mrp

103
LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara JAIPRAKASH POWER VENTURES LIMITED Document No: LT-P0-00003 Progress Report No-11 JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 1 of 103 MONTHLY PROGRESS REPORT Progress Report No- 11 Sep 2010 JAYPEE NIGRIE SUPER THERMAL POWER PROJECT, (2 X 660 MW) STEAM TURBINE GENERATORS & AUXILIARIES PACKAGE OWNER: JAIPRAKASH POWER VENTURES LIMITED OWNER’S CONSULTANT: DEVELOPMENT CONSULTANTS PRIVATE LIMITED EPC CONTRACTOR: LARSEN & TOUBRO LIMITED L&T’S CONSULTANT: L&T-SARGENT & LUNDY LIMITED Issued for Information PS SP/VP VL 25/09/2010 Description Prepared Checked Approved Date

Upload: priyank-jadav

Post on 01-Dec-2014

511 views

Category:

Documents


1 download

TRANSCRIPT

Page 1: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 1 of 103

  

MONTHLY PROGRESS REPORT Progress Report No- 11

Sep 2010

 

 

 

 

 

 

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT, (2 X 660 MW)

STEAM TURBINE GENERATORS & AUXILIARIES PACKAGE OWNER: JAIPRAKASH POWER VENTURES LIMITED 

OWNER’S CONSULTANT:                                                                              

DEVELOPMENT CONSULTANTS PRIVATE LIMITED

EPC CONTRACTOR: LARSEN & TOUBRO LIMITED

   L&T’S CONSULTANT: L&T-SARGENT & LUNDY LIMITED 

Issued for Information PS SP/VP VL 25/09/2010

Description Prepared Checked Approved Date

Page 2: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 2 of 103

  

INDEX

SECTION CONTENTS PAGE NO.

1 Executive Summary 4

1.1 Project Details 5

1.2 Progress Statistic 6

1.3 Major Achievements During The Month 6-7

1.4 S Curves 8

1.4.1 Overall S Curve 9

1.4.2 Engineering S Curve 10

1.4.3 Procurement S Curve 11

1.4.4 S Curve Trend Analysis 12

1.5 Areas of Support Required 13-14

1.6 Calendar of Major Events 15

2 Detail Project Status 16

2.1 Engineering Status 17

2.1.1 Engineering Progress Statistics 17

2.1.2 Engineering Progress for The Month 17-21

2.1.3 Cumulative Major Engineering Completed Till Sep’10 ( Action 2) 21-25

2.1.4 Summary of Document Approval Status 26

2.1.5 Detail Figures of Engineering Drawings/Documents 27

2.1.6 List of Documents On Which Comments Awaited 28-31

2.2 Procurement Status 32

2.2.1 Procurement Progress Statistics 32

2.2.2 Procurement Progress for The Month 32

2.2.3 Vendor Progress for Major Packages 33-36

2.4 Milestone Status 37

2.4.1 L&T’s Plan # Unit 1 37

2.4.2 L&T’s Plan # Unit 2 38

Page 3: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 3 of 103

  

2.4.3 Client Obligation – Construction Phase # Unit 1 & 2 39

2.4.4 Client Obligation – Commissioning Phase # Unit 1 & 2 40

3 Activities Planned For Next Month 41

3.2 Engineering Plan 42-44

3.3 Procurement Plan 44

4 Annexure 45

4.1 Document Control Index 46-58

4.2 Procurement Status 59

4.2.1 Ordering Status 60-64

4.2.2 Manufacturing Status 65-68

4.3 Project WBS Structure, Weightage Principle and Basis of Progress Measurement 69-70

4.4 Primavera Schedule –Level 2 71-99

4.5 Project Photographs 100-103

Page 4: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 4 of 103

  

SECTION -1

EXECUTIVE SUMMARY

Page 5: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 5 of 103

  

1.1 Project Details: Project : 2 x 660 MW Steam Turbine Generators & Auxiliaries

Package for Jaypee Nigrie Super Thermal Power Project Owner : Jaiprakash Power Ventures Limited, New Delhi Owner’s Consultant: Development Consultants Private Limited, Kolkata EPC Contractor : Larsen & Toubro Limited, Scope of Work : Design, Engineering, Manufacture, Supply, Transportation,

Insurance, Erection, Testing, Commissioning, Performance Guarantee Tests for 2x660 MW Steam Turbine Generators &

Auxiliaries Project Key Dates : LOI/NTP: - July 23, 2009 Project Completion : Unit 1:- 45 months from NTP (April 22, 2013) Unit 2:- 51 months from NTP (Oct 22, 2013)

Page 6: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 6 of 103

  

1.2 Progress Statistics :

1.3 Major Achievements During The Month: 1.3.1 General :

1) Kickoff Meeting for Condensate Extraction Pump held with M/s KSB, India at Pune

1.3.2 Engineering:

A) Documents Approved:

1) Calculation for LP Bypass Steam System Sizing (Rev C) – Action 2 2) Crab drawing for 40/10T BFP Bay EOT Crane (Rev A) – Action 2 3) DCD for Piping Stress Analysis (Rev E) – Action 2

- With this Approval, All DCDs have been approved in Action 2

B) Documents Submitted:

1) Single Line Diagram for Generator Circuit (Rev C) 2) Schematic Diagram of Generator Circuit (Rev B) 3) Schematic Diagram of Generator Auxiliaries (Rev B) 4) Condenser Datasheet (Rev D)

Overall Project (100%)

S.No Description %

During the Month (%) Cumulative Till Sep (%)

Sch Sch Actual

Sch Sch Actual

(Early) (Late) (Early) (Late)

1 Engineering 10% 0.33 0.27 0.39 5.03 4.01 4.90

2 Procurement 75% 2.69 2.56 1.92 20.79 19.74 18.49

3 Construction 15% 0.21 0.09 0.06 0.51 0.29 0.06

Overall 100% 3.23 2.92 2.37 26.33 24.04 23.45

Page 7: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 7 of 103

  

5) Technical Datasheet for HP Closed Feed Water Heater (Rev D), LP Closed Feed Water Heaters (Rev C) and Duplex LP Closed Feed Water Heaters (Rev C) 8) GA Drawing for 115/15T x 31.20M Span TG Hall D/G EOT Crane (1&2) (Rev D) 9) Crab Sub Assembly for 115/15T x 31.20M Span TG Hall D/G EOT Crane (1&2) (Rev D)

1.3.3 Procurement:

1) Order Finalized on M/s Siemens , India for Condenser Polishing Unit 2) RFQ for Erection Services released

Critical Forthcoming Client Obligation Schedule Date Requested Date 1) Service bay readiness for EOT crane erection - 21-MAY-11 21-Apr-11 2) Clearance for insitu condenser - 22-SEP-11 22-July-11 3) Turbine building readiness for STG erection - 22-SEP-11 22-Aug-11

Note:- Requested date are given with reference to the JPVL’s suggestion for adopting insitu erection of condenser (Ref :- LTH-JPVLO-JNSTPP-T209001-10-L-0005, 18TH August 2010)

Page 8: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 8 of 103

  

1.4 S - CURVES

Page 9: mrp

Overall S‐Curve ‐ Jaypee Nigrie 2 X 660 MW Project 

90

95

100

55

60

65

70

75

80

85

90

95

100

Early Curve

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

Early Curve

Late Curve

Actual Progress

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

Jul/09

Aug

/09

Sep/09

Oct/09

Nov/09

Dec/09

Jan/10

Feb/10

Mar/10

Apr/10

May/10

Jun/10

Jul/10

Aug

/10

Sep/10

Oct/10

Nov/10

Dec/10

Jan/11

Feb/11

Mar/11

Apr/11

May/11

Jun/11

Jul/11

Aug

/11

Sep/11

Oct/11

Nov/11

Dec/11

Jan/12

Feb/12

Mar/12

Apr/12

May/12

Jun/12

Jul/12

Aug

/12

Sep/12

Oct/12

Nov/12

Dec/12

Jan/13

Feb/13

Mar/13

Apr/13

Early Curve

Late Curve

Actual Progress

0

5

10

15

20

25

30

35

40

45

50

55

60

65

70

75

80

85

90

95

100

Jul/09

Aug

/09

Sep/09

Oct/09

Nov/09

Dec/09

Jan/10

Feb/10

Mar/10

Apr/10

May/10

Jun/10

Jul/10

Aug

/10

Sep/10

Oct/10

Nov/10

Dec/10

Jan/11

Feb/11

Mar/11

Apr/11

May/11

Jun/11

Jul/11

Aug

/11

Sep/11

Oct/11

Nov/11

Dec/11

Jan/12

Feb/12

Mar/12

Apr/12

May/12

Jun/12

Jul/12

Aug

/12

Sep/12

Oct/12

Nov/12

Dec/12

Jan/13

Feb/13

Mar/13

Apr/13

Early Curve

Late Curve

Actual Progress

20007241
Stamp
20007241
Line
20007241
Rectangle
Page 10: mrp

Engineering S‐Curve ‐ Jaypee Nigrie 2 X 660 MW Project 

90

100

60

70

80

90

100

30

40

50

60

70

80

90

100

Early Schedule

Late Schedule

Actual Progress

0

10

20

30

40

50

60

70

80

90

100

Jul/09

Aug

/09

Sep/09

Oct/09

Nov/09

Dec/09

Jan/10

Feb/10

Mar/10

Apr/10

May/10

Jun/10

Jul/10

Aug

/10

Sep/10

Oct/10

Nov/10

Dec/10

Jan/11

Feb/11

Mar/11

Apr/11

May/11

Jun/11

Jul/11

Aug

/11

Sep/11

Oct/11

Nov/11

Dec/11

Jan/12

Feb/12

Mar/12

Apr/12

May/12

Jun/12

Jul/12

Aug

/12

Sep/12

Oct/12

Nov/12

Dec/12

Jan/13

Feb/13

Mar/13

Apr/13

Early Schedule

Late Schedule

Actual Progress

0

10

20

30

40

50

60

70

80

90

100

Jul/09

Aug

/09

Sep/09

Oct/09

Nov/09

Dec/09

Jan/10

Feb/10

Mar/10

Apr/10

May/10

Jun/10

Jul/10

Aug

/10

Sep/10

Oct/10

Nov/10

Dec/10

Jan/11

Feb/11

Mar/11

Apr/11

May/11

Jun/11

Jul/11

Aug

/11

Sep/11

Oct/11

Nov/11

Dec/11

Jan/12

Feb/12

Mar/12

Apr/12

May/12

Jun/12

Jul/12

Aug

/12

Sep/12

Oct/12

Nov/12

Dec/12

Jan/13

Feb/13

Mar/13

Apr/13

Early Schedule

Late Schedule

Actual Progress

20007241
Stamp
20007241
Rectangle
20007241
Line
Page 11: mrp

Procurement S‐Curve ‐ Jaypee Nigrie 2 X 660 MW Project 

90

100

60

70

80

90

100

30

40

50

60

70

80

90

100

Early CurveLate CurveActual PRogress

0

10

20

30

40

50

60

70

80

90

100

Jul/09

Aug

/09

Sep/09

Oct/09

Nov/09

Dec/09

Jan/10

Feb/10

Mar/10

Apr/10

May/10

Jun/10

Jul/10

Aug

/10

Sep/10

Oct/10

Nov/10

Dec/10

Jan/11

Feb/11

Mar/11

Apr/11

May/11

Jun/11

Jul/11

Aug

/11

Sep/11

Oct/11

Nov/11

Dec/11

Jan/12

Feb/12

Mar/12

Apr/12

May/12

Jun/12

Jul/12

Aug

/12

Sep/12

Oct/12

Nov/12

Dec/12

Jan/13

Feb/13

Mar/13

Apr/13

Early CurveLate CurveActual PRogress

0

10

20

30

40

50

60

70

80

90

100

Jul/09

Aug

/09

Sep/09

Oct/09

Nov/09

Dec/09

Jan/10

Feb/10

Mar/10

Apr/10

May/10

Jun/10

Jul/10

Aug

/10

Sep/10

Oct/10

Nov/10

Dec/10

Jan/11

Feb/11

Mar/11

Apr/11

May/11

Jun/11

Jul/11

Aug

/11

Sep/11

Oct/11

Nov/11

Dec/11

Jan/12

Feb/12

Mar/12

Apr/12

May/12

Jun/12

Jul/12

Aug

/12

Sep/12

Oct/12

Nov/12

Dec/12

Jan/13

Feb/13

Mar/13

Apr/13

Early CurveLate CurveActual PRogress

20007241
Stamp
20007241
Rectangle
20007241
Line
Page 12: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 12 of 93

  1.4.1 S Curve Trend Analysis:-

• Engineering As far as cumulative progress is concerned the actual progress is below early curve (well ahead of late curve) however monthly progress is ahead of scheduled progress for this period The cumulative actual progress is 49.04% against scheduled early (50.4%) and late basis (40.1%) of Engineering progress respectively Delay reasons are as follows:

Ordering of BFP and Drive Turbine for BFP had been delayed which is hampering downstream Engineering

There were delay in final issue of Deaerator datasheet because of ‘Deaerator sizing criteria’ finalization

There were delay in sending comments from client side on 1st submission of Datasheets & GAs of Condenser and Heaters which hampered downstream progress of drawing review

There is delay in receipt of data regarding TG Building by DCPL/JPVL (Refer Section 1.5) which is causing delay in 3D Modeling and LMTG Engineering

There were delay in sending comments from client side on various LMTG documents which caused delay in progress of drawing review

• Procurement

As far as cumulative progress is concerned the actual progress is below late curve The cumulative actual progress is 24.66% against scheduled early (27.7%) and late basis (26.3%) of procurement progress respectively

Delay reasons are as follows Ordering of BFP and Drive Turbine for BFP had been delayed which in turn

hampering downstream manufacturing progress There were delay in final issue of Datasheets & GAs of Deaerator,

Condenser and Heaters which is hampering their downstream product engineering ,sub ordering and other manufacturing activities

• Overall

During the reporting period curve is below early curve. The cumulative actual progress is 23.45% against scheduled early (26.3%) & late basis (24%) of overall progress respectively

Page 13: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 13 of 93

  

1.5 Areas of Support Required

S.No Area of Concern Constraint Impact on Schedule

Action Plan

Action By

Target Date

Remarks

Engineering :-

1 Layout of Cable Trays within TG Building

required from DCPL/JPVL

Impact on 3D modeling Delay in

Engineering &

Procurement

Progress

JPVL/

DCPL

Immediate

2 TG Building Beam .Brace bay sizes etc. Major impact on Pipe routing and

Piping Support Design

Delay in

Engineering &

Procurement

Progress

JPVL/

DCPL

Immediate Firm inputs required

3 Structure Frame drawings and Concrete

Layout Drawings of turbine deck design

Template Design Manufacturing

Progress

JPVL/

DCPL

Immediate Template's Manufacturing

lead time is 4-5 months

4 Approval on MHI/MELCO documents - Vendor Drawing review

- Downstream manufacturing

activities

(Refer section 2.1.6 for detail list)

- Delay in

Procurement

progress

DCPL Immediate 58 nos (A- 7,I -51 )

MHI/Melco documents

are pending for approval

for more than 30 days

Page 14: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 14 of 93

  

5 Approval on HED documents - Vendor Drawing review

- Downstream manufacturing

(Refer section 2.1.6 for detail list)

- Delay in

Procurement

progress

DCPL Immediate 11 nos (I -11 ) of HED

documents are pending

for approval for more than

30 days

6 Approval on LTSL documents

(Refer section 2.1.6 for detail list)

- Delay in

Detail

Engineering

DCPL Immediate 08 nos (I -8)of LTSL

documents are pending

for approval for more than

30 days

7 Approval on KSB (CEP) &,Flowserve (MD &

TD BFP) & AIL (EOT) documents

(Refer section 2.1.6 for detail list)

- Delay in

Detail

Engineering

DCPL Immediate -01 no (A-1) of KSB(CEP)

-05 nos ( A-3, I-2)

Flowserve(MD&TD BFP)

-13 nos (A-2 , I-11) AIL

(EOT) documents are

pending for approval for

more than 30 days

Page 15: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 15 of 103

  

Calendar of Major Events :

• Letter of Intent/ Notice To Proceed date : 23/07/2009

• LOI finalization meeting at Delhi : 23/07/2009

• Post LOI meeting with JPVL : 27/07/09-28/07/09

• Initial site visit : 29/07/2009

• Contract finalization meeting at JPVL , Delhi : 03/08/09-11/08/09

• Invoice submitted for first 5% advance payment : 05/08/2009

• Official contract signing & press meet at JPVL, Delhi : 12/08/2009

• First 5% Advance payment received : 26/08/2009

• Invoice submitted for second 5% advance payment : 03/09/2009

• L1 schedule approved : 11/09/2009

• Kick off meeting held at L&T Faridabad : 23/09/2009

• Layout finalization meeting held at DCPL, Kolkata : 21/10/09-22/10/09

• Contract review meeting at L&T, Vadodara : 05/11/2009

• Contract Coordination Procedure finalized @ JPVL,Noida : 01/12/2009

• Meeting regarding Project Insurance at JPVL, Noida : 11/12/2009

• Technical review meeting with JPVL, DCPL at L&T Faridabad : 07/01/10-08/01/10

• L2 schedule finalized on : 21/01/10

• Technical review meeting with JPVL/DCPL at DCPL, Kolkata : 27/01/10-28/01/10

• Technical Co-ordination meeting with JPVL/DCPL : 06/04/10-08/04/10 at L&T Baroda

• Jaypee Nigrie Site Visit by L&T personnel : 19/04/10-23/04/10

• PAC issued from client : 01/05/10

• TCM held with JPVL/DCPL at L&T Faridabad : 15/06/10-18/06/10

• Kick off Meeting for EOT crane with M/s Anupam Cranes, : 01/7/10 India

• Kick off Meeting for MDBFP & TDBFP with M/s Flowserve : 28/07/10 – 29/07/10

• TCM held & 3D Model Review Completed with JPVL / DCPL : 05/08/10 – 06/08/10 at L&T, Vadodara

• Hazira Manufacturing Location Visit by JPVL senior official : 07/08/10

• Kick off Meeting for Condensate Extraction Pump with M/s KSB held at Pune : 14/Sep/10

Page 16: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 16 of 103

  

SECTION-2

DETAIL PROJECT STATUS

PROGRESS WEIGHTAGE

10%

75%

15%

Engineering    ‐10%

Procurement  ‐75%

Construction   ‐15%

Page 17: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 17 of 103

  

2.1 ENGINEERING STATUS:

2.1.1 Engineering Progress Statistics

Engineering (100%) During The Month (%) Cumulative Till Sep’10 (%)

Early Sch (%) Late Sch. (%) Actual (%) Early Sch (%) Late Sch. (%) Actual (%)

3.3 2.6 3.9 50.4 40.1 49

2.1.2 Engineering Progress for the Month:-

A) Documents Approved:

Sl No.

Document No. Description Rev No

Action Cat.

LTSL Drawings/Documents

1.0 DCD

LTSL-M0-00115 DCD - Piping Stress Analysis E 2 A

2.0 Calculation

LTSL-M0-00305 Calculation for LP Bypass Steam System Pipe Sizing C 2 I

3.0 List

LTSL-M1-00701 List -Pipeline B 6

LTSL-M1-00702 List-Valve B 6

LTSL-M1-00703 Specialty Item List A 6

LMTG Drawings/Documents

1.0 Turbine

LMTG-M0-01004 Oil Piping Diagram B 3 A

LMTG-M0-01017 Equipment List for Steam Turbine B 6 I

Page 18: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 18 of 103

  

2.0 Generator

LMTG-E0-02005 Electrical Load List C 6 I

LMTG-E0-02315 Turbine Generator Terminal & CT Assembly C 6 I

LMTG-E0-02102 Specification & Schematic Diagram of AVR Cubicle A 6 A

LMTG-E0-02311 Turbine Generator H2 Gas Dryer Outline A 6 I

LMTG-E0-02313 Turbine Generator Vapour Extractor Outline A 6 I

LMTG-E0-02314 Turbine Generator Loop Seal Tank Outline A 6 I

AIL Drawings / Documents

1.0 EOT

AIL-M0-03255 Crab Drawing for 40/10T BFP Bay EOT Crane A 2 I

AIL-M0-03215 Electrical Equipment Layout in Cabin for 115/15 T TG Hall EOT Crane B 6 I

AIL-E0-03272-76 GA Drawing of Control panel for 40/10T BFP Bay EOT Crane A 6 I

KSB Drawings / Documents

1.0 CEP

KSB-M0-03504 P&ID for Condensate Extraction Pump A 3 A

B) Documents Submitted During Reporting Period:

Sl No Document No Description Rev No

Cat.

LTSL Drawings/Documents

1.0 P&ID

1) LTSL-M1-00209 P&ID for Circulating Water System 1 (IFC) I

HED Drawings/Documents

1.0 Condenser

Page 19: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 19 of 103

  

1) LT-M0-03000-DS Condenser Datasheet D A

2) LT-M0-03025 Painting Scheme for Condenser A A

2.0 Deaerator

1) LT-M0-03100-DS Data Sheet for Deaerator F A

2) LT-M0-03117 Painting Scheme for Deaerator A A

3.0 Heaters

1) LT-M0-03057 Technical Datasheet for HP closed Feed Water Heaters D A

2) LT-M0-03070 Technical Datasheet for LP closed Feed Water Heaters C A

3) LT-M0-03079 Technical Datasheet for Duplex LP closed Feed Water Heaters C A

4) LT-M0-03094 Painting Scheme for Feed Water Heaters A A

LMTG Drawings/Documents

1.0 Turbine

1) LMTG-I0-01302 Drive List for TCS and TPS A I

2) LMTG-M0-01013 Utility List for Steam Turbine E I

3) LMTG-M0-01014 Electrical Load List for Steam turbine F I

2.0 Generator

1) LMTG-E0-02333 Turbine Generator Foundation Embedded Materials layout (1/4) B I

2) LMTG-E0-02005 Electrical Load List C I

3) LMTG-E0-02011 Painting Color List (MELCO Portion) C I

4) LMTG-E0-02315 Turbine Generator terminal and CT assembly C I

5) LMTG-E0-02323-02325

Turbine Generator Auxiliary Equipment Wiring Diagram (3 sheets) B I

6) LMTG-E0-02326 Turbine Generator Foundation Conduit arrangement A I

7) LMTG-E0-02330-02331 Turbine Generator Method of Mounting ( 2 sheets) B I

8) LMTG-E0-02361 Turbine Generator grout retainer arrangement A I

9) LMTG-E0-02362 Embedded plate arrangement for neutral cover support A I

Page 20: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 20 of 103

  

10) LMTG-E0-02007 Single Line diagram Generator Circuit C A

11) LMTG-E0-02016 Outline drawing of generator control & synchronization panel C A

12) LMTG-E0-02017 Outline drawing of generator Auxiliary panel C A

13) LMTG-E0-02023 Assembly drawing of Generator bushing CT terminal box C I

14) LMTG-E0-02031 Specification for Motor Local control panel A I

15) LMTG-E0-02036 Outline drawing of Direct Current Motor for ST Jacking oil pump (B) B I

16) LMTG-E0-02034 Outline drawing of Direct Current Motor for ST Emergency oil pump B I

17) LMTG-E0-02302 Turbine Generator H2 & CO2 gas diagram B A

18) LMTG-E0-02601 Outline dimensions and unit datasheet of Unit 1 & 2 DC Motor starter B A

19) LMTG-E0-02024 Schematic diagram of generator circuit B A

20) LMTG-E0-02025 Schematic diagram of generator auxiliaries B A

21) LMTG-E0-02602 Outline dimensions and unit datasheet of Unit 1 & 2 distribution board B I

22) LMTG-E0-02035 Outline dimension of three phase induction motor for ST turning oil pump B I

23) LMTG-E0-02807 Outline dimension of AC Motor for main oil tank vapor extractor fan(A) C I

24) LMTG-E0-02808 Outline dimension of AC Motor for main oil tank vapor extractor fan(B) C I

25) LMTG-E0-02809 Outline dimension of AC Motor for EH oil pump(A) B I

26) LMTG-E0-02810 Outline dimension of AC Motor for EH oil pump(B) B I

27) LMTG-E0-02605 General specification for unit 1& 2 distribution board B I

28) LMTG-E0-02801 Outline dimension of AC Motor for Turning gear D I

29) LMTG-E0-02802 Outline dimension of AC Motor for Auxiliary oil pump D I

30) LMTG-E0-02803 Outline dimension of AC Motor for Jacking oil pump(A) D I

31) LMTG-E0-02804 Outline dimension of AC Motor for Main oil tank oil transfer pump C I

32) LMTG-E0-02805 Outline dimension of AC Motor for storage tank oil transfer pump C I

33) LMTG-E0-02806 Outline dimension of AC Motor for polishing pump C I

34) LMTG-E0-02807 Outline dimension of AC Motor for main oil tank vapor extractor fan(A) C I

35) LMTG-E0-02808 Outline dimension of AC Motor for main oil tank vapor extractor fan(B) C I

Page 21: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 21 of 103

  

36) LMTG-E0-02809 Outline dimension of AC Motor for EH oil pump(A) B I

37) LMTG-E0-02810 Outline dimension of AC Motor for EH oil pump(B) B I

38) LMTG-E0-02605 General specification for unit 1& 2 distribution board B I

Other Vendor’s Drawings/Documents

1.0 Anupam Industries Limited - EOT Crane

1) AIL-M0-03257 DSL System arrangement for 40/10T x 9M span BFP Bay D/G EOT Crane A I

