Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana. Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014) M/s. DLF New Gurgaon Homes Developers Private Limited. 1 Name of Project: Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana by M/s. DLF New Gurgaon Homes Developers Private Limited. Environmental Clearance Letter No.: SEIAA/HR/2013/839 dated 1/10/2013 Chapter 1 Compliance of Stipulated Conditions of Environmental Clearance A. Specific Conditions: Construction Phase S. No. Conditions Compliance Status 1. “Consent for Establishment” shall be obtained from Haryana State Pollution Control Board under Air and Water Act and a copy shall be submitted to the SEIAA before start of any construction work at the site. We have obtained consent for establishment from Haryana State Pollution Control Board under Air and Water Act. Vide letter No. HSPCB/Consent: 2821213GUSOCTE272713 dated 16.10.2013 is enclosed as Annexure - 2 2. A First Aid Room will be provided in the project both during construction and operation of the project. A first aid room at the site is being provided and to be used both during construction and operation phase of the project. 3. Adequate drinking water and sanitary facilities should be provided for construction workers at the site. Provision should be made for mobile toilets. Open defecation by the laborers is strictly prohibited The safe disposal of wastewater and solid wastes generated during the construction phase should be ensured. Presently, soil excavation is undergoing on the site and almost about to complete. Site photographs showing the present condition of the site has been enclosed as Annexure 4. We are providing adequate drinking water (hired water tankers from nearby villages is being provided) & sanitary facility to the workers. Mobile toilets have been provided. Open defecation by the laborers is strictly prohibited. No waste water drainage system yet developed. We ensure that the waste water and the solid waste generated during the construction phase will be disposed off safely. 4. All the top soil excavated during construction activities should be stored for use in horticulture/landscape development within the Excavated top soil is being stored at earmarked location & further used in green belt development and Landscape development.

Upload: lyanh

Post on 06-Feb-2018

218 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 1

Name of Project: Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana

by M/s. DLF New Gurgaon Homes Developers Private Limited.

Environmental Clearance Letter No.: SEIAA/HR/2013/839 dated 1/10/2013

Chapter 1

Compliance of Stipulated Conditions of Environmental Clearance

A. Specific Conditions:

Construction Phase

S. No. Conditions Compliance Status

1. “Consent for Establishment” shall be obtained

from Haryana State Pollution Control Board

under Air and Water Act and a copy shall be

submitted to the SEIAA before start of any

construction work at the site.

We have obtained consent for establishment from

Haryana State Pollution Control Board under Air and

Water Act. Vide letter No. HSPCB/Consent:

2821213GUSOCTE272713 dated 16.10.2013 is

enclosed as Annexure - 2

2. A First Aid Room will be provided in the project

both during construction and operation of the

project.

A first aid room at the site is being provided and to

be used both during construction and operation

phase of the project.

3. Adequate drinking water and sanitary facilities

should be provided for construction workers at

the site. Provision should be made for mobile

toilets. Open defecation by the laborers is strictly

prohibited The safe disposal of wastewater and

solid wastes generated during the construction

phase should be ensured.

Presently, soil excavation is undergoing on the site

and almost about to complete. Site photographs

showing the present condition of the site has been

enclosed as Annexure 4.

We are providing adequate drinking water (hired

water tankers from nearby villages is being

provided) & sanitary facility to the workers.

Mobile toilets have been provided. Open defecation

by the laborers is strictly prohibited. No waste water

drainage system yet developed. We ensure that the

waste water and the solid waste generated during

the construction phase will be disposed off safely.

4. All the top soil excavated during construction

activities should be stored for use in

horticulture/landscape development within the

Excavated top soil is being stored at earmarked

location & further used in green belt development

and Landscape development.

Page 2: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 2

project site.

5. The project proponent shall ensure that the

building material required during

construction phase is properly stored within

the project area and disposal of construction

waste should not create any adverse effect

on the neighboring communities and should

be disposed of after taking necessary

precautions for general safety and health

aspects of people, only in approved sites with

the approval of competent authority.

Presently, soil excavation is undergoing on the site

and almost about to complete.

We will ensure that the building material required

during construction phase is properly stored

within the project area and disposal of

construction waste should not create any

adverse effect on the neighboring communities.

6. Construction spoils, including bituminous

material and other hazardous materials, must

not be allowed to contaminate watercourses

and the dump sites for such material must be

secured so that. they should not leach into the

ground water and any hazardous waste

generated during construction phase, should

be disposed off as per applicable rules and

norms with necessary approval of the

Haryana State Pollution Control Board.

Construction spoils will be stored in a dedicated area

duly bounded to avoid contamination to the

environment in proximity. Storage area will be

covered by insulated lining to prevent

contamination from hazardous materials like fuel of

DG sets. Waste oil of the generators shall be

disposed off through authorized vendors.

