ

PM, SO2 &

મા ંઆવશે.

ફ ટર લગાવ

ણ તરીકે ડી

રહશેે તેથી

ment):-

ના નમનૂાઓ

જળ તેમજ

થળોના ભ

મ (98th ટકાવ

m3 ૮૦

able  Limit 

કાય કે હવાન

તા લ ૂગેસ

માડો છે.

આવશે ની

NO2 હશે

ટીમ બોઈલ

વવામા ંઆ

ીઝલ વાપર

D.G.Set મ

ઓની ગણુવ

જ જમીન પ

ભગૂભર્ જળ

M/s. WelmSurvey no

Taluka & D

Execut

વાર ) SO2 ૧૨.૬૪ 

૧૦.૩૪ 

૧૭.૩૯ 

૧૩.૨૧ 

૦ µg/m3

ની ગણુવતા

સ ઉ સ ન કે

જ િરયાત

ના વાતાવ

લર સાથે હવ

વશે. યારે

રવામા ં આવ

ાટે હવા પ્રદૂ

ા પરીક્ષણ

પરનુ ંપાણી

તેમજ જમી

mica Laminateo. 98, Village: District: Morb

tive Summary

NO2 ૧૭.૮૨

૧૦.૪૪

૨૨.૧૭

૧૫.૪૫

૮૦ µg/

ા નેશનલ એ

કે ટીમ

૭.૯ મે.ટન

રણમા ંયોગ્ય

વા પ્રદૂષણ

ર D.G. SE

વશે અને

દૂષણ િનયતં્ર

પરથી તાર

કૃિષ પ્રવિૃ

મીન પરના

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 4

૨ 

૪ 

૭ 

૫ 

m3

એ બીયટં

બોઈલર

ન/િદવસ

ય ફેલાવ

િનયતં્રક

ET કે

લ ૂ ગેસ

ત્રક જ રી

રણ કાઢી

િ સિહત

પાણીના

Environ

 

 

નમનૂાઓ

પરનુ ંપ

પાણીની

પ્ર તાિવ

ઘરગ થુ

વપરાશ

િકલોલી

ારા મેળ

ગદંાપાણ

પ્ર તાિવ

ઘરગ થુ

બગીચા

પ્ર તાિવ

મા ં રે

િકલોલી

િકલોલી

નીકળશે

કેમીકલ

આ ગદં

ઓ ોગી

નિહં અન

૪. જમ

કામગીર

આડકત

nmental Impa

T. R. AssoNABET A

ઓમા ં ડહોળ

પાણી પીવાલ

ી જ ર યાત

િવત પરીયોજ

થ ુ વપરાશ

શ માટે ૨૧.૭

ીટર/િદવસ

ળવવામા ંઆ

ણીનો ઉદભવ

િવત પરીયોજ

થ ુગદંા પાણ

મા ંકરવામાં

િવત પરીયોજ

રઝીન ઉ પ

ીટર/ િદવ

ીટર/િદવસ)

શે અને તેને

લ ઓકસીડશે

દા પાણીને ઈ

ીક વપરાશમ

ને એકમ ઝી

મીન પયાવ

રી તબક્કા

તરી અસરો થ

act Assessmen

ociates (AhmeAccredited

ળાશ અને બૅ

લાયક પાણી

:-

જના માટે પ

માટે ૧૧.

૭ િકલોલીટર

ટલુ ં પાણ

આવશે.

વ અને ગદં

જના માથંી ૧

ણીનુ ંશુ ીક

ા ંઆવશે.

જનામા ં કુલ

પાદન પ્રિકય

સ), કુલીંગ

) અને આર

ને ટાકંીમા ં સ

શન ારા કર

ઈવોપરેટરમ

મા ંફરીથી ક

ીરો ડી ચા

વરણ

દર યાન હ

થાય છે.

nt Report

edabad)

બૅક્ટેરીયા જો

ીની ગણુવ

પાણીનો કુલ

૩ િકલોલીટ

ર/ િદવસ

ણી વપરાશે.