2) AIL-M0-03206 Gantry rail installation for 115/15T TG Hall EOT Crane B I

3) AIL-M0-03208 115T Main Hook block assembly for TG Hall EOT Crane B I

4) AIL-M0-03209 15T Aux. Hook block assembly for TG Hall EOT Crane B I

5) AIL-M0-03210 LT drive Wheel Assembly for TG Hall EOT Crane B I

6) AIL-M0-03211 LT Idle Wheel Assembly for TG Hall EOT Crane B I

7) AIL-M0-03212 CT drive Wheel Assembly for TG Hall EOT Crane B I

8) AIL-M0-03213 CT Idle Wheel Assembly for TG Hall EOT Crane B I

9) AIL-M0-03214 LT Machinery Assembly for TG Hall EOT Crane B I

10) AIL-M0-03230 Typical Arrangement for Centralized Lubrication with Hand pump for TG Hall EOT Crane B I

11) AIL-M0-03281 Structure Calculation for 40/10T x9M span BFP Bay EOT Crane B I

12) AIL-M0-03204 GA Drawing for 115/15T x 31.20M span TG Hall D/G EOT Crane (Crane no.-1 & 2) B I

13) AIL-M0-03205 Crab Sub Assembly for 115/15T x 31.20M span TG Hall D/G EOT Crane (Crane no.-1 & 2) B I

2.1.3 Cumulative Major Engineering Completed Till Sep’10 (Action-2)

SL No. Drawing/Document No Description

LTSL Drawings/Documents

1.0 Design Criteria Documents

1) LTSL-M0-00102 DCD - Feed Water System

2) LTSL-M0-00101 DCD - Condensate System

Page 22: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 22 of 103

  

3) LTSL-M0-00105 DCD - LP Bypass Steam System

4) LTSL-M0-00103 DCD - Extraction Steam System

5) LTSL-M0-00104 DCD - Heaters, Vents, & Drains System

6) LTSL-M0-00107 DCD - Auxiliary Steam System

7) LTSL-M0-00109 DCD - Circulating Water System

8) LTSL-M0-00113 DCD - Service Water Distribution System

9) LTSL-E0-00100 DCD - Electrical System

10) LTSL-I0-00100 DCD - C&I System

11) LTSL-M0-00108 DCD - Condenser Air Removal System

12) LTSL-M0-00110 DCD - Closed Cooling Water System

13) LTSL-M0-00111 DCD - DM Water Distribution System

14) LTSL-M0-00112 DCD – Instrument Air / Service Air Distribution System

15) LTSL-I0-00100 DCD-Condensate Polishing Unit

16) LTSL-M0-00115 DCD-Piping Stress Analysis

2.0 Calculations

1) LTSL-M0-00333 Calc - Feed Water Pump Sizing

2) LTSL-M0-00332 Calc - Condensate Extraction Pump Sizing

3) LTSL-M0-00302 Calc - Feed Water System Pipe Sizing

4) LTSL-M0-00304 Calc - Heater Drain & Vent Pipe Sizing

5) LTSL-M0-00308 Calc - Condenser Air Removal System

6) LTSL-M0-00309 Calc - Circulating Water System Pipe Sizing

7) LTSL-M0-00311 Calc - DM Water distribution system Pipe Sizing

8) LTSL-M0-00301 Calc - Condensate System Pipe Sizing

9) LTSL-M0-00305 Calc – LP Bypass Steam System Pipe Sizing

3.0 P&IDs

1) LTSL-M1-00200 P&ID - Index, Legends & Symbols

Page 23: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 23 of 103

  

2) LTSL-M1-00208 P&ID - Condenser Air Removal System

3) LTSL-M1-00205 P&ID - LP Bypass steam System

4) LTSL-M1-00207 P&ID - Auxiliary Steam System

5) LTSL-M1-00201 P&ID-Condensate System

6) LTSL-M1-00202 P&ID - Feed Water System

7) LTSL-M1-00203 P&ID - Extraction Steam System

8) LTSL-M1-00204 P&ID - Heaters, Vents, & Drains System

9) LTSL-M1-00209 P&ID - Circulating Water System

10) LTSL-M1-00211 P&ID - DM Water Distribution System

11) LTSL-M1-00213 P&ID - Service Water Distribution System

12) LTSL-M1-00210 P&ID - Closed Cooling Water System

13) LTSL-M1-00212 P&ID - Instrument Air / Service Air Distribution System

LMTG Drawings/Documents

1.0 Turbine

1) LMTG-Q0-01000 QAP - Steam Turbine

2.0 Generator

1) LMTG-E0-02016 Outline Drawing of Generator Control & Synchronization Panel

2) LMTG-E0-02017 Outline Drawing of Generator Auxiliary Panel

HED Drawings/Documents

1.0 Heaters

1) LT-M0-03057 Technical Datasheet for HPH-8A/8B,7A/7B,6A/6B

2) LT-M0-03070 Technical Datasheet for LPH-4,LPH-3,

3) LT-M0-03079 Technical Datasheet for Duplex Heaters

4) LT-QO-00001 QAP - HP Heater

5) LT-QO-03002 QAP - LP Heater

2.0 Condenser

Page 24: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 24 of 103

  

1) LT-M0-03000-DS Condenser Datasheet

2) LT-QO-03000 QAP - Condenser

3.0 Deareator

1) LT-QO-03003 QAP - Deaerator

Other Vendor’s Drawings/Documents

1.0 Anupam Industries Limited - EOT Crane

1) AIL-M0-03255 Crab drawing for 40/10T BFP Bay EOT Crane

QAP Drawings/Documents

1.0 QAP

1) LT-QO-00002 QAP - Boiler Feed Water Pump & Booster Pump

2) LT-Q0-00003 QAP - BFP Drive Turbine

3) LT-QO-00004 QAP - Condensate Extraction Pump

4) LT-Q0-00011 QAP - HT Motor

5) LT-QO-00001 QAP - HP Heater

6) LT-QO-03002 QAP - LP Heater

7) LT-QO-03003 QAP - Deaerator

8) LT-QO-03000 QAP - Condenser

9) LT-Q0-00009 QAP - Condensate Polishing Unit

10) LT-QO-00012 QAP - Vacuum Pump

11) LT-QO-00013 QAP - DMCW Pump

12) LT-QO-00014 QAP - Plate Heat Exchanger

13) LT-Q0-00010 QAP - EOT Crane

14) LT-Q0-00020 QAP - Online tube Cleaning System

15) LT-Q0-00019 QAP - Vibration Monitoring System

16) LT-Q0-00021 QAP - Control Valve

17) LT-Q0-00015 QAP - LP Bypass Valve

Page 25: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 25 of 103

  

18) LT-Q0-00016 QAP - HP Heater three way Bypass Valve

19) LT-Q0-00018 QAP - Butterfly Valve

20) LT-Q0-00017 QAP - Rubber Expansion Joint

21) LT-Q0-00022 QAP - Metallic Expansion Joint

22) LMTG-Q0-01000 QAP - Steam Turbine

23) LMTG-Q0-00021 QAP-Control Valves

Page 26: mrp

JOB NO: T209001 PAGE: - 26 of 103

SR. NO.GENERATING AGENCY OF 

DOCUMENTSCAT.

TOTAL NO. OF DRG/DOC

SUBMITTED TO DCPL

APP. APP. CAT. 4PENDING FROM 

DCPL

APP. 27 23 23 0 0INFO. 98 38 23 9 6TOTAL 125 61 46 9 6APP. 14 8 3 5 0INFO. 71 22 18 0 4TOTAL 85 30 21 5 4APP. 68 42 17 18 7INFO. 116 60 26 10 24TOTAL 184 102 43 28 31APP. 15 13 10 1 2INFO. 61 27 2 22 3TOTAL 76 40 12 23 5APP. 2 2 0 2 0INFO. 85 60 11 5 44TOTAL 87 62 11 7 44APP. 5 5 0 0 5INFO. 149 2 0 0 2TOTAL 154 7 0 0 7APP. 2 2 0 0 2INFO. 46 1 0 0 1TOTAL 48 3 0 0 3

557 295 133 72 90

APP. 24 24 23 1 0INFO. 0 0 0 0 0TOTAL 24 24 23 1 0

1 LTSL Generated Document

LARSEN & TOUBRO LIMITED POWER PROJECT MANAGEMENT SERVICES, VADODARA

2x660 MW STEAM TURBINE GENERATOR & AUXILIARIES

DOCUMENT APPROVAL STATUS

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

DOC NO:- LT-P0-00003

GRAND TOTAL  =

8 QAP

2 MHI (Steam Turbine)

3 MELCO (Generator)

4 HED (Condenser, Deaerator & Hetars)

5 ANUPAM (EOT Cranes)

6 FLOWSERVE (Boiler Feed Pump)

7 KSB (Condensate Extractionm Pump)

Page 27: mrp

AA 13 0 0 0 13 13 8 13 0 0 0 0I 3 0 1 0 3 3 1 3 0 0 0 0

Total 16 0 1 0 16 16 9 16 0 0 0 0A 2 0 0 0 2 2 0 2 0 0 0 0I 18 0 4 0 17 11 0 5 1 6 0 2

Total 20 0 4 0 19 13 0 7 1 6 0 2A 7 0 2 0 7 7 2 7 0 0 0 0I 6 0 0 1 6 6 3 4 1 1 0 0

Total 13 0 2 1 13 13 5 11 1 1 0 0A 0 0 0 0 0 0 0 0 0 0 0 0I 15 0 2 0 10 5 0 0 0 2 0 7

Total 15 0 2 0 10 5 0 0 0 2 0 7A 5 0 0 0 1 1 0 0 1 0 0 0I 56 1 0 0 2 0 0 0 0 0 0 0

Total 61 1 0 0 3 1 0 0 1 0 0 0A 27 0 2 0 23 23 10 22 1 0 0 0I 98 1 7 1 38 25 4 12 2 9 0 9

Total 125 1 9 1 61 48 14 34 3 9 0 9C

A 14 0 0 0 8 7 0 1 2 5 0 0I 71 4 4 0 22 11 0 0 5 0 0 13

Total 85 4 4 0 30 18 0 1 7 5 0 13A 68 0 6 0 42 27 0 2 1 18 1 14I 116 8 29 0 60 27 0 0 5 10 1 21

Total 184 8 35 0 102 54 0 2 6 28 2 35A 15 3 6 0 13 9 0 8 2 1 0 0I 61 1 4 0 27 8 0 0 0 22 0 2

Total 76 4 10 0 40 17 0 8 2 23 0 2A 2 1 1 0 2 0 0 0 0 2 0 0I 85 20 19 0 60 0 0 0 2 5 20 9

Total 87 0 20 0 62 0 0 0 2 7 20 9A 5 4 0 0 5 0 0 0 0 0 2 0I 149 2 0 0 2 0 0 0 0 0 0 0

Total 154 0 0 0 7 0 0 0 0 0 2 0A 2 0 0 0 2 0 0 0 0 0 0 0I 46 0 0 0 1 0 0 0 0 0 0 0

Total 48 0 0 0 3 0 0 0 0 0 0 0A 106 8 13 0 72 43 0 11 5 26 3 14I 528 35 56 0 172 46 0 0 12 37 21 45

Total 634 43 69 0 244 89 0 11 17 63 24 59A 133 8 15 0 95 66 10 33 6 26 3 14I 626 36 63 1 210 71 4 12 14 46 21 54

Total 759 44 78 1 305 137 14 45 20 72 24 68

B A 24 0 0 0 24 24 0 0 0 0 0 0I 0 0 0 0 0 0 0 0 0 0 0 0

Total 24 0 0 0 24 24 0 0 0 0 0 0

Note :- For Detail Enginerring list refer annexure 5.1 'Overall Engineering Status'

LARSEN & TOUBRO LIMITEDPower Project Mangement Services, Vadodara

JAIPRAKASH POWER VENTURESLIMITED

Document No: - LT-P0-00003Progress Report No: - 11

2 X 660 MW Steam Turbine Generator & Auxiliaries Page No- 27 of 103

3.1.3 SUMMARY STATUS OF ENGINEERING DRAWINGS /DOCUMENTS

S.NO DOCUMENT NAMEDOCUMENT CATEGORY

(A/I)

TOTAL NO OF DOCUMENTS

DRAWINGS RELEASED CLIENT'S APPROVAL STATUS REMARKSDURING THE MONTH CUMULATIVE

FINAL SUB CODE2 CODE3 CODE4 CODE5 CODE6

LTSL DOCUMENTS

1.1 Design Criteria Documents

1.2 Calculation

1st SUB >1st SUB FINAL SUB 1st SUB >1st SUB

1.3 P&IDs

1.4 Lists

1.5 Other LTSL Documents

4 ANUPAM (EOT Cranes)

Subtotal of Vendor Drawing Reviews

3 HED (Condenser, Deaerator & Heaters)

Subtotal LTSL

MAJOR VENDOR DRG REVIEWS

1 MHI (Steam Turbine)

2 MELCO (Generator)

L&T QUALITY DOCUMENTS

1 QAP

5 FLOWSERVE (Boiler Feed Pump)

6 KSB (Condensate Extraction Pump)

Grand Total

Page 28: mrp

Page No:- 28 of 103

Sr No. Drawing No Description Rev No Category L&T DTN No. DTN Date

1 LMTG-P1-01003 Heat Balance Diagram D A DT0153 1-Jun-10

2 LMTG-M0-01020 Control and Lubricating oil System Diagram B A DT0153 1-Jun-10

3 LMTG-E0-02018 Outline Drawing of generator Seal Oil Control Panel B A DT0156 4-Jun-10

4 LMTG-E0-02019Outline Drawing of Generator Stator Coil Cooling Water Control Panel

B A DT0155 4-Jun-10

5 LMTG-E0-02021 Arrengement Drawing of Generator Seal Oil Control Panel B A DT0155 4-Jun-10

6 LMTG-E0-02022Arrengement Drawing of Generator Stator Coil Cooling Water Control Panel

B A DT0155 4-Jun-10

7 LMTG-E0-02014 LOGIC DIAGRAM OF GENERATOR AUXILIARIES A A DT096 16-Mar-10

8 AIL-M0-03201 Data sheet of 115/15 T TG Hall EOT Crane (Double Girder) C A DT0231 17-Aug-10

9 AIL-M0-03251 Data sheet of 40/10 T BFP Bay EOT Crane (Double Girder) A A DT0231 17-Aug-10

10 FPD-M0-03311 Complete Grout Pump Datasheet B A 240 23-Aug-10

11 FPD-M0-03466 Motor Sizing Calculation B A 240 23-Aug-10

12 FMD-M0-03311 Complete Grout Pump Datasheet B A 240 23-Aug-10

13 KSB-M0-03503 CEP GA drawing common for pump & motor access A A DT-0205 23-Jul-10

Information Category

Sr No. Drawing No Description Rev No Category L&T DTN No. DTN Date

1 LTSL-M0-00310 Calculation for Closed Cooling Water System Pipe Sizing A I DT0136 23-Apr-10

2 LTSL-E0-00301 24 V DC Battery & Battery Charger Sizing calculation A I DT0128 23-Apr-10

3 LTSL-M1-00700 List - Equipment 0 I DT0206 23-Jul-10

4 LTSL-I1-00700 List - Instrument A I DT0208 23-Jul-10

5 LTSL-M0-00313 Calculation for Service Water Distribution System Pipe Sizing C I DT0232 13-Aug-10

6 LTSL-M1-00704 Interface/terminal point list B I DT0236 23-Apr-10

7 LTSL-M0-00303 Calculation for Extraction Steam System Pipe Sizing B I DT0219 11-Aug-10

8 LTSL-M0-00335 Calculation for Closed Cooling Water Pump Sizing B I DT0219 11-Aug-10

9 LT-M0-03059 Complete Mechanical Design Calculation for HPH-8A/8B C I DT0180 14-Jul-10

10 LT-M0-03063 Complete Mechanical Design Calculation for HPH-7A/7B B I DT0180 14-Jul-10

11 LT-M0-03067 Complete Mechanical Design Calculation for HPH-6A/6B B I DT0181 14-Jul-10

12 LT-M0-03072 Complete Mechanical Design Calculation for LP4 B I DT0181 14-Jul-10

13 LT-M0-03076 Complete Mechanical Design Calculation for LP3 B I DT0179 14-Jul-10

14 LT-M0-03081 Complete Mechanical Design Calculation for Duple Heater B I DT0179 14-Jul-10

2.1.6 List of Documents On Which Comments Awaited From Client For More Than 30 Days

Approval Category

LARSEN & TOUBRO LIMITEDPower Project Management Services,Vadodara.

JAIPRAKASH POWER VENTURESLIMITED

Document No:- LT-P0-00003Progress Report No: - 11Annexure No: -

JOB NO: - T209001 2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES

Page 29: mrp

Page No:- 29 of 103

2.1.6 List of Documents On Which Comments Awaited From Client For More Than 30 Days

LARSEN & TOUBRO LIMITEDPower Project Management Services,Vadodara.

JAIPRAKASH POWER VENTURESLIMITED

Document No:- LT-P0-00003Progress Report No: - 11Annexure No: -

JOB NO: - T209001 2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES

15 LT-M0-03003 Loading Data for Condenser 0 I DT0143 4-Jan-10

16 LT-M0-03016 Procedure for Surface preparation & Painting C I DT-0237 20-Aug-10

17 LT-M0-03018 Hydrostatic Test Procedure B I DT-0237 20-Aug-10

18 LT-M0-03022 Post Weld Heat Treatment Procedure B I DT-0237 20-Aug-10

19 LT-M0-03015 WPS & PQR A I DT-0237 20-Aug-10

20 LMTG-P0-01025 Steam Purity Recommendation A I DT0090 22-Feb-10

21 LMTG-M0-01016 Valve List A I DT0121 16-Apr-10

22 LMTG-E0-02316 Turbine Generator CT Terminal Box & Coduits Arrengement A I DT0201 20-Jul-10

23 LMTG-E0-02338 Turbine Generator Exhaust Piping (1 / 2) A I DT0201 20-Jul-10

24 LMTG-E0-02339 Turbine Generator Exhaust Piping (2 / 2) A I DT0201 20-Jul-10

25 LMTG-E0-02340 Turbine Generator Cooling Water Piping (1 / 5) A I DT0201 20-Jul-10

26 LMTG-E0-02341 Turbine Generator Cooling Water Piping (2 / 5) A I DT0201 20-Jul-10

27 LMTG-E0-02342 Turbine Generator Cooling Water Piping (3 / 5) A I DT0201 20-Jul-10

28 LMTG-E0-02343 Turbine Generator Cooling Water Piping (4 / 5) A I DT0201 20-Jul-10

29 LMTG-E0-02344 Turbine Generator Cooling Water Piping (5 / 5) A I DT0201 20-Jul-10

30 LMTG-E0-02345 Turbine Generator Gas & Seal Oil Piping (1 / 10) A I DT0201 20-Jul-10

31 LMTG-E0-02346 Turbine Generator Gas & Seal Oil Piping (2 / 10) A I DT0201 20-Jul-10

32 LMTG-E0-02347 Turbine Generator Gas & Seal Oil Piping (3 / 10) A I DT0201 20-Jul-10

33 LMTG-E0-02348 Turbine Generator Gas & Seal Oil Piping (4 / 10) A I DT0201 20-Jul-10

34 LMTG-E0-02349 Turbine Generator Gas & Seal Oil Piping (5 / 10) A I DT0201 20-Jul-10

35 LMTG-E0-02350 Turbine Generator Gas & Seal Oil Piping (6 / 10) A I DT0201 20-Jul-10

36 LMTG-E0-02351 Turbine Generator Gas & Seal Oil Piping (7 / 10) A I DT0201 20-Jul-10

37 LMTG-E0-02352 Turbine Generator Gas & Seal Oil Piping (8 / 10) A I DT0201 20-Jul-10

38 LMTG-E0-02353 Turbine Generator Gas & Seal Oil Piping (9 / 10) A I DT0201 20-Jul-10

39 LMTG-E0-02354 Turbine Generator Gas & Seal Oil Piping (10 / 10) A I DT0201 20-Jul-10

40 LMTG-E0-02355 Turbine Generator Gas Feed Piping (1 / 2) A I DT0201 20-Jul-10

41 LMTG-E0-02356 Turbine Generator Gas Feed Piping (2 / 2) A I DT0201 20-Jul-10

42 LMTG-P0-01026 Performance Curves of STG B I DT0195 19-Jul-10

43 LMTG-E0-02004 Utility List B I DT0154 1-Jun-10

44 LMTG-E0-02012 Painting Procedure (MELCO PORTION) B I DT0159 8-Jun-10

45 LMTG-E0-02327 Turbine Generator Foundation Bolt Arrengement I DT0096 16-Mar-10

46 LMTG-M0-01022 Plan for Arrangement of Foundation Bolt C I DT0166 21-Jun-10

Page 30: mrp

Page No:- 30 of 103

2.1.6 List of Documents On Which Comments Awaited From Client For More Than 30 Days

LARSEN & TOUBRO LIMITEDPower Project Management Services,Vadodara.

JAIPRAKASH POWER VENTURESLIMITED

Document No:- LT-P0-00003Progress Report No: - 11Annexure No: -

JOB NO: - T209001 2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES

47 LMTG-M0-01023 Plan for Arrangement of Anchor Bolt C I DT0166 21-Jun-10

48 LMTG-M0-01019 Turbine Generator Outline E I DT0167 24-Jun-10

49 LMTG-M0-01008 TG foundation design criteria D I DT0167 24-Jun-10

50 LMTG-P0-01036 System description for steam turbine A I DT0171 2-Jul-10

51 LMTG-I0-01308 Instrument List For Steam Turbine A I DT0213 30-Jul-10

52 LMTG-M0-01210 Embedded Metal Plan Around Storage Tank R0 I DT0215 2-Aug-10

53 LMTG-M0-01209 Foundation Of Lube Oil Storage Tank R0 I DT0215 2-Aug-10

54 LMTG-M0-01206 Details Of Embedded Materials 3 I DT0215 2-Aug-10

55 LMTG-M0-01201 Oil Piping And Equipment Arrangement 4 I DT0217 7-Aug-10

56 LMTG-M0-01202 Foundation Of Lubricating Oil Equipment R2 I DT0217 7-Aug-10

57 LMTG-M0-01205 Foundation Embedded Material For Piping 2 I DT0217 7-Aug-10

58 LMTG-M0-01207 Embedded Metal Plan Around Lube Oil Purifier R2 I DT0217 7-Aug-10

59 LMTG-E0-02326 Turbine Generator Foundation Embedded Conduit Layout

A I DT0124 20-Apr-10

60 LMTG-E0-02038 Electrical Equipment General Arrangment (El.+0.00M)

C I DT0177 13-Jul-10

61 LMTG-E0-02039 Electrical Equipment General Arrangment (El.+9.00M)

C I DT0177 13-Jul-10

62 LMTG-E0-02040 Lectrical Equipment General Arrangment (El.+17.00M)

C I DT0177 13-Jul-10

63 LMTG-E0-02357 Plan Of Scaffolding For Turbine Generator Maintenance

A I DT0201 20-Jul-10

64 LMTG-E0-02332 Turbine Generator Hydrogen Gas Temperature Control Valve Outline A I DT0201 26-Jul-10

65 LMTG-E0-02302 Turbine Generator H2&Co2 Gas Diagram A I DT0216 7-Aug-10

66 LMTG-Q0-02202 Shop Test And Inspection Procedure For Control Panels

A I DT0218 9-Aug-10

67 LMTG-Q0-02203 Shop Test And Inspection Procedure For Control Panels

A I DT0218 9-Aug-10

68 LMTG-E0-02309 Turbine Generator Co2 Gas Vaporizer Outline B I DT0224 12-Aug-10

69 LMTG-E0-02310Turbine Generator H2 Gas Pressure/Purity Monitoring Unit Outline

B I DT0224 12-Aug-10

70 LMTG-E0-02312 Turbine Generator Water Detector Outline B I DT0224 12-Aug-10

71 AIL-M0-03231 Structural calculations for 115/15 T TG Hall crane A I DT0231 17-Aug-10

72 AIL-M0-03253 Mechanism Sizing Calculation for 40/10 T BFP Bay EOT cranes A I DT0228 13-Aug-10

73 AIL-M0-03256 Gantry Rail installation for 40/10 T BFP Bay EOT cranes A I DT0241 23-Aug-10

74 AIL-M0-03258 40T main hook block assembly A I DT0241 23-Aug-10

75 AIL-M0-03259 10 T Aux Hook Block Assembly A I DT0241 23-Aug-10

76 AIL-M0-03260 LT Drive wheel assembly A I DT0241 23-Aug-10

77 AIL-M0-03261 LT idle wheel assembly A I DT0241 23-Aug-10

78 AIL-M0-03262 CT Drive wheel assembly A I DT0241 23-Aug-10

79 AIL-M0-03263 CT idle wheel assembly A I DT0241 23-Aug-10

Page 31: mrp

Page No:- 31 of 103

2.1.6 List of Documents On Which Comments Awaited From Client For More Than 30 Days

LARSEN & TOUBRO LIMITEDPower Project Management Services,Vadodara.

