MS Consultancy MS Consultancy MS Consultancy WATER SUPPLY AND SANITATION PROJECTS SEBETA and BURAYU TOWNS WATER SUPLY and SANITATION Project Profile No.1 : SYSTEM DESIGN & BUSSINESS PLAN PREPARATION and SUPER- VISION WORK Assignment Name: Design Review of Water Supply & Sanitation System of Sebeta and Burayu towns followed by construction supervision Approximate Value of the Contract Birr 2,000,000 Location within Country Sebeta and Burayu, Ethiopia Duration of the Assignment 4.5 months Name of Client: Oromia Water Resource Bureau Total No of Staff-Months of Assignment: 20 Address OWRB P.O.Box: 8630 Finfinne, Ethiopia Approx. Value of Services provided by your firm: Birr 2,000,000 Start Date (Month/ Year): October 2009 Completion Date (Month/ Year): March 2010 No of Months of Professional Staff Provided by Associated Consultants: None Name of Associated Consultants, If any: None Name of Senior Professional Staffs Provided your firm involved and functions performed: Project Manger and Sanitary Engineers: Fanuel Tadesse, Abebe Belete Water & Waste Engineers: Mesfin Shenkut, Asefa Nega Electromechanical Engineers: Shewarega Dibabu, Aseged Mamo Environmentalist: Getahun Worku, Eyob Yilma Socio Economist: Girma Seyoum, Mengesha H/Melekot Structural Engineers: Getahun Worku, Fikadu Melesse Project Supervisors: Nigussu Emiru and Habtamu Abebe Surveyors: Yonas Fikre, Fantahun Narrative Description of Project: Design and design review of the Water Supply and Sanitation System for the Sebeta and Burayu towns water supply projects with population figure of about 500 thousand Description of Actual Services Provided By Your Staff: Design of rising and distribution lines of over 220 km size up to 500 mm, design of reservoirs sizes from 500 – 4,000 m3, design of access roads and auxiliary buildings followed by supervision work Firm’s Name MS Consultancy

Upload: others

Post on 05-Jul-2020

10 views

Category:

Documents


0 download

TRANSCRIPT

Page 1: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyWATER SUPPLY AND SANITATION PROJECTS

SEBETA and BURAYU TOWNS WATER SUPLY and SANITATION Project Profile No.1 : SYSTEM DESIGN & BUSSINESS PLAN PREPARATION and SUPER-VISION WORK

Assignment Name:Design Review of Water Supply & Sanitation System of Sebeta and Burayu towns followed by construction supervision

Approximate Value of the Contract

Birr 2,000,000

Location within Country Sebeta and Burayu, Ethiopia

Duration of the Assignment4.5 months

Name of Client:Oromia Water Resource Bureau

Total No of Staff-Months of Assignment: 20

Address OWRBP.O.Box: 8630Finfinne, Ethiopia

Approx. Value of Services provided by your firm: Birr 2,000,000

Start Date (Month/ Year): October 2009

Completion Date (Month/ Year): March 2010

No of Months of Professional Staff Provided by Associated Consultants: None

Name of Associated Consultants, If any: NoneName of Senior Professional Staffs Provided your firm involved and functions performed:Project Manger and Sanitary Engineers: Fanuel Tadesse, Abebe BeleteWater & Waste Engineers: Mesfin Shenkut, Asefa NegaElectromechanical Engineers: Shewarega Dibabu, Aseged MamoEnvironmentalist: Getahun Worku, Eyob YilmaSocio Economist: Girma Seyoum, Mengesha H/MelekotStructural Engineers: Getahun Worku, Fikadu MelesseProject Supervisors: Nigussu Emiru and Habtamu Abebe Surveyors: Yonas Fikre, Fantahun Narrative Description of Project: Design and design review of the Water Supply and Sanitation System for the Sebeta and Burayu towns water supply projects with population figure of about 500 thousand Description of Actual Services Provided By Your Staff: Design of rising and distribution lines of over 220 km size up to 500 mm, design of reservoirs sizes from 500 – 4,000 m3, design of access roads and auxiliary buildings followed by supervision work

Firm’s Name MS Consultancy

Page 2: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-Project Profile No.2 : OPMENT STUDY and DESIGN

Assignment Name:Study and Design of Terminal Boosting Station and Borehole Developments at Sabian, and Legahare and Goro well fields, respectively

Approximate Value of the Contract

ETB 300,000

Location within Country Dire Dawa

Duration of the Assignment2 months

Name of Client:Dire Dawa Water Supply and Sewerage Authority

Total No of Staff-Months of Assignment: 4

Address Dire Dawa Water Supply and Sewerage AuthorityDire Dawa, Ethiopia

Approx. Value of Services provided by your firm: ETB 300,000

Start Date (Month/ Year): July 2009

Completion Date (Month/ Year): September 2009

No of Months of Professional Staff Provided by Associated Consultants: None

Name of Associated Consultants, If any: NoneName of Senior Professional Staffs Provided your firm involved and functions performed:Project Manger and Water supply Engineer: Mesfin ShenkutElectromechanical Engineers: Shewarega DibabuStructural Engineers: Getahun WorkuSurveyors: Fantahun BizunehNarrative Description of Project: Study and Design of the terminal boosting station at Sabian well fields,and borehole development at Legahare and Goro well fields Description of Actual Services Provided By Your Staff: Design of rising and collector systems of over 13 km size up to 400 mm, design of main distribution lines of about 14km with size up to 900mm and 500 mm, design of reservoirs sizes from 1,000 – 1,500 m3, design of access roads and associated buildings