7. The diesel generator sets to be used during

construction phase should be of ultra low

sulphur diesel type and should conform to

Environment (Protection) Rules prescribed

for air and noise emission standards.

In construction phase D.G. Set will be kept in

Acoustic enclosure and low sulphur diesel type.

8. The diesel required for operating DG sets shall be

stored in underground tanks and if required.

Clearance from Chief Controller of Explosives

shall be taken.

The diesel required for operating DG sets shall be

stored in underground tanks. The quantity of diesel

stored is less than 2500 litres so approval of chief

controller of explosives is not applicable.

9. Ambient noise levels should conform to the Ambient Noise level and Air Quality monitoring has

Page 3: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 3

residential standards both during day and night.

Incremental pollution loads on the ambient air

and noise quality should be closely monitored

during construction phase. Adequate measures

should be taken to reduce ambient air and noise

level during construction phase, so as to conform

to the stipulated residential standards.

been done & test results are enclosed as Annexure-

3 conforming to standards both during day and

night.

10. Fly ash should be used as building material in the

construction as per the provisions of Fly Ash

Notification of September 1999 and as amended

on 27th August 2003.

Ready mix concrete will be used in construction. Fly

ash mix as per regulatory requirement will be

incorporated into the structural design and concrete

mix for building material.

11. Storm water control and its re-use as per CGWB

and BIS standards for various applications

should be ensured.

Storm water will be controlled & re-used as per

CGWB and BIS standards.

12. Water demand during construction should be

reduced by use of pre-mixed concrete, curing

agents and other best practices.

Ready mix concrete will be used to reduce the water

demand.

13. In view of the severe constrains in water

supply augmentation in the region and

sustainability of water resources, the

developer will submit the NOC from CGWA

specifying water extraction quantities and

assurance from HUDA/ utility provider

indicating source of water supply and quantity

of water with details of intended use of water

- potable and non-potable. Assurance is

required for both construction and operation

stages separately. It shall be submitted to the

SEIAA and RO, MOEF, Chandigarh before the

start of construction.

Affidavit regarding the supply of construction

water shall be met from Behrampur STP already

submitted to SEIAA and the respective authorities.

Assurance For Water Supply From HUDA in

operation phase is already submitted.

Page 4: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 4

14. Roof should meet prescriptive requirement as

per Energy Conservation Building Code by using

appropriate thermal insulation material.

Energy Conservation Building Code requirement

will be provided for Roof by using appropriate

thermal insulation material.

15. Opaque wall should meet prescriptive

requirement as per Energy Conservation

Building Code which is proposed to be

mandatory for all air conditioned spaces while it

is desirable for non-air-conditioned spaces by

use of appropriate thermal insulation material to

fulfill requirement.

Opaque wall and appropriate thermal insulation

material will be used for all air conditioned spaces

and for non air conditioned spaces respectively as

per the energy conservation building code and EC

condition.

16. The approval of the competent authority shall be

obtained for structural safety of the building on

account of earthquake, adequacy of fire fighting

equipments, etc. as per National Building Code

including protection measures from lightening

etc. If any forest land is involved in the proposed

site, clearance under Forest Conservation Act

shall be obtained

The necessary approval has been taken/ applied for.

Schematic fire approval obtained.

17. Overexploited groundwater and impending

severe shortage of water supply in the region

requires the developer to redraw the water and

energy conservation plan. Developer shall reduce

the overall footprint of the proposed

development. Project proponent shall

incorporate water efficiency {savings measures

as well as water reuse/recycling within 3 months

and before start of construction to the SEIAA,

Haryana and RO, MOEF, 001, Chandigarh.

Dual plumbing will be adopted for conservation of

water.

18. The Project Proponent as stated in the proposal

shall construct 11 rain water harvesting pits for

recharging the ground water within the project

premises. Rain water harvesting pits shall be

RWH Pits will be constructed in due course of time.

Page 5: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 5

designed to make provisions for silting chamber

and removal of floating matter before entering

harvesting pit. Maintenance budget and persons

responsible for maintenance must be provided.

Care shall also be taken that contaminated water

do not enter any RWH pit.

19. The project proponent shall provide for

adequate fire safety measures and equipments

as required by Haryana Fire Service Act, 2009

and instructions issued by the local

Authority/Directorate of fire from time to time.

Further the project proponent shall take

necessary permission regarding fire safety

scheme/NOC from competent Authority as

required.

We will provide adequate fire safety measures and

equipments as required by Haryana Fire Service Act,

2009 and instructions issued by the local

Authority/Directorate of fire from time to time. NOC

from fire station has been obtained.

20. The Project Proponent shall obtain assurance

from the DHBVN for supply of 6730 KW of power

supply before the start of construction. In no case

project will be operational solely on generators

without any power supply from any external

power utility.

