M/S. WELMICA LAMINATES PVT. LTD
(New Proposed Resin Manufacturing Project)
(Phenol Formaldehyde Resin: 700 MT/month, Melamine Formaldehyde Resin: 400 MT/month,
Urea Formaldehyde Resin: 400 MT/month)
Survey No. 98, Opposite 66 KV Substation, Before Millennium Tiles, Old Rafaleshwar
Road, at Village: Bhadiyad, Taluka & District: Morbi-363642, Gujarat.
DRAFT RAPID ENVIRONMENTAL IMPACT ASSESSMENT REPORT
Prepared By:
T. R. Associates
(NABET Accredited ‘Category –A’ Environmental Consultant) (NABET/EIA/1619/RA0033)
Baseline Monitoring Period : October 2017 to December 2017
NABL Accreditation : (NABL Accredited Certificate No. T-3189 valid up to 13-11-2018)
Ganesh Meridian, Block No.: C, Office No. 605-A, Opp. Kargil Petrol Pump, Nr. Sola Over Bridge,
S. G. Highway, Ahmedabad-380060.
Email ID: [email protected]
Contact No. 09825371099
FEBRUARY,2018
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
1
TERMS OF REFERENCE (TOR) COMPLIANCE
Point wise compliance to the TOR points issued by EAC, MoEF&CC New Delhi vide
their letter no. J TOR wide letter no. J-11011/274/2017-IA.II (I) dated 3rd August,2017
(attached as Annexure -1) for proposed manufacturing of Melamine Formaldehyde
Resin, Phenol Formaldehyde Resin & Urea Formaldehyde Resin at Survey No.: 98,
Village: Bhadiyad, Taluka & District: Morbi, Gujarat.
A tabular chart with index for point wise compliance is as given below:
Sr.
No. TOR Condition Compliance Status
Page
No.
A Additional TOR
1. A plan for implementation of zero liquid discharge system shall be submitted
Details of domestic and industrial effluent is given in Section 2.11.1 of Chapter - 2
2.23
2. No construction activity (other than securing land) shall be started without obtaining prior EC
PP has not started any construction activity related to proposed project.
--
3.
A layout plan earmarking space greenbelt of at least 10m width along the periphery of the plant with three layers of perennial trees, which can control/reduce the pollutant from the project, shall be submitted. At least 33% of the area shall be developed as green belt area with trees. Trees shall be selected as per CPCB norms
Refer Figure 2.6 of Chapter – 2 of the EIA report for detailed Plant Layout of the project.
2.10
4.
At least 2.5% of the total project cost may be earmarked towards Enterprise Social Commitment (ECS). PP shall submit a five year plan for ESC.
Refer Section 8.4 of Chapter – 8 of
the EIA report for requisite details.
8.2
5.
Public hearing to be conducted
and as per the provision of EIA
Notification, 2006.
We have taken note of the same.
Minutes of public consultation along
with commitments made and
budgetary allocation for the same
will be incorporated in EIA report
--
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
2
Sr.
No. TOR Condition Compliance Status
Page
No.
after the public consultation.
ANNEXURE - I : GENERIC TOR WITH RESPECT TO INDUSTRY SECTOR
1 Executive Summary Executive summary of the project in
both English & Gujarati language
has been incorporated in the EIA
report.
--
2 Introduction
i. Details of the EIA Consultant
including NABET
accreditation.
Details of EIA consultant has been
incorporated in Chapter – 12 of the
EIA report. NABET accreditation
certificate is attached as Annexure –
7.
12.1-
12.4
ii. Information about the project
proponent.
Refer Section 1.3 in Chapter - 1 1.2
iii. Importance and benefits of the
project
Refer Section 1.4 in Chapter - 1 1.3
3 Project Description
i. Cost of project & time of
completion
Refer Section 2.4 of Chapter - 2 2.9
ii. Product with capacities for the
proposed project
Refer Section 2.5 of Chapter - 2 2.11
iii. If expansion project, details of
existing products with capacities
and whether adequate land is
available for expansion,
reference of earlier EC if any
Not applicable as this is a proposed
project.
--
iv. List of raw materials required
and their source along with
mode of transportation.
Refer Section 2.5 and 2.7 of Chapter
- 2
2.11 &
2.18
v. Other chemicals & materials Refer Section 2.5 and 2.7 of Chapter 2.11 &
2.18 –
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
3
Sr.
No. TOR Condition Compliance Status
Page
No.
required with quantities and
storage capacities
- 2 2.19
vi. Details of emission, effluents,
hazardous waste generation and
their management.
Details of air emission i.e. process
and flue gas emission is given in
Section 2.11.2 of Chapter - 2
2.28 –
2.32
Details of domestic and industrial
effluent is given in Section 2.11.1 of
Chapter - 2
2.23 –
2.27
Details of hazardous waste
generation & their management is
given in Section 2.11.3 of Chapter - 2
2.33
vii. Requirement of water,
power, with source of supply,
status of approval, water
balance diagram, man-power
requirement (regular and
contract)
Refer Section 2.11.1 of Chapter -2 for
the details of water consumption
and water balance diagram.
It may be noted that we have
already made application to CGWB
for obtaining permission for
groundwater abstraction. Proof of
the same is attached as Annexure –
3.
Refer Section 2.9.1 of Chapter - 2 for
the details of power requirement
and its source.
Refer Section 2.9.2 of Chapter - 2 for
the details of man-power
requirement.
2.23-
2.25
2.20
2.20-
2.21
viii. Process description along
with major equipments and
machineries, process flow sheet
(quantities) from raw material to
products to be provided.
Process description along with
process flow diagram and mass
balance is given in Section 2.6 of
Chapter - 2
2.12 –
2.17
Major equipments & machineries are 2.21-
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
4
Sr.
No. TOR Condition Compliance Status
Page
No.
given in Section 2.9.5 of Chapter - 2 2.22
ix. Hazard identification and
details of proposed safety
systems.
Refer Section 7.3.2 and 7.3.3 of
Chapter - 7.
7.4-
7.11
x. Expansion/modernization
proposals:
a. Copy of all the
Environmental Clearance(s)
including Amendments
thereto obtained for the
project from MOEF/SEIAA
shall be attached as an
Annexure. A certified copy of
the latest Monitoring Report
of the Regional Office of the
Ministry of Environment and
Forest as per circular dated
30th May, 2012 on the status
of compliance of conditions
stipulated in all the existing
environmental clearances
including Amendments shall
be provided. In addition,
status of compliance of
Consent to Operate for the
ongoing/existing operation
of the project from SPCB shall
be attached with the EIA-
EMO report.
b. In case the existing project
has not obtained
environmental clearance,
reasons for not taking EC
under the provisions of the
Not applicable as this is a proposed
project
--
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
5
Sr.
No. TOR Condition Compliance Status
Page
No.
EIA Notification 1994 and/or
EIA Notification 2006 shall be
provided. Copies of Consent
to Establish/No Objection
Certificate and Consent to
Operate (in case of units
operating prior to EIA
Notification 2006, CTE and
CTO of FY 2005-2006)
obtained from the SPCB shall
be submitted. Further,
compliance report to the
conditions of consents form
the SPCB shall be submitted.
4 Site Details
i. Location of the project site
covering village, Taluka/Tehsil,
District and State, Justification
for selecting the site, whether
other sites were considered.
Refer Section 2.2 of Chapter - 2 for
the requisite details.
2.1- 2.6
ii. A toposheet of the study
area of radius of 10km and
site location on
1:50,000/1:25,000scaleonanA3/
A2sheet. (Including all eco-
sensitive areas and
environmentally sensitive
places.
A toposheet of the 10 km radius
study area along with site location is
incorporated as Figure 2.4 in the EIA
Report.
2.5
iii. Details w.r.t. option analysis for
selection of site.
Refer Section 1.5 of Chapter - 1 as
well as Section 5.3 of Chapter - 5 of
the EIA report for the requisite
details.
1.3 -1.6
5.1-5.2
iv. Co-ordinates (lat-long) of all
four corners of the site.
Refer Figure 1.1 of Chapter - 1 of the
EIA report.
1.4
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
6
Sr.
No. TOR Condition Compliance Status
Page
No.
v. Google map-Earth downloaded
of the project site.
Refer Figure 2.2 of Chapter - 2 of the
EIA report.
2.3
vi. Layout maps indicating
existing unit as well as
proposed unit indicating
storage area, plant area,
greenbelt area, utilities etc. If
located within an Industrial
area/Estate/Complex, layout
of Industrial Area indicating
location of unit within the
Industrial area/Estate.
Refer Figure 2.6 of Chapter – 2 of the
EIA report for detailed Plant Layout
of the project.
2.10
vii. Photographs of the proposed
and existing (if applicable)
plant site. If existing, show
photographs of
plantation/greenbelt, in
particular.
Refer Figure 1.2 of Chapter - 1 of the
EIA report.
1.5
viii. Land use break-up of total
land of the project site
{identified and acquired},
government/private-
agricultural, forest, wasteland,
water bodies, settlements, etc.
shall be included.(not required
for industrial area).
Refer Section 2.3 of Chapter - 2 for
the land use break-up of project site.
Refer Section 2.2.3 of Chapter - 2 for
the salient features of the proposed
project site.
2.8-2.9
2.8
ix. A list of major industries with
name and type within study area
{10km radius} shall be
incorporated. Land use details of
the study area
Refer Section 2.2.2 of Chapter - 2 for
the requisite details.
2.6-2.7
Land use details of the study area is
given in Section 3.7 of Chapter - 3
3.37 -
3.46
x. Geological features and Geo-
hydrological status of the study
Refer Section 3.6 of Chapter – 3 for
the requisite details.
3.32-
3.36
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
7
Sr.
No. TOR Condition Compliance Status
Page
No.
area shall be included.
xi. Details of Drainage of the project
up to 5 km radius of study area.
If the site is within 1 km radius
of any major river, peak and
lean season river discharge as
well as flood occurrence
frequency based on peak
rainfall data of the past 30
years. Details of Flood Level of
the project site and maximum
Flood Level of the river shall
also be provided. (mega green
field projects)
Refer Section 3.6 of Chapter – 3 for
the requisite details.
3.32-
3.36
xii. Status of acquisition of land. If
acquisition is not complete, stage of
the acquisition process and
expected time of complete
possession of the land.
It may be noted that the land is on
lease. NA permission and Lease
Deed copy is attached as Annexure –
2.
--
xiii. R&R details in respect of
land in line with state
Government policy
Not applicable --
5 Forest and Wildlife related Issues (if applicable):
i. Permission and approval for
the use of forest land (forestry
clearance), if any, and
recommendations of the State
Forest Department. (if
applicable)
Not Applicable --
ii. Land use map based on High
resolution satellite imagery
Not Applicable --
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
8
Sr.
No. TOR Condition Compliance Status
Page
No.
(GPS) of the proposed site
delineating the forestland (in
case of projects involving
forest land more than 40 ha)
iii. Status of Application
submitted for obtaining the
stage I forestry clearance along
with latest status shall be
submitted.
Not Applicable --
iv. The projects to be located
within 10 km of the National
Parks, Sanctuaries, Biosphere
Reserves, Migratory Corridors
of Wild Animals, the project
proponent shall submit the
map duly authenticated by
Chief Wildlife Warden
showing these features vis-à-
vis the project location and the
recommendations or
comments of the Chief Wildlife
Warden-thereon
Not applicable as no wild life
sanctuary is located within 10 km
radius of the project site.
--
v. Wildlife Conservation Plan
duly authenticated by the
Chief Wildlife Warden of the
State Government for
conservation of Schedule I
fauna, if any exists in the study
area
Not Applicable --
vi. Copy of application submitted
for clearance under the
Wildlife (Protection) Act, 1972,
to the Standing Committee of
the National Board for Wildlife
Not Applicable --
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
9
Sr.