Firm’s Name MS Consultancy

Page 3: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS Consultancy

GONDAR WATER SUPPLY PROJECT DESIGN REVIEW, BOREHOLE Project Profile No.3 : SITTING AND BUSSINESS PLAN PREPARATION

Assignment Name:Design and Design Review of Water supply System bore hole site identification followed by construction supervision

Country Ethiopia

Location within Country Gondar

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply EngineerWater Quality ExpertHydrogeologistGeo-physistHydrologistEnvironmentalistSocio EconomistStructural EngineerSurveyors

Name of Client:Gondar Water Supply and Sewerage Service

No of Staff:20

Address Telephone-251-581-110459GondarEthiopia

No of Staff-Months; Duration of Assignment: 100

State Date (Month/ Year): Sep 2009

Completion Date (Month/year Sep 2010

Approx. Value of Services: Birr 2,000,000.00

Name of Associated Consultants, If any: None

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut, Tessema Chala, Getahun Worku, Getaneh Terefe, Girma Seyoum, Tesema Chala, Yoseph, Mesfin Aytenfisu,

Narrative Description of Project: Design and design review of the Water Supply System bore holes site identification and construction supervisionDescription of Actual Services Provided By Your Staff: Review and update all civil and electromechanical components, hydro geological and geophysical investigation, and design of associated civil and electromechanically components

Firm’s Name: MS Consultancy

Page 4: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

ADDIS ABABA EASTERN CATCHMENT WATER SUPLY SYSTEM Project Profile No.4 : DESIGN and DESIGN REVIEW and WORK SUPERVISION

Assignment Name:Design and Design Review of Water supply System of Eastern Catchment followed by construction supervision

Country Ethiopia

Location within Country Addis Ababa

Professional Staff Provided By Your Firm/Entity (Profiles):Water & Waste EngineersEnvironmentalistSocio EconomistStructural EngineerSurveyors

Name of Client:Addis Ababa Water Supply and Sewerage Authority

No of Staff:15

Address AAWSATel 0115 510267Addis Ababa Ethiopia

No of Staff-Months; Duration of Assignment: 56

State Date (Month/ Year): Jan 2008

Completion Date (Month/year May 2009

Approx. Value of Services: Birr1, 500,000

Name of Associated Consultants, If any: None

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Biruk Simur, Mesfin Shenkut, Fikadu Melese, Getahun Worku, Million Gebereyes, Tesema Chala, Tegeng, Abdulkerim Awel, Fantahun

Narrative Description of Project: Design and design review of the Water Supply System for the Eastern Catchment Addis Ababa with population figure of 1,000,000 and estimated pipe line of over 260 k.m with sizes up to 1000 mm. Description of Actual Services Provided By Your Staff: Design and design review and completion of the detail design previously prepared by DHV and Thal, desing of access road, buildings and activated sludge treatment plant

Firm’s Name: MS Consultancy

Page 5: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS Consultancy

DEBERE TABOR, WOLDIA, BATI AND SHEHEDI WSSPProject Profile No.5 :

Assignment Name:Debere Tabor, Woldia, Bati and Shehedi Water Towns Water Supply and Sanitation Project study and Detail Design

Country Ethiopia

Location within Country Amhara Region

Professional Staff Provided By Your Firm/Entity (Profiles):Professional Staff Provided By Your Firm/Entity (Profiles):Sanitary Engineer, HydrogeologistGeotechnical EngineerStructural EngineerEnvironmentalistConstruction supervision engineersSocio Economist and Surveyor

Name of Client:Amhara Water Resources Bureau

No of Staff:30

Address Tel. 058 220 2044Amhara Water Resources Bureau Amhara Ethiopia, Bahir Dar

No of Staff-Months; Duration of Assignment: 100

State Date (Month/ Year): April 2008 -to date

Completion Date (Month/year August 2008

Approx. Value of Services: Birr 1,200,000

Name of Associated Consultants, If any: No of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Ayitenfisu, Mesfin Shenkut, Alemu Asana, Geberetsadik Eshete, Girma Sime, ,Tegene Tadesse, Fanuel Tadesse, Yifredew Abraham, Getahun Worku, Girma Seyoum, Dereje Nigusse, Shimeles Kebede, Narrative Description of Project: The project consists of the detail study of water supply and sanitation project of the four townsDescription of Actual Services Provided By Your Staff: Planning, study and design and construction supervision of the water supply and sanitation project

Firm’s Name MS Consultancy

Page 6: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyDEBREMARKOS, DANGLA AND KOBO WSSPProject Profile No.6 :

Assignment Name:DebreMarkos, Dangla and Kobo Towns Water Supply and Sanitation Project Design review and Construction Supervision