Agreed. The project will operate only after obtaining

connection of DHBVN power supply. The project will

not be operational solely on generators without any

power supply from any external power utility.

21. Detail calculation of power load and ultimate

power load of the project shall be submitted to

DHBVN under intimation to SElAA Haryana

before the start of construction. Provisions shall

be made for electrical infrastructure in the

project area.

We will be submit in due course of time.

22. The Project Proponent shall not raise any

construction in the natural land depression/

Nullah/ water course and shall ensure that the

natural flow from the Nallah/water course is not

As per the site plan there is no nullah/ water course

passing from the project site. So this condition is Not

Applicable in this project.

Page 6: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 6

obstructed.

23. The Project Proponent shall keep the plinth

level of the building blocks sufficiently above

the level of the approach road to the Project as

per prescribed by-laws. Levels of the other areas

in the Projects shall also be kept suitably so as to

avoid flooding.

The project is being constructed complying with all

statutory by laws.

24. Construction shall be carried out so that density

of population does not exceed norms approved

by Director General Town and Country

Department Haryana.

All the workers employed/ hired are from nearby

areas. Hence, there is minor influx of people in the

area.

25. The Project Proponent shall submit an affidavit

with the declaration that ground water will not

be used for construction and only treated water

should be used for construction.

Already submitted to SEIAA.

26. The project proponent shall not cut any existing

tree and project landscaping plan should be

modified to include those trees in green area.

As the site is vacant land and does not have any

existing tree scenic amenity or landscaping in its

surroundings.

27. The project proponent shall provide 3

meter high barricade around the project

area, dust screen for every floor above the

ground, proper sprinkling and covering of

stored material to restrict dust and air

pollution during construction.

We will provide 3 meter high barricade around

the project area, dust screen for every floor above

the ground, proper sprinkling and covering of

stored material to restrict dust and air pollution

during construction.

28. The project proponent shall construct a

sedimentation basin, in the lower level of the

project site to trap pollutant and other wastes

during rains.

We will Construct a sedimentation basin, in the

lower level of the project site to trap pollutant and

other wastes during rains.

29. The project proponent shall provide proper

Rasta of proper width and proper strength for

each project before the start of construction.

We provide proper Rasta of proper width and

proper strength for each project before the start of

construction.

Page 7: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 7

30. The project proponent shall ensure that the U

value of the glass is less than 3.177 and

maximum solar heat gain co-efficient is 0.25 for

vertical fenestration.

Same shall be provided.

31. The project proponent shall adequately control

construction dusts like silica dust, non-silica

dust, wood dust. Such dusts shall not spread

outside project premises. Project Proponent shall

provide respiratory protective equipment to all

construction workers.

Agreed. Personal Protective Equipments have been

provided to all construction workers.

32. The project proponent shall develop complete

civic infrastructure of the Group Housing colony

including internal roads, green belt development,

sewerage line, Rain Water recharge

arrangements, Storm water drainage system.

Solid waste management site and provision for

treatment of bio-degradable waste, STP, water

supply line, dual plumbing line, electric supply

lines etc. and shall offer possession of the units/

flats thereafter.

Same Shall be provided.

33. The project proponent shall provide one refuse

area till 24 meter, one till 39 meter and one after

every 15 meter as per National Building Code

We will provide the same as per National Building

Code.

34. The project proponent shall provide fire control

room and fire officer for building above 30 meter

as per National Building Code.

Same shall be provided.

35. The project proponent shall obtain permission of

Mines and Geology Department for excavation of

soil before the start of construction.

Permission of Mines and Geology Department for

excavation of soil for the project has already been

obtained prior to start of the project activity.

Page 8: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 8

36. The project proponent shall seek specific prior

approval from concerned local Authority HUDA

regarding provision of storm drainage and

sewerage system including their integration with

external services of HUDA/Local authorities

beside other required services before taking up

any construction activity.

Prior approval from concerned local Authority

HUDA regarding provision of storm drainage and

sewerage system includes their integration with

external services of HUDA/Local authorities beside

other required services before taking up any

construction activity has been obtained.

37. The site for solid waste management plant be

earmarked on the layout plan and the detailed

project for setting up the solid waste

management plant shall be submitted to the

Authority within one month.

Already Submitted to SEIAA.

38. The project proponent shall ensure that no

construction activity is undertaken either on

surface or below or above surface of revenue

rasta passing through the project area.

We will ensure that no construction activity is

undertaken either on surface or below or above

surface of revenue rasta passing through the project

area.

39. The project proponent shall indicate the width

and length of revenue rasta passing through the

project area on sign board and shall display the

same at both the ends of revenue rasta stretch,

for awareness of public. Sign board shall also

display the message that this is public rasta/road

and any citizen can use it. There shall not be any

gate with or without guards on revenue rasta.

Same shall be provided.

40. The project proponent shall provide helipad

facility as required under NBC norms and shall

seek permission of helipad from AAI accordingly.