No. TOR Condition Compliance Status
Page
No.
6 Environmental Status
i. Determination of atmospheric
inversion level at the project site
and site-specific micro-
meteorological data using
temperature, relative humidity,
hourly wind speed and
direction and rainfall.
Site specific micro-meteorological
data are given in Annexure – 4.
Refer Section 3.2.1 of Chapter – 3 for
requisite details.
--
3.2 -
3.7
ii. AAQ data (except monsoon) at 8
locations for PM10, PM2.5, SO2,
NOX, CO and other parameters
relevant to the project shall be
collected. The monitoring
stations shall be based CPCB
guidelines and take into account
the pre-dominant wind
direction, population zone and
sensitive receptors including
reserved forests.
Refer Section 3.2.2 of Chapter – 3 for
requisite AAQ data.
3.8 –
3.13
iii. Raw data of all AAQ
measurement for 12 weeks of all
stations as per frequency given
in the NAQQM Notification of
Nov. 2009 along with – min.,
max., average and 98% values
for each of the AAQ parameters
from data of all AAQ stations
should be provided as an
annexure to the EIA Report.
Refer Table 3.6 of Chapter – 3 for
requisite detail.
Please refer Annexure – 5 for raw
data of all AAQ measurement for 12
weeks for all selected sampling
stations.
3.12-
3.13
--
iv. Surface water quality of
nearby River (100m upstream
and downstream of discharge
point) and other surface drains
at eight locations as per
Refer Table 3.12 of Chapter – 3 for
surface water quality data.
3.25 -
3.27
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
10
Sr.
No. TOR Condition Compliance Status
Page
No.
CPCB/MoEF&CC guidelines.
v. Whether the site falls near to
polluted stretch of river
identified by the CPCB/MoEF &
CC, if yes give details.
Not Applicable --
vi. Ground water monitoring
at minimum at 8 locations shall
be included.
Refer Table 3.11 of Chapter – 3 for
ground water quality data.
3.22 -
3.24
vii. Noise levels monitoring at 8 locations within the study area.
Refer Table 3.9 of Chapter – 3 for
Noise Level Monitoring Data. 3.17
viii. Soil characteristic as per
CPCB guidelines.
Refer Table 3.14 of Chapter – 3 for
Soil Characteristic Data. 3.30
ix.Traffic study of the area, type of
vehicles, frequency of vehicles
for transportation of materials,
additional traffic due to
proposed project, parking
arrangement etc.
Refer Section 3.10 of Chapter 3 for
traffic study data.
3.85-
3.86
x. Detailed description of flora and
fauna (terrestrial and aquatic)
existing in the study area shall
be given with special reference
to rare, endemic and
endangered species. If Schedule-
I fauna are found within the
study area, a Wildlife
Conservation Plan shall be
prepared and furnished.
Refer Section 3.8 of Chapter – 3 for
ecology & biodiversity study data.
3.47-
3.59
xi.Socio-economic status of the
study area.
Refer Section 3.9 of Chapter – 3 for
socio economic status of the study
area.
3.68-
3.84
7 Impact and Environment Management Plan
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
11
Sr.
No. TOR Condition Compliance Status
Page
No.
i. Assessment of ground level
concentration of pollutants from
the stack emission based on site-
specific meteorological features.
In case the project is located on a
hilly terrain, the AQIP
Modelling shall be done using
inputs of the specific terrain
characteristics for determining
the potential impacts of the
project on the AAQ. Cumulative
impact of all sources of
emissions (including
transportation) on the AAQ of
the area shall be assessed.
Details of the model used and
the input data used for
modelling shall also be
provided. The air quality
contours shall be plotted on a
location map showing the
location of project site,
habitation nearby, sensitive
receptors, if any.
Please refer Section 4.8 as well as
Figure 4.1, 4.2 & 4.3 & Table 4.10,
4.11, 4.12 of Chapter – 4 for requisite
details.
4.21 -
4.27
ii. Water Quality modelling – in
case of discharge in water body
Not applicable, as no wastewater
discharge from the industry in any
type of water body.
--
iii. Impact of the transport of
the raw materials and end
products on the surrounding
environment shall be assessed
and provided. In this regard,
options for transport of raw
materials and finished products
Refer Section 4.9 of Chapter – 4 for
requisite data.
4.27-
4.28
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
12
Sr.
No. TOR Condition Compliance Status
Page
No.
and wastes (large quantities) by
rail or rail-cum road transport or
conveyor-cum-rail transport
shall be examined.
iv. A note on treatment of
wastewater from different plant
operations, extent recycled and
reused for different purposes
shall be included. Complete
scheme of effluent treatment.
Characteristics of untreated and
treated effluent to meet the
prescribed standards of
discharge under E (P) Rules.
Refer Section 2.11.1 of Chapter - 2 for
the requisite details.
2.23 -
2.27
v. Details of stack emission and
action plan for control of
emissions to meet standards.
Refer Section 2.11.2 of Chapter - 2 for
the requisite details.
2.28 -
2.31
vi. Measures for fugitive emission
control
Refer Section 2.11.2 of Chapter - 2 for
the requisite details.
2.31-
2.32
vii. Details of hazardous waste
generation and their storage,
utilization and management.
Copies of MOU regarding
utilization of solid and
hazardous waste in cement
plant shall also be included.
EMP shall include the concept
of waste-minimization,
recycle/reuse/recover
techniques, Energy
conservation, and natural
resource conservation.
Refer Section 2.11.3 of Chapter - 2 for
the requisite details.
Refer Section 10.10 of Chapter - 10
for the details of cleaner production.
2.33
10.15
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
13
Sr.
No. TOR Condition Compliance Status
Page
No.
viii. Proper utilization of fly ash
shall be ensured as per Fly Ash
Notification, 2009. A detailed
plan of action shall be
provided.
Refer Section 10.5.1 of Chapter - 10
of the EIA report.
10.8
ix. Action plan for the green belt
development plan in 33 % area
i.e. land with not less than 1,500
trees per ha. Giving details of
species, width of plantation,
planning schedule etc. shall be
included. The green belt shall be
around the project boundary
and a scheme for greening of the
roads used for the project shall
also be incorporated.
Refer Section 10.6 of Chapter – 10 for
detailed greenbelt development
plan.
10.11 –
10.12
x. Action plan for rainwater
harvesting measures at plant
site shall be submitted to
harvest rainwater from the roof
tops and storm water drains to
recharge the ground water and
also to use for the various
activities at the project site to
conserve fresh water and reduce
the water requirement from
other sources.
Refer Section 10.7 of Chapter – 10 for
the detail of rain water harvesting
scheme.
10.12-
10.13
xi. Total capital cost and recurring
cost/annum for environmental
pollution control measures
shall be included.
Refer Section 10.11 of Chapter – 10 of
the EIA report.
10.15 –
10.17
xii. Action plan for post-project
environmental monitoring
shall be submitted.
Refer Section 6.2 of Chapter – 6 of
the EIA report.
6.2-6.3
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
14
Sr.
No. TOR Condition Compliance Status
Page
No.
xiii. Onsite and Offsite Disaster
(natural and Man-made)
Preparedness and Emergency
Management Plan including
Risk Assessment and damage
control. Disaster management
plan should be linked with
District Disaster Management
Plan.
Refer Section 7.9.3 & 7.11 of Chapter
– 7 of the details.
7.28 –
7.37
8 Occupational Health
i. Plan and fund allocation to
ensure the occupational health
& safety of all contract and
casual workers
Refer Section 10.11 of Chapter – 10 of
the EIA report.
10.15 –
10.17
ii. Details of exposure specific
health status evaluation of
worker. If the workers’ health is
being evaluated by pre designed
format, chest x rays,
Audiometry, Spirometry, Vision
testing (Far & Near vision,
colour vision and any other
ocular defect) ECG, during pre-
placement and periodical
examinations give the details of
the same. Details regarding last
month analyzed data of above
mentioned parameters as per
age, sex, duration of exposure
and department wise.
Not applicable as this is a proposed
project
--
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
15
Sr.
No. TOR Condition Compliance Status
Page
No.
iii. Details of existing Occupational
& Safety Hazards. What are the
exposure levels of hazards and
whether they are within
Permissible Exposure level
(PEL). If these are not within
PEL, what measures the
company has adopted to keep
them within PEL so that health
of the workers can be preserved
It may be noted that this is a
proposed project. Nevertheless,
measures to be taken by the
company after commissioning of the
project are given in the Section 7.8.1
of Chapter - 7
7.27
iv. Annual report of health status of
workers with special reference
to Occupational Health and
Safety.
Not applicable as this is a proposed
project
--
9 Corporate Environment Policy
i. Does the company have a well
laid down Environment Policy
approved by its Board of
Directors? If so, it may be
detailed in the EIA report.
At present, we have not laid down
environment policy. We will lay
down such a policy once our unit is
in operation.
--
ii. Does the Environment Policy
prescribe for standard operating
process /procedures to bring
into focus any infringement /
deviation / violation of the
environmental or forest norms /
conditions? If so, it may be
detailed in the EIA.
Our unit has yet not started
production. Nevertheless, we shall
see to it that Environmental Policy
that we have frozen will bring things
into focus and any future issues
related to the environment.
--
iii. What is the hierarchical system
or Administrative order of the
company to deal with the
environmental issues and for
ensuring compliance with the
environmental clearance
Not applicable as our proposed
project but environment
management cell will be established
and details for the same is given in
Section 10.4.3 of Chapter – 10 of the
EIA Repot.
10.3
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
16
Sr.
No. TOR Condition Compliance Status
Page
No.
conditions? Details of this
system may be given.
iv. Does the company have
system of reporting of non-
compliances/violations of
environmental norms to the
Board of Directors of the
company and/or shareholders
or stakeholders at large? This
reporting mechanism shall be
detailed in the EIA report
We have not yet started production.
However, we shall definitely set up
a system to report such issues to
partners.
--
10 Details regarding infrastructure
facilities such as sanitation, fuel,
restroom etc. to be provided to the
labour force during construction as
well as to the casual workers
including truck drivers during
operation phase.
Workers including casual workers
such as truck drivers will be
provided with basic amenities like
water supply, sanitation facilities,
first aid, personal protective
equipments, approach roads,
communication etc.
--
11 Enterprise Social Commitment (ESC)
i. Adequate funds (at least 2.5 % of
the project cost) shall be
earmarked towards the
Enterprise Social Commitment
based on Public Hearing issues
and item-wise details along with
time bound action plan shall be
included. Socio-economic
development activities need to be
elaborated upon.
Refer Section 8.4 of Chapter – 8 of
the EIA report for requisite details.
8.2-8.3
12 Any litigation pending against
the project and/or any
direction/order passed by any
Court of Law against the project,
if so, details thereof shall also be
Not applicable as this is a proposed
project
--
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad)
NABET Accredited
TOR Compliance
17
Sr.
No. TOR Condition Compliance Status
Page
No.
included. Has the unit received
any notice under the Section 5 of
Environment (Protection) Act,
1986 or relevant Sections of Air
and Water Acts? If so, details
thereof and compliance/ATR to
the notice(s) and present status of
the case.
13 A tabular chart with index for
point wise compliance of above
TORs.
Complied --
14 The TORs prescribed shall be valid
for a period of three years for
submission of the EIA-EMP
reports.
We have taken note of the same --
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 1
INDEX
CHAPTER
NO. CONTENT
PAGE
NO.