Country Ethiopia

Location within Country Amhara Region

Professional Staff Provided By Your Firm/Entity (Profiles):Professional Staff Provided By Your Firm/Entity (Profiles):Sanitary EngineerHydrogeologistGeotechnical EngineerStructural EngineerEnvironmentalistConstruction supervision engineersSocio EconomistSurveyor

Name of Client:Amhara Water Resources Bureau

No of Staff:45

Address Amhara Water Resources Bureau Amhara Ethiopia

No of Staff-Months; Duration of Assignment: 200

State Date (Month/ Year): January 2006 –to date

Completion Date (Month/year January 2009

Approx. Value of Services: Birr 2,5000,000

Name of Associated Consultants, If any:

Dorsh Consult of Germany Lead Consultant

No of Months of Professional Staff Provided by Associated Consultants: 30

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Ayitenfisu, Mesfin Shenkut, Yemareshet Yemane, Girma Sime, Abebaw Bekele ,Tegene Tadesse, Abera Negash Narrative Description of Project: The project consists of the design review and construction supervision of the water supply and sanitation project of the three townsDescription of Actual Services Provided By Your Staff: Planning, study and design and construction supervision of the water supply and sanitation project

Firm’s Name MS Consultancy

Page 7: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyBURE AND DEMBECHA WATER SUPPLY AND SANITATION PROJ-Project Profile No.7 : ECT

Assignment Name:Bure and Dembecha Water Supply and Sanitation Project Design review and Construction Supervision

Country Ethiopia

Location within Country Amhara Region

Professional Staff Provided By Your Firm/Entity (Profiles):Professional Staff Provided By Your Firm/Entity (Profiles):Sanitary EngineerHydrogeologistGeotechnical EngineerStructural EngineerEnvironmentalistConstruction supervision engineersSocio EconomistSurveyor

Name of Client:Amhara Water Resources Bureau

No of Staff:12

Address Amhara Water Resources Bureau AmharaEthiopia

No of Staff-Months; Duration of Assignment: 30

State Date (Month/ Year): May 2007 –to date

Completion Date (Month/year N o v e m b e r 2007

Approx. Value of Services: Birr 500,000

Name of Associated Consultants, If any:

Dorsh Consult of Germany Lead Consultant

No of Months of Professional Staff Provided by Associated Consultants: 30

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Alemu Asana, Mesfin Shenkut, Asefa Nega, Fanuel Tadess, Yifredew Abraham, Tesema Cahala, Shewarega Dibabu

Page 8: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyNarrative Description of Project: The project consists of the study and detail design review and of the water supply and sanitation project of the two townsDescription of Actual Services Provided By Your Staff: Planning, study and design and the water supply and sanitation project

Firm’s Name MS Consultancy

Page 9: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyLANGANO RESORT WATER TREATMENT SYSTEMProject Profile No.8 :

Assignment Name:Design, fabrication, installation and commissioning of water treatment plant for Langano Wabe Shebelle Hotels

Country Ethiopia

Location within Country Oromia Region/Langano Lake

Professional Staff Provided By Your Firm/Entity (Profiles):Professional Staff Provided By Your Firm/Entity (Profiles):Sanitary EngineerWater Treatment SpecialistConstruction supervision engineersStructural EngineerSurveyor

Name of Client:Wabe Shebelle Hotels Ent.

No of Staff:6

Address Watb Shebelle Hotels, Addis Ababa, Ethiopipa

No of Staff-Months; Duration of Assignment: 2 months

State Date (Month/ Year): July 2007 – Sept 2007

Completion Date (Month/year Sept 2007

Approx. Value of Services: Birr 400,000

Name of Associated Consultants, If any: No of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut, Nigusu Emiru, Fanuel Tadess, Kasshun Tadesse , Shewarega DibabuNarrative Description of Project: The project consists of the study and detail design , manufacturing, installation and commissioning of Water Treatment Facility that treats raw water from Lake Langano to drinkable level Description of Actual Services Provided By Your Staff: Planning, study and design, manufacture, install and commissioning of water treatment facilities

Firm’s Name MS Consultancy

Page 10: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyFINCHAA WATER SUPPLY AND SANITATION PROJECTProject Profile No.9 :

Assignment Name:Fincha Water Supply and Sanitation Design and Construction Supervision

Country Ethiopia

Location within Country Oromia Region

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply EngineerHydrogeologistElectromechanical EngiGeophysisitEnvironmentalistSocio EconomistSurveyor

Name of Client:Ethiopian Electric Power Authority

No of Staff:10

Address EEPCOTel 251 1 152710P.O.Box 1233Addis Ababa

No of Staff-Months; Duration of Assignment: 34

State Date (Month/ Year): July 2005 – Dec. 2006

Completion Date (Month/year Dec 2006

Approx. Value of Services: Birr 800,000

Name of Associated Consultants, If any:

None

Zenas Eng:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut, , Alemu Asana, Getachew Digese, Shimeles Kebede, Asegid Mamo, Tegene Tadesse,

Narrative Description of Project: The project consists of the design and construction supervision of a complete township water supply and sanitation ProjectDescription of Actual Services Provided By Your Staff: Planning, study and design and construction supervision of water supply and sanitation project for the Ethipian Electric Power Authority staff and surrounding dwellers.