Building height of the tallest tower is 97.10 m. NOC

from Airport Authority of India has already been

submitted to SEIAA.

41. The project proponent shall ensure that canal

water is not contaminated because of any activity

in the licensed area.

There is no canal in the licensed area. So this

condition is Not Applicable in our project.

Page 9: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 9

II Operation Phase

a. "Consent to Operate” shall be obtained from

Haryana State Pollution Control Board under Air

and Water Act and a copy shall be submitted to

the SEIAA, Haryana.

"Consent to Operate” shall be obtained before

commissioning of the project from Haryana State

Pollution Control Board under Air and Water Act.

b. The Sewage Treatment Plant (STP) shall be

installed for the treatment of the sewage to the

prescribed standards including odour and

treated effluent shall be recycled. The installation

of STP should be certified by an independent

expert and a report in this regard should be

submitted to the SElAA, Haryana before the

project is commissioned for operation. Tertiary

treatment of waste water is mandatory.

Discharge of treated sewage shall conform to the

norms and standards of HSPCB, Panchkula.

Project Proponent shall implement such STP

technology which does not require filter

backwash.

STP of adequate capacity will be installed and

treated effluent will be recycled. Same shall be

complied with.

c. Separation of the grey and black water should be

done by the use of dual plumbing line. Treatment

of 100% grey water by decentralized treatment

should be done ensuring that the re-circulated

water should have BOD level less than 10

mg/litre and the recycled water will be used for

flushing, gardening and DG set cooling etc. to

achieve zero exit discharge.

Same will be complied with and dual plumbing lines

will be installed for separation of grey and black

water.

d. For disinfection of the treated wastewater ultra-

violet radiation or ozonization process should be

used.

We will use the ultra violate radiation or ozonization

for disinfection of treated waste water.

e. Diesel power generating sets proposed as Same shall be complied with.

Page 10: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 10

source of back-up power for lifts, common area

illumination and for domestic use should be of

enclosed type and conform to rules made under

the Environment (Protection) Act, 1986. The

location of the DG sets should be in the basement

as promised by the project proponent with

appropriate stack height i.e. above the roof level

as per the CPCB norms. The diesel used for DG

sets should be ultra low sulphur diesel (0.05%

sulphur), instead of low sulphur diesel.

f. Ambient Noise levels should be controlled to

ensure that it does not exceed the prescribed

standards both within and at the boundary of the

proposed Residential Complex.

Ambient Noise will be well within the prescribed

standards during operational phase of the proposed

Residential complex project

g. The project proponent as stated in the proposal

should maintain at least 41.42% as green cover

area for tree plantation especially all around the

periphery of the project and on the road sides

preferably with local species which can provide

protection against noise and suspended

particulates matter. The open spaces inside the

project should be preferably landscaped and

covered with vegetation/grass, herbs & shrubs.

Only locally available plant species shall be used.

Green Area Development will be done on 37268.00

m2 (approx. 41.42%) of the plot area.

The green belt along the plot boundary shall be

regulated to conform to the day & night standards of

CPCB for residential land. Therefore plantations

would be of large leaf trees that provide adequate

shade and are semi-evergreen to evergreen.

h. The project proponent shall strive to minimize

water in irrigation of landscape by minimizing

grass area, using native variety, xeriscaping and

mulching, utilizing efficient irrigation system,

scheduling irrigation only after checking evapo-

Transpiration data.

Same shall be provided.

i. Rain water harvesting for roof run-off and

surface run-off, as per plan submitted should be

All measures for rain water harvesting will be

implemented.

Page 11: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 11

implemented. Before recharging the surface run

off, pre- treatment through sedimentation tanks

must be done to remove suspended matter, oil

and grease. The bore well for rainwater

recharging shall be kept at least 5 mts, above the

highest ground water table. Care shall be taken

that contaminated water do not enter any RWH

pit, The project proponent shall avoid Rain Water

Harvesting of first 10 minutes of rain fall. Roof

top of the building shall be without any toxic

material or paint which can contaminate rain

water. Wire mess and filters should be used

wherever required.

j. The ground water levels and its quality should be

monitored regularly in consultation with Central

Ground Water Authority.

The same shall be carried out in operational phase of

the project.

k. There should be no traffic congestion near the

entry and exit points from the roads adjoining

the proposed project site. Parking should be fully

internalized and no public space should be

utilized.

There will be no traffic congestion near the entry

and exit points due to separate entry and exit points,

Wide roads will be developed as to avoid congestion

in traffic. Parking will be fully internalized. The

adequate space has been given for fulfill the parking

needs

l. A report on the energy conservation measures

conforming to energy conservation norms

finalized by Bureau of Energy Efficiency should

be prepared incorporating details about building

materials & technology, R & U Factors etc and

submitted to the SEIAA, Haryana in three months

time.