ાપાણીનો િન

૧૦.૩ િકલોલ

રણ STPમાં

૧૫ િકલોલ

યા દર યાન

ગ ટાવર(

ર.ઓ. રી ક્

સગં્રહ કરવ

રવામા ંઆવ

મા ંબા પીભવ

કરવામા ંઆ

રહશેે.

હવા, પાણી,

જોવા મળેલ

ાના ધારાધો

લ વપરાશ

ટર/િદવસ

ટલુ ંપાણી

. પ્ર તાિવત

િનકાલ:-

લીટર/િદવસ

ા ં કરવામા ં

લીટર/િદવસ

ન (૧.૮ િક

૧.૫ િકલ

ક્ટ ૧ (૧૦

વામા આવશે

વશે અને હો

વન કરવામ

આવશે. થી

, ઘનકચરા

છે તે િસવ

ધોરણો (આઇ

૩૩.૭ િકલો

ટલુ ં પાણ

ી તેમજ ગ્રીન

ત પરીયોજન

સ ટલુ ંઘર

આવશે અને

સ ટલુ ંઓ

િકલોલીટર/

લોલીટર/િદવ

.૫ િકલોલી

શે. આ ગદં

ડીંગ ટક મ

મા ંઆવશે અ

આ પ્રિકયામ

ના પ્રદૂષણ

M/s. WelmSurvey no

Taluka & D

Execut

વાય ભગૂભર્

.એસ. ૧૦૫

લોલીટર/િદવ

ણી વપરાશે

ન બે ટ ડેવ

ના માટે જ

ગ થ ુગદું પ

ને આ પાણી

ઓ ોિગક ગં ુ

િદવસ) અ

વસ), બોઈ

ટર/િદવસ)

દા પાણીનુ ં

મા ંભેળવવા

અને કં ડે સેટ

માથંી કોઈ ગ

ણથી જમીન

mica Laminateo. 98, Village: District: Morb

tive Summary

જળ તેમજ

૫૦૦) ની મજુ

વસ રહશેે.

શે યારે ઓ

વલોપમે ટ મ

રી પાણી

પાણી ઉદભ

ણીનો ઉપયો

ગદુ પાણી ઉ

અને વોશીંગ

ઈલર લો

) ગદું પાણી

પ્રાથિમક શ

ામા ંઆવશે.

ટ પાણીનો

ગદું પાણી ઉ

પર સીધી

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 5

જ જમીન

જબ છે.

માથંી

ઓ ોિગક

માટે ૦.૭

બોરવેલ

વશે. આ

ોગ બાગ

ઉદભવશે,

ગ (૦.૨

ડાઉન(૧

ણી બહાર

શિુ કરણ

. અંતમા ં

ઉપયોગ

ઉદભવશે

અથવા

Environ

 

 

હવાના

આડઅસ

મા ં લ

માત્રા (

ન ધનીય

અતે્ર ન

આડઅસ

ઘન કચ

લેવામા ં

૫. વ

અ યાિસ

ચકાસણ

માકં

૧ 

૨ 

૩ 

૪ 

૫ 

૬ 

૭ 

૮ 

nmental Impa

T. R. AssoNABET A

પ્રદૂષણને ર

સર થશે નિ

લા ટના કામ

(Ground Le

ય આડઅસર

ન ધનીય છે

સર થશે નિહ

ચરાને સભંા

આવશે થ

િન પયાવ

િસત કે્ષત્રમા ં

ણી કરવામા ં

ક  થ

ો ટ સ

લાલપર

જોધપર

લીલાપર

રવાપર

ાજપર

કાલીકાન

પાનેલી

act Assessmen

ociates (AhmeAccredited

રોકવા માટે

િહં. હવાના

મગીરી તબ

evel Conce

ર થશે નિહ.ં

કે ગદું પા

િહં.

ાળવા, સગં્ર

થી ઘન કચર

વરણ :-

પ્રવતર્માન

આવી હતી.