Firm’s Name: MS Consultancy

Page 11: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyFIVE VILLAGE WATER SUPPLY PROJECT/ ETHIO-ITALY DEVEL-Project Profile No.10 : OPMENT PROGRAM

Assignment Name:Five Villages Water Supply Project

Country Ethiopia

Location within Country Bale, Dodola

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Project Coordinator, Hydrogeologist and geologlogist

Name of Client:Arsi Bale Rural Development Project

No of Staff: 4

Address Oromia Arsi and Bale

No of Staff-Months; Duration of Assignment: 5

State Date (Month/ Year): June 2007 – Dec 2007 date

Completion Date (Month/year Jan 2008

Approx. Value of Services: Birr 109,000

Name of Associated Consultants, If any: No of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut: Project Coordinator Shewarega Dibabu: Electrical EngineerAlemu Assana – HydrogeologistDereje Nigussa GeologistNarrative Description of Project: The project involves a site selection and drilling supervision of five deep wells Description of Actual Services Provided By Your Staff: Drilling site identification and drilling supervision of five deep wells.

Firm’s Name: MS Consultancy

Page 12: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyYEM SPECIAL WOREDA COMMUNITY WATER SUPPLY SURVEY, Project Profile No.11 : STUDY AND DESIGN WORKS

Assignment Name:Yem Special Woreda Community Water Supply Survey, Study and Design Works

Country Ethiopia

Location within Country Addis Ababa

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply EngineerHydrogeologistEnvironmentalistSocio EconomistSurveyor

Name of Client:Actionaid Ethiopia

No of Staff:5

Address Actionaid Ethiopia, P.O. Box 1261, Tel 2511654671, Addis Ababa

No of Staff-Months; Duration of Assignment: 14

State Date (Month/ Year): Dec 2004 – April 2005

Completion Date (Month/year April 2005

Approx. Value of Services: Birr 450,000

Name of Associated Consultants, If any:

-

No of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut, Abera Negash, Alemu Asana, Shawel Astatke, Seauare Birhane

Narrative Description of Project: Yem special Woreda is one of the Action aid newly established community centered development area and the people of Yem are highly suffering from lack of access to safe and potable water. Hence, community water supply is incontrovertible prior program, which Action aid has taken the initiative to do in the form of integrated water supply, sanitation and hygiene education.Description of Actual Services Provided By Your Staff: Planning, study and design of various water supply and sanitation projects.

Firm’s Name: MS Consultancy

Page 13: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyALGE TOWN WATER SUPPLY PROJECTProject Profile No.12 :

Assignment Name:Alge Town Water Supply Project

Country Ethiopia

Location within Country Elibabor/Oromia Region

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Structural Engineer, Electro-mech. Engineer and site engineers

Name of ClientMenschen fur Menschen

No of Staff:9

Address Menschen fur Menschen, Addis Ababa

No of Staff-Months; Duration of Assignment: 26

State Date (Month/ Year): March 2005 – June 2007

Completion Date (Month/year June 2007

Approx. Value of Services: Birr 450,000

Name of Associated Consultants, If any: No of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut: Project Coordinator, Shewarega Dibabu: Electrical EngineerAbera Negash Engineer, Nigussie Emiru Narrative Description of Project: The project involves a design review and consisting of pumping scheme, rising main of ND 150 mm, reservoirs, treatment plants and reticulation system from a high yielding spring Description of Actual Services Provided By Your Staff: Design review of intake structures, reservoirs, pumping systems, electromechanical works, distribution systems of the town and contract administration and work supervision

Firm’s Name: MS Consultancy

Page 14: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyDODOLA TOWN WATER SUPPLY PROJECT/ ETHIO-ITALY DEVEL-Project Profile No.13 : OPMENT PROGRAM

Assignment Name:Dodola Town Water Supply Project

Country Ethiopia

Location within Country Bale, Dodola

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Project Coordinator, Community Promotion Agent Structural Engineer, Electro-mech. Engineer and site engineers

Name of Client:Arsi Bale Rural Development Project

No of Staff: 7

Address Oromia Water Bureau, Addis Ababa

No of Staff-Months; Duration of Assignment: 130

State Date (Month/ Year): Januar 2003 –Jan 2005

Completion Date (Month/year January 2005

Approx. Value of Services: Birr 1,000,000

Name of Associated Consultants, If any:

Continental Consultants

No of Months of Professional Staff Provided by Associated Consultants: 30

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut: Project Coordinator Shewarega Dibabu: Electrical EngineerAsegid Mamo: Electro-mechanical Engineer Alemayehu Admasu: Resident EngineerTesfay Bahiru: Work InspectorBeyourdanos Tetemke: Office EngineerWako Aga: Community PromoterNarrative Description of Project: The project involves a complete design review and construction supervision work consisting of pumping scheme, rising main of ND 350 mm, reservoirs and reticulation system from a high yielding spring Description of Actual Services Provided By Your Staff: Design review of intake structures, reservoirs, pumping systems, electromechanical works, distribution systems of the town and contract administration and work supervision