1
Executive Summary English & Gujarati
INTRODUCTION
1.1- 1.11
1.1 Preamble 1.1
1.2 Purpose of the EIA report 1.1
1.3 Promoters and their back ground 1.2
1.4 Need of the project and its importance in the country 1.3
1.5 Location of the proposed project and siting criteria 1.3
1.6 Scope of EIA study 1.7
1.7 Regulatory frame work 1.8
2 PROJECT DESCRIPTION 2.1-2.34
2.1 Introduction 2.1
2.2 Project location 2.1
2.2.1. Justification of site selection 2.6
2.2.2. List of major industries within 10 km study area 2.6
2.2.3. Salient features of the proposed project site 2.8
2.3 Details of project land & plant lay-out 2.8
2.4 Capital cost of the proposed project 2.9
2.5 Details of product and raw material consumption 2.11
2.6 Manufacturing Process 2.12
2.6.1. Melamine Formaldehyde Resin 2.12
2.6.2. Phenol Formaldehyde Resin 2.14
2.6.3. Urea Formaldehyde Resin 2.16
2.7 Storage details of raw materials and products 2.18
2.8 Solvent requirement & recovery system 2.19
2.9 Requirement of Resources 2.20
2.9.1. Electricity / Power 2.20
2.9.2. Manpower 2.20
2.9.3. Water 2.21
2.9.4. Fuel 2.21
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 2
CHAPTER
NO. CONTENT
PAGE
NO.
2.9.5. Plant, Machineries & Utilities 2.21
2.10 Energy Balance 2.22
2.11 Pollution Potential & Proposed Control Measures 2.23
2.11.1 Water Pollution 2.23
2.11.2 Air Pollution 2.28
2.11.3 Solid / Hazardous Waste 2.33
2.11.4 Noise & Vibration 2.33
3 DESCRIPTION OF ENVIRONMENT 3.1-3.86
3.1 Introduction 3.1
3.2 Air Environment 3.2
3.2.1 Micrometeorological Data 3.2
3.2.1.1 Meteorological Data from Secondary Sources 3.3
3.2.1.2 Meteorology - Data Generated at the Project Site 3.6
3.2.2 Selection of AAQ Stations 3.8
3.2.2.1 Existing AAQ (Pre-project) Status 3.9
3.2.2.2 Baseline Interpretation of AAQ of Study Area 3.13
3.3 Noise Environment 3.14
3.3.1 Existing Noise Levels 3.15
3.3.2 Baseline Interpretation of Ambient Noise Quality 3.17
3.4 Water Environment 3.18
3.4.1 Water Quality 3.18
3.4.1.1 Sample Collection and Analysis 3.18
3.4.1.2 Baseline Interpretation of Ground Water 3.24
3.4.1.3 Baseline Interpretation of Surface Water 3.27
3.5 Soil Environment 3.28
3.5.1 Methodology of Sample Collection and Analysis 3.28
3.5.2 Baseline Interpretation of Soil Quality 3.31
3.6 Geo-Hydrological Features 3.32
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 3
CHAPTER
NO. CONTENT
PAGE
NO.
3.7 Land Use Status 3.37
(A) Data Used 3.38
(B) Methodology 3.38
(C) Interpretation of Remote Sensing Data 3.38
3.7.1 Topography 3.44
3.8 Ecology 3.47
3.8.1 Baseline Data Collection 3.47
3.8.2 Detail of Methodology
3.8.3 Detail Sampling Method & Literature of Review
3.48
3.49
3.8.4 Biodiversity Status
3.8.5 Study Habitats
3.8.6 Status of Flora
3.8.7 Status of Fauna
3.50
3.50
3.51
3.53
3.8.8 Conclusion & Recommendation 3.58
3.9 Socio Economic Environment 3.68
3.9.1 Introduction 3.68
3.9.2 Socioeconomics 3.68
3.9.3 Households 3.69
3.9.4 Population 3.69
3.9.5 Occupational Structure 3.71
3.9.6 Literacy 3.75
3.9.7 Amenities 3.76
3.9.8 Site Specific Studies 3.83
3.10 Traffic Survey 3.85
4 ANTICIPATED IMPACTS & MITIGATION
MAESURES
4.1- 4.28
4.1 Preamble 4.1
4.2 Prediction and Evaluation of Impacts 4.2
4.3 Impact Identification 4.3
4.4 Assessment of Impacts 4.7
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 4
CHAPTER
NO. CONTENT
PAGE
NO.
4.5 Quantification of Impacts 4.10
4.5.1 Environmental Attributes & Relative Importance 4.10
4.5.2 Magnitude Criteria 4.11
4.5.3 Matrix Development 4.12
4.6 Mitigation Measures for Impacts on environment during
Construction Phase
4.15
4.7 Mitigation Measures for Impacts on Environment during
Operational Phase
4.18
4.8 Impact on Air Quality 4.21
4.9 Existing Traffic & Vehicular Pollution 4.27
5 ANALYSIS OF ALTERNATIVES 5.1-5.2
5.1 Introduction 5.1
5.2 Project Details 5.1
5.3 Site Alternatives 5.1
5.4 Alternative for Technologies 5.2
6 ENVIRONMENT MONITORING PROGRAM 6.1-6.4
6.1 Introduction 6.1
6.2 Environment Monitoring Program 6.2
6.3 Budget for Implementation of Environmental Monitoring
Plan
6.3
7 ADDITIONAL STUDIES 7.1-7.37
A Public Consultation 7.1
B Risk Assessment Study 7.1
C Social Impact Assessment, R & R Action Plan 7.1
7.1 Introduction 7.2
7.2 Surrounding Area 7.2
7.2.1 Objective and Scope 7.2
7.2.2 Risk Analysis Methodology 7.3
7.3 Hazard Identification and Risk Analysis 7.3
7.3.1 Hazard Identification Methods 7.3
7.3.2 Identification of Hazardous Chemicals used within 7.4
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 5
CHAPTER
NO. CONTENT
PAGE
NO.
Premises
7.3.3 Storage Details of Raw Material and Products 7.5
7.3.4 Hazard Indices 7.12
7.3.5 Credible Accident Sources/Worst Case Scenarios 7.13
7.4 Consequence Modeling 7.14
7.4.1 Damage Criteria 7.14
7.4.2 Details of Model Used for Consequence Analysis 7.17
7.5 Failure Frequency 7.23
7.6 Estimation of Effect of Damage / Impact Identification 7.23
7.7 Proposed Risk Reduction Measures 7.24
7.8 Occupational Health Surveillance Program 7.26
7.8.1 Treatment Facilities Provided to Workers affected by
accidental Spillage of Chemicals
7.27
7.8.2 Minimization of the manual handling of hazardous
substance
7.28
7.9 Disaster Management Plan 7.28
7.9.1 Disaster 7.28
7.9.2 Statutory Provisions 7.28
7.9.3 On-Site Emergency Plan 7.28
7.9.4 Site Plan of the Factory and Surrounding 7.29
7.9.5 Types of Overall Emergencies 7.29
7.9.6 Assessment of In-plant Hazards 7.30
7.9.7 Emergency Control System 7.30
7.9.8 General Procedures and responsibilities 7.33
7.10 Offsite Emergency Preparedness Plan 7.34
8 PROJECT BENEFITS 8.1-8.3
8.1 Introduction 8.1
8.2 Employment Potential 8.1
8.3 Direct & Indirect Benefits 8.1
8.4 Corporate Social Responsibility (CSR) 8.2
9 ENVIRONMENTAL COST BENEFIT ANALYSIS 9.1
9.1 Environmental cost benefit analysis 9.1
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 6
CHAPTER
NO. CONTENT
PAGE
NO.
10 ENVIRONMENTAL MANAGEMENT PLAN 10.1-10.17
10.1 Introduction 10.1
10.2 Environmental Management Plan for Construction phase 10.1
10.3
10.4
Environmental Management Plan for Operation phase
Component of EMP
10.2
10.2
10.4.1 Environment Management System (EMS) 10.2
10.4.2 Environmental Health & Safety (EHS) 10.2
10.4.3 Environmental Management Cell (EMC) 10.3
10.5 Environmental Management Plan for Proposed Project 10.4
10.5.1 Environmental Management during Operational
Phase
10.4
10.6 Greenbelt Development Plan 10.11
10.7 Conservation of Water - Rain Water Harvesting Scheme 10.12
10.8 Occupational Health Management Plan 10.14
10.9 Fire & Safety Management Plan 10.14
10.10 Cleaner Production Technologies 10.15
10.11 Budget for Environment Protection Measures 10.15
11 SUMMARY & CONCLUSION 11.1–11.4
11.1 Introduction 11.1
11.2 Air Environment 11.1
11.3 Water Environment 11.1
11.4 Noise Environment 11.2
11.5 Land/Soil Environment 11.2
11.6 Ecology & Biodiversity 11.3
11.7 Socio-Economic Environment 11.3
11.8 Conclusion 11.3
12 DISCLOSURE OF CONSULTANT ORGANIZATION 12.1-12.4
12.1 Declaration for Involvement in EIA study 12.1
12.2 Company Profile 12.3
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 7
LIST OF TABLES
TABLE
NO. LIST OF TABLES
PAGE
NO.
1.1 Details of Proposed Product 1.1
1.2 Promoters and their Background 1.2
1.3 General Siting Criteria 1.5
1.4 Scope of the study 1.7
1.5 Regulatory Frame Work 1.9
2.1 Salient Features of the Proposed Project Site 2.8
2.2 Area Break-up of Project Site 2.9
2.3 Break-up of capital cost for Proposed Resin Project 2.9
2.4 Details of Product 2.11
2.5 Details of Raw Material Consumption 2.11
2.6 Details of Proposed Raw Materials 2.18
2.7 Details of Storage of Proposed Products 2.19
2.8 Manpower Requirement 2.21
2.9 Fuel Requirement 2.21
2.10 List of Plant, Machineries and Utilities 2.22
2.11 Energy Balance 2.22
2.12 Stream-wise Water Requirement & Wastewater Generation 2.24
2.13 Stream-wise Quality of Effluent 2.27
2.14 Details of Flue Gas Emissions 2.28
2.15 Details of Air Pollution Control System 2.28
2.16 Details of Process Gas Emissions 2.31
2.17 Details of Hazardous Waste Management 2.33
3.1 Period of Meteorological Data Collection 3.3
3.2 Monthly Mean values of Meteorological Data (Secondary Data) 3.3
3.3 Ambient Air Monitoring Locations 3.9
3.4 Air – Parameters Analyzed and Sampling Duration 3.10
3.5 Ambient Air Quality – Methodology 3.10
3.6 Ambient Air Monitoring Results 3.12
3.7 Baseline Status of Ambient Air Quality 3.13
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 8
TABLE
NO. LIST OF TABLES
PAGE
NO.
3.8 Noise Monitoring Locations 3.16
3.9 Noise Level Monitoring Data 3.17
3.10 Water Monitoring Locations 3.21
3.11 Water Quality - Physico-Chemical Analysis of Ground Water 3.22
3.12 Water Quality - Physico-chemical Analysis of Surface Water 3.25
3.13 Soil Sampling Locations 3.30
3.14 Physico-Chemical Characteristic of Soil 3.30
3.15 Rainfall Data of the Region 3.33
3.16 Land Use / Land Cover Classification 3.39
3.17
3.18
Information of Field Survey
Taxonomic Status of Plant Species
3.47
3.51
3.19 Life Form Status of Plant Species 3.52
3.20 List of Agriculture and Commercial Crop Species Recorded 3.53
3.21 Taxonomical Status of Herpetofauna 3.54
3.22 Overall Status of Terrestrial and Aquatic Birds 3.55
3.23 Overall Status of Mammals 3.57
3.24 List of Villages covered in 10 km Radius Area 3.68
3.25 Population Distribution in the Study Area 3.70
3.26 Occupational Structure in the Study Area 3.73
3.27 Literacy Status in the Study Area 3.75
3.28 Basic amenities detail for study villages covered in 10 km radius 3.77
3.29 Traffic Count Data 3.86
4.1 Impact Identification Matrix 4.5
4.2 Assessment of Impacts 4.8
4.3 Environmental Attributes 4.10
4.4 The Activity – Impact Evaluation Matrix 4.12
4.5 Cumulative Impact Matrix 4.14
4.6 Construction Phase: Impacts & its Mitigation Measures 4.15
4.7 Operation Phase: Impacts & its Mitigation Measures 4.18
4.8 Details of Flue Gas Stacks 4.21
4.9 Expected Pollutants and its Emission Rate 4.22
4.10 Predicted 24 Hourly Short term incremental concentration of PM10 4.26
4.11 Predicted 24 hourly short term incremental Concentrations of SO2 4.26
4.12 Predicted 24 hourly short term incremental Concentrations of NO2 4.27
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 9
TABLE
NO. LIST OF TABLES
PAGE
NO.