ળ 

સાઈટ   ૪

નદ ૪

ર ૪

નગર ૪

nt Report

edabad)

જ રી બધા

પ્રદૂષણથી

બક્કા દર યા

entration) ન

ાણી જમીન

હ કરવા અ

રાને કારણે જ

વિનનુ ંમા

ના પરીણ

ઘ ઘાટ ુ ત( દવસ

માપન 

૪૨.૦૧ 

૪૫.૦૨ 

૪૦.૦૧ 

૪૧.૦૨ 

૪૪.૦૨

૪૬.૦૬ 

૪૩.૦૨ 

૪૮.૦૫ 

ા જ પગલા

જમીન પર

ાન જમીન ન

ના પરીણામ

પર છોડવ

અને તેના િ

જમીન પર

ાપદંડ કાઢવ

ણામો નીચે

તર (Leq) in dસ દર યાન)

વીકાય મ

૭૫

૫૫

૫૫

૫૫

૫૫

૫૫

૫૫

૫૫

લેવામા ંઆ

સીધી અથ

ની સપાટી

મો પરથી ક

વામા ંઆવતુ

િનકાલ માટે

કોઈ આડઅ

વા માટે ૮ અ

પ્રમાણે છે.

dBA 

મયાદા મ

M/s. WelmSurvey no

Taluka & D

Execut

આવશે થી

થવા આડકત

પર હવાના

કહી શકાય

તુ ંનથી થી

ટના દરેક િ

અસર થશે ન

અલગ- અલ

ઘ ઘાટ ુ ત(રા ી

માપન 

૨૫.૦૬ 

૨૨.૧૧ 

૩૨.૦૧ 

૩૩.૦૨ 

૩૮.૦૧ 

૨૩.૦૫ 

૨૯.૦૭ 

૪૧.૦૧ 

mica Laminateo. 98, Village: District: Morb

tive Summary

જમીન પર

તરી અસરો

ા િવિવધ પ્ર

કે જમીન પ

થી જમીન પ

િનયતં્રીત પ

નિહં.

લગ થળે ઘ

તર(Leq) in dBદર યાન) વીકાય મય

૭૦ 

૪૫ 

૪૫ 

૪૫ 

૪૫ 

૪૫ 

૪૫ 

૪૫ 

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 6

કોઈ જ

થાય છે

પ્રદૂષકોની

પર કોઈ

પર કોઈ

પગલાઓ

ઘ ઘાટની

BA 

યાદા

Environ

 

 

ઘ ઘાટન

મજુબ છે

૬. સામ

સામાજી

મહ વની

વ તીનુ ં

પ્ર તાિવ

રોજગાર

દુકાનોમ

આ લ

પસદંગી

થાિનક

આજુબા

૭. વ

અ યાિસ

અને પ્રા

અ યાિસ

ખીજડો,

અ યાિસ

અ યાિસ

જોવા મ

nmental Impa

T. R. AssoNABET A

ની ચકાસણી

છે.

મા ક-આ

ક અથર્ ય

ની િવગત છે

પ્રમાણ, કા

િવત પરીયોજ

રી પ્રા ત થ

મા ંવગેરેમા ં

લા ટની કામ

ી કરવામા ં

લોકોની આ

ાજુના િવ તા

વ પિરિ થત

િસત કે્ષત્રનો

ાણી-પક્ષીઓ

િસત કે્ષત્રમા ં

કેસડુો અને

િસત કે્ષત્રના

િસત કે્ષત્રમા ં

મળે છે. અ

act Assessmen

ociates (AhmeAccredited

ીના પિરણામ

િથક પયાવ

થાનો અ

છ. આ કારણ

મગીરી નો

જનાને કારણે

થશે. પ્ર તાિવ

રોજગારીની

મગીરી માટે

આવશે. આ

આિથર્ક પિરિ

ારમા ંસાક્ષર

તી અને

િવ તાર મુ

ઓની િવિવધત

થાિનક વ

ન આસોપાલ

મખુ્ય ખેતીલ

સામા ય રી

યાિસત િવ

nt Report

edabad)

મ પરથી તા

વરણ:-

યાસ એ પ

ણસર અ યાિ

પ્રકાર વગેરે

ણે કુલ ૧૦૦

િવત પરીયોજ

ી તકો ઉભી

જ ર લાગે

આજુબાજુના

િ થતી સધુર

તા, આરોગ્ય

વ િવિવધ

મખુ્ય વે ખેત

તા બહ ુઓછ

વન પિતની પ્ર

લવ જોવા મળે

લાયક પાકો

ીતે દેખાતા

િવ તારમા ંપ

ારણ કાઢી શ

પયાર્વરણ ૃ

િસત કે્ષત્રમાં

ર જી લા વ

૦ ટલા કુશ

જનાને કારણે

થશે.