Firm’s Name: MS Consultancy

Page 15: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyOROMIA SIX TOWN’S WATER SUPPLY PROJECT DESIGN REVIEW Project Profile No.14 : AND CONSTRUCTION SUPERVISION: ARSI NEGELLE, LEAD CONSULTANT

Assignment Name:Oromia Six Town’s Water Supply Project Design Review and Construction Supervision

Country Ethiopia

Location within Country Arsi Negele,

Professional Staff Provided By Your Firm/Entity (Profiles):Project Coordinator, Water Supply Engineer, Water Treatment Engineer, Hydrogeologist, Structural Engineer, Electro-mech. Engineer and site engineers

Name of Client:Oromia Water Resources Bureau

No of Staff:8

Address Oromia Water Bureau, Addis Ababa

No of Staff-Months; Duration of Assignment: 35

State Date (Month/ Year): July 2001 - 2003

Completion Date (Month/year Dec. 2003

Approx. Value of Services: Birr 600,000

Name of Associated Consultants, If any:

Desta Horecha WSSE

No of Months of Professional Staff Provided by Associated Consultants: Jointly Shared

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Alemeshet Tsegay: Project Coordinator Desta Horecha: Hydro - geologist Mesfin Shenkut: Water Treatment Specialist Shewarega Dibabu: Electrical EngineerKassa Waka: Electro-mechanical Engineer Asefa Nega Abay: Water Supply Engineer Getaneh Terefe: Structural Engineer Assefa Nega Habte Wolde: Resident EngineerNarrative Description of Project: It involves a complete design review and construction supervision work to supply the town’s water supply from six bore-holes, pipe works of over 30 km, reservoirs of 500 and 1000 m3 etc. and costing over 20 million Birr. Description of Actual Services Provided By Your Staff: Design review and construction supervision of reservoirs, pumping systems, electromechanical works, distribution systems.

Firm’s Name: MS Consultancy previously called Mesfin Shenkut WRMC

Page 16: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyHERERO AND ASSASA TOWNS WATER SUPPLY PROJECTProject Profile No.15 :

Assignment Name:Herero and Assasa Towns Water Supply Project

Country Ethiopia

Location within Country Bale, Herero

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Project Coordinator, Community Promotion Agent Structural Engineer, Electro-mech. Engineer and site engineers

Name of Client:Arsi Bale Rural Development Project

No of Staff:5

Address Oromia Water Bureau, Addis Ababa

No of Staff-Months; Duration of Assignment: 120

Date (Month/ Year): January 2003 – June 2004

Completion Date (Month/year June 2004

Approx. Value of Services: Birr 1,000,000

Name of Associated Consultants, If any:

Continental Consultants

No of Months of Professional Staff Provided by Associated Consultants: 55

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Kelemu Sinke: Project Coordinator Shewarega Dibabu: Electrical EngineerAsegid Mamo: Electro-mechanical Engineer Kebede Asrat: Resident Engineer/ Project HeadSemerab Demisse: Work InspectorAbebaw Tesfaye: Office EngineerBizunesh Aga: Community PromoterNarrative Description of Project: The project is involves a complete design review and construction supervision work consisting of bore holes pumping scheme, rising main of ND 350 mm, reservoirs and reticulation system from bore holes Description of Actual Services Provided By Your Staff: Design review of intake structures, , reservoirs, pumping systems, electromechanical works, distribution systems of the towns and contract administration and work supervision

Firm’s Name: MS Consultancy

OROMIA SIX Project Profile No.16 : TOWN’S WATER SUPPLY PROJECT DESIGN REVIEW AND CONSTRUCTION SUPERVISION: AGARO TOWN, LEAD CON-SULTANT

Assignment Name:Oromia Six Town’s Water Supply Project Design Review and Construction Supervision

Country Ethiopia

Page 17: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyLocation within Country Agaro Town

Professional Staff Provided By Your Firm/Entity (Profiles):

Water Supply Engineer, Project Coordinator, water Treatment Engineer, Hydrogeologist, Structural Engineer, Electro-mech. Engineer and site engineers.

Name of Client:Oromia Water Resources Bureau, Addis Ababa

No of Staff: 9

Address Oromia Water Bureau, Addis Ababa

No of Staff-Months; Duration of Assignment: 40

State Date (Month/ Year): July 2001 – May 2003

Completion Date (Month/year Dec 2003

Approx. Value of Services: Birr 600,000

Name of Associated Consultants, If any:

Desta Horecha WSSE

No of Months of Professional Staff Provided by Associated Consultants: Jointly Shared

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Alemeshet Tsegaye: Project Coordinator Desta Horecha: Hydro - geologist Mesfin Shenkut: Water Treatment Specialist Shewarega Dibabu: Electrical EngineerKass Waka: Electro-mechanical Engineer Getachew Degissie: Water Supply Engineer Getaneh Terefe: Structural EngineerAdugna Tujuba: Resident EngineerNarrative Description of Project: The source of water is 4 wells with a total yield of over 60 l/s. The system consists of electromechanical systems, reservoirs, rising mains and distribution system to serve over 40,000 people. Description of Actual Services Provided By Your Staff: Design review of bore-holes, treatment plants, reservoirs, pumping systems, electromechanical works, distribution systems followed by contract administration and supervision of works