We shall provide as per our approved scheme from

MoEF.

Page 12: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 12

m. Energy conservation measures like installation of

LED for lighting the areas outside the building

should be integral part of the project design and

should be in place before project commissioning.

Use of solar panels must be adapted to the

maximum energy conservation.

The same shall be complied with.

n. The Project Proponent shall use zero ozone

depleting potential material in insulation,

refrigeration, air-conditioning and adhesive.

Project Proponent shall also provide Halon free

fire suppression system.

Same shall be complied with.

o. The solid waste generated should be properly

collected and segregated as per the requirement

of the MSW Rules, 2000, and as amended from

time to time. The bio- degradable waste should

be treated by appropriate technology at the site

ear-marked within the project area and dry/inert

solid waste should be disposed off to the

approved sites for land filling after recovering

recyclable material.

Total solid waste generated from project (residential

& visiting population) will be approx 2561 kg/day.

The solid waste generated shall be properly

collected and segregated as per the requirement of

the MSW Rules, 2000.

p. The provision of the solar water heating system

shall be as per norms specified by HAREDA and

shall be made operational in each building block.

Same shall be provided as per norms specified by

HAREDA.

q. The traffic plan and the parking plan proposed

by the Project Proponent should be adhered to

meticulously with further scope of additional

parking for future requirement. There should be

no traffic congestion near the entry and exit

points from the roads adjoining the proposed

project site. Parking should be fully internalized

Followed. There will be no traffic congestion near

the entry and exit points due to separate entry and

exit points, Wide roads will be developed as to avoid

congestion in traffic. Parking will be fully

internalized. The adequate space has been given for

fulfill the parking needs

Page 13: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 13

and no public space should be used.

r. The Project shall be operationalized only when

HUDA/local authority will provide domestic

water supply system in the area.

The project will be made operational only after

obtaining water supply connection from HUDA.

s. Operation and maintenance of STP, solid waste

management and electrical Infrastructure.

Pollution control measures shall be ensured even

after the completion of sale.

Agreed and same shall be provided.

t. Different type of wastes should be disposed off as

per provisions of municipal solid waste,

biomedical waste, hazardous waste, e-waste,

batteries & plastic rules made under

Environment Protection Act, 1986. Particularly

E-wasle and Battery waste shall be disposed of as

per existing E-waste Management Rules 2011

and Batteries Management Rules 2001. The

project proponent should maintain a collection

center for E-waste and it should be disposed off

to only registered and authorized dismantler /

recycler.

As this is a group housing project there will be no

other waste except Domestic Waste, If any we will

take care of it respectively. Solid waste will be

collected & segregated and handed over to

authorized vendors.

u. Standards for discharge of environmental

pollutants as enshrined in various schedules of

rule 3 of Environment Protection Rule 1986 shall

be strictly complied with.

Same shall be Complied with.

Page 14: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 14

v. Water supply shall be metered among different

users of utilities.

Same shall be metered among different users of

utilities.

w. The project proponent shall ensure that the stack

height of DG sets is as per the CPCB guide lines

and also ensure that the emission standards of

noise and air are within the CPCB prescribed

limits. Noise and Emission level of DG sets

greater than 800 KVA shall be as per CPCB latest

standards for high capacity DG sets.

We will ensure that the stack height of DG sets is as

per the CPCB guide lines and also ensure that the

emission standards of noise and air are within the

CPCB prescribed limits. Noise and Emission level of

DG sets greater than 800 KVA shall be as per CPCB

latest standards for high capacity DG sets.

x. All electric supply exceeding 100 amp, 3 phase

shall maintain the power factor between 0.98 lag

to 1 at the point of connection.

Same shall be provided.

y. The project proponent shall use only treated

water instead of fresh water for DG cooling. The

Project Proponent shall also use evaporative

cooling technology and double stage cooling

system for HVAC in order to reduce water

consumption. Further temperature, relative

humidity during summer and winter seasons

should be kept at optimal level. Variable speed

drive, best Co-efficient of Performance, as well as

optimal integrated point load value and

minimum outside fresh air supply may be

resorted for conservation of power and water.

Coil type cooling DG Sets shall be used for saving

cooling water consumption for water cooled DG

Sets.

Agreed & Same shall be followed.

Page 15: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 15

z. The project proponent shall ensure that the

transformer is constructed with high quality

grain oriented, low loss silicon steel and virgin

electrolyte grade copper. The project proponent

shall obtain manufacturer’s certificate also for

that.

We will ensure that the transformer is constructed

with high quality grain oriented, low loss silicon

steel and virgin electrolyte grade copper. The project

proponent shall obtain manufacturer’s certificate

also for that.

aa. The project proponent shall ensure that exit

velocity from the stack should be sufficiently

high. Stack shall be designed in such a way that

there is no stack down-water under any

meteorological conditions.