4.13 Assessment of Proposed Traffic Load 4.28
5.1 Proposed Technology Alternatives 5.2
6.1 Environmental Monitoring Program 6.2
6.2 Budget for Implementation of Environmental Monitoring Plan 6.3
7.1 Chemical Properties of Hazardous Chemicals 7.4
7.2 Storage Details of Raw Material 7.5
7.2 (A) Storage Details of Products 7.6
7.3 Identification Hazard Associated with Storage of Raw Materials 7.6
7.4 Fire & Explosion Index 7.12
7.5 Scenarios Considered for MCA Analysis 7.13
7.6 Damage Due to Incident Radiation Intensities 7.14
7.7 Damage Due to Peak Over Pressure 7.16
7.8 Consequence analysis and Damage Distance (Failure of raw
material storage tanks) 7.18
7.9 Estimation of Fatality 7.23
7.10 Types of Emergencies 7.29
7.11 Details of Fire Extinguishers 7.33
7.12 Offsite Action Plan 7.36
8.1 Action Plan for Socio-Economic Development Activities 8.3
10.1 Details of Plant Species in Greenbelt 10.11
10.2
10.3
Details of Rain Water Harvesting
Budgetary allocation towards Environmental Management
10.13
10.16
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 10
LIST OF FIGURES
FIGURE
NO. LIST OF FIGURES
PAGE
NO.
1.1 Location of the project site 1.4
1.2 Photograph of the project site 1.5
2.1 Index Map 2.2
2.2
2.3
Google Image showing surrounding 1,5,10 km radius area from
the project site
Google map showing surrounding 500 meter radius area from
the project site
2.3
2.4
2.4 Toposheet showing surrounding 10 km radius area from the
project site
2.5
2.5 Google Map showing nearby Industries 2.7
2.6 Plant Lay-out 2.10
2.7 Methanol Recovery System 2.20
2.8 Water Balance Diagram 2.25
2.9 Schematic Flow Diagram of Effluent Treatment Plant 2.26
3.1 Wind Rose Diagram of Entire Year (Secondary Source) 3.5
3.2 Photograph showing Automatic Weather Station installed near
project site
3.6
3.3 Wind Rose Diagram based on Primary Meteorological Data 3.7
3.4 Map showing Ambient Air Quality Locations 3.8
3.5 Photograph showing Ambient Air Monitoring 3.10
3.6 Map Showing Noise Sampling Locations 3.15
3.7 Photograph showing Noise Measurement 3.16
3.8 Photograph showing Ground & Surface Water Sample
Collection
3.20
3.9 Map showing Surface & Ground Water Quality Locations 3.21
3.10 Photograph showing Soil Sample Collection 3.29
3.11 Map showing Soil Sampling Locations 3.29
3.12 Ground Water Prospect Map 3.36
3.13 Land use and Land cover map of the 10 km radius study area 3.41
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 11
FIGURE
NO. LIST OF FIGURES
PAGE
NO.
3.14 Imagery view map of the 10 km radius study area 3.42
3.15 Infrastructure Map of the 10 km radius study area 3.43
3.16 Topography Map of the 10 km radius study area 3.46
3.17
3.18
Photographs showing Surrounding Habitat
Land use/Land cover Map
3.47
3.48
3.19 Percentage of Total Population Distribution 3.71
3.20 Percentage Distribution of Workers 3.75
3.21 Percentage Distribution of Literacy Levels 3.76
3.22 Photograph showing Socio-Economic Data Collection 3.82
3.23 Image showing Traffic Surveying Location 3.85
4.1 Ground Level Concentration of PM10 4.23
4.2 Ground Level Concentration of SO2 4.24
4.3 Ground Level Concentration of NO2 4.25
7.1 Methanol Pool Fire (Threat Zone) 7.19
7.2 Methanol BLEVE Worst Case Scenario (Threat Zone) 7.20
7.3 Methanol Toxic Dispersion 7.21
7.4 Phenol Toxic Dispersion 7.22
7.5 Off-Site Emergency Plan 7.35
10.1 Environmental Management Cell 10.3
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
INDEX 12
LIST OF ANNEXURES
ANNEXURE
NO.
LIST OF ANNEXURES
1 TOR Letter issued by MoEFCC, New Delhi
2 NA permission
3 Proof of CGWB Application
4 Site Specific Primary Meteorological Data
5 Raw data of all AAQ measurement for all Sampling Locations
6 Material Safety Data Sheets of Raw Materials
7 Copy of NABET Accreditation Certificate
8 Copy of NABL Accreditation Certificate
EXECUTIVE SUMMARY IN ENGLISH
OF
M/s. Welmica Laminates Pvt. Ltd.
(New Proposed Resin Manufacturing Project)
(Phenol Formaldehyde Resin - 700 MT/month
Melamine Formaldehyde Resin - 400 MT/month Urea Formaldehyde Resin - 400 MT/month)
Address:
Survey No. 98, Opposite 66 KV Substation, Before Millennium
Tiles, Old RafaleshwarRoad, at Village: Bhadiyad, Taluka & District:
Morbi-363642, Gujarat.
Prepared by:
T.R. ASSOCIATES
Ganesh Meridian, Block No – C, Office No-605 A, Opp. Kargil Petrol Pump,
Nr. Sola Over Bridge, S.G.Highway, Ahmedabad – 380060.
M – 9825371099
Email – [email protected] [email protected]
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 1
EXECUTIVE SUMMARY – ENGLISH & GUJARATI
Executive Summary – ENGLISH
1. INTRODUCTION
M/s. Welmica Laminates Pvt. Ltd. is proposing to manufacture Melamine
Formaldehyde Resin, Phenol Formaldehyde Resin & Urea Formaldehyde Resin
at Survey No. 98, Opposite 66 KV Substation, Before Millennium Tiles, Old
Rafaleshwar Road, At Village: Bhadiyad, Taluka & District: Morbi 363642,
Gujarat. Details of proposed products are as given below:
Details of Proposed Products
Sr. No. Name of Product Production Capacity
1. Phenol Formaldehyde Resin 700 MT/Month
2. Melamine Formaldehyde Resin 400 MT/Month
3. Urea Formaldehyde Resin 400 MT/Month
Note: Please note that above said Resin products will be used in captive consumption in manufacturing of laminated sheets as well as for sale purpose.
M/s. Welmica Laminates Pvt. Ltd. has a total land area of 13,456m2. Out of the
stated 13,456m2 of land area approximately 4,470m2 is green belt area (approx.
33.22% of the total land area). Non Agriculture (NA) permission has been
already obtained from the concerned authority.
Proposed manufacturing unit is a Small Scale Unit having total investment of
about Rs. 1.3 Crores. Approximately Rs. 45 Lakhs will be allocated towards
environmental management facilities.
M/s. T. R. Associates (NABET Accredited EIA Consultant) was appointed by
M/s. Welmica Laminates Pvt. Ltd. to carry out the Environmental Impact
Assessment study for their proposed project.
The proposed products like Melamine Formaldehyde Resin, Phenol
Formaldehyde Resin & Urea Formaldehyde Resin (being synthetic organic
chemicals) falls under Category 5(f) as stated in Environment Impact
Assessment Notification Published on 14th September, 2006. Further, the
location of proposed project is outside the notified industrial estate and not fall
in Small Scale Industrial Unit criteria as per the Notification dated 25th June
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 2
2014. Hence, project proponent has to obtain the Environmental Clearance from
the Ministry of Environment, Forests & Climate Change (MoEF&CC), New
Delhi. As a part of this procedure, Public Hearing is required to be carried out
as per the notification as well as the TOR granted to the unit by the Expert
Appraisal Committee (Industry-2).
This study of Environment Impact Assessment (EIA) is based on studies
carried out during the month of October 2017 to December 2017. The
environmental parameters (ambient air, water, soil, noise, flora and fauna)
selected for study are those, which are likely to be most affected by the project.
The study area is defined as an area within 10 km radius from centre of the
project site.
Salient Features of the surrounding area is as follows:
Sr.
No. Important Features Description
1 Location Survey No. 98, Village: Bhadiyad, Taluka &
District: Morbi, Gujarat
2 Project Site Co-ordinates Latitude: 22°47'42.61"N
Longitude: 70°52'18.91"E
3 Temperature Range
(average)
18˚C to 43˚C
4 Mean Sea Level 15 m
5 Annual Rain Fall (average) 551 mm
6 Ground Water Depth 30 to 60 m (Source: CGWB)
7 Soil Type Medium black soils, Red Sandy soils and Silty
soils
8 Nearest Railway Station Nazarbag railway station – 0.35 km NE
9 Nearest Airport Rajkot airport – 53.6 km in south direction
10 Nearest Village Bhadiyad – 1.1 km in NW direction
11 Nearest State Highway SH 22 – 4.6 km in WNW direction.
12 Nearest National Highway NH 8A – 1.3 km in NE direction.
13 Nearest River/Water body Machhu River – 1.8 km in West direction
14 National Parks / Sanctuary/
Eco Sensitive Zone/
Reserved Forest
Reserved Forest – Paneli: 4 kms East direction
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 3
2. AIR ENVIRONMENT
The base line Ambient Air Quality (AAQ) status within 10 km study area has
been assessed through a monitoring network of 8 AAQ sampling stations
during October 2017 to December 2017. Map showing 10 km radius area is
shown here. Design of network for Ambient Air Quality monitoring locations
were decided on meteorology & available infrastructure facilities. The baseline
Ambient Air Quality of the study area was monitored for Particulate Matter
(PM10 & PM2.5), Sulphur Dioxide (SO2) and Nitrogen Dioxide (NO2), CO &
VOC. The result for the same is given as below:
Location Results (98th Percentile)
PM2.5 PM10 SO2 NO2
Project Site 56.4 80.13 18.41 20.98
Lalpar 60.13 72.34 11.91 12.13
JodhparNadi 56.49 62.95 20.47 25.76
Lilapar 50.42 66.59 17.56 19.60
Ravapar 46.90 65.03 12.64 17.82
Trajpar 35.61 55.07 10.34 10.44
Paneli 40.97 60.06 17.39 22.17
Kalikanagar 55.04 70.35 13.21 15.45
Permissible limit
[NAAQ standards-
2009]
60 µg/m3 100 µg/m3 80 µg/m3 80 µg/m3
Note: CO: Not Detected; VOC: Not Detected
Analysis of ambient air samples revealed that the Air quality is found well
within the prescribed limits of National Ambient Air Quality standards.
The main source of gaseous emission is flue gas emission from stack attached
to Steam boiler, TFH and D. G. set.
Agro-waste/ Briquettes will be used as a fuel & the requirement shall be 7.9
MT/Day. Adequate stack height will be provided for proper atmosphere
dispersion of pollutant. The probable emitted pollutants will be PM, SO2 &
NO2. Cyclone separator followed by Bag Filter will be provided as Air
Pollution Control Measures. Since Diesel will be used as a fuel for D. G. Set
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 4
(back–up system) the flue gas emission will also be well within prescribed
norms and there is no need of any air pollution control measures for D. G. Set.
3. WATER ENVIRONMENT
Analysis of ground water and surface water samples revealed that it is suitable for domestic activity including agricultural activity. Ground water and surface water quality in the area meets the Water Quality Standards (IS 10500) for drinking water except for Turbidity, E. Coli. and Coliforms at some locations.