Firm’s Name: MS Consultancy previously called Mesfin Shenkut WRMC

Page 18: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyOROMIA SIX TOWN’S WATER SUPPLY PROJECT DESIGN REVIEW Project Profile No.17 : AND CONSTRUCTION SUPERVISION: HIDHABU ABOTE, LEAD CONSULTANT

Assignment Name:Oromia Six Towns Water Supply Project Design Review and Construction Supervision

Country Ethiopia

Location within Country Hidebu Abote,

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Project Coordinator, water Treatment Engineer, Hydrogeologist, Structural Engineer, Electro-mech. Engineer and site engineers

Name of Client:Oromia Water Resources Bureau

No of Staff:8

Address Oromia Water Bureau, Addis Ababa

No of Staff-Months; Duration of Assignment: 25

State Date (Month/ Year): July 2001 - 2003

Completion Date (Month/year Dec. 2003

Approx. Value of Services: Birr 500,000

Name of Associated Consultants, If any:

Desta Horecha WSSE

No of Months of Professional Staff Provided by Associated Consultants: Jointly Shared

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Alemeshet Tsegaye: Project Coordinator Shewarega Dibabu: Electrical EngineerKass Waka: Electro-mechanical Engineer Getachew Degissie: Water Supply Engineer Getaneh Terefe: Structural and Geotechnical Engineer Shawel Astatke: Resident Engineer.Narrative Description of Project: The project is consists of spring source of yield over 30l/s. It is a gravity scheme with five spring protection works and over 60 km and 12 reservoirs. Description of Actual Services Provided By Your Staff: Design review of intake structures, treatment plants, reservoirs, pumping systems, electromechanical works, and distribution systems.

Firm’s Name: MS Consultancy previously called Mesfin Shenkut WRMC

Page 19: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyOROMIA SIX TOWNProject Profile No.18 : ’S WATER SUPPLY PROJECT DESIGN REVIEW AND CONSTRUCTION SUPERVISION: CHELENKO TOWN, LEAD CONSULTANT

Assignment Name:Oromia Six Towns Water Supply Project Design Review and Construction Supervision

Country Ethiopia

Location within Country Chelenko,

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Project Coordinator, water Treatment Engineer, Hydrogeologist, Structural Engineer, Electro-mech. Engineer and site engineers

Name of Client:Oromia Water Resources Bureau

No of Staff:10

Address Oromia Water Bureau, Addis Ababa

No of Staff-Months; Duration of Assignment: 25

State Date (Month/ Year): July 2001 – 2004

Completion Date (Month/year June 2004

Approx. Value of Services: Birr 500,000

Name of Associated Consultants, If any:

Desta Horecha WSSE

No of Months of Professional Staff Provided by Associated Consultants: Jointly Shared

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Alemeshet Tsegaye: Project Coordinator Mesfin Shenkut: Water Treatment Specialist Shewarega Dibabu: Electrical EngineerKass Waka: Electro-mechanical Engineer Getachew Degissie: Water Supply Engineer Getaneh Terefe: Structural and Geotechnical EngineerBirhanu Demisse: Resident EngineerNarrative Description of Project: The project consists of spring of over 40l/s, two booster-pumping stations, reservoirs, and pipelines of over 20 km. Description of Actual Services Provided By Your Staff: Design review of intake structures, treatment plants, reservoirs, pumping systems, electromechanical works, distribution systems followed by contract administration and construction supervision.

Firm’s Name: MS Consultancy previously called Mesfin Shenkut WRMC

Page 20: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyOROMIA SIX TOWN’S WATER SUPPLY PROJECT DESIGN REVIEW Project Profile No.19 : AND CONSTRUCTION SUPERVISION: METEHARA TOWN, LEAD CONSULTANT

Assignment Name:Oromia Six Towns Water Supply Project Design Review and Construction Supervision

Country Ethiopia

Location within Country Metehara,

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Ass Project Coordinator, water Treatment Engineer, Hydrogeologist, Structural Engineer, Electro-mech. Engineer and site engineers

Name of Client:Oromia Water Resources Bureau

No of Staff:10

Address Oromia Water Bureau, Addis Ababa

No of Staff-Months; Duration of Assignment: 70

State Date (Month/ Year): July 2001 – Dec. 2003

Approx. Value of Services: Birr 700,000

Name of Associated Consultants, If any:

Desta Horecha WSSE

No of Months of Professional Staff Provided by Associated Consultants: Jointly Shared

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Alemeshet Tsegaye: Project Coordinator Mesfin Shenkut: Water Supply Engineer and Water Treatment Specialist Shewarega Dibabu: Electrical EngineerGetaneh Terefe: Structural and Geotechnical EngineerKass Waka: Electro-mechanical Engineer Yihun Bekele: Resident EngineerNarrative Description of Project: The project is currently one of the largest water supply projects ever given for local consulting firms supervision in the country. It involves a complete design review and construction supervision work to supply the intake on Awash river, high tech. treatment plants, over 40 km pipe lines, elevated reservoirs 250 m3 high elevated and 1000 m3 ground, etc.. Description of Actual Services Provided By Your Staff: Design review of intake structures, treatment plants, reservoirs, pumping systems, electromechanical works, distribution systems of the town and contract administration and work supervision