JAIPRAKASH POWER VENTURESLIMITED

Document No:- LT-P0-00003Progress Report No: - 11Annexure No: -

JOB NO: - T209001 2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES

80 AIL-M0-03264 Long travel Machinery Assembly for 40/10 T TGHall EOT crane A I DT0241 23-Aug-10

81 AIL-M0-03280 Crane lubrication A I DT0241 23-Aug-10

82 FPD-C0-03305 Complete Grout General Arrangement A I 235 23-Aug-10

83 FMD-M0-03372 Complete Grout General Arrangement A I 235 23-Aug-10

Page 32: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 32 of 103

  

2.2 Procurement Status:

2.2.1 Procurement Progress Statistics:

Procurement (100%)

During The Month (%) Cumulative Till Sep 10 (%)

Early Sch (%) Late Sch. (%) Actual (%) Early Sch (%) Late Sch. (%) Actual (%)

3.6 3.4 2.6 27.7 26.3 24.7

2.2.2 Procurement Progress for the Month:

Order Finalized for CPU on M/s Siemens,India Enquires Floated for the following items

a) Erection Services b) LP Valves

Offers Received for the following items: a) Butterfly Valve

Bid Evaluation of the following items are in progress a) Elevators b) OLTCS c) VMS d) DCS e) HP Valve

• Bid Evaluation completed for Vacuum Pump

Page 33: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 33 of 103

  

Sl No Equipment Vendor Items

Ordering Status Receiving Status Manufacturing

Unit-1 Unit-2 Unit-1 Unit-2 Unit-1 Unit-2

1) Deaerator L&T HED

Carbon Steel Plates Ordered In Progress

Spray Nozzles Ordered In Progress

Nozzle Flanges Enquiries Sent

2) Condenser L&T HED

Carbon Steel Plates Ordered Received

SS Plates Ordered In Progress

Tube Sheets Ordered Received

Tubes Enquiries Sent

Nozzle Flanges Enquiries Sent

3) HP-Heaters

HPH-6,HPH-7& HPH-8

L&T HED

Carbon Steel Plates Under Finalization

SS Plates Under Finalization

Tube Sheets Ordered In Progress

Tubes Under Finalization

Nozzle Flanges Under Finalization

4) LP-Heaters Duplex,LP 3&4 L&T HED

Carbon Steel Plates Under Finalization

SS Plates Under Finalization

2.2.3 Vendor Progress for Major Packages (Up to Sep 2010)

Page 34: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 34 of 103

  

Sl No Equipment Vendor Items

Ordering Status Receiving Status Manufacturing

Unit-1 Unit-2 Unit-1 Unit-2 Unit-1 Unit-2

4) LP-Heaters Duplex,LP 3&4 L&T HED

Tube Sheets Ordered In Progress

Tubes Under Finalization

Nozzle Flanges Under Finalization

5) Turbine LMTG

HIP & LP Rotor

Forging Ordered Received -> LP-1,LP-2 &HP

Rotor machining in progress ->Stationary & Rotating Blades machining in progress ->HIP casing machining started

->LP-1 ,LP-2 &HP Rotor machining in progress ->Stationary & Rotating blades machining in progress

HIP Outer Casing Casting

Ordered Received

Stationary and ordinary

blade material

Ordered Received

LP inner casing Ordered In Progress

6) Generators LMTG

Rotor Forging Ordered In Progress

->Generator Stator manufacturing in progress ->Generator Rotor machining in progress

Retaining Ring

Material Ordered In Progress

Through Bolt Material & Core Bolt Material

Ordered In Progress

Steel Plate for

Generator Stator

Ordered In Progress

Page 35: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 35 of 103

  

Sl No Equipment Vendor Items

Ordering Status Receiving Status Manufacturing

Unit-1 Unit-2 Unit-1 Unit-2 Unit-1 Unit-2

7) EOT Crane for TG Hall Bay AIL

Motor Ordered

Brake Ordered In Progress

Forgings Ordered In Progress

Bearing Ordered In Progress

Wire Rope Ordered In Progress

Spring Buffer Ordered In Progress

Hook Ordered In Progress

Rope Drum Pipe Ordered In Progress

8) EOT Crane for BFP AIL

Motor Ordered In Progress

Brake Ordered In Progress

Forgings Ordered In Progress

Bearing Ordered In Progress

Wire Rope Ordered In Progress

Hook Ordered In Progress

Rope Drum Pipe Ordered In Progress

Page 36: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 36 of 103

  

Sl No Equipment Vendor Items

Ordering Status Receiving Status Manufacturing

Unit-1 Unit-2 Unit-1 Unit-2 Unit-1 Unit-2

9) MDBFP Flowserve

Motor Ordered In Progress

Booster Pump Ordered In Progress

Hydraulic Coupling Ordered In Progress

Shaft Material Ordered In Progress

Mechanical Seal Ordered In Progress

10) TDBFP Flowserve

Booster Pump Ordered In Progress

Gear Box Ordered In Progress

Shaft Material Ordered In Progress

Mechanical Seal Ordered In Progress

11) CEP KSB Motor Ordered In Progress

Page 37: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 37 of 103

  

2.4 Major Milestone Status :-

2.4.1 L&T’S Plan – Unit # 1

Sr No

MILESTONE DESCRIPTION MONTH SCHEDULED

DATE EXPECTED

DATE ACTUAL

DATE

1 Opening of site office & mobilization (For unit 1 & 2) 15 22-Oct-10

2 Supply of embedded parts for TG 17 22-Dec-10

3 Start of EOT crane erection 22 23-May-11

4 Receipt of MDBFP at site 26 22-Sept-11

5 Commencement of insitu Condenser Erection 26 23-Sep-11

6 Receipt of Deaerator at Site 27 22-Oct-11

7 Receipt of LP turbine at Site 29 22-Dec-11

8 Commencement of TG Erection 29 23-Dec-11

9 Receipt of Generator at Site 32 22-Mar-12

10 Readiness of TG/C&I system 38 22-Sep-12

11 Commissioning MDBFP 39 22-Oct-12

12 TG Boxing-up 39 22-Oct-12

13 TG oil Flushing Completion 39 22-Oct-12

14 Steam blowing completion 41 22-Dec-12

15 Completion of Governing System 41 22-Dec-12

16 TG on Barring Gear 41 22-Dec-12

17 TG Rolling & Synchronization ( On Oil ) 43 16-Feb-13

18 TG Rolling & Synchronization ( On Coal ) 43 22-Feb-13

19 Completion of Trial Operation of Unit 45 22-Apr-13

Page 38: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 38 of 103

  2.4.2 L&T’S Plan – Unit # 2

Sr No

MILESTONE DESCRIPTION MONTH SCHEDULED

DATE EXPECTED

DATE ACTUAL

DATE

1 Supply of embedded parts for TG 23 22-Jun-11

2 Start of EOT crane erection 28 23-Nov-11

3 Receipt of MDBFP at site 32 22-Mar-12

4 Commencement of insitu Condenser Erection 32 23-Mar-12

5 Receipt of Deaerator at Site 33 22-Apr-12

6 Receipt of LP turbine at Site 35 22-Jun-12

7 Commencement of TG Erection 35 23-Jun-12

8 Receipt of Generator at Site 38 22-Sep-12

9 Readiness of TG/C&I system 44 22-Mar-13

10 Commissioning MDBFP 45 22-Apr-13

11 TG Boxing-up 45 22-Apr-13

12 TG oil Flushing Completion 45 22-Apr-13

13 Steam blowing completion 47 22-Jun-13

14 Completion of Governing System 47 22-Jun-13

15 TG on Barring Gear 47 22-Jun-13

16 TG Rolling & Synchronization ( On Oil ) 49 16-Aug-13

17 TG Rolling & Synchronization ( On Coal ) 49 22-Aug-13

18 Completion of Trial Operation of Unit 51 22-Oct-13

Page 39: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 39 of 103

  2.4.3 Client’s Obligation - Construction Phase

Sr No.

Customer Input Unit # 1 Unit # 2

Month Sch Actual Month Sch Actual

1

Availability of leveled & graded land, water & electricity for site infrastructure (Office, Stores, Workshop & Colony)

14 22-Sep-10

14 22-Sep-10

2 Readiness of site access road for transportation of heavy eqpt

16 22-Nov-10

22 22-May-11

3 Service bay readiness for EOT crane erection

22 21-May-11

28 21-Nov-11

4 Readiness of foundation/floor @ 9 mtrs

25 22-Aug-11

31 22-Feb-12

5 Clearance for insitu condenser erection 26 22-Sep-11 32 22- Mar-12

6 Turbine building readiness for STG erection

26 22-Sep-11

32 22-Mar-12

7 Readiness of 0 mtr foundations (BFPs, CPU ,PHE, etc) 26 22-Sep-11 32 22-Mar-12

8 Readiness of foundation/floor @ 17 mtrs

28 22-Nov-11

34 22-May-12

9 Readiness of strand jack foundation for generator lifting 28 22-Nov-11 34 22-May-12

10 Readiness of floor @ 31 mtrs ( Deaerator foundation)

30 21-Jan-12

36 22-July-12

11 Main & Service building readiness for Elevator erection

32 22- Mar-12

38 22-Sep-12

12 Readiness of electrical & instrumentation earth grids

32 22- Mar-12

38 22-Sep-12

13 Readiness of AC/DC/UPS panel & Battery bank floor

32 22- Mar-12

38 22-Sep-12

14

Readiness of Control room for DCS & Marshalling panel erection

33 21-Apr-12

39 21-Oct-12

Page 40: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 40 of 103

  2.4.4 Client’s Obligation – Commissioning Phase

Sr No.

Customer Input Unit # 1 Unit # 2

Month Sch Actual Month Sch Actual

1 Readiness of 415V supply for EOT & Elevator 25 22-Aug-11

31 22-Feb-12

2 Availability of DM water 34 22-May-12

40 22-Nov-12

3 Availability of trained O&M manpower for commissioning etc.

34 22-May-12

40 21-Nov-12

4 Readiness of HVAC system for DCS commissioning 36 21-July-12

42 21-Jan-13

5 Readiness of 415V,3.3 kV,11kV & emergency power supply

36 21-July-12

42 21-Jan-13

6 Readiness of 220V & 24 DC power supply 36 21-July-12

42 21-Jan-13

7 Readiness of fire protection, detection, & alarm system 36 21-July-12

42 21-Jan-13

8 Availability instru & service air 36 21-July-12

42 21-Jan-13

9 Availability of auxiliary cooling water 36 21-July-12

42 21-Jan-13

10 Availability of condenser cooling water 38 22-Sept-12

44 22-Mar-13

11 Readiness of GT , UAT, GCB & switchyards 41 22-Dec-12

47 22-Jun-13

Page 41: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 41 of 103

  

SECTION-3

ACTIVITIES PLANNED FOR NEXT MONTH

Page 42: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 42 of 103

  3.1 Engineering Plan

Sl. No. Document No. Description

LTSL Drawings/Documents

1.0 Calculations

1) LTSL-E0-00300 LV Cable Sizing Calculation

LMTG Drawings/Documents

1.0 Turbine

Cable Schedule

1) T3101MGP101 Gland Steam and Steam Drain Piping Arrangement

2) 61000-1010 Turbine Auxiliary Machine Control - Logic Diagram

3) 61000-1011 Control Loop & Control Logic Diagram

4) 61000-1021 Turbine Supervisory Instrument Diagram

5) 61000-1031 Turbine Interlock Diagram

6) 61000-3022 SOE List for TPS

7) 61140-1001 Steam Turbine Governor Control Diagram

8) 92250-0681 Specification of Terminal Box

9) 92250-8121 Layout of Terminal Box

10) LMTG-P0-01025 Steam Purity Recommendation

11) T3101ADAC850 Painting Schedule

12) T3101AAAA410 Dimensions & Weight of Turbine Major Part

13) 92250-8401 Arrangement of Embedded Conduit (Turbine Internal)

14) 61000-3001 Instrument List for Steam Turbine

15) 61140-3016-1, 

61140-3016-2 TCS/TPS I/O List

16) 92250-1601 Cable Connection Diagram of Terminal Box

17) 92250-4111 Earthing Requirement

2.0 Generator

1) LMTG-E0-02008 Instrument List

2) LMTG-E0-02360 Generator Design Datasheet

3) LMTG-E0-02015 Signal interface list with DCS

4) LMTG-E0-02103 External terminal of AVR Cubicle

5) LMTG-E0-02359 Erection Procedure for Reference Plant (Generator & its Auxiliaries)

Page 43: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 43 of 103

  EOT Drawings/Documents

1.0 TG Hall EOT Crane

1) AIL-M0-03201 Data sheet of 115/15 T TG Hall EOT Crane (Double Girder)

2) AIL-M0-03203 Mechanism Sizing Calculation for 115/15 T TG Hall EOT cranes

3) AIL-M0-03215 Electrical equipment layout in cabin for 115/15 T TG Hall EOT crane

4) AIL-M0-03206 Gantry Rail installation for 115/15 T TG Hall EOT cranes

5) AIL-M0-03207 General arrangement for PVC shrouded conductor type DSL for 115/15T TG

Hall EOT crane

6) AIL-M0-03208 115T main hook block assembly

7) AIL-M0-03209 15 T Aux Hook Block Assembly

8) AIL-M0-03214 Long travel Machinery Assembly for 115/15 T TG Hall EOT crane

9) AIL-M0-03231 Structural calculations for 115/15 T TG Hall crane

10) AIL-M0-03233 Painting procedure

11) AIL-M0-03230 Crane lubrication

12) AIL-M0-03210 LT Drive wheel assembly

13) AIL-M0-03211 LT idle wheel assembly

14) AIL-M0-03212 CT Drive wheel assembly

15) AIL-M0-03213 CT idle wheel assembly

2.0 BFP EOT Crane

1) AIL-M0-03284 Make of Bought Out Item List

2) AIL-M0-03253 Mechanism Sizing Calculation for 40/10 T TG Hall EOT cranes

3) AIL-M0-03251 Data sheet of 40/10 T TG Hall EOT Crane (Double Girder)

4) AIL-M0-03254 General arrangement for 40/10 T TG Hall EOT crane

5) AIL-M0-03255 Crab sub assembly for 40/10T TG Hall EOT crane

6) AIL-M0-03256 Gantry Rail installation for 40/10 T TG Hall EOT cranes

7) AIL-M0-03257 General arrangement for PVC shrouded conductor type DSL for 40/10T TG Hall

EOT crane

8) AIL-M0-03258 115T main hook block assembly

9) AIL-M0-03259 15 T Aux Hook Block Assembly

10) AIL-M0-03264 Long travel Machinery Assembly for 40/10 T TG Hall EOT crane

11) AIL-M0-03283 Painting procedure

12) AIL-M0-03260 LT Drive wheel assembly

Page 44: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 44 of 103

  

13) AIL-M0-03261 LT idle wheel assembly

14) AIL-M0-03262 CT Drive wheel assembly

15) AIL-M0-03263 CT idle wheel assembly

16) AIL-M0-03280 Crane lubrication

17) AIL-M0-03281 Structural calculations for 40/10 T TG Hall crane

BFP Drawings /Documents

1.0 MDBFP

1) FPD-M0-03311 Complete Group Pump Performance

2) FPD-Q0-03332 Performance test procedure for Booster Pump

3) FPD-M0-03466 Motor Sizing Calculation

2.0 TDBFP

1) FMD-M0-03311 Complete Group Pump Performance

2) FQD-Q0-03332 Performance test procedure for Booster Pump

3.2 Procurement Plan

Enquires shall be floated for the following items a) Control Valves

Offers shall be received for the following items: a) LP Valves b) Erection Services

Orders shall be placed for the following items : a) Vacuum Pump b) HP Valves

Page 45: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 45 of 103

  

SECTION-4

ANNEXURES

Page 46: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 46 of 103

  

4.1 DOCUMENT CONTROL INDEX

Page 47: mrp

LARSEN & TOUBRO LIMITED

JOB NO: ‐ T209001

BASIC ENGINEERING35% 3.50%

35000

DESCRIPTION % OF WEIGHTAGE WTG POINTS

DESIGN CRITERIA DOCUMENTS 20% 7000

CALCULATIONS 10% 3500

P&IDS 30% 10500

PROCUREMENT ASSISTANCE 40% 14000

DETAIL ENGINEERING65% 6.50%

65000

DESCRIPTION % OF WEIGHTAGE WTG POINTS

TG BUILDING GA & PIPING COMPOSITE DRGs 20% 13000

VENDOR DRAWING & DOCUMENTS REVIEW 20% 13000

PIPING STRESS ANALYSIS, ISOMETRICS & LIST 30% 19500

PIPE SUPPORT DRAWINGS 15% 9750

O&M MANUALS & PG TEST PROCEDURE 3% 1625

ELECTRICAL DOCUMENTS 3% 1625

C&I DOCUMENTS 10% 6500

TOTAL POINTS = 100000

ENGINEERING (100%)

% of Overall Project = 10%Total Weightage Points (Per Unit Basis) = 100000

ANNEXURE NO.

ANNEXURE NO.

ANNEXURE - 4.1

Total Weightage Points (Per Unit Basis) =

ANNEXURE - 4.1

ANNEXURE - 4.1

ANNEXURE - 4.1

ANNEXURE - 4.1

ANNEXURE - 4.1

% of Overall Project =

ANNEXURE - 4.2

ANNEXURE - 4.1

ANNEXURE - 4.1

ANNEXURE - 4.1

ANNEXURE - 4.1

DISTRIBUTION OF WTG. POINTS WITHIN ENGINEERING STATUS ANNEXURES BASED ON WBS STRUCTURE

% of Overall Project =Total Weightage Points (Per Unit Basis) =

JAYPEE NIGRIE SUPER THERMAL POWER PROJECT

DOCUMENT NO.: ‐          LT‐P0‐00003 PROGRESS REPORT NO.: ‐ 11

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGES :‐ 12

POWER PROJECT MANEGEMENT SERVICES, VADODARA

Page 48: mrp

Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No.

TRANSMITTAL WITH CUSTOMERBASIC Engineering 35000.0 35.00%

1 Design Criteria Document 7000.0 20.00%1.1 Power System 5250.0 75.00%

Sch. 1-Oct-09 31-Oct-09 █ 10-Nov-09 10-Dec-09 20-Dec-09 19-Jan-10 29-Jan-10 28-Feb-10 13-May-10 12-Jun-10 6-Apr-10Act. 21-Sep-09 8-Dec-09 █ 19-Jan-10 9-Feb-10 9-Apr-10 23-Apr-10Sch. 7-Oct-09 6-Nov-09 16-Nov-09 16-Dec-09 26-Dec-09 25-Jan-10 4-Feb-10 6-Mar-10 13-May-10 12-Jun-10 6-Apr-10Act. 16-Nov-09 8-Dec-09 18-Jan-10 6-Feb-10 9-Apr-10 23-Apr-10Sch. 5-Nov-09 5-Dec-09 15-Dec-09 14-Jan-10 24-Jan-10 23-Feb-10 5-Mar-10 4-Apr-10 █ 4-Mar-10 3-Apr-10 6-Apr-10Act. 27-Nov-09 24-Dec-09 18-Dec-09 11-Jan-10 19-Jan-10 12-Feb-10 10-Feb-10 23-Apr-10 █ 11-Aug-10 30-Aug-10Sch. 13-Oct-09 12-Nov-09 22-Nov-09 22-Dec-09 1-Jan-10 31-Jan-10 10-Feb-10 12-Mar-10 22-Mar-10 21-Apr-10 6-Apr-10Act. 20-Nov-09 29-Dec-09 18-Jan-10 17-Feb-10 10-Feb-10 2-Mar-10 9-Apr-10Sch. 19-Oct-09 18-Nov-09 28-Nov-09 28-Dec-09 7-Jan-10 6-Feb-10 16-Feb-10 18-Mar-10 13-May-10 12-Jun-10 6-Apr-10

Receipt Date of Approval

JNSTPP

FLAG

Last

Wk

Rec

dTo

Rcv

d N

ext W

kR

ecd

aftr

Lo

ng T

ime

DCPLO-DT0221

DCPl - 0173

5th Submission (Rev. E)

Release Receive

DCPL - 0092

DCPLO-DT0080

Last

Wk

Rec

d

DCPLO-DT0054

DCPL - 0010

To R

cvd

Nex

t Wk

JNSTPP

Last

Wk

Rec

d

DCPL - 0092

DCPL - 0040

DCPLO-DT0059

DCPL - 0049

DCPLO-DT0049

DCPLO-DT0026

DCPLO-

DCPl - 0038

Rec

d af

tr

Long

Tim

e

ReleaseL & T

To R

cvd

Nex

t Wk3rd Submission (Rev. C)

FLAG

Rec

d af

tr

Long

Tim

e

L & T

FLAG

JNSTPPRelease

DCPLO-DT0117

DCPL - 0092

2nd Submission (Rev. B)`

DCPLO-DT0117

Receive

DCPL -

DCPLO-DT0117

DCPLO-DT0049

DCPLO-DT0080DCPLO-

FLAG

DCPL -

DCPL - 0057

Last

Wk

Subm

ited 4th Submission (Rev. D)

Subm

. N

ext W

k

Receive

DCPL -

DCPL - 0049

Last

Wk

Subm

ited

DCPLO-

Subm

. N

ext W

k

DCPL - 0031

FLAG

Release Receive

Schedule First

Submission Date

Cat

egor

y (A

/I)

A2

1.1.3 5-Nov-09

Last

Wk

Subm

ited

Receive

LTSL-M0-00102

Drawing / Doc. No.

Subm

. N

ext W

k

L & T

DCPL - 0012

LTSL M0 00104

7-Oct-09

19 O t 09

A DCPLO-DT0018

A2A

C

Subm

. N

ext W

kLa

st W

k Su

bmite

d

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Release

1-Oct-09

1.1.4

JPVLO-DT0004

FLAG

1st Submission (Rev. A)

1.1.1 DCD - Feed Water System

FLAG

Last

Wk

Rec

d

DCPL - 0010

Late

st A

ppro

val

Stat

us fr

om

Clie

nt

L & T

A2 DCPLO-DT0016

DCPLO-DT0012

I 2

1.1.2

FLAG

JNSTPP

DCD - Condensate System LTSL-M0-00101

Uni

t No.

Sr. No. Description

DCPL - 0014A

A

C

C

C

C 1 1 5

LTSL-M0-00103

A2LTSL-M0-00105DCD - LP Bypass Steam System

DCD H t V t & D i S t

DCD - Extraction Steam System 13-Oct-09

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.1REV. NO: :A

Sch. 19-Oct-09 18-Nov-09 28-Nov-09 28-Dec-09 7-Jan-10 6-Feb-10 16-Feb-10 18-Mar-10 13-May-10 12-Jun-10 6-Apr-10Act. 20-Nov-09 29-Dec-09 19-Jan-10 12-Feb-10 9-Apr-10 23-Apr-10Sch. 24-Oct-09 23-Nov-09 3-Dec-09 2-Jan-10 12-Jan-10 11-Feb-10 █ 21-Feb-10 23-Mar-10 █ 1-Jul-10 31-Jul-10 2-Aug-10Act. 27-Nov-09 11-Jan-10 10-Feb-10 5-Mar-10 9-Apr-10 █ 16-Apr-10 1-Jun-10 █ 1-Jul-10 2-Aug-10Sch. 30-Oct-09 29-Nov-09 9-Dec-09 8-Jan-10 18-Jan-10 17-Feb-10 27-Feb-10 29-Mar-10 6-Apr-10Act. 5-Dec-09 29-Dec-09 18-Jan-10 12-Feb-10

1.2 BOP System 1750.0 25.00%Sch. 28-Dec-09 27-Jan-10 6-Feb-10 8-Mar-10 █ 18-Mar-10 17-Apr-10 27-Apr-10 27-May-10 13-May-10 12-Jun-10 6-Apr-10Act. 27-Nov-09 11-Jan-10 10-Feb-10 29-Mar-10 █ 9-Apr-10 23-Apr-10Sch. 11-Nov-09 11-Dec-09 █ 21-Dec-09 20-Jan-10 30-Jan-10 1-Mar-10 11-Mar-10 10-Apr-10 6-Apr-10Act. 10-Feb-10 3-Apr-10 █ 9-Apr-10 3-Apr-10Sch. 16-Dec-09 15-Jan-10 25-Jan-10 24-Feb-10 6-Mar-10 5-Apr-10 15-Apr-10 15-May-10 14-May-10 13-Jun-10 6-Apr-10Act. 7-Nov-09 9-Dec-09 10-Feb-10 8-Mar-10 9-Apr-10 24-Apr-10Sch. 22-Dec-09 21-Jan-10 █ 31-Jan-10 2-Mar-10 12-Mar-10 11-Apr-10 21-Apr-10 21-May-10 30-Apr-10Act. 16-Nov-09 5-Jan-10 █ 9-Apr-10 30-Apr-10Sch. 17-Nov-09 17-Dec-09 27-Dec-09 26-Jan-10 5-Feb-10 7-Mar-10 17-Mar-10 16-Apr-10 13-May-10 12-Jun-10 6-Apr-10Act. 27-Nov-09 11-Jan-10 10-Feb-10 2-Mar-10 9-Apr-10 23-Apr-10Sch. 23-Nov-09 23-Dec-09 █ 2-Jan-10 1-Feb-10 █ 11-Feb-10 13-Mar-10 23-Mar-10 22-Apr-10 13-May-10 12-Jun-10 6-Apr-10Act. 30-Nov-09 █ 10-Feb-10 3-Apr-10 █ 9-Apr-10 23-Apr-10Sch. 28-Nov-09 28-Dec-09 7-Jan-10 6-Feb-10 █ 16-Feb-10 18-Mar-10 28-Mar-10 27-Apr-10 13-May-10 12-Jun-10 6-Apr-10Act. 27-Nov-09 11-Jan-10 10-Feb-10 29-Mar-10 █ 9-Apr-10 23-Apr-10Sch. 4-Dec-09 3-Jan-10 13-Jan-10 12-Feb-10 █ 22-Feb-10 24-Mar-10 3-Apr-10 3-May-10 13-May-10 12-Jun-10 6-Apr-10Act. 30-Nov-09 11-Jan-10 10-Feb-10 3-Apr-10 █ 9-Apr-10 23-Apr-10Sch. 10-Dec-09 9-Jan-10 █ 19-Jan-10 18-Feb-10 28-Feb-10 30-Mar-10 █ █ 9-Apr-10 9-May-10 █ █ 15-Sep-10Act. 19-Dec-09 9-Feb-10 █ 19-Feb-10 31-Mar-10 21-Apr-10 █ █ 19-Jul-10 █ █ 12-Aug-10 15-Sep-10

2 Calculations 3500.0 10.00%2.1 Power System 2625.0 75.00%

Sch. 14-Jan-10 13-Feb-10 █ █ 23-Feb-10 25-Mar-10 4-Apr-10 4-May-10 14-May-10 13-Jun-10Act 18 Jan 10 15 Mar 10 █ █