ગે યા ં થા

િવ તારમાં

રશે અને તે

ય અને રહણે

ધતા શા :-

તીલાયક જમ

છી જોવા મળે

પ્રજાિતઓ

ળેલ છે. કપ

ો છે.

પક્ષીઓમા ં

પાલતુ ંપ્રાણી

શકાય કે ઘ ઘ

ૃ થકરણ અ

ા સામાજીક

તી ગણતરી

શળ અને અ

ણે આડકતરી

ાિનક લોકોન

ા ધધંાની ઉ

તથી એકમને

ણીકરણીમા ંસ

-

મીન ધરાવે

ળેલ છે.

વી કે બાવ

પાસ, તલ, ચ

કાળો કોશી,

ીઓ ઉપરાતં

M/s. WelmSurvey no

Taluka & D

Execut

ઘાટ ુ તર

અસર અ યા

અથર્ ય થા

ી પિુ તકા મ

અધર્કુશળ કાર

રી રીતે વી

ની તેમની

ઉ વળ ત

ન કારણે હકા

સધુારો થશે.

વ છે. આ િવ

વળ, લીમડો

ચોખા, ઘઉં,

લીલો પત

ત જગંલ

mica Laminateo. 98, Village: District: Morb

tive Summary

િનયત ધા

ાસ માટેની

ાની માિહતી

માથંી મેળવેલ

રીગરોને સી

વી કે વાહન

કુશળતાના

તકોને કારણે

ારા મક અસ

.

િવ તારમા ંવ

ો, ગલુમહોર

બાજરી, અને

રંગો, િટટોડી

લી સ તન

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 7

ારાધોરણ

ખબૂ જ

ી વી કે

લ છે.

ીધી રીતે

વહાર,

આધારે

ણે યાનંા

સર થશે.

વન પિત

ર, કરંજ,

ને જુવાર

ી, પોપટ

પ્રાણીઓ

Environ

 

 

જોવા મ

છે.

૮. સોલ

મખુ્ય હે

થેલીઓ

ઈટીપી

વપરાયે

થેલીઓ

એકમ

ની સાથે

ટ્રીટમે ટ

ની મે બ

૯. પય

પયાર્વર

બનાવવ

જાળવવ

વા કે

પયાર્વર

ન લાગે

કરવામાં

આ પય

એકમની

૧૦. પ

nmental Impa

T. R. AssoNABET A

મળેલ હતા ંતે

લીડ વે ટ

હઝેાડર્સ વે

ઓ અને ડ્રમનો

કચરાનો+ઈ

યેલુ ં ઓઈલ

ઓ અને ડ્રમ મ

હઝેાડર્સ વે

થે પક્કા લો

ટ લા ટમા

બરશીપ મેળ

યાવરણીય

રણ પર થ

વામા ં આવેલ

વા માટે અને

ક ગ્રીન બે

રણીય ઘટકો

ગ તેવા તકેદ

ા ંઆવે છે.

યાવરણીય ય

ની રચના કર

પયાવરણીય

act Assessmen

ociates (AhmeAccredited

તેમા ંિનલગ

મેનેજમે ટ

ટમા ં ઈટીપી

નો સમાવેશ થ

ઈવેપોરેશન

યબુ્રીકે ટ

મજૂંર થયેલ

ટના સગં્રહ

ોિરંગ હશે. જ

શિુ કરણ ક

ળવી લેશે.

યવ થાપ

તી આડઅસ

લ છે. આ

ને પ્રદૂષકોને

ટ ડવેલપ

ોની ચકસણી

દારીના પગલ

ય થાપન ય

રવામા ંઆવ

ય ચકાસણ

nt Report

edabad)

ગાય, િશયાળ

ટ :-

પી કચરો+ઈ

થાય છે.