Water Requirement
The total water requirement for the proposed project will be 33.7 kl/day. Out
of this said fresh water quantity 11.3 kl/day will be used for domestic purpose,
21.7 kl/day will be used for industrial activities and 0.7 kl/day will be used for
greenbelt development purpose. The required water will be obtained through
Borewell.
Wastewater Generation and its Disposal
The total generation of domestic wastewater will be 10.3 kl/day from the
proposed project activity. The domestic wastewater generated will be treated
in STP and treated sewage will be used for gardening purpose.
The total industrial effluent generation from proposed project activity will be
15 kl/day, which will be from resin manufacturing (1.8 Kl/day) & Washing
(0.2 Kl/day). Effluent generated from utilities which will be from cooling tower
(1.5 Kl/day), boiler blow down (1 Kl/day), and RO-1 reject (10.5 Kl/day) and It
will be collected in collection tank and treated with oxidation treatment and
send it to holding tank. After that it will be evaporated in evaporator system.
Condensate water will be reuse in the industrial process. This maintains Zero
Discharge.
4. LAND / SOIL ENVIRONMENT
During operation activity the impact of air, water and solid waste pollution on
soil causes direct / indirect effect on soil.
As all necessary air pollution control steps will be provided and based on the
results of the dispersion model for the Ground Level Concentrations of various
pollutants after commissioning of the proposed project, there will not be any
adverse impact of air pollution on soil.
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 5
It may be noted that there will be no disposal of untreated effluent on land. So,
there will be no adverse effect on land / soil due to water.
All necessary control steps will be provided for handling, storage and disposal
of solid/hazardous waste generated from the plant. Thus, there will not be any
significant impact of solid/hazardous waste on the soil environment.
5. NOISE ENVIRONMENT
Noise level was recorded at 8 locations within the study area to provide the
baseline data to describe the existing situations.
Sr.
No. Location
Noise Level (Leq) in dBA (Day Time)
Noise Level (Leq) in dBA (Night Time)
Measured Permissible
Limit Measured
Permissible
Limit
1 Project Site 42.01 75 25.06 70
2 Lalpar 45.02 55 22.11 45
3 Jodhpar Nadi 40.01 55 32.01 45
4 Lilapar 41.02 55 33.02 45
5 Ravapar 44.02 55 38.01 45
6 Trajpar 46.06 55 23.05 45
7 Kalikanagar 43.02 55 29.07 45
8 Paneli 48.05 55 41.01 45
6. SOCIO-ECONOMIC ENVIRONMENT
An assessment of socio-economic environment forms an integral part of an EIA
study. Socio-economic environment – demographic & related socio-economic
data was collected from District Census Handbook to assess socio-economic
status of the study area.
For proposed project activity, total 100 nos. of skilled and unskilled
employees/ workers will be required. The indirect employment will be
generated by way of transportation, shopkeepers and other casual employment
for many people.
Local people will be given preference wherever found suitable for all the jobs in
the plant. Economic status of the local people will improve due to the increased
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 6
business opportunities, thereby, making a positive impact. Educational,
medical and housing facilities in the study area will considerably improve.
7. ECOLOGY & BIODIVERSITY
The study area was dominated by agriculture landscape. The floral and faunal
diversity was very less.
Domestic tree species found in the study area are Baval, Neem, Gulmohar,
Karanj, Kesudo, Khijado and Asopalav. Major crops in the study area are
Cotton, Sesame, Rice, Wheat, Millet, and Sorghum.
The commonly spotted bird species of this area were Drongo, Green Bee eater,
Houses wift, Kingfisher, Common Myna, Lapwing, Rosering Parakeet.
The wild mammals found other than domesticated ones from study area were Nilgai, Golden Jackal, Grey Mongoose, Hare and Wild Boar.
8. SOLID WASTE MANAGEMENT
The main hazardous waste generation will be ETP Sludge + Evaporation
Residue, Used Oil, and Discarded Plastic Bags/Drums.
ETP Sludge + Evaporation Residue will be disposed off at approved TSDF site.
Used Oil will be reused within premises as a lubricant or sold to registered
recycler. Discarded Plastic Bags/Drums will be sold to authorized vendor.
Unit will provide storage area for hazardous wastes having roof, pucca flooring
with leachate collection system. Leachate, if any will be collected and treated in
effluent treatment plant. Unit will take membership of TSDF site after
commencement of proposed project.
9. ENVIRONMENTAL MANAGEMENT PLAN
An Environmental Management Plan has been prepared for mitigation of the
adverse impacts.
The Environmental Management Plan describes in brief, the management’s
plan for proper and adequate implementation of treatment and control system
for pollutants and for maintaining the environment. It also includes
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 7
development of green belt, proper safety of workers, environmental
monitoring plan, rain water harvesting, fire protection system and measures
etc.
An Environmental Management Cell will be formed for effective
implementation of Environmental Management Plan.
10. ENVIRONMENT MONITORING PROGRAME
Monitoring of environmental factors will enable us to identify the changes in
the environmental impacts at various locations and their mitigative measures.
To ensure the effective implementation of the EMP, monitoring of ambient air
quality, stack emissions, analysis & monitoring of water environment and noise
level will be carried out as required / specified by statutory authority.
11. RISK ASSESSMENT
Risk analysis and study have been carried out for identification of hazards,
selection of maximum credible scenarios, risk mitigation measures etc. All the
hazardous chemicals will be stored and handled as per MSDS guidelines.
12. GREEN BELT DEVELOPMENT
Total land area of 4470 m2 (33.22%) has been allotted for greenbelt
development. This will contains common tree species found in study area
which is tolerant to pollutants, acts as noise absorbers. This will not only
mitigate the ecological problem but also enhance the beauty of project area that
will attract avifauna, small mammals & insect species, and by this way
ecological balance can be maintained to great extent.
13. PROJECT BENEFITS:
The proposed project will become beneficial to the surrounding area or
community in terms of infrastructural development, social development,
employment and other benefits.
The proposed project has a potential for employment of skilled, semi-skilled
and unskilled employees during construction phase as well as operation phase.
A total 100 nos. of person is likely to get employment due to the proposed
Environmental Impact Assessment Report
M/s. Welmica Laminates Pvt. Ltd. Survey No. 98, Village: Bhadiyad, Taluka &District: Morbi, Gujarat.
T. R. Associates (Ahmedabad) NABET Accredited
Executive Summary - English 8
project. The project will earmark 2.5 % of project cost for socio-economic
development activities in surrounding villages.
14. CONCLUSION:
Negligible impacts will occur on air quality. However, all the necessary air
pollution control measures will be provided.
No ecological damage will occur.
No adverse impacts will occur on water environment.
Local employment opportunities will increase.
Various other environment parameters like Forest/ National Park/
Sanctuary and Religious / Historical Places will not be affected.
Environment Management Plan has been formulated to control all the
pollutant parameters and Environment Management Cell has been set-up
to ensure that these parameters do not exceed the norms set out by the
concerned authorities.
After commissioning of the proposed project the Environmental
Management Cell will take care of all the pollution control measures.
It can be concluded on a positive note that after the implementation of the
mitigation measures and environmental management plan during the
construction & operational phase, there will be negligible impact on the
environment.
સકં્ષીપ્ત અહવેાલ
મેસસસ ળેમાઇકા ેમીનેટ્સ પ્રા. ી. (નવો રેઝીન ઉત્પાદન એકમ)
(ફીનો ફોમાસલ્ડીહાઈડ રેઝીન – ૭૦૦ મ.ેટન/માસ
મેેમાઈન ફોમાસલ્ડીહાઈડ રેઝીન – ૪૦૦ મ.ેટન/માસ
યરુીયા ફોમાસલ્ડીહાઈડ રેઝીન – ૪૦૦ મ.ેટન/માસ)
સળે ન.ં-૯૮, ૬૬ કેળી સબસ્ટેનની સામ,ે મીેનીયમ ટાઈલ્સ પહેા, જુના રફાલેશ્વર
રોડ, ગામ:-ભડીયાદ, તાલકુો અને જીલ્ો:- મોરબી, ગજુરાત
Prepared by:
T.R. ASSOCIATES
Ganesh Meridian, Block No – C, Office No-605 A, Opp. Kargil Petrol Pump,
Nr. Sola Over Bridge, S.G.Highway, Ahmedabad – 380060.
M – 9825371099
Email – [email protected] [email protected]
Environ
૧.
મેસસર્ વે
૯૮, ૬૬
ભડીયાદ
િફનોલ
દરખા ત
મ ં૧૨૩
ન ધ: ઉપ
માટે થશે
પ્ર તાિવ
માથંી
આવશે.
છે.
પ્ર તાિવ
યવ થ
મેસસર્
એકમનો
nmental Impa
T. R. AssoNABET A
તાવના:-
વેલમાઈકા
૬ કેવી સબ
દ, તાલકુો અ
ફોમાર્ ડીહાઈ
ત કરેલ છે.
ાકં મે
પરોક્ત રેઝીન
.
િવત વેલમાઈ
૪,૪૭૦ ચો
બીનખેતી
િવત એકમને
થાપન પ ધિ
વેલમાઈકા
નો પયાર્વરણી
act Assessmen
ociates (AhmeAccredited
EXECU
લેમીને સ પ્ર
બ ટેશનની
અને જી લો:
ઈડ રેઝીન
ોડિફનોલ ફોમ
મેલેમાઈન ફોયરુીયા ફોમ
નનો ઉપયોગ
ઈકા લેમીને
ો.મી. (આશ ે
માટેની મજૂં
ને પ્ર થાિપત
િત માટે આશ
લેમીને સ
ણીય પ ૃ થકર
nt Report
edabad)
UTIVE SU
સં ી
પ્રા. િલ. એ
સામે, મીલે
- મોરબી, ગ
અને યરુી
તાિવત ોડ
ડ ટ ુ ંનામ માર્ ડીહાઈડ ેોમાર્ ડીહાઈડમાર્ ડીહાઈડ ે
કે ટીવ વપરા
સ પ્રા. િલ.
રે કુલ િવ ત
જૂરી અગાઉથી
ત કરવાની
શરે િપયા ૪
પ્રા. િલ.
રણ અસર અ
UMMAR
ી ત અહ
પ્ર તાિવત
લનીયમ ટાઈ
ગજુરાત રાજ
ીયા ફોમાર્ ડી
ડ ટ (ઉ પાદ
રેઝીન ડ રેઝીન રેઝીન
ાશ માટે (લેમી
એકમનો કુ
તારના ૩૩.૨
થી સબંિધત
િકંમત િપ
૪૫ લાખ ફ
ારા મેસસ
અ યાસ (E
RY – GU
વાલ
એકમ છે.
ઈ સ પહલેા
જય ખાતે મે
ડીહાઈડ રેઝી
દન) ની િવગ
૭૪૪
મીનેટેડ શીટના
લ િવ તાર
૨૨%) જમી
સ ા પાસેથ
િપયા ૧.૩
ાળવવામા ંઆ
સર્ ટી. આર
EIA) કરવા
M/s. WelmSurvey no
Taluka & D
Execut
JARATI
આ પ્ર તાિવ
, જુના રફા
મલેમાઈન ફો
ઝીનનુ ં ઉ પા
ગત
મત૭૦૦ મેટ્રીક ૪૦૦ મેટ્રીક ૪૦૦ મેટ્રીક
ા ઉ પાદન મા
આશરે ૧૩,
ીન ગ્રીન બે
થી જમીન મ
કરોડ થશે
આવશે.