Same shall be followed.

bb. The project proponent shall provide water

sprinkling system in the project area to suppress

the dust in addition to the already suggested

mitigation measures in the Air Environment

Chapter of EMP.

We will provide water sprinkling system in the

project area to suppress the dust.

Part - B. General Conditions

i. The Project Proponent shall ensure the

commitments made in Form-I, Form-IA.

ElA/EMP and other documents submitted to the

SEIAA for the protection of environment and

proposed environmental safeguards are

complied with in letter and spirit. In case of

contradiction between two or more documents

on any point, the most environmental friendly

commitment on the point shall be taken as

commitment by project proponent.

The environmental safeguards contained in the

documents will be strictly implemented.

ii. Six monthly compliance reports should be

submitted to the HSPCB and Regional Office,

MOEF, GOI, Northern Region, Chandigarh and a

We will regularly submit the six monthly monitoring

reports to the SEIAA and the regional office, MoEF.

GOI, Northern region Chandigarh.

Page 16: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 16

copy to the SEIAA, Haryana.

iii. STP outlet after stabilization and stack emission

shall be monitored monthly. Other

environmental parameters and green belt shall

be monitored on quarterly basis. After every 3

(three) months the project proponent shall

conduct environmental audit and shall take

corrective measure, if required, without delay.

Agreed.

iv. The SEIAA, Haryana reserves the right to add

additional safeguard measures subsequently, if

found necessary. Environmental Clearance

granted will be revoked if it is found that false

information has been given for getting approval

of this project. SEIAA reserves the right to revoke

the clearance if conditions stipulated are not

implemented to the satisfaction of SEIAA/MoEF.

Agreed.

v. The Project proponent shall not violate any

judicial orders/pronouncements issued by any

Court/Tribunal

Noted.

vi. All other statutory clearances such as the

approvals for storage of diesel from Chief

Controller of Explosives, Fire Department, Civil

Aviation Department, Forest Conservation Act,

1980 and Wildlife (protection) Act, 1972, Forest

Act, 1927. PLPA 1900, etc, shall be obtained, as

applicable by project proponents from the

respective authorities prior to construction of

the project.

All relevant clearances have been obtained/ will be

obtained as and when required.

vii. The Project proponent should inform the public

that the project has been accorded Environment

The same has been informed.

Page 17: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 17

Clearance by the SEIAA and copies of the

clearance letter are available with the Haryana

State Pollution Control Board & SElAA. This

should be advertised within 7 days from the date

of issue of the clearance letter at least in two

local newspapers that are widely circulated in

the region and the copy of the same should be

forwarded to SElAA Haryana. A copy of

Environment Clearance conditions shall also be

put on project proponent’s web site for public

awareness.

viii. Under the provisions of Environment

(protection) Act, 1986, legal action shall be

initiated against the Project Proponent if it was

found that construction of the project has been

started before obtaining prior Environmental

Clearance.

All Statutory clearance will be obtained from

respective departments.

ix. Any appeal against the this Environmental

Clearance shall lie with the National Green

Tribunal, if preferred, within a period of 30

days as prescribed under Section 16 of the

National Green Tribunal Act, 2010.

Agreed.

x. The project proponent shall put in place

Corporate Environment Policy as mentioned

in MoEF, GoI OM No. J-II0I3/41/2006-IA II

(I) dated 26.4.2012 within 3 months period.

Latest Corporate Environment Policy should be

submitted to SEIAA within 3 months of issuance

of this letter.

Agreed.

xi. The fund ear-marked for environment

protection measures should be kept in

Noted.

Page 18: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 18

separate account and should not be

diverted for other purposes and year wise

expenditure shall be reported to the SElAA/ RO

MOEF GOI under rules prescribed for

Environment Audit

xii. The project proponent shall ensure the

compliance of Forest Department, Haryana

Notification no. S.O.121PA2/1900/S.4/97

dated 28.11.1997.

Noted.

xiii. The Project Proponent shall ensure that no

vehicle during construction/ operation phase

enter the project premises without valid

'Pollution Under Control' certificate from

competent Authority.

Noted & Agreed.

xiv. The project proponent is responsible for

compliance of all conditions in

Environmental Clearance letter and

project proponent can not absolve himself

/herself of the responsibility by shifting it to

any contractor engaged by project

proponent

Agreed.

xv. The project proponent shall seek fresh

Environmental clearance if at any stage there is

change in the planning of the proposed project.

Same shall be followed.

xvi. Besides the developer/ applicant, the

responsibility to ensure the compliance of

Environmental Safeguards/ conditions

imposed in the Environmental Clearance

letter shall also lie on the

licensee/licensees in whose name/names the

license/CLU has been, granted by the Town

& Country Planning Department,

Haryana.

Noted.