રેસીડ ુનો

તરીકે પનુ

વે ડર ને વે

માટે અલગ

જો કોઇ િલચે

કરવામા આ

પન યોજન

સરોને રોકવ

આ પયાર્વરણ

ને િનયતં્રીત

કરવો અને

ી યોજનાનો

લા લેવા અ

યોજનાના અ

વશે.

ણી યોજના:

ળ, નોળીયો,સ

ઈવેપોરેશન

મજુંર થયેલ

નઃ વપરાશે

વેચાશે.

ગ જગ્યા ફ

ચેટ હશે તો

વશે. પ્ર તિવ

ના:-

વા/નાથવા

ણીય યવ

ત માત્રામા ં ર

ને તેનુ ં જત

અમલ કરવ

અને આગ ન

અસરકારક અ

:-

સસલા અને

રેસીડ ,ુ વ

લ TSDF Si

શે અથવા

ાળવશે મ

તેને એકઠું ક

િવત એકમ પ્ર

માટે પયાર્

થાપન યોજ

રાખવા માટે

તન કરવુ,ં

વો, વરસાદ

ાથવાના સા

અમલીકરણ

M/s. WelmSurvey no

Taluka & D

Execut

જગંલી સવુ

વપરાયેલુ ંઓ

te મા ંિનકા

રીસાઈકલર

મા રુફ, િલચે

કરવામા આ

પ્રારંભ થયા

વરણીય ય

જનામા ં પય

ટ જ રી અને

કામદારોની

ના પાણીનો

ાધનો રાખવ

માટ પયાવ

mica Laminateo. 98, Village: District: Morb

tive Summary

વરનો સમાવે

ઓઈલ અને

લ કરવામા ં

ને વેચાશે,

ચટ કલેક્શન

આવશે અને એ

ા પછી TSD

વ થાપન

યાર્વરણને

ને યોગ્ય પ

ની યોગ્ય સ

ો સગં્રહ કરવ

વા વગેરેનો

વરણીય ય

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 8

વેશ થાય

ન નકામી

આવશે.

નકામી

ન સી મ

એફ યુ ટ

DF સાઇટ

યોજના

યથાવત

પગલાઓં

સલામતી,

વો, આગ

સમાવેશ

થાપન

Environ

 

 

પયાર્વર

ઓળખવ

આ હતે ુ

ચકાસણ

માપદંડ

૧૧. જો

જોખમ

રસાયણો

૧૨. ી

આશરે

ડેવલોપ

પ્રદૂષણ

ટલો િ

૧૩. ો સિૂચત િવકાસ, સિૂચત તબક્કા પ્રો ક્ટ આિથર્ક

nmental Impa

T. R. AssoNABET A

રણીય પિરબ

વા માટે મદ

થી પયાર્વર

ણી, ચીમનીમ

ની ચકાસણી

જોખમની આ

આકારણીનો

ણોનો સગં્રહણ

ીન બે ટ

કુલ ૪,૪૭૦

પ કરવામા ં

/ધોવાણ અ

િવ તાર ગ્રીન

ો ટ થી

પ્રો ક્ટ આરોજગાર અ

પ્રો ક્ટ કુશદરિમયાન ારા રોજગિવકાસ માટે

act Assessmen

ociates (AhmeAccredited

બળોની ચક

દદ પ થશે.

રણીય યવ

માથંી િનકળ

ણી કાયદામા ં

આકારણી:-

નો અ યાસ

ણ અને િનયં

ડવલપમે

૦ (૩૩.૨૨%

આવશે કે

અ ટકાવવા

નબે ટ તરીકે

થતા લાભ

આસપાસના અને અ ય ફ

શળ, અધર્કુશરોજગારી આ

ગાર મળી શ ેટ કરાશે.

nt Report

edabad)

ાસણી િવિવ

થાપન યોજ

ળતા પ્રદૂષકો

જણા યા મુ

જોખમી ર

ત્રણ MSDS

ટ :-

%) ચો.મી.