Firm’s Name: MS Consultancy previously called Mesfin Shenkut WRMC

Page 21: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyOROMIA SIX TOWN’S WATER SUPPLY PROJECT DESIGN REVIEW Project Profile No.20 : AND CONSTRUCTION SUPERVISION: BEDELLE TOWN, LEAD CONSULTANT

Assignment Name:Oromia Six Towns Water Supply Project Design Review and Construction Supervision

Country Ethiopia

Location within Country Bedelle Town

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Ass Project Coordinator, water Treatment Engineer, Hydrogeologist, Structural Engineer, Electro-mech. Engineer and site engineers

Name of Client:Ministry of Water Resources Addis Ababa

No of Staff:14

Address Oromia Water Bureau, Addis Ababa

No of Staff-Months; Duration of Assignment: 50

State Date (Month/ Year): July 2001 - 2003

Completion Date (Month/year June 2004

Approx. Value of Services: Birr 700,000

Name of Associated Consultants, If any:

Desta Horecha WSSE

No of Months of Professional Staff Provided by Associated Consultants: Jointly Shared

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Alemeshet Tsegaye: Project Coordinator Mesfin Shenkut: Water Treatment Specialist Shewarega Dibabu: Electrical EngineerKass Waka: Electro-mechanical Engineer Getachew Degissie: Water Supply Engineer Getaneh Terefe: Structural and Geotechnical EngineerTadesse Abdisa: Resident Manager.Narrative Description of Project: The project is currently one of the largest water supply project given to local consultants in the country. It consists of river intakes, treatment plants, road of over 18 km, pipe lines of over 30 km reservoirs of 1000 and 500 m3 etc.. Description of Actual Services Provided By Your Staff: Design review of intake structures, treatment plants, and reservoirs, pumping systems, electromechanical works, distribution systems of the project and contract administration and work supervision.

Firm’s Name: MS Consultancy previously called Mesfin Shenkut WRMC

Page 22: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyOROMIA REGION FENTALE WOREDAProject Profile No.21 :

Assignment Name:Design and Construction Supervision of Dire Saden and Kobo Projects

Country Ethiopia

Location within Country East Shoa Zone, Fentale Woreda of Oromia Regional State

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineers, Electromechanical Engineer Hydrogeologist and surveyor

Name of Client:Gudina Tumsa Foundation

No of Staff:6

Address Addis Ababa Tel. 45 6614,460953P.O.Box 4003

No of Staff-Months: 30

State Date (Month/ Year): June 2003 – Dec 2003

Completion Date (Month/year February 2004

Approx. Value of Services: Birr 220,000

Name of Associated Consultants, If any: None

No of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut Project Coordinator Assefa Nega Water Supply EngineerAlemu Asana HydrogeologistAsefa Fita SurveyorAsegid Mamo Electromechanical EngineerSofia Tilahun Socio-economist

Narrative Description of Project: The project involves the study and design of borhole based water supply projects followed by construction supervision works for the Dire Saden Part and the deisng and construction supervsion of sand dams for Kobo projectDescription of Actual Services Provided By Your Staff: Desisign of sand dams, rising main, reticulation system, reservoir, electromechanical items, supervision of supplies.

Firm’s Name: MS Consultancy

Page 23: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancyDETAIL DESIGN AND CONSTRUCTION SUPERVISION OF GAM-Project Profile No.22 : BELLA WATER SUPPLY PROJECT

Assignment Name:Detail Design and Construction supervision of Gambella water supply project

Country Ethiopia

Location within Country Gambella

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Treatment plant Engineer, Hydrogeologist, surveyor,Draftsman, secretaries

Name of Client:Swiss Disaster Relied, UNICEF and Gambella Water Bureau

No of Staff:Seven

Address Gambella Town

No of Staff-Months; Duration of Assignment: Twenty man-month

State Date (Month/ Year): 1993

Completion Date (Month/year June 1996

Approx. Value of Services: 180,000

Name of Associated Consultants, If any: No of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut Chief DesignerTesfaye Zeleke, Senior EngineerAbebe G/Hiot , Hydrogeologist,Taha Husen, Surveyor

Narrative Description of Project: The project consists of an infiltration gallery based intake, pumping units, rising main, storage tanks, disinfection system, distribution network etc. The system is none chemical dependent and a one stage pumping. Description of Actual Services Provided By Your Staff: The entire feasibility study, detail design and construction supervision, besides, approaching donors and getting financial assistance.

Firm’s Name: MS Consultancy

Page 24: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancySURFACE WATER AND GROUND WATER STUDY BENSHANGUL Project Profile No.23 : GUMUZ

Assignment Name:Surface water and Ground water study

Country Ethiopia

Location within Country Benshangul Gumuz

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Hydrogeologist, Socio-economist, geophysicist etc.