DCPLO-DT0170

DCPl - 0158

DCPL - 0123

DCPLO-DT0191

DCPLO-DT0223

DCPL - 0181

DCPl - 0092

Nt Come DCPLO-DT0117-0DCPLO-DT0117

DCPL - 0061

DCPLO-DT0117-0

DCPL - 0074

DCPLO-DT0050

DCPLO-DT0082DCPLO-DT0082

DCPLO-DT0117

DCPLO-DT0082

DCPLO-DT0059

DCPL - 0064

DCPLO-0102

DCPLO-DT0082

DCPLO-DT0118DCPLO-DT0080

DCPL - 0057

DCPLO-DT0082-0

DCPL - 0092

DCPL - 0092

DCPLO-DT0117-0

DCPL - 0092

DCPLO-DT0117-0

DCPLO-DT0118-1

DCPLO-DT0117-0

DCPLO-DT0120-1

DCPL - 0092

DCPL - 0042

DCPL - 0049

DCPLO-DT0117

1.2.6

LTSL-M0-00108

LTSL-M0-00109 DCPLO-DT0082

DCPL - 0014

DCPL - 0092

DCPLO-DT0016

DCD - Service Water Distribution System

DCD - Condensate Polishing System

A2

DCPl - 0031

A

A

28-Dec-09 DCPLO-DT0018

DCPLO-DT0018A2

DCPL - 0016

2

A2

LTSL-M0-00104 19-Oct-09

DCPL - 0031

1.2.3

DCPLO-DT0019

24-Oct-09LTSL-M0-00106

A2

A

11-Nov-09

A2

DCPLO-DT0082

DCPL - 0030

DCPLO-DT0020

A

A

DCPL - 0078

23-Nov-09LTSL-M0-00110 A

1.2.9

1.2.7

Calc - Turbine Building Piping Load Data

1.2.2

DCD - Auxiliary Steam System

14-Jan-10

28-Nov-09LTSL-M0-00111

LTSL-M0-00551

DCD - Closed Cooling Water System

22-Dec-09

17-Nov-09

I

A

LTSL-M0-00113

1.2.8

C

C

C

C

1.1.5

DCD - Electrical System

DCD - Condenser Air Removal System

1.2.4 DCD - C&I System

1.2.5

2.1.1

DCD - Instrument Air / Service Air Distribution System

DCD - DM Waer Distribution System

C

C

C

C

C

A4-Dec-09

10-Dec-09LTSL-M0-00115

LTSL-M0-00112

DCD - Piping Stress Analysis

DCPL - 0028

DCPLO-DT0012

I

A2

DCPLO-DT0011

DCPLO-DT0018

A2

2

A

A2

C

C

C

C

30-Oct-09

LTSL-E0-00100 16-Dec-09

LTSL-M0-00107

DCD - Circulating Water System

A

LTSL-I0-00100 A2

1.2.1

1.1.7

DCD - Heaters, Vents, & Drains System

1.1.6

DCPLO-DT0019

DCPl - 0031

DCPLO-DT0018

A2

I 3

DCPL - 0011

DCPL - 0075

DCPl - 0022

DCPLO-DT0028

DCPL - 0039

DCPLO-DT0087

DCPl - 0070

DCPLO-DT0051

DCPL - 0096

DCPl - 0078

DCPL - 0078

DCPl - 0078

DCPL - 0074

DCPLO-DT0125

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.1REV. NO: :A

Act. 18-Jan-10 15-Mar-10 █ █

Sch. 24-Oct-09 23-Nov-09 3-Dec-09 2-Jan-10 █ 12-Jan-10 11-Feb-10 21-Feb-10 23-Mar-10 13-May-10 12-Jun-10 23-Apr-10Act. 18-Nov-09 8-Dec-09 31-Dec-09 █ 30-Mar-10 23-Apr-10Sch. 24-Oct-09 23-Nov-09 █ 3-Dec-09 2-Jan-10 12-Jan-10 11-Feb-10 █ 21-Feb-10 23-Mar-10 19-Sep-10 19-Oct-10Act. 18-Nov-09 11-Jan-10 █ 26-Feb-10 5-Apr-10 16-Jul-10 30-Aug-10 █

Sch. 30-Oct-09 29-Nov-09 9-Dec-09 8-Jan-10 █ 18-Jan-10 17-Feb-10 27-Feb-10 29-Mar-10 13-May-10 12-Jun-10 23-Apr-10Act. 9-Dec-09 24-Dec-09 31-Dec-09 █ 30-Mar-10 23-Apr-10Sch. 30-Oct-09 29-Nov-09 9-Dec-09 8-Jan-10 █ 18-Jan-10 17-Feb-10 █ 27-Feb-10 29-Mar-10 19-Sep-10 19-Oct-10Act. 17-Dec-09 11-Jan-10 25-Feb-10 5-May-10 █ 20-Jul-10 30-Aug-10 █

Sch. 16-Dec-09 15-Jan-10 █ 25-Jan-10 24-Feb-10 █ 6-Mar-10 5-Apr-10 15-Apr-10 15-May-10Act. 21-Dec-09 12-Feb-10 █ 16-Jul-10 30-Aug-10 █

Sch. 10-Dec-09 9-Jan-10 █ 19-Jan-10 18-Feb-10 █ 28-Feb-10 30-Mar-10 9-Apr-10 9-May-10 15-Mar-10Act. 9-Dec-09 15-Feb-10 █ 11-Aug-10 █

Sch. 2-Jan-10 1-Feb-10 █ 11-Feb-10 13-Mar-10 █ 23-Mar-10 22-Apr-10 2-May-10 1-Jun-10 26-Sep-10 26-Oct-10 15-Mar-10Act. 19-Dec-09 15-Feb-10 █ 20-Jul-10 █ 13-Aug-10 6-Sep-10Sch. 11-Nov-09 11-Dec-09 █ 21-Dec-09 20-Jan-10 30-Jan-10 1-Mar-10 11-Mar-10 10-Apr-10 Not RqrdAct. 10-Feb-10 █

Sch. 28-Dec-09 27-Jan-10 █ █ 6-Feb-10 8-Mar-10 18-Mar-10 17-Apr-10 27-Apr-10 27-May-10Act. 24-May-10 17-Jul-10 █ █

Sch. 14-Jan-10 13-Feb-10 23-Feb-10 25-Mar-10 █ █ 4-Apr-10 4-May-10 14-May-10 13-Jun-10 15-Mar-10Act. 12-Feb-10 15-Mar-10 10-Jun-10 █ █

2.2 BOP System 875.0 25.00%Sch. 10-Dec-09 9-Jan-10 █ 19-Jan-10 18-Feb-10 28-Feb-10 30-Mar-10 █ 9-Apr-10 9-May-10 19-Sep-10 19-Oct-10Act. 18-Dec-09 24-Apr-10 █ 24-May-10 18-Jun-10 20-Jul-10 30-Aug-10 █

Sch. 20-Jan-10 19-Feb-10 █ 1-Mar-10 31-Mar-10 10-Apr-10 10-May-10 █ 20-May-10 19-Jun-10 19-Sep-10 19-Oct-10Act. 18-Dec-09 3-Apr-10 █ 24-May-10 18-Jun-10 19-Jul-10 30-Aug-10 █

Sch. 16-Dec-09 15-Jan-10 █ 25-Jan-10 24-Feb-10 █ 6-Mar-10 5-Apr-10 15-Apr-10 15-May-10Act. 23-Apr-10 26-Jul-10 █ 11-Aug-10 █

Sch. 16-Dec-09 15-Jan-10 █ █ 25-Jan-10 24-Feb-10 6-Mar-10 5-Apr-10 15-Apr-10 15-May-10Act. 23-Apr-10 █ █

Sch 22-Dec-09 21-Jan-10 █ 31-Jan-10 2-Mar-10 █ █ 12-Mar-10 11-Apr-10 █ 21-Apr-10 21-May-10 19-Sep-10 19-Oct-10

Calc - Condensate System Pipe Sizing

DCPL - 0174

DCPL - 0173

DCPL - 0173

DCPL -

DCPL - 0147

DCPL - 0093

DCPLO-DT0092

20-Jan-10

22 D 09

16-Dec-09

I

30-Oct-09

I

10-Dec-09

Calc - Condensate Extraction Pump Sizing

Calc Turbine Building Piping Load Data

2.1.2

2.1.4

14 Jan 10LTSL M0 00551

LTSL-M0-00333

A

Calc - Feed water System Pipe Sizing

2.1.5

LTSL-M0-00340

LTSL-M0-00304

2.1.7

Calc - Driver Rating Calculation

2.1.11 Calc - Turbine Building Equipment Weight Data

2.1.3

Calc - Feed Water Pump Sizing

Calc - Heaters, Vents, Drain, System Pipe Sizing

2.1.6

LTSL-M0-00550

Calc - Condenser Air Removal System Sizing

C

C

C

C

C

C

C

10-Dec-09

16-Dec-09

2.2.2

Calc -Closed Cooling Water Pump Sizing

Calc -Closed Cooling Water System pipe Sizing

Calc - Auxiliary Steam System Pipe Sizing

Calc - DM Water Distribution System pipe

Calc - LP Bypass Steam System Pipe Sizing

Calc - Extraction Steam System Pipe Sizing LTSL-M0-00303

2-Jan-10

2 2 5

28-Dec-09

LTSL-M0-00305

LTSL-M0-00307

LTSL-M0-00335

30-Oct-09 I

I

11-Nov-09

16-Dec-09

24-Oct-09

24-Oct-09

6

I

I

2.1.10

Calc - Circulating Water System Pipe Sizing

2.2.1

2.2.4

2.1.8C

C

C

C

C

C

C

C

C

LTSL-M0-00308

LTSL-M0-00309

LTSL-M0-00302

LTSL-M0-00332

LTSL-M0-00301

2.1.9

2.2.3

LTSL-M0-00310

LTSL M0 00311

4

A2

A

I

I

I DCPLO-DT00282

2

DCPLO-DT0029

DCPLO-DT0026

4

I

614-Jan-10

DCPLO-DT0149

A2

DCPLO-DT0136

I

DCPL - 0107

DCPLO-DT0021

2

DCPLO-DT0136

I 3

2

I

4

4

I

Nt Come

DCPL - 0173

DCPLO-DT0230

DCPLO-DT0200

DCPLO-

DCPLO-DT0108

DCPL - 0080

DCPLO-DT0079

DCPLO-DT0184

DCPL - 0010

DCPL - 0032

DCPLO-DT0022

DCPLO-DT0200

2

Nt Come

DCPL - 0070

DCPLO-DT0163

DCPLO-DT0091

DCPLO-DT0149

DCPL - 0153

DCPLO-DT0040

DCPLO-DT0041

0070

DCPL - 0012

DCPL - 0033

DCPLO-DT0014DCPLO-DT0014

DCPL - 0045

DCPLO-DT0219

DCPL - 0047

DCPL - 0047

DCPLO-DT0219

DT0051

DCPLO-DT0025

DCPLO-

DCPLO-DT0149

DCPLO-DT0085

DCPLO-DT0026

DCPLO- DCPL -

DCPL - 0094

DCPLO-DT0191

DCPL - 0173

DCPL - 0134

DCPLO-DT0108

DCPLO-DT0200

DCPLO-DT0184

Nt Come

DCPL - 0173

DCPL - 0093

DCPL - 0134

DCPL - 0079

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.1REV. NO: :A

Sch. 22-Dec-09 21-Jan-10 █ 31-Jan-10 2-Mar-10 █ █ 12-Mar-10 11-Apr-10 █ 21-Apr-10 21-May-10 19-Sep-10 19-Oct-10Act. 25-Dec-09 3-May-10 █ 24-May-10 █ █ 19-Jul-10 30-Aug-10 █

Sch. 4-Dec-09 3-Jan-10 █ 13-Jan-10 12-Feb-10 █ █ 22-Feb-10 24-Mar-10 █ 3-Apr-10 3-May-10Act. 10-Feb-10 3-May-10 █ 19-Jul-10 █ █ 18-Aug-10 █

Sch. 28-Dec-09 27-Jan-10 █ █ 6-Feb-10 8-Mar-10 18-Mar-10 17-Apr-10 27-Apr-10 27-May-10Act. 25-Feb-10 24-Apr-10 █ █

Sch. 8-Mar-10 7-Apr-10 █ █ 17-Apr-10 17-May-10 27-May-10 26-Jun-10 6-Jul-10 5-Aug-10Act. 23-Apr-10 █ █

Sch. █ 5-May-10 4-Jun-10 14-Jun-10 14-Jul-10 24-Jul-10 23-Aug-10 2-Sep-10 2-Oct-10Act. █

3 P&IDs 10500.0 30.00%3.1 Up to Release for Construction 10237.5 97.50%

Sch. 1-Oct-09 31-Oct-09 █ 10-Nov-09 10-Dec-09 █ 20-Dec-09 19-Jan-10 29-Jan-10 28-Feb-10 30-Nov-09Act. 1-Oct-09 30-Nov-09 █ 29-Dec-09 █

Sch. 10-Dec-09 9-Jan-10 █ 19-Jan-10 18-Feb-10 28-Feb-10 30-Mar-10 9-Apr-10 9-May-10 █ █ 16-Jun-10 16-Jul-10 18-Jun-10Act. 31-Dec-09 2-Mar-10 █ 10-Feb-10 2-Mar-10 23-Apr-10 27-May-10 24-May-10 █ █ 24-Jun-10 9-Jul-10Sch. 23-Nov-09 23-Dec-09 █ 2-Jan-10 1-Feb-10 11-Feb-10 13-Mar-10 23-Mar-10 22-Apr-10 █ █ 16-Jun-10 16-Jul-10 18-Jun-10Act. 31-Dec-09 2-Mar-10 █ 10-Feb-10 2-Mar-10 23-Apr-10 27-May-10 24-May-10 █ █ 24-Jun-10 9-Jul-10Sch. 8-Jan-10 7-Feb-10 17-Feb-10 19-Mar-10 29-Mar-10 28-Apr-10 8-May-10 7-Jun-10 █ █ 1-Jun-10 1-Jul-10 12-May-10Act. 19-Jan-10 5-Mar-10 10-Feb-10 5-Mar-10 23-Apr-10 12-May-10 24-May-10 █ █

Sch. 16-Dec-09 15-Jan-10 █ 25-Jan-10 24-Feb-10 █ █ 6-Mar-10 5-Apr-10 15-Apr-10 15-May-10 █ 12-Aug-10 11-Sep-10Act. 10-Feb-10 10-May-10 █ 23-Apr-10 █ █ 3-Jul-10 23-Jul-10 11-Aug-10 █

Sch. 2-Jan-10 1-Feb-10 11-Feb-10 13-Mar-10 23-Mar-10 22-Apr-10 2-May-10 1-Jun-10 16-Jun-10 16-Jul-10 18-Jun-10Act. 18-Jan-10 2-Mar-10 10-Feb-10 2-Mar-10 21-Apr-10 27-May-10 24-Jun-10 9-Jul-10Sch. 28-Dec-09 27-Jan-10 █ 6-Feb-10 8-Mar-10 18-Mar-10 17-Apr-10 █ 27-Apr-10 27-May-10 29-Jul-10 28-Aug-10 24-Apr-10Act. 10-Feb-10 █ 17-Apr-10 24-Apr-10 24-May-10 9-Jul-10 █ 7-Sep-10Sch. 10-Dec-09 9-Jan-10 █ 19-Jan-10 18-Feb-10 28-Feb-10 30-Mar-10 9-Apr-10 9-May-10 14-May-10 13-Jun-10 24-Apr-10Act. 16-Jan-10 8-Mar-10 █ 10-Feb-10 8-Mar-10 17-Apr-10 24-Apr-10Sch. 4-Dec-09 3-Jan-10 █ 13-Jan-10 12-Feb-10 22-Feb-10 24-Mar-10 █ 3-Apr-10 3-May-10 29-Jul-10 28-Aug-10 12-May-10

DCPLO-DT0169

DCPL - 0145

Calc - Service Water Distribution System pipe Sizing

3.1.5

Calc - LV Cable

P&ID - Index, Legends & Symbols

LTSL-M0-00313

P&ID - Extraction Steam System3.1.6

LTSL-M1-00202

2.2.8

LTSL M1 00213

8-Jan-10

2.2.6

10-Dec-09

3.1.7

LTSL-M1-00208

P&ID S i W t Di t ib ti S t

P&IDs - Condenser Air Removal System

I

P&ID - Circulating Water System

LTSL-M1-00204

28-Dec-09

P&ID - Heaters, Vents, & Drains System

3 1 9

A

LTSL-M1-00201

3.1.2 P&ID - Feed Water System

16-Dec-09

3.1.8

LTSL-M1-00210

3.1.4

P&ID - Closed Cooling Water System

2-Jan-10

4 D 09

LTSL-M1-00203

LTSL-E0-00300

DCPL - 0145

DCPLO-DT0169

DCPL - 0145

DCPL - 0095

DCPL - 0151

DCPL - 0173

23-Nov-09

4

22-Dec-09

I

I

10-Dec-09

8-Mar-10

I 4LTSL-M0-003122.2.7

C

C

Calc - DM Water Distribution System pipe Sizing

2.2.5

4-Dec-09

28-Dec-09Calc - Instrument Air / Service Air Distribution System Pipe

A

ILTSL-M1-00209

A2

3.1.3

Calc - 24 V DC Battery & Battery Charger Sizing

I

A

1-Oct-09LTSL-M0-00200

2.2.9

3.1.1

P&ID - Condensate System

LTSL-E0-00301

C LTSL-M0-00311

C

DCPLO-DT0048

DCPLO-DT0082I

C

3

DCPLO-DT0091DCPLO-DT0128

5-May-10

4 DCPLO-DT0191

DCPL - 0097

DCPLO-DT0191

Nt Come DCPLO-DT0123

DCPL - 0057

DCPL - 0062

DCPL - 0057

DCPLO-DT0059

DCPL - 0095

DCPLO-DT0149

DCPLO-DT0041DCPLO-DT0041

DCPLO-DT0081

DCPLO-DT0081

DCPLO-DT0081

DCPL - 0104

DCPLO-DT0049

DCPLO-DT0033

DCPL - 0103

DCPL - 0057

DCPLO-DT0136

DCPL - 0108

DCPL - DCPLO-

A2

DCPLO-DT0128

Nt Come

A2

A2

DCPLO-DT0125

Nt C

DCPL - 0067

DCPL - 0059

DCPl - 0067

DCPLO-DT0082

DCPLO-DT0148-0

DCPL-DT0123

I

A2

A

A

DCPLO-

I

DCPLO-DT0147DCPLO-DT0147

DCPLO-DT0173

DCPLO-DT0128

DCPLO-DT0129

4 DCPLO-DT0082

DCPLO-DT0036-0

2

JPVLO-DT0002

2

DCPL - 0120

DCPL - 0059

DCPL - 0120

DCPLO-DT0253

DCPLO-DT0169

DCPL - 0008

DCPL - 0062

DCPLO-DT0081

DCPLO-

DCPLO-DT0081

DCPL - 0120

DCPl -

DCPl - 0145

DCPL - 0057

DCPLO-DT0232

DCPLO-DT0148-0DCPLO-DT0222

DCPL - 0116

1

1

1

1

1

1

1

1

1

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.1REV. NO: :A

Sch. 4 Dec 09 3 Jan 10 █ 13 Jan 10 12 Feb 10 22 Feb 10 24 Mar 10 █ 3 Apr 10 3 May 10 29 Jul 10 28 Aug 10 12 May 10Act. 10-Feb-10 █ 23-Apr-10 12-May-10 24-May-10 9-Jul-10 █

Sch. 2-Jan-10 1-Feb-10 █ 11-Feb-10 13-Mar-10 23-Mar-10 22-Apr-10 2-May-10 1-Jun-10 14-May-10 13-Jun-10 24-Apr-10Act. 19-Jan-10 8-Mar-10 █ 10-Feb-10 8-Mar-10 17-Apr-10 24-Apr-10Sch. 28-Dec-09 27-Jan-10 █ 6-Feb-10 8-Mar-10 18-Mar-10 17-Apr-10 27-Apr-10 27-May-10 Send to LMBAct. 18-Jan-10 8-Mar-10 █ 10-Feb-10 8-Mar-10Sch. 22-Dec-09 21-Jan-10 █ 31-Jan-10 2-Mar-10 12-Mar-10 11-Apr-10 21-Apr-10 21-May-10 5-Aug-10Act. 10-Feb-10 █ 21-Apr-10 4-Jun-10 11-Aug-10 30-Aug-10Sch. 22-Dec-09 21-Jan-10 █ 31-Jan-10 2-Mar-10 █ █ 12-Mar-10 11-Apr-10 █ 21-Apr-10 21-May-10 29-Jul-10 28-Aug-10 22-Jun-10Act. 10-Feb-10 17-May-10 █ 21-Apr-10 █ █ 24-May-10 9-Jul-10 █

DCPl - 0173

P&ID - LP Bypass Tseam System3.1.10

A

2-Jan-10

LTSL-M1-00213

LTSL-M1-00207

P&ID - Instrumnent Air / Service Air Distribution System

LTSL-M1-00212

I

P&IDs - Auxiliary Steam System

22-Dec-09

3.1.13

P&ID - Service Water Distribution System

LTSL-M1-00211

28-Dec-09

22-Dec-09

3.1.11

3.1.12

3.1.9

2

4-Dec-09

LTSL-M1-00205

P&ID - DM Water Distribution System

I

DCPLO-DT0054

DCPL - 0067

DCPLO-DT0081

DCPLO-DT0081

DCPL 0116

DCPLODT0129Nt Come

DCPL - 0067

DCPL - 0124

DCPLO-DT0125

DCPL - 0067

DCPL - 0115

DCPLO-DT0082

DCPLO-DT0050A2

2

DCPLO-DT0082

A2

I DCPLODT0083

A

2

DCPLO-DT0125

DCPL - 0095

DCPLODT0148-0

DCPL-DT0123

DCPl 0145

DCPL - 0067

Nt Come

DCPl - 0145

DCPLO-DT0222

DCPLO-DT0148

1

1

1

1

1

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.1REV. NO: :A

Page 02 of 12

Page 49: mrp

Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No.

Receipt Date of Approval

JNSTPP

FLAG

Last

Wk

Rec

dTo

Rcv

d N

ext W

kR

ecd

aftr

Lo

ng T

ime 5th Submission (Rev. E)

Release ReceiveLast

Wk

Rec

dTo

Rcv

d N

ext W

k

JNSTPP

Last

Wk

Rec

d

Rec

d af

tr

Long

Tim

e

ReleaseL & T

To R

cvd

Nex

t Wk3rd Submission (Rev. C)

FLAG

Rec

d af

tr

Long

Tim

e

L & T

FLAG

JNSTPPRelease

2nd Submission (Rev. B)`

Receive

FLAG

Last

Wk

Subm

ited 4th Submission (Rev. D)

Subm

. N

ext W

k

ReceiveLast

Wk

Subm

ited

Subm

. N

ext W

k

FLAG

Release Receive

Schedule First

Submission Date

Cat

egor

y (A

/I)

Last

Wk

Subm

ited

Receive

Drawing / Doc. No.

Subm

. N

ext W

k

L & T

Subm

. N

ext W

kLa

st W

k Su

bmite

d

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Release

FLAG

1st Submission (Rev. A)

FLAG

Last

Wk

Rec

d

Late

st A

ppro

val

Stat

us fr

om

Clie

nt

L & T

FLAG

JNSTPP

Uni

t No.

Sr. No. Description

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.1REV. NO: :A

4 PROCUREMENT ASSISTANCE 14000.0 40.00%

4.1 PROC. ASSI. - MECHANICAL SYSTEM 12600.0 90.00%

4.1.1 SPECIFICATIONSch. 23-Jul-09 15-Oct-09Act. 15-Oct-09Sch. 23-Jul-09 15-Oct-09Act. 15-Oct-09Sch. 23-Jul-09 15-Oct-09Act. 15-Oct-09Sch. 24-Oct-09 13-Nov-09Act. 13-Nov-09Sch. 4-Dec-09 27-Nov-09

LTSL-M0-00606-SP

LTSL M0 00604 SP4 1 1 5

23-Jul-09

24-Oct-09

LTSL-M0-00607-SP

23-Jul-09Water Cooled Surface Condenser

23-Jul-09Deaerator

4.1.1.4

4.1.1.3

4.1.1.1

Feed Water Heaters

4 Dec 09

4.1.1.2

LTSL-M0-00601-SP

LTSL-M0-00603-SP

Condensate Extraction Pump

BFP (TD & MD) -

N -

N

N -

-

N

N

C

C

C

C

C Sch. 4 Dec 09 27 Nov 09Act. 27-Nov-09Sch. 2-Jan-10 24-Dec-09Act. 24-Dec-09Sch. 28-Nov-09 19-Feb-10Act. 19-Feb-10Sch. 10-Dec-09 8-Feb-10Act. 8-Feb-10Sch. 26-Jan-10 11-Feb-10Act. 11-Feb-10Sch. 16-Dec-09 16-Feb-10Act. 16-Feb-10Sch. 17-Apr-10 13-Jan-10Act. 13-Jan-10Sch. 16-Dec-09 12-Feb-10Act. 12-Feb-10Sch. 20-Jan-10 25-Mar-10Act. 25-Mar-10Sch. 29-Apr-10 25-Mar-10Act. 25-Mar-10Sch. 29-Apr-10 19-Jul-10Act. 19-Jul-10Sch. 28-Dec-09 24-Feb-10Act. 24-Feb-10Sch. 17-May-10 21-May-10Act. 21-May-10Sch. 18-Feb-10 14-Mar-10Act. 14-Mar-10Sch. 3-Jun-10 24-May-10Act. 24-May-10Sch. 21-Jun-10 29-Apr-10A t 29 A 10

Shop Fabricated Tanks - Steel

17-May-10

OLTC System & Debris Filter 28-Dec-09

LTSL-M0-00628-SP

4.1.1.17

LP Valves - Gate, Globe, Check….