ર. એસોસીએ
માટે િનમણ ૂ
mica Laminateo. 98, Village: District: Morb
tive Summary
િવત એકમે સ
ાળે ર રોડ,
ોમાર્ ડીહાઈડ
ાદન કરવા
તા ટન/માસ ટન/માસ ટન/માસ
ાટે) તેમ જ વે
,૪૫૬ ચો. મ
ટ માટે ફાળ
માિલક ારા
તથા પયાર્
એ સની પ્ર
ણ ૂકં કરવામાં
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 1
સવેર્ ન.ં-
, ગામ:-
ડ રેઝીન,
માટેની
વેચાણ હતે ુ
મીટર છે.
ળવવામા ં
મેળવેલ
ાર્વરણીય
પ્ર તાિવત
ા આવેલ
Environ
છે.
અતે્ર ન
યરુીયા
નોટીફીકે
ઓ ોિગ
પ્રમાણે
Environ
(Enviro
પયાર્વર
એ યિુન
પયાર્વર
૨૦૧૭
(આસપ
અસર પ
૧૦ િકમ
આસપા
માં૧
૨
૩ ૪ ૫ ૬
nmental Impa
T. R. AssoNABET A
ન ધનીય છે
ફોમાર્ ડીહા
કેશન-૨૦૦૬
િગક િવ તારન
નાના પાયા
nment, Fo
onmental C
રણીય લોકસુ
નટને આપેલ
રણ ૃ થકર
થી િડસે બ
પાસ ની હવા
પામી શકે તે
મી. િત્ર યાન
સના ૧૦ ક
ક ુપ્ર તાિવ
અક્ષાશં તાપમાસમદુ્રી વાિષર્ક ભગૂભર્ જ
act Assessmen
ociates (AhmeAccredited
કે મેલામા
ઈડ રેઝીન
૬ ના િવભા
ની બહાર
ાના ઓ ોિગ
rest & C
Clearance)
સનુાવણી એ
ા TOR પ્રમ
ણ અસર અ
બર ૨૦૧૭
ા, પાણી, જ
તેમ છે, તેનો
ના વતુર્ળાકાર
કમી િ યાન
ુ ય લા ણિવત એકમનુ ં
– રેખાશં
ન તરના સરેરવરસાદ જળની ઉડાઈં
nt Report
edabad)
ાઇન ફોમાર્
(સી થેટીક
ાગ-૫ (એફ
છે અને સિૂ
િગક એકમ અં
Climate Ch
મેળવવાન
જાહરેનામા
ાણે કરવામાં
અ યાસ (En
દરિમયાન
જમીન, વિન
ો અ યાસ ક
ર િવ તારને
ના િવ તારન
ણ તાઓ થાન
રાશ
ઈ
ડીહાઈડ રેઝ
ક ઓગેર્નીક
ફ) મા ંઆવે
િૂચત પરીયો
અંતગર્ત આ
hange), ન
ની જ રીયા
ા પ્રમાણે તથ
ા ંઆવશે.
nvironmenta
કરવામા ં
િન, વન પિત
કરવામા ંઆ
અ યાિસત
ની ુ ય લા
સવેર્ નમીલેનીરોડ, ગમોરબીઅક્ષાશંરેખાશં:૧૮.૦°સ૧૫ મી૫૫૧.૦૩૦ મી
ઝીન, િફનો
ક કેિમકલ)
વે છે. તદ્ઉ
યોજના ૨૫
વતો નથી
નવી િદ હી
ાત રહલે
થા એ પટર્ એ
al Impact A
આવેલ છે.
તઓ અને પ્ર
આ યો છે. પ્ર
કે્ષત્ર તરીકે
ા ણકતાઓ
ન.ં-૯૮, ૬૬ીયમ ટાઈગામ:-ભડીય, ગજુરાત રશ:- ૨૨0૪૭’૪- ૭૦0૫૨’૧સે. થી ૪૩.૦ીટર ૦૦ મી.મી (સીટર થી ૬૦
M/s. WelmSurvey no
Taluka & D
Execut
લ ફોમાર્ ડી
નુ ં પ્ર તાિવ
પરાતં એક
જૂન ૨૦૧
તેથી MoEF
પાસેથી પ
છે. આ પ્ર
એપ્રાઈઝલ
Assessment
પયાર્વરણી
પ્રાણીઓ)
તાિવત એક
નક્કી કરવ
ઓ નીચે મા
વણન કેવી સબસ પહલેા, યાદ, તાલકુોરાજય. ૪૨.૬૧”N ૧૮.૯૧”E ૦°સે. (સરેર
સરેરાશ)
મીટર
mica Laminateo. 98, Village: District: Morb
tive Summary
ીહાઈડ રેઝી
િવત ઉ પાદ
મની જગ્યા
૪ ના નોટી
F&CC (Min
પયાર્વરણીય
પ્રકીયાના ભ
કમીટી (ઇ
t Study) ઓ
ણીય ઘટકો
પ્ર તાિવત
કમને કે દ્રમ
વામા ંઆવેલ
ાણે છે.
બ ટેશનની જુના રફાો અને જી
રાશ)
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 2
ીન અને
દન EIA
ા સિૂચત
ટીફીકેશન
nistry Of
ય મજૂંરી
ભાગ પે
ડ ટ્રી-૨)
ઓકટોબર
વા કે
એકમથી
મા ંલઈને
લ છે.
સામે, ળે ર લો:-
Environ
માં૭ ૮ ૯ ૧૦ ૧૧
૧૨ ૧૩
૧૪
૨. હવ
પ્રવતર્મ
થળથી
થી ડીસે
ગણુવ
પ્રા ત સ
(PM10&
ની ચકા
ના પિ
ોલાલજોધલીલ
nmental Impa
T. R. AssoNABET A
ક ુજમીન નજીક નનજીક નનજીક નનજીકનો
નજીકનોનજીકનોત
રા ટ્રીયપ્રાણીઓ
વા ુ ંપયાવ
માન આસપા
ી ૧૦ િકમી
સે બર ૨૦૧
ા નક્કી કર
સિુવધાઓના
& PM2.5), સ
ાસણી કરવા
િરણામો નીચે
થળ
ટ સાઈટ લપર ધપર નદ લાપર
act Assessmen
ociates (AhmeAccredited
ુ ય લા ણપ્રકાર નુ ંરે વે ટેશનુ ંએરપોટર્ નુ ંગામ નો રા ય ધો
નો રા ટ્રીય ધોના જમીન પ
ય ઉઓ માટેનુ ંઅ
વરણ (Air
ાસની હવાન
િત્ર યાના વ
૧૭ દરિમયા
વા માટેના
ા આધારે ન
સ ફર ડાયોક
ામા ંઆવી હ
ચેના ટેબલમ
PM૫૬
૬૦.
૫૬.
૫૦.
nt Report
edabad)
ણ તાઓ
શન
રીમાગર્
ધોરીમાગર્ પરના પાણીન
પવન-જગંલયાર ય
Environm
ની (Ambie
વતુર્ળાકાર િવ
ાન નમનૂા
થળની પસ
ક્કી કરેલ હ
કસાઈડ (SO
હતી.
મા ંદશાર્ યા
M2.5 ૬.૪
.૧૩
.૪૯
.૪૨
કાળી જનઝરબરાજકોટભડીયાટેટ હપિ મનેશનલ
ના મ ન
લી પાનેલી
ment) :-
nt Air) ગણુ
િવ તારમા ં૮
લઈને તેની
સદંગી વાયશુ
હતી. હવાની
O2), નાઈટ્રો
મજુબ છે.
પ રણામPM10 ૮૦.૧૩
૭૨.૩૪
૬૨.૯૫
૬૬.૫૯
જમીન, લાલબાગ રે વે ટેટ એરપોટર્–દ –૧.૧ િકમહાઈવે ૨૨
લ હાઈવે ૮ નદી –૧.૮ િ
ી રીઝવર્ ફોરે
ણવ ા જાણ
૮ અલગ અલ
ની ચકાસણી
શા , CPCB
ગણુવ ા ન
ોજન ડાયોક
મ (98th ટકાવ
૧
૧
૨
૧
M/s. WelmSurvey no
Taluka & D
Execut
વણન લ રેતાળ, કાંટેશન–૦.૩૫૫૩.૬ િકમીમી ઉ ર પિ– ૪.૬ િકમ
એ – ૧.૩ િિકમી પિ મ
ર ટ -૪.૦ િક
ણવા માટે પ્ર
લગ થળેથી
કરવામા ંઆ
B ની માગર્દ
નક્કી કરવા
સાઈડ (NO
વાર ) SO2 ૧૮.૪૧
૧૧.૯૧
૨૦.૪૭
૧૭.૫૬
mica Laminateo. 98, Village: District: Morb
tive Summary
ાપવાળી જમ૫ િકમી ઉ રી દક્ષીણ િ મ મી પિ મ
િકમી ઉ ર પમ
િકમી પવૂર્
પ્ર તાિવત
થી ઓક્ટોબર
આવી હતી.
દિશર્કા અને
માટે પાિટર્ક
O2), CO અ
NO2 ૨૦.૯૮
૧૨.૧૩
૨૫.૭૬
૧૯.૬૦
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 3
મીન રપવૂર્
ઉ ર
પવૂર્
એકમના
ર ૨૦૧૭
હવાની
નજીકની
કલ મેટર
અને VOC
૮
૩
૬
૦
Environ
રવાપાજ
પાનેકાલીવી
ન ધ: CO
આસપા
એર ક્વો
હવાના
અને થિ
એગ્રો વે
રહશેે. સ
માટે ચી
તરીકે સ
પાવરક
ઉ સ ન
નથી.
૩. જળ
ભગૂભર્ જ
શકાય
થાિનક
nmental Impa
T. R. AssoNABET A
થળ
પર જપર નલી ીકાનગર કાય મયાદા
O: Below De
સની હવાન
વોલીટીના ધ
પ્રદૂષણનો
િમર્ક યડુ હ
વે ટ/િબ્રકેટસ
સભંિવત બહ
ીમની ની પ
સાયક્લોન
ટ વખતે વ
ન પણ િનય
ળ પયાવર
જળ તેમજ
કે અ યાિસ
પ્રવિૃ મા
act Assessmen
ociates (AhmeAccredited
PM૪૬.
૩૫.
૪૦.
૫૫.
ા ૬૦µg
tectable Lim
ના પિરણામ
ધારાધોરણ મુ
મખુ્ય ોત
હીટર, D.G.
સ બળતણ
હાર િનકળત
પયાર્ ત ઉંચા
સેપરેટર અ
વપરાશે તેમ
ત ધારાધોર
ણ (Water
જમીન પર
સત િવ તાર
ાટે યોગ્ય છે
nt Report
edabad)
M2.5 .૯૦
.૬૧
.૯૭
.૦૪
g/m3
mit; VOC: Bel
પરથી તાર
મજુબ છે.
ચીમની મ
Set માથંી િ
તરીકે વાપ
તા પ્રદૂષકો P
ાઈ રાખવામ
અને બેગ-િફ
મા ં બળતણ
ણો મજુબ ર
r Environ
ના પાણીન
નુ ંભગૂભર્
છે. કેટલાક
પ રણામPM10 ૬૫.૦૩
૫૫.૦૭
૬૦.૦૬
૭૦.૩૫
૧૦૦ µg/m
low Detecta
ણ કાઢી શક
માથંી નીકળત
િનકળતો ધમુ
પરવામા ંઆ
PM, SO2 &
મા ંઆવશે.
ફ ટર લગાવ
ણ તરીકે ડી
રહશેે તેથી
ment):-
ના નમનૂાઓ
જળ તેમજ
થળોના ભ
મ (98th ટકાવ
૧
૧
૧
૧
m3 ૮૦
able Limit
કાય કે હવાન
તા લ ૂગેસ
માડો છે.