Name of Client:Benshangu Gumuz Water Bureau

No of Staff:Six

Address Assosa

No of Staff-Months; Duration of Assignment: 40

State Date (Month/ Year): Dec 2000

Completion Date (Month/year April 2001

Approx. Value of Services: 210,000

Name of Associated Consultants, If any:

Desta Horesha Water Supply Eng. Services

No of Months of Professional Staff Provided by Associated Consultants: 4

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Alemeshet Desta Hoecha, Mesfin Shenkut

Narrative Description of Project: The assignment involves the groundwater and surface water potential assessment of eight towns in the Regional state. The assignment includes detail geophysical survey, surface water source study and socio-economic surveys.

Description of Actual Services Provided By Your Staff: The entire feasibility study and detail design

Firm’s Name: MS Consultancy

Page 25: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS Consultancy9/25 TOWNS WORLDBANK FINANCED WATER SUPPLY PROJECT Project Profile No.24 :

Assignment Name:9/25 Towns World Bank Financed Water Supply Project

Country Ethiopia

Location within Country Holeta Genet, Shambu, Kibre Mengist, Sebeta, Alem Gena, Gebre Guracha, Fiche, Gambella and Assosa towns

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer with focus on Water Treatment Engineering

Name of Client:Ministry of Water Resources Addis Ababa

No of Staff:Two

Address Norconsult, Addis Ababa, Tel 50 78 18

No of Staff-Months; Duration of Assignment: Fifteen

State Date (Month/ Year): 1998 - 2001

Completion Date (Month/year April, 2001

Approx. Value of Services: Birr 120,000

Name of Associated Consultants, If any:

No of Months of Professional Staff Provided by Associated Consultants: 1

Name of Senior Staff) Involved and Functions Performed: Mesfin Shenkut - Water Supply Engineer and Water Treatment Specialist

Narrative Description of Project: The Ministry of Water Resources obtained financial assistance from the World Bank for the immediate rehabilitation of the existing systems followed by feasibility study and detail design of the water supply systems of 25 towns in Ethiopia. Among these towns, the study and design of Holeta, Shambu, Sebeta, Alem Gena Fiche, Gebre Guracha, Kibre Mengist. Gambella and Assosa are given to Nor consult International. As local counter part, Mesfin Shenkut Water Resources Management who is an associate member of Mesfin Shenkut WRMC together with other freelance consultants participated in the entire study and design works. The detail design involves a complete engineering works to supply adequate and safe drinking water for the period 2005-2025 to the nine towns. Description of Actual Services Provided By Your Staff: Involved in the entire study and design works by the team members. Services include designs, tender documents and detail drawing preparation. The major Treatment Plant works of Kiberemengist and Gambella Towns including intake designs were undertaken by Mesfin Shenkut WRMC

Firm’s Name: MS Consultancy

Page 26: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS ConsultancyGODE TOWN WATER SUPPLY PROJECTProject Profile No.25 :

Assignment Name:Gode Town Water Supply Project

Country Ethiopia

Location within Country Gode Town

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Water Treatment Engineer, surveyors Draft Men, Electrical Engineer, secretaries, etc.

Name of Client:UNICEF/SDR

No of Staff:Five

Address UNICEF/Addis Ababa

No of Staff-Months; Duration of Assignment: 45

State Date (Month/ Year): 1994-1997

Completion Date (Month/year Feb 1997

Approx. Value of Services: Birr 350,000

Name of Associated Consultants, If any: No of Months of Professional Staff Provided by Associated Consultants:

Name of Senior Staff (Project Director/ Coordinator, Team Leader) Involved and Functions Performed: Mesfin Shenkut: Chief Designer Shewarega Dibabu: E & M Engineer Tesfaye Zeleke: Water Supply Engineer Abebe G/Hiot: Hydrogeologist Kornisa Nigeri: Draftsman Teklu T/Yohanes: Surveyor Secretaries, drivers Narrative Description of Project: The design includes river intake at Wabe Shebelle River, water treatment system, low lift and high lifit pumping systems, rising main, elevated and ground tanks, distribution network. Description of Actual Services Provided By Your Staff: Feasibility study, detail design, and contract document preparation construction supervision

Firm’s Name: MS Consultancy

Page 27: MS Consultancyms-consultancy-et.com › pdf › project_1.pdf · MS Consultancy MS Consultancy MS Consultancy Project Profile No.2 : DIRE DAWA TERMINAL BOOSTING STATION and WELL DEVEL-OPMENT

MS Consultancy

MS Consultancy

MS Consultancy

MS ConsultancySTUDY OF DESIGN OF SCHOOL WATER AND SANITATION SYS-Project Profile No.26 : TEM

Assignment Name:Study and Design of School Water and Sanitation Systm

Country Ethiopia

Location within Country Addis Ababa

Professional Staff Provided By Your Firm/Entity (Profiles):Water Supply Engineer, Sanitary Engineer

Name of Client:Africare

No of Staff:Two

Address

Afreicare Ethiopia, Addis Ababa

No of Staff-Months; Duration of Assignment: 2

Starting Date Jan 15, 2005 Completed Feb 28 2005 Approx. Value of Services: Birr 30,000

No of Months of Professional Staff Provided by Associated Consultants: 2

Name of Senior Staff) Involved and Functions Performed: Mesfin Shenkut, Yihun Bekele

Narrative Description of Project: Study and design roof catchments and school sanitary facilities

Description of Actual Services Provided By Your Staff: As above

Firm’s Name: MS Consultancy