4.1.1.18

21-Jun-10

4.1.1.14

LTSL-M0-00613-SP

Piping Specialities

LP Bypass Valve

LTSL-M0-00610-SP

4.1.1.8

Plate Heat Exchanger

2-Jan-10

26-Jan-10

20-Jan-10

4.1.1.6

10-Dec-09

Piping & Valves Material

LTSL-M0-00608-SP

18-Feb-10

16-Dec-09

17-Apr-10

LTSL-M0-00614-SP

28-Nov-09

4.1.1.16

LTSL-M0-00609-SP

4.1.1.10

4.1.1.13

Piping & Fittings4.1.1.15

4.1.1.20 LTSL-M0-00619-SP

LTSL-M0-00604-SP

LTSL-M0-00612-SP

4.1.1.11

Butterfly Valves

4.1.1.5

29-Apr-10Power Cycle Valves - Gate, Globe, Check…(HP Valve)

3-Jun-10

29-Apr-10

LTSL-M0-00617-SP

LTSL-M0-00620-SP

LTSL-M0-00618-SP

16-Dec-09

4.1.1.12

4.1.1.9

4.1.1.19

LTSL-M0-00624-SP

Vacuum Pump

LTSL-M0-00602-SP

LTSL-M0-00605-SP

DMCW Pump

4.1.1.7 Steam Turbine Drive

LTSL-M0-00712 - SP

4-Dec-09

Condensate Polishing Unit

Condensate Extraction Pump

EOT Crane N

N

N

-

N

-

N

N

-

N

N -

N

N

-

-

-

-

N

N

N

-

-

N

N

N

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

CAct. 29-Apr-10Sch. 3-Jun-10 25-Mar-10Act. 25-Mar-10Sch. 2-Jan-10 2-Jan-10Act. 2-Jan-10Sch. 26-Jul-10 25-Mar-10Act. 25-Mar-10Sch. 30-Aug-10 19-Jul-10Act. 19-Jul-10Sch. 26-Jul-10 24-May-10Act. 24-May-10Sch. 12-Aug-10 10-May-10Act. 10-May-10Sch. 30-Aug-10 23-Aug-10Act. 23-Aug-10Sch. 16-Sep-10 21-May-10Act. 21-May-10Sch. 13-Nov-10 23-Aug-10Act. 23-Aug-10

4.1.2 BID EVALUATION REPORTSch. 24-Aug-09 4-Dec-09Act. 4-Dec-09Sch. 24-Aug-09 4-Dec-09Act. 4-Dec-09Sch. 24-Aug-09 28-Nov-09Act. 28-Nov-09Sch. 30-Jan-10 15-Mar-10Act. 15-Mar-10Sch. 24-Mar-10 15-Jun-10Act. 15-Jun-10Sch. 5-Apr-10 15-Mar-10

4.1.1.23

Feed Water Heaters

N

N

N

N

24-Aug-09

N

24-Aug-09

LTSL-M0-00621-SP

Misc. Chain Pully Block, Hoists HOT, etc….

24-Mar-10

5 Apr 10

LP Valves Gate, Globe, Check….

30-Aug-10LTSL-M0-00623-SP

4.1.1.27 Extraction Steam Check Valve

21 Jun 10

30-Aug-10

26-Jul-10

2-Jan-10

Safety & Relief Valve

12-Aug-10

13-Nov-10

16-Sep-10LTSL-M0-00615-SP

4.1.1.25

3-Jun-10

26-Jul-10

4.1.1.20

4.1.1.22 LTSL-M0-00626-SP

LTSL M0 00619 SP

Elevators

LTSL-M0-00611-SP

4.1.1.21

Mechanical Shop Fabricated Piping

Expansion Joints (Metallic & Rubber)

4.1.1.24

LTSL-M0-00625-SP

LTSL-M0-00601-BR

LTSL-M0-00607-BR

LTSL M0 00604 BR

Chemical Feed System (DMCW)

LTSL-M0-00606-BR

4.1.1.28

Water Cooled Surface Condenser 24-Aug-09

Strainers

Hp Heater Three Way Bypass Valve

4.1.2.5

BFP (TD & MD)

LTSL-M0-00602-BR

LTSL-M0-00616-SP

-

N

4.1.2.4 LTSL-M0-00603-BR

LTSL-M0-00622-SP

30-Jan-10

4.1.2.3

4.1.1.32

4.1.1.30

4.1.2.1

4 1 2 6 Condensate E traction P mp

4.1.2.2 Deaerator

Steam Turbine Drive

N -

N -

N

N

N

N

N

N

N

N

-

-

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C Sch. 5 Apr 10 15 Mar 10Act. 15-Mar-10Sch. 9-Apr-10 8-Apr-10Act. 8-Apr-10Sch. 27-May-10 17-Aug-10Act. 17-Aug-10Sch. 14-Jun-10 21-Aug-10Act. 21-Aug-10

4.1.3 PERCHASE SPECIFICATIONSch. 10-Sep-09 4-Dec-09Act. 4-Dec-09Sch. 10-Sep-09 4-Dec-09Act. 4-Dec-09Sch. 10-Sep-09 4-Dec-09Act. 4-Dec-09Sch. 11-Feb-10 24-May-10Act. 24-May-10Sch. 10-Apr-10 15-Jun-10Act. 15-Jun-10Sch. 20-May-10 24-May-10Act. 24-May-10Sch. 27-May-10 24-May-10Act. 24-May-10

4.2 PROC. ASSI. - ELECTRICAL SYSTEM 700.0 5.00%

4.2.1 SPECIFICATIONSch. 10-Aug-10 15-Jun-10Act. 15-Jun-10Sch. 1-Oct-10 20-Jul-10Act. 20-Jul-10

9-Apr-10

5-Apr-10

LTSL-M0-00624-PS

LTSL-M0-00603-PS

20-May-10

10-Apr-10

11-Feb-10

10-Sep-09

1-Oct-10

27-May-10

4.1.3.5

LTSL-M0-00604-PS

24 V DC System LTSL-E0-00602-SP

LTSL-M0-00604-BR

EOT Crane

AC & DC Distribution Board

Condensate Polishing Unit

Vacuum Pump

LTSL-M0-00607-PS

LTSL-M0-00605-BR

N

4.1.2.9

4.1.3.4

N

10-Aug-104.2.1.1

4.2.1.2

LTSL-E0-00600-SP

N

LTSL-M0-00606-PSDeaerator

LTSL-M0-00601-PS

LTSL-M0-00624-BR

4.1.3.7

4.1.3.6

N

LTSL-M0-00610-BR

10-Sep-09

27-May-10

LTSL-M0-00602-PS

4.1.2.8

4.1.3.3

BFP (TD & MD)

4.1.2.7

4.1.2.6 Condensate Extraction Pump

Condensate Extraction Pump

EOT Crane

Steam Turbine Drive

4.1.3.2

4.1.3.1

Feed Water Heaters

10-Sep-09

Water Cooled Surface Condenser

14-Jun-10

N

N

N

N

N

N

N

N

- N

-

C

C

C

C

C

C

C

C

C

C

C

C

C

Sch. 10-Dec-10 19-Jul-10Act. 19-Jul-10Sch. 1-Feb-11 21-Aug-10Act. 21-Aug-10

4.2.2 BID EVALUATION REPORT4.2.3 PERCHASE SPECIFICATION

LTSL-E0-00603-SP

1-Feb-11

10-Dec-10

4.2.1.4 LTSL-E0-00604-SP

4.2.1.3

Erection & Installation

NLV Power & Control Cables

N

C

C

Page 03 of 12

Page 50: mrp

Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No.

Receipt Date of Approval

JNSTPP

FLAG

Last

Wk

Rec

dTo

Rcv

d N

ext W

kR

ecd

aftr

Lo

ng T

ime 5th Submission (Rev. E)

Release ReceiveLast

Wk

Rec

dTo

Rcv

d N

ext W

k

JNSTPP

Last

Wk

Rec

d

Rec

d af

tr

Long

Tim

e

ReleaseL & T

To R

cvd

Nex

t Wk3rd Submission (Rev. C)

FLAG

Rec

d af

tr

Long

Tim

e

L & T

FLAG

JNSTPPRelease

2nd Submission (Rev. B)`

Receive

FLAG

Last

Wk

Subm

ited 4th Submission (Rev. D)

Subm

. N

ext W

k

ReceiveLast

Wk

Subm

ited

Subm

. N

ext W

k

FLAG

Release Receive

Schedule First

Submission Date

Cat

egor

y (A

/I)

Last

Wk

Subm

ited

Receive

Drawing / Doc. No.

Subm

. N

ext W

k

L & T

Subm

. N

ext W

kLa

st W

k Su

bmite

d

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Release

FLAG

1st Submission (Rev. A)

FLAG

Last

Wk

Rec

d

Late

st A

ppro

val

Stat

us fr

om

Clie

nt

L & T

FLAG

JNSTPP

Uni

t No.

Sr. No. Description

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.1REV. NO: :A

4.3 PROC. ASSI. - C&I SYSTEM 700.0 5.00%

4.3.1 SPECIFICATIONSch. 6-Apr-10 21-Jul-10Act. 21-Jul-10Sch. 28-Jun-10 30-Jun-10Act. 30-Jun-10Sch. 20-Oct-10 21-Apr-10Act. 21-Apr-10Sch. 24-Nov-10 14-Mar-10Act. 14-Mar-10

4.3.2 BID EVALUATION REPORT4.3.3 PERCHASE SPECIFICATION

28-Jun-10

6-Apr-10

Flow Elements

LTSL-I0-00606-SP

4.3.1.2

DCS LTSL-I0-00600-SP

LTSL-I0-00602-SP

Control Valves & Pneumetic ON / OFF Valves

4.3.1.4

4.3.1.1

4.3.1.3 Vibration Monitoring System

LTSL-I0-00601-SP

20-Oct-10

24-Nov-10

N

-

N

N

N

C

C

C

C

Detail Engineering 65000.3 65.00%

5 Turbine Building Layout - GA / Piping Composite Drawings

13000.0 20.00%

5.1 Up to Release for Construction 12675.0 97.50%Sch. 19-Sep-09 19-Oct-09 29-Oct-09 28-Nov-09 █ 8-Dec-09 7-Jan-10 17-Jan-10 16-Feb-10 █ 18-Mar-10 17-Apr-10Act. 16-Oct-09 23-Oct-09 18-Nov-09 5-Jan-10 █ 19-Jan-10 26-Feb-10 23-Apr-10 8-Jun-10 █ 9-Jul-10

6 Pipe Stress Analysis, Isometrics, & Lists

15000.3 23.08%

6.1 Piping Stress Analysis 2000.0 13.33%Sch. 1-Oct-10 31-Oct-10 10-Nov-10 10-Dec-10 20-Dec-10 19-Jan-11 29-Jan-11 28-Feb-11Act. 9-Sep-10

6.2 Isometric Drawings 2620.3 17.47%6.2.1 Large Bore Isometric 1069.4 7.13%

Sch. 7-Jul-10 6-Aug-10 16-Aug-10 15-Sep-10 25-Sep-10 25-Oct-10 4-Nov-10 4-Dec-10Act. 26-May-10

6.2.2 Smoll Bore Isometric

6.4 Lists 3250.0 21.67%Sch. 6-Feb-10 8-Mar-10 █ 18-Mar-10 17-Apr-10 █ █ 27-Apr-10 27-May-10 6-Jun-10 6-Jul-10 3-Jul-10Act. 21-Apr-10 3-Jul-10 █ 23-Jul-10 █ █

Sch. 12-Feb-10 14-Mar-10 █ 24-Mar-10 23-Apr-10 3-May-10 2-Jun-10 12-Jun-10 12-Jul-10 5-Aug-10Act. 23-Apr-10 30-Jun-10 █ 11-Aug-10 30-Aug-10Sch. 12-Feb-10 14-Mar-10 █ 24-Mar-10 23-Apr-10 3-May-10 2-Jun-10 12-Jun-10 12-Jul-10 5-Aug-10Act. 23-Apr-10 30-Jun-10 █ 23-Jul-10 30-Aug-10Sch. 1-Mar-10 31-Mar-10 █ 10-Apr-10 10-May-10 20-May-10 19-Jun-10 29-Jun-10 29-Jul-10 5-Aug-10Act 23 Apr 10 30 Jun 10 █ 26 Jul 10 30 Aug 10

GA - Turbine Building Plan & Sections5.1.1 LTSL-M0-0001 DCPLO-DT0013

DCPLO-DT0175

DCPLO-DT0057

DCPL - 0055

DCPL - 0126

6.2.1.1

List - Equipments

6.4.2

6.4.3

List - Pipelines

List - Specialities

I6-Feb-10 DCPLO-DT0125

LTSL-M1-00703

6

6

6

N

LTSL-M1-00702 12-Feb-10

12-Feb-10

Large Bore Isometric / 3D Model Preparation

DCPL - 0141

LATER 7-Jul-10

6.4.1

6.4.4

LTSL-M1-00701

LTSL-M1-00700

List - Valves

DCPLO-DT0136

1-Mar-10

I

DCPLO-DT0210

I

6

DCPLO-DT0135

DCPL - 0141

DCPL - 0143

19-Sep-09

DCPLO-DT0206

DCPL - 0173

I DCPLO-DT0136

A A3 DCPL - 0001

DCPLO-DT0136

DCPLO-DT0005

DCPL - 0020

DCPLO-DT0206

DCPL - 0173

DCPLO-DT0221

DCPL - 0141

DCPL - 0173

C

1

1

1

1

1

1 6.1.1 Pipe Load Data of Stress Analysed Systems for Civil Design (Feed Water System)

LTSL-M0-00920 1-Oct-10 I DCPLO-DT0258

Act. 23-Apr-10 30-Jun-10 █ 26-Jul-10 30-Aug-10Sch. 18-Feb-10 20-Mar-10 █ 30-Mar-10 29-Apr-10 █ 9-May-10 8-Jun-10 18-Jun-10 18-Jul-10Act. 21-Apr-10 2-Aug-10 █ 23-Aug-10 █

Sch. 10-May-10 9-Jun-10 19-Jun-10 19-Jul-10 29-Jul-10 28-Aug-10 7-Sep-10 7-Oct-10 18-May-10Act. 23-Apr-10 18-May-10

6.5 Lists / ElectricalSch. 1-Feb-10 3-Mar-10 13-Mar-10 12-Apr-10 22-Apr-10 22-May-10 1-Jun-10 1-Jul-10 30-Apr-10Act. 17-Apr-10 30-Apr-10Sch. 23-Feb-10 25-Mar-10 █ 4-Apr-10 4-May-10 14-May-10 13-Jun-10 23-Jun-10 23-Jul-10Act. 21-Apr-10 30-Apr-10 █

Sch. 26-May-10 25-Jun-10 5-Jul-10 4-Aug-10 14-Aug-10 13-Sep-10 23-Sep-10 23-Oct-10 18-May-10Act. 23-Apr-10 18-May-10

6.6 Lists / C&ISch. 10-May-10 9-Jun-10 █ █ 19-Jun-10 19-Jul-10 29-Jul-10 28-Aug-10 7-Sep-10 7-Oct-10Act. 23-Jul-10 █ █

7 Pipe Support Drawings 9750.0 15.00%

8 O&M Manual & PG Test Procedure 1625.0 2.50%

9 ELE SCHEM & Cable Sched etc…. 1625.0 2.50%

9.1 Up to Release for Construction 1584.4 97.50%Sch. 12-Feb-10 14-Mar-10 █ █ 24-Mar-10 23-Apr-10 3-May-10 2-Jun-10 12-Jun-10 12-Jul-10Act. 23-Apr-10 █ █

10 C&I Schem & Cable Sched 6500.0 10.00%13 Extra Documents 0.00 0.00%

6.4.6

LTSL-I1-00700

LTSL-E0-00704

6.6.1

st Spec a t es

LTSL-E0-00702 1-Feb-10

26-May-10

DCPLO-DT0236

S 00 03

10-May-10

6

I

10-May-10

LTSL-M1-00704

23-Feb-10 4

18-Feb-10

DCPL - 0099

I

I

DCPLO-DT0125

DCPL - 0117

6.4.5

List - Feeder List for UPS DB6.5.1

List - Interface / Terminal Points

IList - Feeder List for 220V DCDB

List - Electrical Load List

List - Instruments

LTSL-M1-00711 DCPLO-DT0128

DCPLO-DT0125

a 0

I

DCPLO-DT0208

6

I

DCPLO-DT0128

24 V DC System SLD LTSL-E0-00200 12-Feb-10

6.5.2

6.5.3 List - Consolidated Load List

DCPLO-DT0123

DT0210

6

6 0141

DCPL - 0117

9.1.1

LTSL-E0-00703

I

4

DT0136DCPL - 0157

DCPLO - DT0101

0173

DCPLO-DT0128

1

1

1

1

1

1

1

13 Extra Documents 0.00 0.00%Sch. █ 1-Oct-09 31-Oct-09 10-Nov-09 10-Dec-09 20-Dec-09 19-Jan-10 29-Jan-10 28-Feb-10Act. █ 1-Oct-10 1-Oct-09 30-Nov-09Sch. 4-Nov-09 4-Dec-09 14-Dec-09 13-Jan-10 23-Jan-10 22-Feb-10 4-Mar-10 3-Apr-10Act. 4-Nov-09 5-Jan-10Sch. 21-Sep-09 21-Oct-09 31-Oct-09 30-Nov-09 10-Dec-09 9-Jan-10 19-Jan-10 18-Feb-10Act. 21-Sep-09 5-Nov-09 6-Jan-10Sch. 1-Oct-09 31-Oct-09 10-Nov-09 10-Dec-09 20-Dec-09 19-Jan-10 29-Jan-10 28-Feb-10Act. 21-Sep-09 5-Nov-09Sch. 12-Feb-10 14-Mar-10 24-Mar-10 23-Apr-10 3-May-10 2-Jun-10 12-Jun-10 12-Jul-10Act. 12-Feb-10Sch. 12-Feb-10 14-Mar-10 24-Mar-10 23-Apr-10 3-May-10 2-Jun-10 12-Jun-10 12-Jul-10Act. 12-Feb-10 17-May-10Sch. 12-Feb-10 14-Mar-10 24-Mar-10 23-Apr-10 3-May-10 2-Jun-10 12-Jun-10 12-Jul-10Act. 12-Feb-10 17-May-10Sch. 1-Feb-10 3-Mar-10 13-Mar-10 12-Apr-10 22-Apr-10 22-May-10 1-Jun-10 1-Jul-10Act. 1-Feb-10 15-Mar-10Sch. 1-Feb-10 3-Mar-10 13-Mar-10 12-Apr-10 22-Apr-10 22-May-10 1-Jun-10 1-Jul-10Act. 1-Feb-10 15-Mar-10Sch. 18-Mar-10 17-Apr-10 27-Apr-10 27-May-10 6-Jun-10 6-Jul-10 16-Jul-10 15-Aug-10Act. 18-Mar-10Sch. 19-Jan-10 18-Feb-10 28-Feb-10 30-Mar-10 9-Apr-10 9-May-10 19-May-10 18-Jun-10Act. 19-Jan-10 9-Feb-10Sch. 16-Sep-09 16-Oct-09 26-Oct-09 25-Nov-09 5-Dec-09 4-Jan-10 14-Jan-10 13-Feb-10Act. 16-Sep-09Sch. 22-Dec-09 21-Jan-10 31-Jan-10 2-Mar-10 12-Mar-10 11-Apr-10 21-Apr-10 21-May-10Act. 22-Dec-09 16-Jan-10 25-Jan-10Sch. 6-Jan-10 5-Feb-10 15-Feb-10 17-Mar-10 27-Mar-10 26-Apr-10 6-May-10 5-Jun-10Act. 6-Jan-10 5-Jun-10Sch. 6-Jan-10 5-Feb-10 15-Feb-10 17-Mar-10 27-Mar-10 26-Apr-10 6-May-10 5-Jun-10Act. 6-Jan-10 5-Jun-10S h 10 J 10 10 J l 10 20 J l 10 19 A 10 29 A 10 28 S 10 8 O t 10 7 N 10

13.15 Information for Boiler feed pump design (LMB Document for Information purpose)

97000-2311-1 6-Jan-10 I DCPLO-DT0045

DCPLO-DT0158

DCPLO-DT0045

DCPLO-DT0158

JPVLO-DT0004

13.4

DCPL - 0008

12-Feb-10

DCPLO-DT0073

DCPL- -0071

DCPLO-DT0010

I

DCPLO-DT0010

JPVLO-DT0004

592201-LOAD 12-Feb-10 I

DCPLO-DT0098

LT-P0-00001

Plant Tagging Procedure

JPVLO-DT0002

AProject Co-Ordination Procedure

6

Loading Data for Rectangular Surface Condenser

1-Oct-09

DCPL - 0115

4 DCPLO-DT0085

DCPL - 0115I13.6 592201.0

13.1 Drawing & Document Numbering Procedure 1-Oct-09 I 6

DCPL - 0021

JPVLO-DT001113.3

LTSL-P0-00200

13.5

13.2

DCPLO-DT0085

13.7 GA-Rectangular Surface Condenser (Condenser - 2)

13.13 Unit 1 STG Package L2 Schedule - 22-Dec-09 A

13.12 Unit 1 STG Package L1 Schedule

Foundation Layout for BFPs LT-JPN-EN-PPM-006 DCPLo-DT0073

DCPLO-DT0085

I1-Feb-10 4

- 16-Sep-09 A

592301.0

JPVLO-0001

4

I

LTSL-P0-00201

4

DCPLO-DT0009

JPN-SK-M-007 19-Jan-10 I 4 DCPLO-DT0056

LT-JPN-EN-PPM-007

DCPL - 0041

Engineering Deliverable List

I

LTSL-JPN:E-0019 4-Nov-09

Wheel Load Diagram for EOT Cranes

GA-Rectangular Surface Condenser (Condenser - 1)

1-Feb-10 I

21-Sep-09 JPVLO-DT0004

Foundation Layout for CEPs

Notes on Inputs Required for PHE & ACW Pump Design

LTSL-M0-00908 18-Mar-10 I

DCPl - 0071

12-Feb-10

JPVLO-DT0012

JPVLO-DT0013

13.14 WDC Drain information (LMB Document for Information purpose)

97000-2381-8 6-Jan-10 I

13.11

13.10

13.9

13.8

DPCLO DCPL

JPVLO-DT0009

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

Sch. 10-Jun-10 10-Jul-10 20-Jul-10 19-Aug-10 29-Aug-10 28-Sep-10 8-Oct-10 7-Nov-10Act. 10-Jun-10 18-Jun-10Sch. 10-Jun-10 10-Jul-10 20-Jul-10 19-Aug-10 29-Aug-10 28-Sep-10 8-Oct-10 7-Nov-10Act. 10-Jun-10 14-Jun-10Sch. 10-Jun-10 10-Jul-10 20-Jul-10 19-Aug-10 29-Aug-10 28-Sep-10 8-Oct-10 7-Nov-10Act. 10-Jun-10Sch. 14-Jul-10 13-Aug-10 23-Aug-10 22-Sep-10 2-Oct-10 1-Nov-10 11-Nov-10 11-Dec-10Act. 14-Jul-10 23-Jul-10

13.19 Note on Interface of TG Building Auxiliary Column with Equipment / Piping

LTSL-M0-00637 14-Jul-10 I DCPLO-DT0178

DCPLO-DT0207

13.17 Feed Water Piping Arrangement upto El. + 17.00 M

JPN-SK-M-021 10-Jun-10

13.18 Response Sheet for DCPL Comments on Sketch no. JPN-SK-M-019, Modified

- 10-Jun-10 I DCPLo-DT0162

I DPCLO-DT0162

DPCLO-DT0164

13.16 LTSL-M0-00635 10-Jun-10 I 1 DPCLO-DT0161

DCPL - 0139

C

C

C

C

Note on Condensate Polishing Plant

Page 04 of 12

Page 51: mrp

Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No.

Receipt Date of Approval

JNSTPP

FLAG

Last

Wk

Rec

dTo

Rcv

d N

ext W

kR

ecd

aftr

Lo

ng T

ime 5th Submission (Rev. E)

Release ReceiveLast

Wk

Rec

dTo

Rcv

d N

ext W

k

JNSTPP

Last

Wk

Rec

d

Rec

d af

tr

Long

Tim

e

ReleaseL & T

To R

cvd

Nex

t Wk3rd Submission (Rev. C)

FLAG

Rec

d af

tr

Long

Tim

e

L & T

FLAG

JNSTPPRelease

2nd Submission (Rev. B)`

Receive

FLAG

Last

Wk

Subm

ited 4th Submission (Rev. D)

Subm

. N

ext W

k

ReceiveLast

Wk

Subm

ited

Subm

. N

ext W

k

FLAG

Release Receive

Schedule First

Submission Date

Cat

egor

y (A

/I)

Last

Wk

Subm

ited

Receive

Drawing / Doc. No.

Subm

. N

ext W

k

L & T

Subm

. N

ext W

kLa

st W

k Su

bmite

d

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Release

FLAG

1st Submission (Rev. A)

FLAG

Last

Wk

Rec

d

Late

st A

ppro

val

Stat

us fr

om

Clie

nt

L & T

FLAG

JNSTPP

Uni

t No.