આવશે ની
NO2 હશે
ટીમ બોઈલ
વવામા ંઆ
ીઝલ વાપર
D.G.Set મ
ઓની ગણુવ
જ જમીન પ
ભગૂભર્ જળ
M/s. WelmSurvey no
Taluka & D
Execut
વાર ) SO2 ૧૨.૬૪
૧૦.૩૪
૧૭.૩૯
૧૩.૨૧
૦ µg/m3
ની ગણુવતા
સ ઉ સ ન કે
જ િરયાત
ના વાતાવ
લર સાથે હવ
વશે. યારે
રવામા ં આવ
ાટે હવા પ્રદૂ
ા પરીક્ષણ
પરનુ ંપાણી
તેમજ જમી
mica Laminateo. 98, Village: District: Morb
tive Summary
NO2 ૧૭.૮૨
૧૦.૪૪
૨૨.૧૭
૧૫.૪૫
૮૦ µg/
ા નેશનલ એ
કે ટીમ
૭.૯ મે.ટન
રણમા ંયોગ્ય
વા પ્રદૂષણ
ર D.G. SE
વશે અને
દૂષણ િનયતં્ર
પરથી તાર
કૃિષ પ્રવિૃ
મીન પરના
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 4
૨
૪
૭
૫
m3
એ બીયટં
બોઈલર
ન/િદવસ
ય ફેલાવ
િનયતં્રક
ET કે
લ ૂ ગેસ
ત્રક જ રી
રણ કાઢી
િ સિહત
પાણીના
Environ
નમનૂાઓ
પરનુ ંપ
પાણીની
પ્ર તાિવ
ઘરગ થુ
વપરાશ
િકલોલી
ારા મેળ
ગદંાપાણ
પ્ર તાિવ
ઘરગ થુ
બગીચા
પ્ર તાિવ
મા ં રે
િકલોલી
િકલોલી
નીકળશે
કેમીકલ
આ ગદં
ઓ ોગી
નિહં અન
૪. જમ
કામગીર
આડકત
nmental Impa
T. R. AssoNABET A
ઓમા ં ડહોળ
પાણી પીવાલ
ી જ ર યાત
િવત પરીયોજ
થ ુ વપરાશ
શ માટે ૨૧.૭
ીટર/િદવસ
ળવવામા ંઆ
ણીનો ઉદભવ
િવત પરીયોજ
થ ુગદંા પાણ
મા ંકરવામાં
િવત પરીયોજ
રઝીન ઉ પ
ીટર/ િદવ
ીટર/િદવસ)
શે અને તેને
લ ઓકસીડશે
દા પાણીને ઈ
ીક વપરાશમ
ને એકમ ઝી
મીન પયાવ
રી તબક્કા
તરી અસરો થ
act Assessmen
ociates (AhmeAccredited
ળાશ અને બૅ
લાયક પાણી
:-
જના માટે પ
માટે ૧૧.
૭ િકલોલીટર
ટલુ ં પાણ
આવશે.
વ અને ગદં
જના માથંી ૧
ણીનુ ંશુ ીક
ા ંઆવશે.
જનામા ં કુલ
પાદન પ્રિકય
સ), કુલીંગ
) અને આર
ને ટાકંીમા ં સ
શન ારા કર
ઈવોપરેટરમ
મા ંફરીથી ક
ીરો ડી ચા
વરણ
દર યાન હ
થાય છે.
nt Report
edabad)
બૅક્ટેરીયા જો
ીની ગણુવ
પાણીનો કુલ
૩ િકલોલીટ
ર/ િદવસ
ણી વપરાશે.
ાપાણીનો િન
૧૦.૩ િકલોલ
રણ STPમાં
૧૫ િકલોલ
યા દર યાન
ગ ટાવર(
ર.ઓ. રી ક્
સગં્રહ કરવ
રવામા ંઆવ
મા ંબા પીભવ
કરવામા ંઆ
રહશેે.
હવા, પાણી,
જોવા મળેલ
ાના ધારાધો
લ વપરાશ
ટર/િદવસ
ટલુ ંપાણી
. પ્ર તાિવત
િનકાલ:-
લીટર/િદવસ
ા ં કરવામા ં
લીટર/િદવસ
ન (૧.૮ િક
૧.૫ િકલ
ક્ટ ૧ (૧૦
વામા આવશે
વશે અને હો
વન કરવામ
આવશે. થી
, ઘનકચરા
છે તે િસવ
ધોરણો (આઇ
૩૩.૭ િકલો
ટલુ ં પાણ
ી તેમજ ગ્રીન
ત પરીયોજન
સ ટલુ ંઘર
આવશે અને
સ ટલુ ંઓ
િકલોલીટર/
લોલીટર/િદવ
.૫ િકલોલી
શે. આ ગદં
ડીંગ ટક મ
મા ંઆવશે અ
આ પ્રિકયામ
ના પ્રદૂષણ
M/s. WelmSurvey no
Taluka & D
Execut
વાય ભગૂભર્
.એસ. ૧૦૫
લોલીટર/િદવ
ણી વપરાશે
ન બે ટ ડેવ
ના માટે જ
ગ થ ુગદું પ
ને આ પાણી
ઓ ોિગક ગં ુ
િદવસ) અ
વસ), બોઈ
ટર/િદવસ)
દા પાણીનુ ં
મા ંભેળવવા
અને કં ડે સેટ
માથંી કોઈ ગ
ણથી જમીન
mica Laminateo. 98, Village: District: Morb
tive Summary
જળ તેમજ
૫૦૦) ની મજુ
વસ રહશેે.
શે યારે ઓ
વલોપમે ટ મ
રી પાણી
પાણી ઉદભ
ણીનો ઉપયો
ગદુ પાણી ઉ
અને વોશીંગ
ઈલર લો
) ગદું પાણી
પ્રાથિમક શ
ામા ંઆવશે.
ટ પાણીનો
ગદું પાણી ઉ
પર સીધી
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 5
જ જમીન
જબ છે.
માથંી
ઓ ોિગક
માટે ૦.૭
બોરવેલ
વશે. આ
ોગ બાગ
ઉદભવશે,
ગ (૦.૨
ડાઉન(૧
ણી બહાર
શિુ કરણ
. અંતમા ં
ઉપયોગ
ઉદભવશે
અથવા
Environ
હવાના
આડઅસ
મા ં લ
માત્રા (
ન ધનીય
અતે્ર ન
આડઅસ
ઘન કચ
લેવામા ં
૫. વ
અ યાિસ
ચકાસણ
માકં
૧
૨
૩
૪
૫
૬
૭
૮
nmental Impa
T. R. AssoNABET A
પ્રદૂષણને ર
સર થશે નિ
લા ટના કામ
(Ground Le
ય આડઅસર
ન ધનીય છે
સર થશે નિહ
ચરાને સભંા
આવશે થ
િન પયાવ
િસત કે્ષત્રમા ં
ણી કરવામા ં
ક થ
ો ટ સ
લાલપર
જોધપર
લીલાપર
રવાપર
ાજપર
કાલીકાન
પાનેલી
act Assessmen
ociates (AhmeAccredited
રોકવા માટે
િહં. હવાના
મગીરી તબ
evel Conce
ર થશે નિહ.ં
કે ગદું પા
િહં.
ાળવા, સગં્ર
થી ઘન કચર
વરણ :-
પ્રવતર્માન
આવી હતી.
ળ
સાઈટ ૪
૪
નદ ૪
ર ૪
૪
૪
નગર ૪
૪
nt Report
edabad)
જ રી બધા
પ્રદૂષણથી
બક્કા દર યા
entration) ન
ાણી જમીન
હ કરવા અ
રાને કારણે જ
વિનનુ ંમા
ના પરીણ
ઘ ઘાટ ુ ત( દવસ
માપન
૪૨.૦૧
૪૫.૦૨
૪૦.૦૧
૪૧.૦૨
૪૪.૦૨
૪૬.૦૬
૪૩.૦૨
૪૮.૦૫
ા જ પગલા
જમીન પર
ાન જમીન ન
ના પરીણામ
પર છોડવ
અને તેના િ
જમીન પર
ાપદંડ કાઢવ
ણામો નીચે
તર (Leq) in dસ દર યાન)
વીકાય મ
૭૫
૫૫
૫૫
૫૫
૫૫
૫૫
૫૫
૫૫
લેવામા ંઆ
સીધી અથ
ની સપાટી
મો પરથી ક
વામા ંઆવતુ
િનકાલ માટે
કોઈ આડઅ
વા માટે ૮ અ
પ્રમાણે છે.
dBA
મયાદા મ
૨
૨
૩
૩
૩
૨
૨
૪
M/s. WelmSurvey no
Taluka & D
Execut
આવશે થી
થવા આડકત
પર હવાના
કહી શકાય
તુ ંનથી થી
ટના દરેક િ
અસર થશે ન
અલગ- અલ
ઘ ઘાટ ુ ત(રા ી
માપન
૨૫.૦૬
૨૨.૧૧
૩૨.૦૧
૩૩.૦૨
૩૮.૦૧
૨૩.૦૫
૨૯.૦૭
૪૧.૦૧
mica Laminateo. 98, Village: District: Morb
tive Summary
જમીન પર
તરી અસરો
ા િવિવધ પ્ર
કે જમીન પ
થી જમીન પ
િનયતં્રીત પ
નિહં.
લગ થળે ઘ
તર(Leq) in dBદર યાન) વીકાય મય
૭૦
૪૫
૪૫
૪૫
૪૫
૪૫
૪૫
૪૫
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 6
કોઈ જ
થાય છે
પ્રદૂષકોની
પર કોઈ
પર કોઈ
પગલાઓ
ઘ ઘાટની
BA
યાદા
Environ
ઘ ઘાટન
મજુબ છે
૬. સામ
સામાજી
મહ વની
વ તીનુ ં
પ્ર તાિવ
રોજગાર
દુકાનોમ
આ લ
પસદંગી
થાિનક
આજુબા
૭. વ
અ યાિસ
અને પ્રા
અ યાિસ
ખીજડો,
અ યાિસ
અ યાિસ
જોવા મ
nmental Impa
T. R. AssoNABET A
ની ચકાસણી
છે.
મા ક-આ
ક અથર્ ય
ની િવગત છે
પ્રમાણ, કા
િવત પરીયોજ
રી પ્રા ત થ
મા ંવગેરેમા ં
લા ટની કામ
ી કરવામા ં
લોકોની આ
ાજુના િવ તા
વ પિરિ થત
િસત કે્ષત્રનો
ાણી-પક્ષીઓ
િસત કે્ષત્રમા ં
કેસડુો અને
િસત કે્ષત્રના
િસત કે્ષત્રમા ં
મળે છે. અ
act Assessmen
ociates (AhmeAccredited
ીના પિરણામ
િથક પયાવ
થાનો અ
છ. આ કારણ
મગીરી નો
જનાને કારણે
થશે. પ્ર તાિવ
રોજગારીની
મગીરી માટે
આવશે. આ
આિથર્ક પિરિ
ારમા ંસાક્ષર
તી અને
િવ તાર મુ
ઓની િવિવધત
થાિનક વ
ન આસોપાલ
મખુ્ય ખેતીલ
સામા ય રી
યાિસત િવ
nt Report
edabad)
મ પરથી તા
વરણ:-
યાસ એ પ
ણસર અ યાિ
પ્રકાર વગેરે
ણે કુલ ૧૦૦
િવત પરીયોજ
ી તકો ઉભી
જ ર લાગે
આજુબાજુના
િ થતી સધુર
તા, આરોગ્ય
વ િવિવધ
મખુ્ય વે ખેત
તા બહ ુઓછ
વન પિતની પ્ર
લવ જોવા મળે
લાયક પાકો
ીતે દેખાતા
િવ તારમા ંપ
ારણ કાઢી શ
પયાર્વરણ ૃ
િસત કે્ષત્રમાં
ર જી લા વ
૦ ટલા કુશ
જનાને કારણે
થશે.