Page 19: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 19

CHAPTER-2

Details of Environmental Monitoring

2.1 AMBIENT AIR QUALITY MONITORING

2.1.1 Ambient Air Quality Monitoring Stations

Ambient air quality monitoring has been carried out at two locations; one is on the project site

(near main gate) and other one is on the boundary of project west side to assess the ambient air

quality of the project site. This will enable to have a comparative analytical understanding about

air quality and the changes in the air environment in the study area with respect to the condition

prevailing. The locations of the ambient air quality monitoring stations are given in Table 2.1.

Table2.1 Details of Ambient Air Quality Monitoring Stations

S.

No.

Locn.

Code

Location Name/ Description Environmental Setting

1. AAQ-1 Project Site (Near Main Gate) Residential

2. AAQ-2 West Boundary of the project Residential

AAQ-1: Project Site

The sampler was placed on the project site at the height of 3-5 meter was free from any

obstacles, surroundings of the sampling site represent residential environmental setting

AAQ-2: Boundary of the project (West Side)

The sampler was placed Boundary of the project (West Side). Vicinity represents residential

environmental setting.

2.1.2 Ambient Air Quality Monitoring Methodology

Monitoring was conducted in respect of the following parameters:

• Particulate Matter (PM 2.5)

• Particulate Matter (PM 10)

• Sulphur dioxide (SO2)

• Nitrogen dioxide (NO2)

Page 20: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 20

The duration of sampling of PM2.5, PM10, SO2 and NO2 was 8 hourly sampling per day. The

monitoring was conducted for eight hours at each location. This is to allow a comparison with

the National Ambient Air Quality Standards.

Ambient Air Quality monitoring was carried out as per the CPCB guidelines and analyze as per

IS: 5182.The techniques used for ambient air quality monitoring and minimum detectable levels

are given in Table 2.2.

Table 2.2 Monitoring Method and Other Details

Attributes Sampling Measurement Method

Duration Instrument Used

Particulate Matter (PM10)

µg/m3

8 Hourly

Repairable Dust

Sampler along with

gaseous attachment

and fine particulate

sampler.

IS: 5182 (P-23), 2006

Particulate Matter (PM2.5)

µg/m3

PM 2.5 Sampler

(Gravimetric)

Sulphur Dioxide (SO2) µg/m3 IS: 5182 (P-2), 2001

Nitrogen dioxide (NO2) µg/m3 IS: 5182 (P-6), 1975

Reffirmed-1998

2.1.3 Ambient Air Quality Monitoring Results

The detailed on-site monitoring results of PM 2.5, PM 10, SO2 and NO2 are presented in Table

2.3.

Table 2.3 Ambient Air Quality Monitoring Results

S. No. Locn.

Code

Location (PM2.5),

µg/m3

(PM10),

µg/m3

NO2

(μg/m3)

SO2

(μg/m3)

1. AAQ-1 Project Site

(Near Main Gate) 39.30 84.60 23.01 10.21

2. AAQ-2 West Boundary of

the project 36.16 80.90 19.40 9.99

*NAAQS 60 100 80 80

*NAAQS – National Ambient Air Quality Standards

Page 21: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 21

Figure 2.1 Location-wise Variation of Ambient Air Quality

2.1.4 Discussion on Ambient Air Quality in the Study Area

The air quality monitoring results define in table: 2.3 infers the environmental scenario at the

project site, It observed that during Monitoring at the project site PM10 level is from 80.90 μg/m3

to 84.60 μg/m3 and PM2.5 level is from 36.16 μg/m3 to 39.30 μg/m3. It has been seen (fig. 2.1)

that all the values are well within the prescribed limits by NAAQS.

In context of Gaseous pollutant (table: 2.3) such as SO2 ranges from 9.99 μg/m3 to 10.21 μg/m3

and NO2 ranges from 19.40 μg/m3 to 23.01 μg/m3 .It has been seen (fig 2.1) that all the values are

well within the prescribed limits by NAAQS.

2.2 AMBIENT NOISE MONITORING

2.2.1 Ambient Noise Monitoring Locations

The main objective of noise monitoring in the study area is to assess the present ambient noise

levels in project site & project boundary due to various construction allied activities and increased

vehicular movement. A preliminary reconnaissance survey has been undertaken to identify the

major noise generating sources in the area. Ambient noise monitoring was conducted at 2

locations at the boundary of the project site as given in Table 2.4.

Page 22: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 22

Table 2.4 Details of Ambient Noise Monitoring Stations

S. No. Locn. Code Location Name/ Description Present Landuse

1. NQS-01 Project Site Residential

2. NQS-02 Boundary of the project Residential

2.2.2 Methodology of Noise Monitoring

Noise is defined as unwanted sound that create interferences in speech communication, causes

annoyance, disturbance in work concentration and sleep, thus deteriorating quality of Noise

environment.In the present study Noise monitoring undertaken at two locations including one

location at project site and one at the boundary of the project.