Sr. No. Description

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.1REV. NO: :A

Sch. 14-Jul-10 13-Aug-10 23-Aug-10 22-Sep-10 2-Oct-10 1-Nov-10 11-Nov-10 11-Dec-10Act. 14-Jul-10Sch. 16-Jul-10 15-Aug-10 25-Aug-10 24-Sep-10 4-Oct-10 3-Nov-10 13-Nov-10 13-Dec-10Act. 16-Jul-10Sch. 16-Jul-10 15-Aug-10 25-Aug-10 24-Sep-10 4-Oct-10 3-Nov-10 13-Nov-10 13-Dec-10Act. 16-Jul-10Sch. 23-Jul-10 22-Aug-10 1-Sep-10 1-Oct-10 11-Oct-10 10-Nov-10 20-Nov-10 20-Dec-10Act. 23-Jul-10Sch. 23-Jul-10 22-Aug-10 1-Sep-10 1-Oct-10 11-Oct-10 10-Nov-10 20-Nov-10 20-Dec-10Act. 23-Jul-10Sch. 12-Aug-10 11-Sep-10 21-Sep-10 21-Oct-10 31-Oct-10 30-Nov-10 10-Dec-10 9-Jan-11Act. 12-Aug-10Sch. 23-Aug-10 22-Sep-10 2-Oct-10 1-Nov-10 11-Nov-10 11-Dec-10 21-Dec-10 20-Jan-11Act. 23-Aug-10Sch 30 Aug 10 29 Sep 10 9 Oct 10 8 Nov 10 18 Nov 10 18 Dec 10 28 Dec 10 27 Jan 11Note on Support Structure Requirement for

JPN-SK-M-024 23-Jul-10 I DCPLO-DT0207

C 13.20 Sketch Interface of Auxiliary Columns (Along row a1, a2& a3) with Equipment /

JPN-SK-M-023 14-Jul-10 I DCPLO-DT0178

C 13.21 Note on Piping Corridor for Condensate Polishing Plant

LTSL-M0-00638 16-Jul-10 I

C 13.22 Sketch Part Copy of Plot Plan (K6A24-DWG-M-002-REV-4)

- 16-Jul-10 I DCPLO-DT0187

DCPLO-DT0187

13.25 TG Building Floor Opening for Unit # 1 Along with the Row B & C

JPN-SK-M-026 12-Aug-10 I DCPLO-DT0223

13.23 Sketch on Interface tie beams with Condenser Tube removal

13.24 Power house unit - 1 _ Column Schedule (Commented)

- 23-Jul-10 I DCPLO-DT0207

DCPLO

C

C

C

C 13.26 Sketch Showing RC Slab & Grating Floor Requirement for Mazzanine Floor Elevation

JPN-SK-M-027 23-Aug-10 I DCPLO-DT0238

Sch. 30-Aug-10 29-Sep-10 9-Oct-10 8-Nov-10 18-Nov-10 18-Dec-10 28-Dec-10 27-Jan-11Act. 30-Aug-10Sch. 27-Aug-10 26-Sep-10 6-Oct-10 5-Nov-10 15-Nov-10 15-Dec-10 25-Dec-10 24-Jan-11Act. 27-Aug-10Sch. 10-Sep-10 10-Oct-10 20-Oct-10 19-Nov-10 29-Nov-10 29-Dec-10 8-Jan-11 7-Feb-11Act. 10-Sep-10Sch.Act. 10-Sep-10

Abbreviation:A - Approval I/W No. - Inward No. Unit type: C - Common for both Units Sch. - Schedule Date for SubmissionI - Information DTN No. - Document Transmittal No. 1 - For Unit No. 1 only Act. - Actual Date of SubmissionN - Not for Submission - Weightage Point not considered 2 - For Unit No. 2 only

x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

C 13.28 Steam Turbine & Generator Componant layout plan at operating Floor EL. (+) 17M

LTSL-M0-00552 27-Aug-10 I DCPLO-DT0244.

C 13.27 Note on Support Structure Requirement for Pipes Connecting to Deaerator

LTSL-M0-00641

C 13.29 Start up Curve for Steam Turbine LMTG-P0-01037 10-Sep-10 I DCPLO-DT0261

30-Aug-10 I DCPLO-DT0246

DCPLO-DT0261C 13.30 Piping Load Data for Stress Analysis

System for CIVIL Design (Feed Water LTSL-M0-00920 I

Page 05 of 12

Page 52: mrp

Early Start Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date-Unit 1 DTN No

TRANSMITTAL WITH CUSTOMER

# VENDOR DRAWING REVIEW 13000.10

13 VDR - Steam Turbine Generator & its Auxiliaries 2192.1

13.1 Documents for Steam Turbine 1273.4Up To Release for Construction

13.1 General DocumentsLMTG-P0-01001 Sch. 30-Oct-09 29-Nov-09 29-Dec-09 28-Jan-10 27-Feb-10 29-Mar-10 28-Apr-10 28-May-10 1 5-Jan-10

T3101AABBOIO A t 22 D 09 5 J 10

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & T

FLAG

Last

Wk

Rcv

dTo

Rcv

d N

ext W

k

JNSTPP

4th Submission (Rev. D)

Release

Subm

. N

ext W

k

ReceiveJNSTPP

Subm

. N

ext W

k

ReleaseRec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Last

Wk

Subm

ited

Rec

d af

tr

Long

Tim

e

JNSTPP L & T

As Built

L & T

2nd Submission (Rev. B)

FLAG

Last

Wk

Rcv

d

Receive

FLAG

Last

Wk

Subm

ited

ReceiveReceive

1st Submission (Rev. A)

FLAG

Last

Wk

Rcv

d

FLAG

JNSTPP

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & TReleaseRelease ReleaseTo

Rcv

d N

ext W

k 3rd Submission (Rev. C)

FLAG

DCPL - 0021

DCPLO-DT0030

FLAG

Rec

d af

tr

Long

Tim

e

Last

Wk

Rcv

d

FLAG

Receipt Date of Approval

Schedule First

Submission Date C

ateg

ory

(A/I/

N)

30-Oct-09 I

Uni

t No.

Sr. No. Description Drawing / Doc. No.

13.1.1 Drawing & Document ListC

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

T3101AABBOIO Act. 22-Dec-09 5-Jan-10LMTG-Q0-01000 Sch. 31-Oct-09 30-Nov-09 30-Dec-09 29-Jan-10 28-Feb-10 30-Mar-10 29-Apr-10 29-May-10 1 19-Jun-10

QAT-P300 Act. 31-Oct-09 19-Nov-09 10-Dec-09 29-Dec-09 1-Feb-10 22-Feb-10 15-May-10 19-Jun-10LMTG-M0-01017 Sch. 15-Jan-10 14-Feb-10 █ █ 16-Mar-10 15-Apr-10 █ █ 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 1

T3101ADAC800 Act. 28-Jan-10 █ █ 24-May-10 30-Aug-10 █ █

LMTG-M0-01028 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 █ 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 1 2-Jan-10T3101AAAA380 Act. 10-Dec-09 2-Jan-10 29-Apr-10 15-Jun-10 █

LMTG-P1-01003 Sch. 30-Oct-09 29-Nov-09 29-Dec-09 28-Jan-10 █ 27-Feb-10 29-Mar-10 28-Apr-10 28-May-10 █ █ 1T3101AAAB110 Act. 1-Oct-09 6-Nov-09 6-Jan-10 █ 25-Jan-10 8-Mar-10 1-Jun-10 █ █

LMTG-P0-01026 Sch. 15-Feb-10 17-Mar-10 █ 16-Apr-10 16-May-10 █ █ 15-Jun-10 15-Jul-10 14-Aug-10 13-Sep-10 1 30-Apr-10T3101AAAB111 Act. 3-Mar-10 30-Apr-10 █ 19-Jul-10 █ █

LMTG-P0-01025 Sch. 15-Mar-10 14-Apr-10 █ █ 14-May-10 13-Jun-10 13-Jul-10 12-Aug-10 11-Sep-10 11-Oct-10 1T3101ADAC010 Act. 22-Feb-10 █ █

Sch. █ 15-Jan-10 14-Feb-10 16-Mar-10 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 1T3101ADAC810 Act. █ 2-Oct-10

LMTG-P0-01027 Sch. 30-Oct-09 29-Nov-09 █ 29-Dec-09 28-Jan-10 █ █ 27-Feb-10 29-Mar-10 28-Apr-10 28-May-10 1T3101AYAC010 Act. 2-Oct-09 30-Nov-09 █ 15-Mar-10 3-Jul-10 █ █

13.2 Mechanical DocumentsLMTG-M0-01019 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 █ █ 14-Apr-10 14-May-10 █ █ 13-Jun-10 13-Jul-10 █ 1 15-Jun-10

T3101AAAA003 Act. 10-Dec-09 5-Jan-10 3-Feb-10 █ █ 24-Jun-10 █ █ 3-Feb-10 15-Jun-10 █

LMTG-M0-01020 Sch. 30-Dec-09 29-Jan-10 █ 28-Feb-10 30-Mar-10 █ █ 29-Apr-10 29-May-10 28-Jun-10 28-Jul-10 1 14-Jun-10T3101AAAA210 Act. 28-Jan-10 14-Jun-10 █ 1-Jun-10 █ █

LMTG-M0-01004 Sch. 30-Dec-09 29-Jan-10 █ 28-Feb-10 30-Mar-10 █ █ 29-Apr-10 29-May-10 28-Jun-10 28-Jul-10 1T3101AAAA220 Act. 28-Jan-10 12-Apr-10 █ 1-Jun-10 30-Aug-10 █ █

LMTG-M0-01005 Sch. 30-Dec-09 29-Jan-10 28-Feb-10 30-Mar-10 █ █ 29-Apr-10 29-May-10 28-Jun-10 28-Jul-10 1T3101AAAA230 Act. 3-Feb-10 15-Mar-10 1-Jun-10 30-Aug-10 █ █

LMTG-M0-01006 Sch. 30-Dec-09 29-Jan-10 28-Feb-10 30-Mar-10 █ █ 29-Apr-10 29-May-10 28-Jun-10 28-Jul-10 1T3101AAAA250 Act. 6-Feb-10 23-Feb-10 1-Jun-10 30-Aug-10 █ █

Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 1 5-Jan-10T3101AAAA001 Act. 10-Dec-09 5-Jan-10

LMTG-M0-01013 Sch 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 1 18-Jun-10

DCPLO-DT0153

DCPL - 0132

DCPL - 0140

DCPLO-DT0153

DCPLO-DT0075

DCPLO-DT0064

DCPLO-DT0023DCPLO-DT0146

DCPL - 0052

DCPLO-DT0143

DCPLO-DT0046

DCPLO-DT0061

DCPLO-DT0195

DCPL - 0015

DCPLO - DT0137

DCPLO-DT0167

DCPL - 0172

DCPl -DCPLO-

DCPLO-DT0153

DCPLO-DT0095

DCPL -

DCPLO-DT0153

DCPL -

DCPL - 0133

DCPL - 0172

DCPLO-DT0153

DCPLO-

DCPL - 0017

DCPLO-DT0065

JPVLO-DT0002

DCPLO-DT0065DCPLO-DT0023

DCPLO-DT0007

DCPL - 0007

DCPL - 0005

DCPLO-DT0093

DCPL - 0089

DCPLO-DT0075

0021

DCPLO-DT0076

DCPL - 0172

DCPLO - 0098

DCPL - 0142

DCPL -

DCPLO-DT0023

DCPLO-DT0090

DCPL - 0172

DCPLO-DT0001

DT0030

DCPL - 0063

DCPLO-DCPLO-

I DCPl - 0021

A

15-Dec-09

DCPl - 0021I

DataSheet for Steam Turbine & Its Auxiliaries

Control and Lubricating oil System Diagram

DCPL - 0069

DCPL - 0008

A

A

15-Dec-09 DCPLO-DT0023Turbine Generator Outline

AOil Piping Diagram

30-Dec-0913.2.2

30-Dec-09

DCPLO-DT0078

JPVLO-DT0002

DCPLO-DT0065-0A DCPL -

0129

DCPL - 0053

30 Oct 09

13.1.10 Steam Purity Recommendation I

15-Dec-09

AHeat Balance Diagram 30-Oct-09

I

13.1.11 Equipment Numbering Procedure for Steam Turbine & Generator

15-Jan-10 I

scope of Supply of TG Foundation

13.1.2

I

15-Jan-10

15-Mar-10

I

A

I

13.1.6

QAP - Steam Turbine

15-Feb-10

C

C

C 30-Dec-09

13.1.24

Turbine Sectional Assembly

Oil Purifier Oil Piping Diagram

Performance Curves of STG

Equipment List

13.1.5

13.1.1 Drawing & Document List

13.2.5

30-Oct-09

13.2.7

13.2.4

13.1.7

13.1.4

31-Oct-09

C

C

C

C

C

C

C

C

13.2.3

13.2.1C

C

C

C Gland Steam and Drain Piping Diagram 30-Dec-09

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

LMTG-M0-01013 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 1 18-Jun-10T3101ADAC110 Act. 10-Dec-09 5-Jan-10 15-Mar-10 7-Apr-10 22-Mar-10 7-Apr-10 18-May-10 18-Jun-10

LMTG-M0-01014 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 1T3101ADAC950 Act. 10-Dec-09 5-Jan-10 15-Mar-10 7-Apr-10 31-May-10 18-Jun-10 11-Aug-10 26-Aug-10

LMTG-M0-01007 Sch. 15-Dec-09 14-Jan-10 █ 13-Feb-10 15-Mar-10 █ █ 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 1 15-Jun-10T3101AAAA310 Act. 23-Oct-09 2-Jan-10 █ 12-Feb-10 █ █ 15-Mar-10 15-Jun-10 14-May-10 15-Jun-10

LMTG-M0-01008 Sch. 14-Feb-10 16-Mar-10 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 1 15-Jun-10T3101AAAA311 Act. 31-May-10 15-Jun-10

LMTG-M0-01011 Sch. 15-Feb-10 17-Mar-10 █ 16-Apr-10 16-May-10 15-Jun-10 15-Jul-10 14-Aug-10 13-Sep-10 1 15-Jun-10T3101AAAA450 Act. 28-Jan-10 15-Jun-10 █

LMTG-M0-01009 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 14-Apr-10 14-May-10 █ 13-Jun-10 13-Jul-10 1 2-Jan-10T3101AAAA330 Act. 10-Dec-09 2-Jan-10 22-Mar-10 17-Jul-10 █

LMTG-M0-01022 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 █ █ 14-Apr-10 14-May-10 █ █ 13-Jun-10 13-Jul-10 1 2-Jan-10T3101AAAA340 Act. 10-Dec-09 2-Jan-10 21-Jun-10 █ █ 22-Mar-10 █ █

LMTG-M0-01023 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 █ █ 14-Apr-10 14-May-10 █ █ 13-Jun-10 13-Jul-10 1 2-Jan-10T3101AAAA370 Act. 10-Dec-09 2-Jan-10 21-Jun-10 █ █ 22-Mar-10 █ █

LMTG-M0-01016 Sch. 15-Mar-10 14-Apr-10 █ █ 14-May-10 13-Jun-10 13-Jul-10 12-Aug-10 11-Sep-10 11-Oct-10 1T3101ADAC990 Act. 16-Apr-10 █ █

LMTG-M0-01015 Sch. 15-Jan-10 14-Feb-10 16-Mar-10 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 1 18-Jun-10T3101ADAC960 Act. 28-Jan-10 12-Feb-10 18-Mar-10 7-Apr-10 1-Jun-10 18-Jun-10 12-Jul-10 26-Jul-10

LMTG-M0-01204 Sch. 15-May-10 14-Jun-10 █ 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 11-Dec-10 1 15-Jun-10T3101PLPE101 Act. 12-May-10 17-Jul-10 █

13.3 C&I DocumentsLMTG-I0-01300 Sch. 15-Mar-10 14-Apr-10 █ 14-May-10 13-Jun-10 13-Jul-10 12-Aug-10 11-Sep-10 11-Oct-10 1 1-Jun-10

61000-0020 Act. 5-Feb-10 1-Jun-10 █

LMTG-I0-01301 Sch. 15-Mar-10 14-Apr-10 14-May-10 13-Jun-10 █ 13-Jul-10 12-Aug-10 11-Sep-10 11-Oct-10 161000-0030 Act. 15-Mar-10 7-Apr-10 11-Aug-10 26-Aug-10 █

LMTG-I0-01302 Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 161000-0040 Act. 27-Aug-10 █

LMTG-I0-01303 Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 161000-0110 Act. 28-Aug-10 15-Sep-10

DCPl - 0168

DCPL - 0152

DCPLO-DT0220DCPLO-

DT0142-BDCPl - 0132

DCPl - 0137

DCPLO-DT0176

DCPLO-DT0095

DCPL - 0084

DCPLO-DT0103

DCPL - 0084

DCPLO-DT0099

DCPLO-DT0220

DCPL - 0084

DCPL - 0132

DCPL - 0018

DCPL - 0132

DCPLO-DT0166

DCPLO-DT0095-C

DCPLO-DT0006-0

DCPLO-DT0095-B

DCPLO-DT0023

DCPL - 0135

DCPL - 0132

DCPLO-DT0152-D

DCPLO-DT0103

DCPLO-DT0065

DCPLO-DT0023

DCPL - 0150

DCPLO-DT0152-C

DCPL - 0017

DCPLO-DT0166

DCPL - 0122

DCPLO-DT0095

DCPL - 0023

DCPLO-DT0085-0

DCPL - 0084

DCPL - 0023

DCPL - 0150

DCPLO-DT0144

DCPLO-DT0153

DCPLO-DT0103

DCPLO-DT0103

DCPL - 0170

DCPL - 0135

I

15-Mar-10

I

I

Motor List for Steam Turbine

DCPL - 0017

DCPL - 0043

DCPL - 0017

DCPLO-DT0239

DCPLO-DT0243

I

DCPL - 0178

DCPL - 0087Drive Control Philosophy

13.2.19

A

I

15-Dec-09

15-Dec-09

15-Apr-10

15-Jan-10

15-Mar-10

15-Dec-09 I

Plan for Turbine Enclosure

Oil Piping Arrengement

15-Dec-09

Plan for Arrangement of T/G Foundation Deck

Utility List for Steam Turbine

DCPLO-DT0023

DCPLO-DT0121

15-Dec-09

I

I

DCPLO-DT0077

DCPLO-DT0141-0

13.3.4

I

I

13.2.13

13.2.10

I

I

I

I

DCPLO-DT0065

DCPLO-DT0023

DCPLO-DT0023

C

C

C

C

C

C

C

13.2.9

13.3.2

Plan for Arrangement of Foundation Bolt

T/G Foundation Loading Diagram

Valve List

13.2.14

Basic Plan for TCS / TPS System

13.2.11

13.2.15

13.3.1

Plan for Arrangement of Anchor Bolt

13.2.12

15-Mar-10

15-Feb-10

15-May-10

15-Apr-10

13.2.8

13.2.20

13.2.17

Drive List for TCS / TPS

Electrical Load List

13.3.3

TCS / TPS System Configuration

T/G Foundation Design Criteria

15-Dec-09

C

C

C

C

C

C

C

C

14-Feb-10

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

6 000 0 0 ct 8 ug 0 5 Sep 0

13.2 DOCUMENTS FOR GENERATOR 918.6LMTG-E0-02001 Sch. 14-Nov-09 14-Dec-09 █ 13-Jan-10 12-Feb-10 14-Mar-10 13-Apr-10 13-May-10 12-Jun-10 1 5-Jan-10

GAE-KN-E120 Act. 4-Nov-09 5-Jan-10 █

LMTG-E0-02003 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 1 7-Apr-10GAE-KN-E-147 Act. 29-Dec-09 19-Jan-10 5-Feb-10 8-Mar-10 24-Mar-10 7-Apr-10 11-May-10 24-May-10

LMTG-E0-02004 Sch. 13-Jan-10 12-Feb-10 █ 14-Mar-10 13-Apr-10 █ █ 13-May-10 12-Jun-10 12-Jul-10 11-Aug-10 1GAE-KN-E146 Act. 22-Feb-10 █ 1-Jun-10 █ █

LMTG-E0-02005 Sch. 13-Jan-10 12-Feb-10 14-Mar-10 13-Apr-10 13-May-10 12-Jun-10 12-Jul-10 11-Aug-10 1 8-Mar-10GAE-KN-E240 Act. 22-Feb-10 8-Mar-10 2-Jul-10 26-Jul-10 7-Sep-10

LMTG-E0-02006 Sch. 16-Mar-10 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 1 28-Jul-10GAE-KN-E400 Act. 26-Mar-10 7-Apr-10 17-Jul-10 28-Jul-10

LMTG-E0-02007 Sch. 13-Jan-10 12-Feb-10 14-Mar-10 13-Apr-10 13-May-10 12-Jun-10 12-Jul-10 11-Aug-10 1JEK79164 Act. 16-Mar-10 30-Apr-10 4-Jun-10 17-Jul-10 10-Sep-10

LMTG-E0-02011 Sch. 13-Jan-10 12-Feb-10 █ 14-Mar-10 13-Apr-10 13-May-10 12-Jun-10 12-Jul-10 11-Aug-10 1 10-May-10GAE-KN-E162 Act. 22-Feb-10 10-May-10 █ 1-Jun-10 18-Jun-10 7-Sep-10

LMTG-E0-02012 Sch. 13-Jan-10 12-Feb-10 █ 14-Mar-10 13-Apr-10 █ █ 13-May-10 12-Jun-10 12-Jul-10 11-Aug-10 1GAE-KN-E163 Act. 22-Feb-10 10-May-10 █ 8-Jun-10 █ █

LMTG-E0-02013 Sch. 13-Jan-10 12-Feb-10 █ 14-Mar-10 13-Apr-10 █ 13-May-10 12-Jun-10 12-Jul-10 11-Aug-10 1 26-Jul-10JEZ2V682 Act. 16-Mar-10 10-May-10 █ 5-Jun-10 26-Jul-10 █

LMTG-E0-02014 Sch. 15-Feb-10 17-Mar-10 █ █ 16-Apr-10 16-May-10 15-Jun-10 15-Jul-10 14-Aug-10 13-Sep-10 1JEZ2V683 Act. 16-Mar-10 █ █

LMTG-E0-02016 Sch. 15-Feb-10 17-Mar-10 16-Apr-10 16-May-10 15-Jun-10 15-Jul-10 14-Aug-10 13-Sep-10 1 17-Jul-10JEJ62354 Act. 1-Feb-10 12-Feb-10 4-Jun-10 17-Jul-10 10-Sep-10

LMTG-E0-02017 Sch. 15-Feb-10 17-Mar-10 16-Apr-10 16-May-10 15-Jun-10 15-Jul-10 14-Aug-10 13-Sep-10 1 17-Jul-10JEJ62355 Act. 1-Feb-10 12-Feb-10 4-Jun-10 17-Jul-10 10-Sep-10

LMTG-E0-02018 Sch. 15-Feb-10 17-Mar-10 16-Apr-10 16-May-10 █ █ 15-Jun-10 15-Jul-10 14-Aug-10 13-Sep-10 1JEJ62356 Act. 1-Feb-10 12-Feb-10 4-Jun-10 █ █

LMTG-E0-02019 Sch. 15-Feb-10 17-Mar-10 16-Apr-10 16-May-10 █ █ 15-Jun-10 15-Jul-10 14-Aug-10 13-Sep-10 1JEJ62357 Act. 1-Feb-10 12-Feb-10 4-Jun-10 █ █

Outline Drawing of Generator Control & Syncronization Panel

I

DCPLO-DT0260

DCPL - 0149

DCPLO-DT0155

DCPLO-DT0063

DCPl - 0136

DCPLO-DT0063

DCPL - 0044

DCPL - 0044

A

DCPL - 0064

DCPL - 004415-Feb-10

A

15-Feb-10

A

14.7

A

14.3

14.11

14.19

A

14.13

14.16

15-Feb-10

I

13-Jan-10

14.14

14.4

14.1

14.6

Electrical Load List

Outline Drawing of Generator Auxiliary Panel

14.5

14.17

Painting Procedure (MELCO PORTION)

Equipment List (MELCO PORTION)

Utility List

Submittal Drawing List (MELCO PORTION)

Outline Drawing of Generator Stator Coil Cooling Water Control Panel

Outline Drawing of generator Seal Oil Control Panel

Logic Diagram of Generator Control

Painting Colour List (MELCO PORTION)

Logic Diagram of Generator Auxiliaries

Motor List of Turbine Generator

14.12

14.18

DCPLO-DT0156

DCPL - 0113

15-Feb-10

DCPLO-DT0159

DCPLO-DT0096

DCPLO-DT0090

DCPL - 0156

DCPL - 0119

DCPL - 0148

DCPL - 0113

DCPL - 0064

DCPLO-DT0156

DCPL - 0085

DCPLO-DT0154

DCPL - 0149

DCPLO-DT0172

DCPl - 0035

DCPL - 0152

13-Jan-10 I

I

13-Jan-10

13-Jan-10

DCPLO-DT0106

I

DCPLO-DT0034

16-Mar-10

15-Dec-09

14-Nov-09 DCPLO-DT0009

DCPLO-DT0090

DCPLO-DT0063

13-Jan-10

DCPLO-DT0090

DCPL - 0044

DCPLO-DT0063

DCPLO-DT0155

DCPLO-DT0090

DCPLO-DT0156

DCPLO-DT0077

I

13-Jan-10

DCPLO-DT0096

15-Feb-10

DCPL - 0085

DCPLO-0100

DCPL - 0024

A

I DCPLO-DT0140

DCPLO-DT0105

DCPLO-DT0260

DCPLO-DT0252

DCPLO-DT0260

DCPLO-DT0252

DCPLO-DT0096

DCPLO-DT0189

DCPL - 0154

DCPLO-DT0157

Single line Diagram Generator Circuit

DCPL - 0112

DCPLO-DT0154

A

C

C

C

C

C

C

C

C

C

C

C

C

C

C

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

LMTG-E0-02020 Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 █ 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1JEJ62358 Act. 13-Apr-10 5-May-10 █ 17-Jul-10 █

LMTG-E0-02021 Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 █ █ 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1JEJ62359 Act. 13-Apr-10 10-May-10 4-Jun-10 █ █

LMTG-E0-02022 Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 █ █ 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1JEJ62360 Act. 13-Apr-10 10-May-10 4-Jun-10 █ █

DCPLO-DT0119

DCPL - 0110

DCPLO-DT0155

14.21

Arrengement Drawing of Generator Control & Synchronization Panel

A

A

15-Apr-10

15-Apr-10

14.22

14.20

Arrengement Drawing of Generator Stator Coil Cooling Water Control Panel

Arrengement Drawing of Generator Seal Oil Control Panel

DCPL - 0106

DCPL - 0109

DCPLO-DT0155

DCPL - 0149

DCPLO-DT0119

DCPLO-DT0119

A15-Apr-10

C

C

C

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

Page 06 of 12

Page 53: mrp

Early Start Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date-Unit 1 DTN No

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & T

FLAG

Last

Wk

Rcv

dTo

Rcv

d N

ext W

k

JNSTPP

4th Submission (Rev. D)

Release

Subm

. N

ext W

k

ReceiveJNSTPP

Subm

. N

ext W

k

ReleaseRec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Last

Wk

Subm

ited

Rec

d af

tr

Long

Tim

e

JNSTPP L & T

As Built

L & T

2nd Submission (Rev. B)

FLAG

Last

Wk

Rcv

d

Receive

FLAG

Last

Wk

Subm

ited

ReceiveReceive

1st Submission (Rev. A)

FLAG

Last

Wk

Rcv

d

FLAG

JNSTPP

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & TReleaseRelease ReleaseTo

Rcv

d N

ext W

k 3rd Submission (Rev. C)

FLAG FLAG

Rec

d af

tr

Long

Tim

e

Last

Wk

Rcv

d

FLAG

Receipt Date of Approval

Schedule First

Submission Date C

ateg

ory

(A/I/

N)

Uni

t No.