ગે યા ં થા
િવ તારમાં
રશે અને તે
ય અને રહણે
ધતા શા :-
તીલાયક જમ
છી જોવા મળે
પ્રજાિતઓ
ળેલ છે. કપ
ો છે.
પક્ષીઓમા ં
પાલતુ ંપ્રાણી
શકાય કે ઘ ઘ
ૃ થકરણ અ
ા સામાજીક
તી ગણતરી
શળ અને અ
ણે આડકતરી
ાિનક લોકોન
ા ધધંાની ઉ
તથી એકમને
ણીકરણીમા ંસ
-
મીન ધરાવે
ળેલ છે.
વી કે બાવ
પાસ, તલ, ચ
કાળો કોશી,
ીઓ ઉપરાતં
M/s. WelmSurvey no
Taluka & D
Execut
ઘાટ ુ તર
અસર અ યા
અથર્ ય થા
ી પિુ તકા મ
અધર્કુશળ કાર
રી રીતે વી
ની તેમની
ઉ વળ ત
ન કારણે હકા
સધુારો થશે.
વ છે. આ િવ
વળ, લીમડો
ચોખા, ઘઉં,
લીલો પત
ત જગંલ
mica Laminateo. 98, Village: District: Morb
tive Summary
િનયત ધા
ાસ માટેની
ાની માિહતી
માથંી મેળવેલ
રીગરોને સી
વી કે વાહન
કુશળતાના
તકોને કારણે
ારા મક અસ
.
િવ તારમા ંવ
ો, ગલુમહોર
બાજરી, અને
રંગો, િટટોડી
લી સ તન
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 7
ારાધોરણ
ખબૂ જ
ી વી કે
લ છે.
ીધી રીતે
વહાર,
આધારે
ણે યાનંા
સર થશે.
વન પિત
ર, કરંજ,
ને જુવાર
ી, પોપટ
પ્રાણીઓ
Environ
જોવા મ
છે.
૮. સોલ
મખુ્ય હે
થેલીઓ
ઈટીપી
વપરાયે
થેલીઓ
એકમ
ની સાથે
ટ્રીટમે ટ
ની મે બ
૯. પય
પયાર્વર
બનાવવ
જાળવવ
વા કે
પયાર્વર
ન લાગે
કરવામાં
આ પય
એકમની
૧૦. પ
nmental Impa
T. R. AssoNABET A
મળેલ હતા ંતે
લીડ વે ટ
હઝેાડર્સ વે
ઓ અને ડ્રમનો
કચરાનો+ઈ
યેલુ ં ઓઈલ
ઓ અને ડ્રમ મ
હઝેાડર્સ વે
થે પક્કા લો
ટ લા ટમા
બરશીપ મેળ
યાવરણીય
રણ પર થ
વામા ં આવેલ
વા માટે અને
ક ગ્રીન બે
રણીય ઘટકો
ગ તેવા તકેદ
ા ંઆવે છે.
યાવરણીય ય
ની રચના કર
પયાવરણીય
act Assessmen
ociates (AhmeAccredited
તેમા ંિનલગ
મેનેજમે ટ
ટમા ં ઈટીપી
નો સમાવેશ થ
ઈવેપોરેશન
યબુ્રીકે ટ
મજૂંર થયેલ
ટના સગં્રહ
ોિરંગ હશે. જ
શિુ કરણ ક
ળવી લેશે.
યવ થાપ
તી આડઅસ
લ છે. આ
ને પ્રદૂષકોને
ટ ડવેલપ
ોની ચકસણી
દારીના પગલ
ય થાપન ય
રવામા ંઆવ
ય ચકાસણ
nt Report
edabad)
ગાય, િશયાળ
ટ :-
પી કચરો+ઈ
થાય છે.
રેસીડ ુનો
તરીકે પનુ
વે ડર ને વે
માટે અલગ
જો કોઇ િલચે
કરવામા આ
પન યોજન
સરોને રોકવ
આ પયાર્વરણ
ને િનયતં્રીત
કરવો અને
ી યોજનાનો
લા લેવા અ
યોજનાના અ
વશે.
ણી યોજના:
ળ, નોળીયો,સ
ઈવેપોરેશન
મજુંર થયેલ
નઃ વપરાશે
વેચાશે.
ગ જગ્યા ફ
ચેટ હશે તો
વશે. પ્ર તિવ
ના:-
વા/નાથવા
ણીય યવ
ત માત્રામા ં ર
ને તેનુ ં જત
અમલ કરવ
અને આગ ન
અસરકારક અ
:-
સસલા અને
રેસીડ ,ુ વ
લ TSDF Si
શે અથવા
ાળવશે મ
તેને એકઠું ક
િવત એકમ પ્ર
માટે પયાર્
થાપન યોજ
રાખવા માટે
તન કરવુ,ં
વો, વરસાદ
ાથવાના સા
અમલીકરણ
M/s. WelmSurvey no
Taluka & D
Execut
જગંલી સવુ
વપરાયેલુ ંઓ
te મા ંિનકા
રીસાઈકલર
મા રુફ, િલચે
કરવામા આ
પ્રારંભ થયા
વરણીય ય
જનામા ં પય
ટ જ રી અને
કામદારોની
ના પાણીનો
ાધનો રાખવ
માટ પયાવ
mica Laminateo. 98, Village: District: Morb
tive Summary
વરનો સમાવે
ઓઈલ અને
લ કરવામા ં
ને વેચાશે,
ચટ કલેક્શન
આવશે અને એ
ા પછી TSD
વ થાપન
યાર્વરણને
ને યોગ્ય પ
ની યોગ્ય સ
ો સગં્રહ કરવ
વા વગેરેનો
વરણીય ય
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 8
વેશ થાય
ન નકામી
આવશે.
નકામી
ન સી મ
એફ યુ ટ
DF સાઇટ
યોજના
યથાવત
પગલાઓં
સલામતી,
વો, આગ
સમાવેશ
થાપન
Environ
પયાર્વર
ઓળખવ
આ હતે ુ
ચકાસણ
માપદંડ
૧૧. જો
જોખમ
રસાયણો
૧૨. ી
આશરે
ડેવલોપ
પ્રદૂષણ
ટલો િ
૧૩. ો સિૂચત િવકાસ, સિૂચત તબક્કા પ્રો ક્ટ આિથર્ક
nmental Impa
T. R. AssoNABET A
રણીય પિરબ
વા માટે મદ
થી પયાર્વર
ણી, ચીમનીમ
ની ચકાસણી
જોખમની આ
આકારણીનો
ણોનો સગં્રહણ
ીન બે ટ
કુલ ૪,૪૭૦
પ કરવામા ં
/ધોવાણ અ
િવ તાર ગ્રીન
ો ટ થી
પ્રો ક્ટ આરોજગાર અ
પ્રો ક્ટ કુશદરિમયાન ારા રોજગિવકાસ માટે
act Assessmen
ociates (AhmeAccredited
બળોની ચક
દદ પ થશે.
રણીય યવ
માથંી િનકળ
ણી કાયદામા ં
આકારણી:-
નો અ યાસ
ણ અને િનયં
ડવલપમે
૦ (૩૩.૨૨%
આવશે કે
અ ટકાવવા
નબે ટ તરીકે
થતા લાભ
આસપાસના અને અ ય ફ
શળ, અધર્કુશરોજગારી આ
ગાર મળી શ ેટ કરાશે.
nt Report
edabad)
ાસણી િવિવ
થાપન યોજ
ળતા પ્રદૂષકો
જણા યા મુ
જોખમી ર
ત્રણ MSDS
ટ :-
%) ચો.મી.
ક વિન
વા કે્ષત્રોમ
કે િવકસાવવ
ભો:-
િવ તારના ાયદાઓની
શળ અને િબઆપવાની ક્ષકે છે. આ પ્રો
વધ થળોએ
જનાના પાલ
કો તથા પાણ
મજુબ કરવામ
સાયણો મા
S ની માગર્દિ
ટલો ગ્રીન
િન પ્રદૂષણ
મા ં મદદ પ
વામા ંઆવશે
સમદુાયનાદ્રિ ટએ લાભ
િબનકુશળ કાક્ષમતા ધરાવેપ્રો કટ કુલ
એ પયાર્વરણી
લન માટે આ
ણીનુ ંપયાર્વ
મા ંઆવશે.
ટે કરવામા ં
િશર્કા હઠેળ
ન બે ટ િવ
તથા હવ
પ થશે. કુલ
શે.
ા અથવા મભદાયી બન
ારીગરોને બવે છે. કુલ ૧નફાના ૨.૫
M/s. WelmSurvey no
Taluka & D
Execut
ણીય અસરો
આસપાસની
વરણની ચક
આવેલ છે
કરવામા ંઆ
િવ તાર પ્રો
વા પ્રદૂષણ
પ્રો ક્ટ િવ
માળખાકીય શે.
બાધંકામ તબ૧૦૦ ટલા ૫% ટલો ખ
mica Laminateo. 98, Village: District: Morb
tive Summary
તથા તેના
હવાની ગણુ
કાસણી તેમજ
છે. બધા જ
આવશે.
ક્ટ સાઈટન
નાથવા,
િવ તારના ૩
િવકાસ, સ
બક્કા અને કયિક્તઓને
ખચર્ સામાજી
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 9
ફેરફારો
ણવ ાની
જ વિન
જોખમી
ની અંદર
જમીનનુ ં
૩૩.૨૨%
સામાજીક
કામગીરી ને સિૂચત જીક તેમજ
Environ
૧૪. ઉ
આ
આથી અપયાર્વરપર થત
nmental Impa
T. R. AssoNABET A
ઉપસહંાર :-
પયાર્વરણ અ હવાની
તમામ કોઈ ઈકો જળ પય થાિનક િવિવધ
ધામીર્કત પયાર્વર
ઘડવામધારાધોસિુનિ ત
પયાર્વરપગલા ં
અનમુાન કરરણીય ય થતી અસરોને
act Assessmen
ociates (AhmeAccredited
-
અસર પ ૃ થગણુવ ા પપગલા લેવકોલોજીકલ નયાર્વરણ પર રોજગારીનપયાર્વરણીતથા ઐતીહારણીય યવમા ં આવી છેરણ કરતા ત કરવામા ંઆરણ ય થાલેશે.
રી શકાય કેથાપન યોજઘટાડી શકા
nt Report
edabad)
કરણ અ યપર નજીવી વામા ંઆવશેનકુશાન થશેર કોઈ પ્રિતકૂની તકો વધશય પિરમાણોાિસક થળો થાપન યોજછે. અને આવધી ના આવે છે. પન એકમ
ક બાધંકામજના અને શમાશે.
યાસ પરથી કઅસર થાય. શે નિહ. કળૂ અસર થશે. ણો વા કે પર કોઈ અજના બધા આ પિરણામોજાય એ મ
સિૂચત પ્રો
મ અને કામગમનના પગલ
કહી શકાય કેય છે. જો કે
થશે નિહ.
જગંલ, રા ટ્રઅસર થશે નપ્રદૂષણ પિમો સબંિધતમાટે પયાર્વ
કટની શ આ
ગીરી તબક્કલાનંા હકારા
M/s. WelmSurvey no
Taluka & D
Execut
કે... હવા પ્રદૂષ
ટ્રીય બગીચનિહ. િરમાણોને િનત સ ાિધકાવરણ ય થ
આત પછી
ક્કા દરિમયાના મક અમલી
mica Laminateo. 98, Village: District: Morb
tive Summary
ષણ િનયતં્રણ
ચા, અ યાર
િનયિંત્રત કરરો ારા થાપન એક
પ્રદૂષણ િન
ન મકૂવામાંલીકરણથી પ
es Pvt. Ltd. Bhadiyad,
bi, Gujarat.
y - Gujarati 10
ણ માટેના
ય અને
રવા માટે થપાયેલ કમ ારા
યતં્રણના ં
ા આવેલ
પયાર્વરણ