Since loudness of sound is the important parameter to access the effects of particular activities

on human being, and for noise environment assessment that must be taken into the account.

Hourly Sound Pressure Level (SPL) was recorded with Sound level Meter (Envirotech SLM 100)

for 24 hours. The Leq value has been computed from SPL readings taken at uniform time

intervals from the relation as under:

Leq = 10 log 1/n ∑ n 1=1 10SPL/10

2.2.3 Ambient Noise Monitoring Results

The location wise ambient noise monitoring results is summarized in Table 2.5. The location-

wise variation of noise levels are graphically presented in Figure 2.2.

Table 2.5 Ambient Noise Monitoring Results

Monitoring

Locations Location Detail Shift

Parameters

Lmax Lmin Leq

NQS-01

Project Site

Day Time 69.30 44.60 53.79

Night Time 52.40 38.00 44.01

NQS-02 Boundary of the Day Time 67.00 44.10 53.09

Page 23: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 23

Figure 2.2 Location-wise Variation of Ambient Noise Levels

2.2.4 Discussion on Ambient Noise Levels in the Study Area

Noise Monitoring has been undertaken at two locations, all the Leq values along with Minimum

and Maximum values are compiled in table 2.5 .At project site the Leq values found in the range of

53.09 dB (A) to 53.79 dB(A) during day time and 43.79 dB(A) to 44.01 dB(A) during night time.

2.3 WATER QUALITY ANALYSIS

Water is the most important natural resources. In order to assess the water quality, one water

sample from the supply Tank and Physico-Chemical examination was undertaken by Standard

methods (American Public Health Association -APHA/ and the Bureau of Indian Standards -BIS).

Bacterial examination was carried out to identify the microbiological contamination in source.

project Night Time 53.50 38.40 43.79

CPCB Limits

for

Residential Area

Day Time - - 55

Night Time

- - 45

Page 24: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 24

2.3.1 Methodology of water Quality Monitoring

Sampling of water was carried out on Mar. 2014. Samples were collected as grab sample and

sampling forms are filled in as per the sampling plan. The preservative sample were properly

added to preserve as per standard operating procedures (SOP) and stored immediately in ice

boxes, which were ensured for appropriate temperatures. Sample for chemical analysis was

collected in polyethylene carboys. Sample collected for metal content were acidified to <2 pH with

1 ml HNO3. A sample for bacteriological analysis was collected in sterilized glass bottles.

The analytical techniques and the test methods & sampling results are enclosed as Annexure-3

2.4 SOIL MONITORING

2.4.1 Soil Monitoring Locations

The objective of the soil monitoring is to identify the impacts of ongoing project activities on soil

quality and also predict impacts, which have arisen due to execution of various constructions allied

activities. Accordingly, a study of assessment of the soil quality has been carried out.

To assess impacts of ongoing project activities on the soil in the area, the physico-chemical

characteristics of soils were examined by obtaining soil samples from selected points and analysis

of the same. single sample of soil was collected from the project site for studying soil

characteristics, the location of which is enclosed as Annexure-3

Table 2.6 Details of Soil Quality Monitoring Location

S. No. Locn. Code Location Name/ Description

1. S1 Onsite

2.4.2 Methodology of Soil Monitoring

The sampling has been done in line with IS: 2720 & Methods of Soil Analysis, Part-1, 2nd edition,

1986 of American Society for Agronomy and Soil Science Society of America. The homogenized

samples were analyzed for physical and chemical characteristics (physical, chemical and heavy

metal concentrations). The soil samples were collected in the month of Mar. 2014

Page 25: M/s. DLF New Gurgaon Homes Developers Private Limited.nromoef.gov.in/SMPR/13102014/156.pdf · M/s. DLF New Gurgaon Homes Developers Private Limited. 1 ... Adequate drinking water

Group Housing Project “The Ultima” In Sector 81, Village Lakhnola, Gurgaon, Haryana.

Half-yearly Compliance status Report of EC Conditions (due on 1 June, 2014)

M/s. DLF New Gurgaon Homes Developers Private Limited. 25

The samples have been analyzed as per the established scientific methods for physico-chemical

parameters. The heavy metals have been analyzed by using Atomic Absorption Spectro-

photometer and Inductive Coupled Plasma Analyzer.

2.4.3 Soil Monitoring Results

Single sample of soil is collected from the site to check the quality of soil of the study area .The

physico-chemical characteristics of the soil, as obtained from the analysis of the soil sample, are

enclosed as Annexure-3

2.5 Stack Monitoring

For the evaluation of gaseous emission level (PM, NO2, HC) from the DG Set, stack monitoring

was done. Presently the stack monitoring was done for one DG Set of capacity 125 KVA and test

result is enclosed as Annexure-3