Sr. No. Description Drawing / Doc. No.

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

LMTG-E0-02023 Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1 17-Jul-10JEU51963 Act. 4-Jun-10 17-Jul-10 10-Sep-10

LMTG-E0-02024 Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1JEZ2V684 Act. 13-Apr-10 5-May-10 █ 17-Sep-10

LMTG-E0-02025 Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1JEZ2V685 Act. 13-Apr-10 10-May-10 █ 17-Sep-10

LMTG-E0-02030 Sch. 15-Feb-11 17-Mar-11 16-Apr-11 16-May-11 15-Jun-11 15-Jul-11 14-Aug-11 13-Sep-11 1 17-Jul-10GAE-KN-E157 Act. 16-Mar-10 7-Apr-10 4-Jun-10 17-Jul-10

LMTG-E0-02031 Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1GAE-KN-E401 Act. 10-Sep-10

LMTG-E0-02034 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10GAE-KN-E801 Act. 17-Jul-10 28-Jul-10 10-Sep-10

LMTG-E0-02035 Sch. 20-Mar-10 19-Apr-10 █ 19-May-10 18-Jun-10 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10GAE-KN-E802 Act. 17-Jul-10 28-Jul-10 █ 17-Sep-10

LMTG-E0-02036 Sch 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10

A

DCPLO-

DCPL - 0156

DCPL - 0109

DCPLO-DT0189

DCPLO-DT0096

DCPL - 0148

DCPLO-DT0155-B

DCPL - 0084

DCPLO-DT0264

A

A

15-Feb-11

14.23

14.30

DCPLO-DT0189

DCPL - 0148

DCPLO-DT0119

DCPLO-DT0265

DCPLO-DT0260

I

A15-Jul-10Specification for Motor Local Control panel

20-Mar-10

A

14.34 20-Mar-10

General Specification of Electrical Control Paneland Cubicle (MELCO PORTION)

A

14.25

Assembly Drawing of Generator Bushing CT Terminal Box

15-Apr-10

Outline Drawing of Direct Current Motor for ST Emergency Oil Pump

14.24 Schematic Diagram of Generator Circuit

14.31

Outline Drawing of Three Phase Induction Motor for ST Turning Oil Pump

14.35

Schematic Diagram of Generator Auxiliaries

DCPLO-DT0260

15-Apr-10

DCPL - 0156

DCPL -

DCPLO-DT026015-Apr-10

DCPL - 0106

DCPLO-DT0119

DCPLO-

DCPLO-DT0155

DCPLO-DT0266

C

C

C

C

C

C

C

LMTG-E0-02036 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10GAE-KN-E803 Act. 17-Jul-10 28-Jul-10 10-Sep-10

LMTG-E0-02037 Sch. 5-Jan-10 4-Feb-10 6-Mar-10 5-Apr-10 █ 5-May-10 4-Jun-10 4-Jul-10 3-Aug-10 1GAE-K N-E901 Act. 2-Oct-09 23-Oct-09 22-Dec-09 5-Jan-10 █

LMTG-E0-02038 Sch. 3-Feb-10 5-Mar-10 4-Apr-10 4-May-10 3-Jun-10 3-Jul-10 2-Aug-10 1-Sep-10 1 18-Jun-10JEK79173 Act. 1-Feb-10 12-Feb-10 1-Jun-10 18-Jun-10

LMTG-E0-02039 Sch. 3-Feb-10 5-Mar-10 4-Apr-10 4-May-10 3-Jun-10 3-Jul-10 2-Aug-10 1-Sep-10 1 18-Jun-10JEK79174 Act. 1-Feb-10 12-Feb-10 1-Jun-10 18-Jun-10

LMTG-E0-02040 Sch. 3-Feb-10 5-Mar-10 4-Apr-10 4-May-10 3-Jun-10 3-Jul-10 2-Aug-10 1-Sep-10 1 18-Jun-10JEK79175 Act. 1-Feb-10 12-Feb-10 1-Jun-10 18-Jun-10

LMTG-E0-02041 Sch. 3-Feb-10 5-Mar-10 4-Apr-10 4-May-10 █ 3-Jun-10 3-Jul-10 █ █ 2-Aug-10 1-Sep-10 1 12-Feb-10JEK79176 Act. 1-Feb-10 12-Feb-10 24-Mar-10 █ 1-Jun-10 █ █

LMTG-E0-02042 Sch. 11-Feb-10 13-Mar-10 12-Apr-10 12-May-10 11-Jun-10 11-Jul-10 10-Aug-10 9-Sep-10 1 12-Feb-10JEU51974 Act. 1-Feb-10 12-Feb-10

LMTG-E0-02101 Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1 28-Jul-10JEJ63766 Act. 22-Dec-09 5-Jan-10 16-Mar-10 7-Apr-10 17-Jul-10 28-Jul-10

LMTG-E0-02102 Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1JEZ2Z308 Act. 12-Aug-10 6-Sep-10

LMTG-Q0-02201 Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 █ 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1JEVM-8F38-02 Act. 31-Oct-09 5-Jan-10 █ 22-Feb-10 8-Mar-10 █

LMTG-Q0-02202 Sch. 15-Aug-10 14-Sep-10 █ █ 14-Oct-10 13-Nov-10 13-Dec-10 12-Jan-11 11-Feb-11 13-Mar-11 1JEVM-8F38-11 Act. 9-Aug-10 █ █

LMTG-Q0-02203 Sch. 15-Aug-10 14-Sep-10 █ █ 14-Oct-10 13-Nov-10 13-Dec-10 12-Jan-11 11-Feb-11 13-Mar-11 1JEVM-8F38-12 Act. 9-Aug-10 █ █

LMTG-E0-02301 Sch. 13-Mar-10 12-Apr-10 █ 12-May-10 11-Jun-10 11-Jul-10 10-Aug-10 9-Sep-10 9-Oct-10 1A11K933 Act. 22-Mar-10 24-Apr-10 █

LMTG-E0-02302 Sch. 13-Mar-10 12-Apr-10 █ █ 12-May-10 11-Jun-10 11-Jul-10 10-Aug-10 9-Sep-10 9-Oct-10 1A11K934 Act. 22-Mar-10 11-Jun-10 █ █ 17-Sep-10

LMTG-E0-02303 Sch. 13-Mar-10 12-Apr-10 █ █ 12-May-10 11-Jun-10 11-Jul-10 10-Aug-10 9-Sep-10 9-Oct-10 1A11K935 Act. 4-Jun-10 █ █

LMTG-E0-02304 Sch. 13-Mar-10 12-Apr-10 █ █ 12-May-10 11-Jun-10 11-Jul-10 10-Aug-10 9-Sep-10 9-Oct-10 1

DCPLO-DT0102

13-Mar-10

13-Mar-10

Turbine Generator Cooling Water Diagram

13-Mar-10

A

13-Mar-10 A

A

A

DCPLO-A DCPL -

DCPLO-DT0102DCPLO-DT0155

DCPL - 0127

DCPLO-DT0189

I

A

DCPL - 0024

DCPLO-DT0189

DCPL - 0002

DCPL - 0044

DCPL - 0085

DCPl -0136

DCPLO-DT0030

DCPLO - 0105

DCPL - 0175

I

I

I

DCPl -0136

DCPLO-DT0088

DCPl - 0156

15-Jul-10

A

A

14.39

DCPLO-DT0063

DCPL - 0044

DCPLO-DT0154

DCPLO-DT0154

14.40

14.36

14.77

14.78

14 80 Turbine Generator Stator Coil Cooling Water Diagram

Specification & Schemetic Diagram of Brushless Excitation System

Turbine Generator H2 & CO2 Gas Diagram

Turbine Generator Seal Oil Diagram

15-Apr-10

5-Jan-10

Electrical Equipments General Arrangements (EL+0.00M)

14.46

Phase Disposition of General Busduct

15-Aug-10

14.42

Shop Test and Inspection Procedure for Control Panel

3-Feb-10

3-Feb-10 I

Outline Drawing of Direct Motor for ST Jacking Oil Pump (B) A20-Mar-10

3-Feb-10

Electrical Equipments General Arrangements (EL+17.00M)

Loading Diagram for MELCO Equipments (EL+0.00M, EL+9.00M, EL+17.00M)

14.37

14.43

3-Feb-10

Shop Test and Inspection Procedure for AVR Cubicle

14.44

QAP - Generator

Outline Drawing AVR Cubicle

14.48

14.41

14.47

14.38

Electrical Equipments General Arrangements (EL+9.00M)

Datasheet for Generator & Accessories

DCPL - 0066

DCPLO-DT0218

DCPLO-DT0224

A

DCPLO-DT0063

DCPL - 0044I

DCPLO-DT006311-Feb-10 DCPL -

0044

DCPl -0136

DCPL - 0156

15-Aug-10

15-Apr-10

DCPL - 0095

14.79

DCPLO-DT0264

DCPLO-DT0007

DCPLO-DT0096

DCPL - 0024

DCPLO-DT0260

DCPLO-DT0154

DCPLO-DT0063

DCPLO-DT0154

DCPLO-DT0030

DCPLO-DT0063

DCPL - 0044

JPVLO-DT0002

DCPL - 0023

DCPLO-DT0218

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

p y g pA11K936 Act. 4-Jun-10 25-Aug-10 █ █

LMTG-E0-02305 Sch. 15-Dec-09 14-Jan-10 13-Feb-10 15-Mar-10 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 1 24-May-10A11K768 Act. 22-Dec-09 5-Jan-10 16-Mar-10 7-Apr-10 11-May-10 24-May-10

LMTG-E0-02306 Sch. 1-May-10 31-May-10 █ █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1A11K937 Act. 29-Apr-10 25-Aug-10 █ █

LMTG-E0-02307 Sch. 1-May-10 31-May-10 █ █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1A11K938 Act. 29-Apr-10 25-Aug-10 █ █

LMTG-E0-02308 Sch. 1-May-10 31-May-10 █ █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1ASO2382 Act. 29-Apr-10 25-Aug-10 █ █

LMTG-E0-02309 Sch. 1-May-10 31-May-10 █ 30-Jun-10 30-Jul-10 █ 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1 8-Jun-10ASO2383 Act. 23-Apr-10 8-Jun-10 █ 12-Aug-10 █

LMTG-E0-02310 Sch. 1-May-10 31-May-10 █ 30-Jun-10 30-Jul-10 █ 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1 8-Jun-10ASO2384 Act. 23-Apr-10 8-Jun-10 █ 12-Aug-10 █

LMTG-E0-02311 Sch. 1-May-10 31-May-10 █ █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1ASO2385 Act. 23-Apr-10 30-Aug-10 █ █

LMTG-E0-02312 Sch. 1-May-10 31-May-10 █ 30-Jun-10 30-Jul-10 █ 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1 8-Jun-10ASO2386 Act. 23-Apr-10 8-Jun-10 █ 12-Aug-10 █

LMTG-E0-02313 Sch. 1-May-10 31-May-10 █ █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1ASO2387 Act. 23-Apr-10 30-Aug-10 █ █

LMTG-E0-02314 Sch. 1-May-10 31-May-10 █ █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1ASO2388 Act. 23-Apr-10 30-Aug-10 █ █

LMTG-E0-02315 Sch. 27-Mar-10 26-Apr-10 26-May-10 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 23-Oct-10 1A11K775 Act. 18-Mar-10 20-Apr-10 17-Jul-10 28-Jul-10 7-Sep-10

LMTG-E0-02316 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K967 Act. 20-Jul-10 █ █

LMTG-E0-02317 Sch. 27-Mar-10 26-Apr-10 █ 26-May-10 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 23-Oct-10 1A11K769 Act. 5-Apr-10 3-May-10 █

LMTG-E0-02318 Sch. 27-Mar-10 26-Apr-10 █ 26-May-10 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 23-Oct-10 1A11K770 Act. 5-Apr-10 3-May-10 █

LMTG-E0-02319 Sch. 27-Mar-10 26-Apr-10 █ 26-May-10 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 23-Oct-10 1A11K771 Act 5 Apr 10 3 May 10 █

1-May-10

1-May-10

I

I

I

DCPL - 0105

1-May-10

DCPL - 0172

1-May-10

13-Mar-10

1-May-10

DCPL - 0105

27-Mar-10

1-May-10

I

DCPLO-DT0100

1-May-10

1-May-10

14.84

14.85

1-May-10

I

DCPLO-DT0126I

DCPLO-DT0126DCPLO-DT0126

DCPL - 0172

DCPl - 0090

DCPLO-DT0113

A

I

DCPLO-DT0113

DT0155

DCPl - 0167

DCPLO-DT0138

DCPLO-DT0224

DCPL - 0105

DCPl - 0167

DCPL - 0172I

DCPLO-DT0189

DCPLO-DT0252

I

A

DCPl - 0156

DCPLO-DT0030-0

0166DCPLO-

DT0096-A

DCPL - 0125

DCPLO-DT0138

I

A

I

A

DCPl - 0167

DCPLO-DT0126

DCPLO-DT0140-B

DCPL - 0125

Turbine Generator CT Terminal Box & Coduits Arrengement

14.93

14.94

14.95

Turbine Generator H2 Has Pressure / Purity Monitoring Unit Outline

14.91

14.92

14.87

27-Mar-10

14.88

14.80 Turbine Generator Stator Coil Cooling Water Diagram

Turbine Generator Outline

Turbine Generator Terminal and CT Assembly

Turbine Generator Instrument Wiring Arregement (2 / 6)

Turbine Generator H2 Has Drayer Outline

Turbine Generator Seal Oil Supply Unit Outline

14.81

14.82

14.83

Turbine Generator Instrument Wiring Arregement (3 / 6)

14.90

14.86

Turbine Generator Vapour Extractor Outline

Turbine Generator Stator Coil Cooling Water Supply unit outline

15-Dec-09

15-Jul-10

27-Mar-10

27-Mar-10

DCPL - 0125

DCPL - 0085-A

I

14.89

Turbine Generator Loop Seal Tank Outline

Turbine Generator Water Detector Outline

Turbine Generator CO2 Gas Supply Unit Diagram

Turbine Generator H2 Gas Supply Unit Diagram

Turbine Generator Instrument Wiring Arregement (1 / 6)

DCPLO-DT0126

DCPLO-DT0138

DCPLO-DT0126

DCPLO-DT0113

DCPLO-DT0201

DCPL - 0021

DCPLO-DT0224

DCPLO-DT0224

DCPL - 0119

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C A11K771 Act. 5-Apr-10 3-May-10 █

LMTG-E0-02320 Sch. 27-Mar-10 26-Apr-10 █ 26-May-10 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 23-Oct-10 1A11K772 Act. 5-Apr-10 3-May-10 █

LMTG-E0-02321 Sch. 27-Mar-10 26-Apr-10 █ 26-May-10 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 23-Oct-10 1A11K773 Act. 5-Apr-10 3-May-10 █

LMTG-E0-02322 Sch. 27-Mar-10 26-Apr-10 █ 26-May-10 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 23-Oct-10 1A11K774 Act. 5-Apr-10 3-May-10 █

LMTG-E0-02323 Sch. 1-May-10 31-May-10 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10A11K939 Act. - 7-Sep-10

LMTG-E0-02324 Sch. 1-May-10 31-May-10 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10A11K940 Act. - 7-Sep-10

LMTG-E0-02325 Sch. 1-May-10 31-May-10 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10A11K941 Act. - 7-Sep-10

LMTG-E0-02326 Sch. 9-Jan-10 8-Feb-10 █ 10-Mar-10 9-Apr-10 9-May-10 8-Jun-10 8-Jul-10 7-Aug-10 1AS02549 Act. 6-Jan-10 17-Jul-10 █ 7-Sep-10

LMTG-E0-02327 Sch. 9-Jan-10 8-Feb-10 10-Mar-10 9-Apr-10 █ █ 9-May-10 8-Jun-10 8-Jul-10 7-Aug-10 1A11K776 Act. 29-Dec-09 2-Jan-10 16-Mar-10 █ █

LMTG-E0-02328 Sch. 9-Jan-10 8-Feb-10 █ █ 10-Mar-10 9-Apr-10 9-May-10 8-Jun-10 8-Jul-10 7-Aug-10 1AS02551 Act. 6-Jan-10 31-Mar-10 █ █

LMTG-E0-02329 Sch. 9-Jan-10 8-Feb-10 █ █ 10-Mar-10 9-Apr-10 █ 9-May-10 8-Jun-10 8-Jul-10 7-Aug-10 1 15-Jun-10AS02550 Act. 6-Jan-10 █ █ 12-Feb-10 15-Jun-10 █

LMTG-E0-02330 Sch. 1-May-10 31-May-10 █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1A11K777 Act. 23-Apr-10 17-Jul-10 █ 7-Sep-10

LMTG-E0-02331 Sch. 1-May-10 31-May-10 █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1A11K778 Act. 23-Apr-10 3-Aug-10 █ 7-Sep-10

LMTG-E0-02332 Sch. 1-May-10 31-May-10 █ █ 30-Jun-10 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 27-Nov-10 1AS02389 Act. 26-Jul-10 █ █

LMTG-E0-02333 Sch. 31-Mar-10 30-Apr-10 █ 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 27-Sep-10 27-Oct-10 1 15-Jun-10A11K942 Act. 20-Apr-10 17-Jul-10 █ 1-Sep-10

LMTG-E0-02334 Sch. 31-Mar-10 30-Apr-10 █ 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 27-Sep-10 27-Oct-10 1 15-Jun-10A11K943 Act. 20-Apr-10 17-Jul-10 █

31-Mar-10

DCPLO-DT0044

DCPLO-DT0124

1-May-10

9-Jan-10

I

27-Mar-10

DCPL - 0150

DCPLO-DT0127

Turbine Generator Foundation Embedded Materials Layout (2 / 4)

0105

1-May-10

I

DCPLO-DT0113

Turbine Generator Foundation Embedded Materials Layout (1 / 4)

I

I

DCPL - 0076

I

DCPLO-DT0124

DCPL - 0018

DCPL - 0150

DCPLO-DT0113

I

DCPLO-DT0209

I

A

I

I

1-May-10

31-Mar-10

1-May-10

DCPLO-DT0127

DCPLO-DT0085-0

DT0113

DCPL - 0105

DCPLO-DT0252

27-Mar-10

DCPLO-DT0252

1-May-10

I

9-Jan-10

DCPLO-DT0044-0I

I

DCPL - 0159

DCPL - 0132

DCPLO-DT0096

9-Jan-10

DCPLO-DT0034-0

DCPL - 0150

9-Jan-10

DCPLO-DT0252

A

A

Turbine Generator Instrument Wiring Arregement (6 / 6)

Turbine Generator Hydragen Gas Temperature Control Valve Outline

14.102

Turbine Generator Instrument Wiring Arregement (4 / 6)

14.99

14.98

14.100

14.104

14.101 Turbine Generator Auxiliary Equipment Wiring Diagram (3 / 3)

Turbine Generator Foundation Bolt Arrengement

Turbine Generator Ground Connection Terminal Arrengement

g g ( )

Turbine Generator Instrument Wiring Arregement (5 / 6)

Turbine Generator Auxiliary Equipment Wiring Diagram (1 / 3)

1-May-10

27-Mar-10

Turbine Generator Auxiliary Equipment Wiring Diagram (2 / 3)

14.109

14.108

14.106 Turbine Generator Method of Mounting (1 / 2)

Turbine Generator Method of Mounting (2 / 2)

14.97

Turbine Generator Foundation Conduit Arrengement

14.110

14.105

14.107

14.103

Turbine Generator Anchor for Pulling Out Rotor

14.96

DCPLO-DT0044

DCPLO-DT0113

DCPLO-DT0252

DCPLO-DT0248

DCPL - 0105

DCPL - 0105

DCPLO-DT0252

DCPL - 0150

DCPLO-DT0252

C

C

C

C

C

C

C

C

C

C

C

C

C

C

Cp

LMTG-E0-02335 Sch. 31-Mar-10 30-Apr-10 █ 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 27-Sep-10 27-Oct-10 1 15-Jun-10A11K944 Act. 20-Apr-10 17-Jul-10 █

( )

31-Mar-10 DCPLO-DT0124

DCPL - 0150ITurbine Generator Foundation Embedded Materials Layout

(3 / 4)14.111C

Page 07 of 12

Page 54: mrp

Early Start Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date-Unit 1 DTN No

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & T

FLAG

Last

Wk

Rcv

dTo

Rcv

d N

ext W

k

JNSTPP

4th Submission (Rev. D)

Release

Subm

. N

ext W

k

ReceiveJNSTPP

Subm

. N

ext W

k

ReleaseRec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Last

Wk

Subm

ited

Rec

d af

tr

Long

Tim

e

JNSTPP L & T

As Built

L & T

2nd Submission (Rev. B)

FLAG

Last

Wk

Rcv

d

Receive

FLAG

Last

Wk

Subm

ited

ReceiveReceive

1st Submission (Rev. A)

FLAG

Last

Wk

Rcv

d

FLAG

JNSTPP

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & TReleaseRelease ReleaseTo

Rcv

d N

ext W

k 3rd Submission (Rev. C)

FLAG FLAG

Rec

d af

tr

Long

Tim

e

Last

Wk

Rcv

d

FLAG

Receipt Date of Approval

Schedule First

Submission Date C

ateg

ory

(A/I/

N)

Uni

t No.

Sr. No. Description Drawing / Doc. No.