ક વિન

વા કે્ષત્રોમ

કે િવકસાવવ

ભો:-

િવ તારના ાયદાઓની

શળ અને િબઆપવાની ક્ષકે છે. આ પ્રો

વધ થળોએ

જનાના પાલ

કો તથા પાણ

મજુબ કરવામ

સાયણો મા

S ની માગર્દિ

ટલો ગ્રીન

િન પ્રદૂષણ

મા ં મદદ પ

વામા ંઆવશે

સમદુાયનાદ્રિ ટએ લાભ

િબનકુશળ કાક્ષમતા ધરાવેપ્રો કટ કુલ

એ પયાર્વરણી

લન માટે આ

ણીનુ ંપયાર્વ

મા ંઆવશે.

ટે કરવામા ં

િશર્કા હઠેળ

ન બે ટ િવ

તથા હવ

પ થશે. કુલ

શે.

ા અથવા મભદાયી બન

ારીગરોને બવે છે. કુલ ૧નફાના ૨.૫

M/s. WelmSurvey no

Taluka & D

Execut

ણીય અસરો

આસપાસની

વરણની ચક

આવેલ છે

કરવામા ંઆ

િવ તાર પ્રો

વા પ્રદૂષણ

પ્રો ક્ટ િવ

માળખાકીય શે.

બાધંકામ તબ૧૦૦ ટલા ૫% ટલો ખ

mica Laminateo. 98, Village: District: Morb

tive Summary

તથા તેના

હવાની ગણુ

કાસણી તેમજ

છે. બધા જ

આવશે.

ક્ટ સાઈટન

નાથવા,

િવ તારના ૩

િવકાસ, સ

બક્કા અને કયિક્તઓને

ખચર્ સામાજી

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 9

ફેરફારો

ણવ ાની

જ વિન

જોખમી

ની અંદર

જમીનનુ ં

૩૩.૨૨%

સામાજીક

કામગીરી ને સિૂચત જીક તેમજ

Environ

 

 

૧૪. ઉ 

 

આથી અપયાર્વરપર થત

nmental Impa

T. R. AssoNABET A

ઉપસહંાર :-

પયાર્વરણ અ હવાની

તમામ કોઈ ઈકો જળ પય થાિનક િવિવધ

ધામીર્કત પયાર્વર

ઘડવામધારાધોસિુનિ ત

પયાર્વરપગલા ં

અનમુાન કરરણીય ય થતી અસરોને

act Assessmen

ociates (AhmeAccredited

-

અસર પ ૃ થગણુવ ા પપગલા લેવકોલોજીકલ નયાર્વરણ પર રોજગારીનપયાર્વરણીતથા ઐતીહારણીય યવમા ં આવી છેરણ કરતા ત કરવામા ંઆરણ ય થાલેશે. 

રી શકાય કેથાપન  યોજઘટાડી શકા

nt Report

edabad)

કરણ અ યપર નજીવી વામા ંઆવશેનકુશાન થશેર કોઈ પ્રિતકૂની તકો વધશય પિરમાણોાિસક થળો થાપન યોજછે. અને આવધી ના આવે છે.  પન એકમ

ક બાધંકામજના અને શમાશે.

યાસ પરથી કઅસર થાય. શે નિહ. કળૂ અસર થશે.  ણો વા કે પર કોઈ અજના બધા આ પિરણામોજાય એ મ

સિૂચત પ્રો

મ અને કામગમનના પગલ

કહી શકાય કેય છે. જો કે

થશે નિહ. 

જગંલ, રા ટ્રઅસર થશે નપ્રદૂષણ પિમો સબંિધતમાટે  પયાર્વ

કટની શ આ

ગીરી તબક્કલાનંા હકારા

M/s. WelmSurvey no

Taluka & D

Execut

કે... હવા પ્રદૂષ

ટ્રીય બગીચનિહ. િરમાણોને િનત સ ાિધકાવરણ ય થ

આત પછી

ક્કા દરિમયાના મક અમલી

mica Laminateo. 98, Village: District: Morb

tive Summary

ષણ િનયતં્રણ

ચા, અ યાર

િનયિંત્રત કરરો ારા થાપન એક

પ્રદૂષણ િન

ન મકૂવામાંલીકરણથી  પ

es Pvt. Ltd. Bhadiyad,

bi, Gujarat.

y - Gujarati 10

ણ માટેના

ય અને

રવા માટે થપાયેલ કમ ારા

યતં્રણના ં

ા આવેલ 

પયાર્વરણ