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

LMTG-E0-02336 Sch. 31-Mar-10 30-Apr-10 █ 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 27-Sep-10 27-Oct-10 1 15-Jun-10A11K945 Act. 20-Apr-10 17-Jul-10 █

LMTG-E0-02337 Sch. 31-Mar-10 30-Apr-10 █ █ 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 27-Sep-10 27-Oct-10 1A11K946 Act. 20-Apr-10 █ █

LMTG-E0-02338 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K947 Act. 20-Jul-10 █ █

LMTG-E0-02339 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K948 Act. 20-Jul-10 █ █

LMTG-E0-02340 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K949 Act. 20-Jul-10 █ █

LMTG-E0-02341 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K950 Act. 20-Jul-10 █ █

LMTG-E0-02342 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K951 Act. 20-Jul-10 █ █

LMTG-E0-02343 Sch 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1

14.113

DCPL - 015014.112

I15-Jul-10

Turbine Generator Cooling Water Piping (1 / 5)

14.114

Turbine Generator Foundation Embedded Conduit Layout

Turbine Generator Exhaust Piping (2 / 2)

Turbine Generator Cooling Water Piping (3 / 5)14.118

I

DCPLO-DT0201

14.115

14.116

DCPLO-DT0124

DCPLO-DT0201

15-Jul-10

DCPLO-DT0124

DCPLO-DT0201

I15-Jul-10

I

I

31-Mar-10

31-Mar-10

15-Jul-10

I

ITurbine Generator Foundation Embedded Materials Layout (4 / 4)

Turbine Generator Exhaust Piping (1 / 2)

14.117 Turbine Generator Cooling Water Piping (2 / 5) DCPLO-DT0201DCPLO-DT0201DCPLO-

15-Jul-10

C

C

C

C

C

C

C

LMTG-E0-02343 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K952 Act. 20-Jul-10 █ █

LMTG-E0-02344 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K953 Act. 20-Jul-10 █ █

LMTG-E0-02345 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K954 Act. 20-Jul-10 █ █

LMTG-E0-02346 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K955 Act. 20-Jul-10 █ █

LMTG-E0-02347 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K956 Act. 20-Jul-10 █ █

LMTG-E0-02348 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K957 Act. 20-Jul-10 █ █

LMTG-E0-02349 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K958 Act. 20-Jul-10 █ █

LMTG-E0-02350 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K959 Act. 20-Jul-10 █ █

LMTG-E0-02351 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K960 Act. 20-Jul-10 █ █

LMTG-E0-02352 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K961 Act. 20-Jul-10 █ █

LMTG-E0-02353 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K962 Act. 20-Jul-10 █ █

LMTG-E0-02354 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K963 Act. 20-Jul-10 █ █

LMTG-E0-02355 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K964 Act. 20-Jul-10 █ █

LMTG-E0-02356 Sch. 15-Jul-10 14-Aug-10 █ █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1A11K965 Act. 20-Jul-10 █ █

LMTG-E0-02357 Sch. 31-Mar-10 30-Apr-10 █ █ 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 27-Sep-10 27-Oct-10 1A11K966 Act. 20-Jul-10 █ █

LMTG-E0-02361 Sch. 9-Jan-10 8-Feb-10 █ 10-Mar-10 9-Apr-10 9-May-10 8-Jun-10 8-Jul-10 7-Aug-10 1 15-Jun-10

Turbine Generator Gas & Seal Oil Piping (8 / 10) I

I

14.123

14.131

14.130

I

I

I

14.121

14.126 Turbine Generator Gas & Seal Oil Piping (6 / 10)

Turbine Generator Cooling Water Piping (4 / 5)

Turbine Generator Gas & Seal Oil Piping (5 / 10)

Turbine Generator Gas Feed Piping (1 / 2)

15-Jul-10

DCPLO-DT0201

DCPLO-DT0201

14.122

DCPLO-DT0201

15-Jul-10

14.129

15-Jul-10

DCPLO-DT0201

14.124

Turbine Generator Cooling Water Piping (5 / 5)

Turbine Generator Gas & Seal Oil Piping (1 / 10)

Turbine Generator Gas & Seal Oil Piping (2 / 10)

15-Jul-10

15-Jul-10

I

15-Jul-10

DCPLO-DT0201

Plan of Scaffolding for Turbine Generator Maintenance DCPLO-DT0201A

9-Jan-10

15-Jul-10

DCPLO-DT0201

14.133

14.132

14.125

14.119

Turbine Generator Gas & Seal Oil Piping (7 / 10)

14 137 Turbine Generator Grout Retainer Arrengement

Turbine Generator Gas & Seal Oil Piping (9 / 10)

14.128

14.127 I

I

15-Jul-10

DCPLO-DT0201

Turbine Generator Gas Feed Piping (2 / 2) I

Turbine Generator Gas & Seal Oil Piping (10 / 10) I

DCPLO-DT0201

I

DCPLO-DT020114.120

DCPLO-

DCPLO-DT0201

DCPLO-DT0201

Turbine Generator Gas & Seal Oil Piping (4 / 10)

Turbine Generator Gas & Seal Oil Piping (3 / 10)

I

15-Jul-10

DCPL -

15-Jul-10

15-Jul-10

I

31-Mar-10

DCPLO-

DCPLO-DT0201

DCPLO-DT0201

I

15-Jul-10

15-Jul-10

I

DCPLO-DT0201

15-Jul-10

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C p y gAS02552 Act. 6-Jan-10 16-May-10 █ 7-Sep-10

LMTG-E0-02362 Sch. 9-Jan-10 8-Feb-10 █ 10-Mar-10 9-Apr-10 9-May-10 8-Jun-10 8-Jul-10 7-Aug-10 1 15-Jun-10AS02553 Act. 6-Jan-10 16-May-10 █ 7-Sep-10

LMTG-E0-02363 Sch. 9-Jan-10 8-Feb-10 █ 10-Mar-10 9-Apr-10 9-May-10 8-Jun-10 8-Jul-10 7-Aug-10 1 15-Jun-10A35E036 Act. 6-Jan-10 16-May-10 █

LMTG-E0-02601 Sch. █ 16-Mar-10 15-Apr-10 █ 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-1009JNG723A0B00 Act. █ █ 17-Sep-10

LMTG-E0-02602 Sch. █ 16-Mar-10 15-Apr-10 █ 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-1009JNG723F0B00 Act. █ █ 17-Sep-10

LMTG-E0-02605 Sch. 16-Mar-10 15-Apr-10 █ 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 1JNM005C682P31 Act. 23-Mar-10 7-Apr-10 █ 17-Sep-10

LMTG-E0-02801 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 18-Jul-10 17-Aug-10 █ 16-Sep-10 16-Oct-10 1 28-Jul-10BC22689 Act. 5-Jun-10 18-Jun-10 19-Jul-10 28-Jul-10 █ 17-Sep-10

LMTG-E0-02802 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 18-Jul-10 17-Aug-10 █ 16-Sep-10 16-Oct-10 1 28-Jul-10BC22690 Act. 5-Jun-10 18-Jun-10 19-Jul-10 28-Jul-10 █ 17-Sep-10

LMTG-E0-02803 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 18-Jul-10 17-Aug-10 █ 16-Sep-10 16-Oct-10 1 28-Jul-10BC22691 Act. 5-Jun-10 18-Jun-10 19-Jul-10 28-Jul-10 █ 17-Sep-10

LMTG-E0-02804 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 █ 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10BC22692 Act. 18-May-10 18-Jun-10 19-Jul-10 28-Jul-10 █ 17-Sep-10

LMTG-E0-02805 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 █ 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10BC22693 Act. 18-May-10 18-Jun-10 19-Jul-10 28-Jul-10 █ 17-Sep-10

LMTG-E0-02806 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 █ 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10BC22694 Act. 18-May-10 18-Jun-10 19-Jul-10 28-Jul-10 █ 17-Sep-10

LMTG-E0-02807 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 █ 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10BC22695 Act. 18-May-10 18-Jun-10 19-Jul-10 28-Jul-10 █ 17-Sep-10

LMTG-E0-02808 Sch. 20-Mar-10 19-Apr-10 19-May-10 18-Jun-10 █ 18-Jul-10 17-Aug-10 16-Sep-10 16-Oct-10 1 28-Jul-10BC22696 Act. 18-May-10 18-Jun-10 19-Jul-10 28-Jul-10 █ 17-Sep-10

15 VDR - Boiler & its Auxiliaries 168.4Sch. 6-Jan-10 5-Feb-10 1 13-May-10A t 6 J 10

DCPL - 0155

DCPL - 0155

DCPL - 0155

Outline Dimensions of AC Motor for Jacking Oil Pump (A)

DCPLO-DT0192

DCPL - 0138

DCPLO-DT0045

DCPL - 0138

DCPL - 0155

9-Jan-10

Outline Dimensions and unit Data sheet of Unit 1 & 2 DC motor Starter

16-Mar-10

14.139

14.181

DCPLO-DT0145

14.138

I

Turnine Generator Load on Foundation

14.160 A

9-Jan-10

14.186

14.137 Turbine Generator Grout Retainer Arrengement

20-Mar-10

A

I

DCPLO-DT0157-B20-Mar-10

Outline Dimensions of AC Motor for Turning Gear

Outline Dimensions and Datasheet of Unit 1 & 2 Distribution Board

16-Mar-10

A

A

DCPLO-DT0145

DCPLO-DT0145

6-Jan-10

20-Mar-10

97000-2381-7

Outline Dimensions of AC Motor for Auxiliary Oil Pump A

20-Mar-10

A

A

A

Information of Boiler Drain to Turbine Atmospheric Flash T k

14.164

14.180

14.185

14.184

14.183

14.182

DCPLO-DT0252

DCPLO-DT0267A

DCPL - 0132

DCPLO-DT0044-0

DCPLO-DT0145

DCPL - 0138

DCPL - 0155

DT0044-0 0132

9-Jan-10

I

Embedded Plate Arrengement for Natural Cover Support

DCPLO-DT0044-0

DCPLO-DT0264

DCPLO-DT0268

DCPLO-DT0268

DT02852

DCPL - 0132

I

DCPLO-DT0192DCPLO-DT0192

14.161

14.179

15.1

16-Mar-10

DCPLO-DT0192

DCPL - 0155

DCPLO-DT0157-B

DCPLO-DT0157-B

DCPL - 0138

DCPLO-DT0104

DCPL - 0138

Outline Dimensions of AC Motor for Main Oil Tank Vapour Extractor Fan (A)

Outline Dimensions of AC Motor for Polishing Pump 20-Mar-10 A

Outline Dimensions of AC Motor for Storage Tank Oil Transfer Pump

20-Mar-10

Outline Dimensions of AC Motor for Main Oil Tank Oil Transfer Pump

20-Mar-10

DCPLO-DT0145

DCPL - 0138

Outline Dimensions of AC Motor for Main Oil Tank Vapour Extractor Fan (B)

DCPLO-DT0192

DCPLO-DT0192

DCPLO-DT0267General Specification of Unit 1 & 2 Distribution Board

DCPLO-DT0266

DCPLO-DT0192

DCPLO-DT0268

DCPL - 0086

DCPL - 0155

DCPLO-DT0267

DCPL - 0138

DCPL - 0155

DCPLO-DT0192

DCPLO-DT0268

DCPLO-DT0268

DCPLO-DT0268

20-Mar-10 A

DCPL - 0138

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

Act. 6-Jan-10Sch. 6-Jan-10 5-Feb-10 1 13-May-10Act. 6-Jan-10Sch. 6-Jan-10 5-Feb-10 1 13-May-10Act. 6-Jan-10Sch. 28-Jun-10 28-Jun-10Act. 28-Jun-10 28-Jun-10Sch. 28-Jun-10 28-Jun-10Act. 28-Jun-10 28-Jun-10Sch. 28-Jun-10 28-Jun-10Act. 28-Jun-10 28-Jun-10Sch. 28-Jun-10 28-Jun-10Act. 28-Jun-10 28-Jun-10Sch. 28-Jun-10 28-Jun-10Act. 28-Jun-10 28-Jun-10Sch. 28-Jun-10 28-Jun-10Act. 28-Jun-10 28-Jun-10Sch. 28-Jun-10 28-Jun-10Act. 28-Jun-10 28-Jun-10

15.2

DT0045

97000-2381-8

15.4 Legend for P&I Diagram

15.3

I

15.4

I DCPLO-DT0045

6 Jan 10

6-Jan-10

97000 2381 7Tank

97000-2281

LMB-531Rev - 0

DCPLO-DT0045

LMB-531Rev - 1

15.1

WDC Valve Drain Information

LMB-531Rev - 0

LMB-531Rev - 0

P&ID - Main Steam & Reheat Steam 97000-2111-1 28-Jun-10 I

6-Jan-10

P&ID - Chemical Injection System 97000-2135-1 28-Jun-10

P&ID - SAH System 97000-2112-2 28-Jun-10

Boiler Feed Water Quality

I

I

28-Jun-10 I97000-2110

LMB-531Rev - 1

I

C

C

C

C

C

C

C

C

C 15.4 P&ID - Start-up System 97000-2111-2 28-Jun-10 I LMB-531Rev - 1

15.4

C 15.4 P&ID - Oxygen Injection System 97000-2135-1-2 28-Jun-10 I

15.4 P&ID - Auxiliary System 97000-2112-1 28-Jun-10 I LMB-531Rev - 0

15.4

Page 08 of 12

Page 55: mrp

Early Start Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date-Unit 1 DTN No

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & T

FLAG

Last

Wk

Rcv

dTo

Rcv

d N

ext W

k

JNSTPP

4th Submission (Rev. D)

Release

Subm

. N

ext W

k

ReceiveJNSTPP

Subm

. N

ext W

k

ReleaseRec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Last

Wk

Subm

ited

Rec

d af

tr

Long

Tim

e

JNSTPP L & T

As Built

L & T

2nd Submission (Rev. B)

FLAG

Last

Wk

Rcv

d

Receive

FLAG

Last

Wk

Subm

ited

ReceiveReceive

1st Submission (Rev. A)

FLAG

Last

Wk

Rcv

d

FLAG

JNSTPP

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & TReleaseRelease ReleaseTo

Rcv

d N

ext W

k 3rd Submission (Rev. C)

FLAG FLAG

Rec

d af

tr

Long

Tim

e

Last

Wk

Rcv

d

FLAG

Receipt Date of Approval

Schedule First

Submission Date C

ateg

ory

(A/I/

N)

Uni

t No.

Sr. No. Description Drawing / Doc. No.

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

16 VDR - HED Items 1204.916.1 VDR - Heaters 355.0

16.1.1 General documentsSch. 15-Oct-09 14-Nov-09 14-Dec-09 13-Jan-10 12-Feb-10 14-Mar-10 13-Apr-10 13-May-10 1 5-Dec-10Act. 15-Oct-09 6-Nov-09 23-Nov-09 5-Dec-09Sch. 15-Oct-09 14-Nov-09 14-Dec-09 13-Jan-10 12-Feb-10 14-Mar-10 13-Apr-10 13-May-10 1 5-Dec-10Act. 15-Oct-09 6-Nov-09 23-Nov-09 5-Dec-09

16.1.2 HP Heater 8A / 8BSch. 12-Jan-10 11-Feb-10 █ 13-Mar-10 12-Apr-10 12-May-10 11-Jun-10 █ 11-Jul-10 10-Aug-10 1 23-Apr-10Act. 4-Jan-10 24-Mar-10 █ 9-Apr-10 23-Apr-10 █ 18-Sep-10Sch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1Act. 22-Jan-10 14-May-10 █ █

Sch. 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 12-Aug-10 11-Sep-10 █ █ 11-Oct-10 10-Nov-10Act 14-Jul-10 █ █

DCPLO-DT0180

16.1.2.2

AQAP - HP Heater

QAP - LP Heater

Technical Datasheet for HPH-8A/8B

16.1.1.3

16.1.1.4

DCPL - 0114

A DCPL - 0073

DCPLO-DT0273

DCPL - 0009

I16.1.2.3

16.1.2.1

Complete Mechanical Design Calculation

DCPL - 0003

DCPLO-DT0017

DCPLO-DT0004LT-QO-03001 DCPL -

000915-Oct-09

LT-M0-03058 IGA Drawing for HPH-8A/8B. (Including Sectional View & Internal Details)

LT-M0-03057

LT-QO-03002 DCPLO-DT0004

DCPLO-DT0017

DCPL - 0091

DCPLO-DT0114

15-Oct-09 A

30-Jan-10

12-Jan-10

14-Apr-10LT-M0-03059

DCPLO-DT0043DCPLO-DT0071

DCPL - 0003C

C

C

C

CAct. 14-Jul-10 █ █

Sch. 14-Feb-10 16-Mar-10 █ █ 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 1Act. 15-Apr-10 1-Jun-10 █ █

16.1.3 Hp Heater 7A / 7BSch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1Act. 22-Jan-10 14-May-10 █ █

Sch. 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 █ █ 12-Aug-10 11-Sep-10 11-Oct-10 10-Nov-10Act. 14-Jul-10 █ █

Sch. 14-Feb-10 16-Mar-10 █ █ 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 1Act. 15-Apr-10 1-Jun-10 █ █

16.1.4 Hp Heater 6A / 6BC Sch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1C Act. 22-Jan-10 14-May-10 █ █

C Sch. 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 █ █ 12-Aug-10 11-Sep-10 11-Oct-10 10-Nov-10C Act. 14-Jul-10 █ █

C Sch. 14-Feb-10 16-Mar-10 █ █ 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 1C Act. 15-Apr-10 1-Jun-10 █ █

16.1.5 LP Haeter 4Sch. 12-Jan-10 11-Feb-10 █ 13-Mar-10 12-Apr-10 █ █ 12-May-10 11-Jun-10 █ 11-Jul-10 10-Aug-10 1 23-Apr-10Act. 4-Jan-10 15-Mar-10 █ 9-Apr-10 █ █ █ 18-Sep-10Sch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1Act. 22-Jan-10 24-May-10 █ █

Sch. 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 █ █ 12-Aug-10 11-Sep-10 11-Oct-10 10-Nov-10Act. 14-Jul-10 █ █

Sch. 14-Feb-10 16-Mar-10 █ █ 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 1Act. 15-Apr-10 1-Jun-10 █ █

16.1.6 LP Heater 3Sch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1Act. 22-Jan-10 24-May-10 █ █

Sch. 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 █ █ 12-Aug-10 11-Sep-10 11-Oct-10 10-Nov-10A 14 J l 10

16.1.5.2

16.1.5.1

16.1.5.3

12-Jan-10

14-Apr-10LT-M0-03072

DT0180

DCPLO-DT0122

Safety Valve Sizing Calculation

LT-M0-03071

16.1.3.3

16.1.3.2

Safety Valve Sizing Calculation

16.1.4.2

16.1.4.1

Complete Mechanical Design Calculation

16.1.4.3

16.1.3.1

Safety Valve Sizing Calculation

GA Drawing for HPH-7A/7B. (Including Sectional View & Internal Details)

Complete Mechanical Design Calculation

14-Feb-10LT-M0-03073

GA Drawing for LPH-3(Including Sectional View & Internal Details)

GA Drawing for HPH-6A/6B. (Including Sectional View & Internal Details)

30-Jan-10

16.1.2.4

DCPLO-DT0114

DCPLO-DT0043

I

I

I

DCPL - 0121

Safety Valve Sizing Calculation

Technical Datasheet for LPH-4

LT-M0-03067 14-Apr-10

I

LT-M0-03075

A

LT-M0-03066

DCPL - 0068LT-M0-03070

GA Drawing for LPH-4(Including Sectional View & Internal Details)

I

DCPL - 0114

DCPL - 0121

DCPL - 0091

DCPLO-DT0180

DCPLO-DT0273

14-Feb-10

LT-M0-03063

LT-M0-03064

LT-M0-03062

I

LT-M0-03060

30-Jan-10

DCPLO-DT0071

DCPL - 0121

I

I

DCPLO-DT0071

LT-M0-03076

14-Feb-10

I

I

30-Jan-10

Complete Mechanical Design Calculation

16.1.6.2

16.1.5.4

16.1.6.1

Complete Mechanical Design Calculation

LT-M0-03068

14-Apr-10

I

DCPLO-DT0122

14-Apr-10

14-Feb-10

30-Jan-10

DCPLO-DT0122

DCPLO-DT0122

DCPLO-DT0071-0

I

DCPL - 0121

DCPL - 0118

DCPLO-DT0181

DCPLO-DT0071+0

DCPLO-DT0181

DCPLO-DT0179

DCPL - 0118

DCPL - 0114

C

C

C

C

C

C

C

C

C

CAct. 14-Jul-10 █ █

Sch. 14-Feb-10 16-Mar-10 █ █ 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 1Act. 15-Apr-10 1-Jun-10 █ █

16.1.7 Duplex HaeterSch. 12-Jan-10 11-Feb-10 █ 13-Mar-10 12-Apr-10 █ █ 12-May-10 11-Jun-10 █ 11-Jul-10 10-Aug-10 1 23-Apr-10Act. 4-Jan-10 24-Mar-10 █ 9-Apr-10 █ █ █ 18-Sep-10Sch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1Act. 22-Jan-10 24-May-10 █ █

Sch. 14-Apr-10 14-May-10 13-Jun-10 13-Jul-10 █ █ 12-Aug-10 11-Sep-10 11-Oct-10 10-Nov-10Act. 14-Jul-10 █ █

16.2 VDR - Condenser 596.016.2.1 Engg. Drawing & Documents

Sch. 12-Jan-10 11-Feb-10 █ 13-Mar-10 12-Apr-10 █ █ 12-May-10 11-Jun-10 █ 11-Jul-10 10-Aug-10 1 23-Apr-10Act. 4-Jan-10 4-Mar-10 █ 18-Feb-10 █ █ 9-Apr-10 23-Apr-10 █ 18-Sep-10Sch. 25-Dec-09 24-Jan-10 █ █ 23-Feb-10 25-Mar-10 24-Apr-10 24-May-10 23-Jun-10 23-Jul-10 1Act. 4-Jan-10 25-Aug-10 █ █

Sch. 15-Oct-09 14-Nov-09 14-Dec-09 13-Jan-10 █ 12-Feb-10 14-Mar-10 13-Apr-10 13-May-10 1 5-Dec-10Act. 15-Oct-09 6-Nov-09 23-Nov-09 5-Dec-09 █ 18-Sep-10Sch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1Act. 22-Jan-10 17-May-10 █ █Sch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1Act. 22-Jan-10 17-May-10 █ █

Sch. 12-Jan-10 11-Feb-10 █ █ 13-Mar-10 12-Apr-10 12-May-10 11-Jun-10 11-Jul-10 10-Aug-10 1Act. 4-Jan-10 █ █

Sch. 15-Apr-10 15-May-10 █ █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1Act. 15-Apr-10 15-Jun-10 █ █

Sch. 15-Apr-10 15-May-10 █ █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1Act. 15-Apr-10 15-Jun-10 █ █

Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1 11-Jun-10A t 15 A 10 11 J 10

DCPLO-DT0273

LT-M0-03077

Standpipe Detail Drawing for condenser-2

Complete Mechanical Design Calculation

DCPL - 0118

DCPLO-DT0122

DCPLO-DT0017

DCPL - 0003

DCPL - 0091

DCPL - 0130

I

DCPLO-DT0273

I

I

LT-M0-03076

30-Jan-10

A

LT-M0-03081

12-Jan-10

I

I

30-Jan-10

16.1.6.2

GA Drawing of Surface Condenser - 1

QAP - Condenser16.2.1.3

16.2.1.6

16.2.1.7

Foundation Loading Data

16.1.7.1

16.1.7.2

Technical Datasheet for Duplex Heaters

LT-M0-03000

LT-QO-03000

16.1.6.3 Safety Valve Sizing Calculation

Standpipe Detail Drawing for condenser-1

LT-M0-03000-DS

LT-M0-03079

LT-M0-03080

16.1.7.3

16.2.1.5

16.2.1.4

16.2.1.8

Filled - in - Datasheet

Complete Mechanical Design Calculation

16.2.1.9

GA Drawing for Duplex LP Heater (Including Sectional View & Internal Details)

GA Drawing of Surface Condenser - 2

LT-M0-03002

Name Plate (condenser-1)

16.2.1.1

Condenser Performance Curves16.2.1.2

LT-M0-03001

14-Apr-10

LT-M0-03006

15-Apr-10

30-Jan-10

12-Jan-10

15-Apr-10

A

15-Apr-10

I

I

I

DCPLO-DT0122-0

DCPLO-DT0043

DCPLO-DT0122 0

14-Apr-10

25-Dec-09

14-Feb-10

15-Oct-09

12-Jan-10

DCPLO-DT0043

DCPl - 0166

DCPL - 0130

LT-M0-03003

LT-M0-03004

LT-M0-03005

DCPLO-DT0071DCPLO-

DT0043-0

A

DCPLO-DT0071

DCPLO-DT0086

DCPL - 0115

DCPL - 0073

DCPL - 0115

A

I

DCPL - 0121

I

DCPLO-DT0043

DCPLO-DT0004

DCPLO-DT0071-0

DCPLO-DT0122-0

DCPL - 0060

DCPL - 0128

DCPLO-DT0114

DCPLO-DT0114

DT0179

DCPLO-DT0179

DCPL - 0009

DCPLO-DT0273

DCPL - 0091

C

C

C

C

C

C

C

C

C

C

C

C

C

C

Act. 15-Apr-10 11-Jun-10 █

Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1 11-Jun-10Act. 15-Apr-10 11-Jun-10 █

16.2.2 Manufacturing DocumentsSch. 15-May-10 14-Jun-10 █ 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 11-Dec-10 1Act. 20-Aug-10 █

Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 █ 12-Oct-10 11-Nov-10 1Act. 25-May-10 6-Jul-10 20-Aug-10 █

Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 █ 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1Act. 25-May-10 6-Jul-10 20-Aug-10 █

Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1Act. 25-May-10 6-Jul-10 █

Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1 6-Jul-10Act. 25-May-10 6-Jul-10Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1 6-Jul-10Act. 25-May-10 6-Jul-10Sch. 15-Apr-10 15-May-10 14-Jun-10 14-Jul-10 █ 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1Act. 25-May-10 6-Jul-10 20-Aug-10 █

Sch. 15-Apr-10 15-May-10 █ 14-Jun-10 14-Jul-10 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 1Act. 25-May-10 6-Jul-10 █ 18-Sep-10

20-Sep-10 20-Oct-10 1 Extra20-Sep-1020-Sep-10 20-Oct-10 1 Extra20-Sep-1020-Sep-10 20-Oct-10 Extra20-Sep-10

16.3 VDR - Deaerator 254.016.3.1 Engg. Drawing & Documents

Sch. 12-Jan-10 11-Feb-10 █ 13-Mar-10 12-Apr-10 █ 12-May-10 11-Jun-10 11-Jul-10 10-Aug-10 █ 1Act 1 Feb 10 3 Apr 10 █ 2 Feb 10 3 Apr 10 █ 10 May 10 15 Jun 10 30 Aug 10 █

I

I

LT-M0-03015

Dye Penetrant Test Procedure

Post weld Heat Treatment Procedure

LT-M0-03100-DS

16.2.2.12

16.2.2.11

16.2.2.10

16.2.1.9

16.2.2.4 WPS & PQR

16.2.1.10

Radiographic Test Procedure

LT-M0-03007

Procedure for Surface Preparation & Painting

LT-M0-03023

LT-M0-03018

LT-M0-03022

Name Plate (condenser 1)

Hydrostatic test Procedure

Name Plate (condenser-2)

16.2.2.7

16.2.2.9

16.2.2.5

Tube Expansion Procedure

LT-M0-03019

Magnetic Test Procedure

16.2.2.8

16.3.1.1

LT-M0-03020

Filled-in-Datasheet with Technical schedule

15-Apr-10

LT M0 03006

I

I15-May-10

15-Apr-10

I

15-Apr-10

15-Apr-10

12-Jan-10

15-Apr-10

15 Apr 10

15-Apr-10

A

15-Apr-10

DCPLO-DT0237

DCPLO-DT0150

I

A

15-Apr-10 DCPLO-DT0150

DCPLO-DT0150

DT0122-0

DCPLO-DT0150

DCPLO-DT0072

DCPLO-DT0150

DCPLO-DT0150

DCPLO-DT0273

LT-M0-03021

LT-M0-03016 DCPL - 0144

DCPLO-DT0122-0

A

I

I

0128DCPL - 0128

DCPL - 0144

DCPLO-DT0139

DCPL - 0144

DCPLO-DT0237

DCPL - 0078

DCPL - 0144

DCPLO-DT0074

DCPLO-DT0237

DCPL - 0144

DCPL - 0131

DCPLO-DT0150

DCPL - 0144

DCPLO-DT0245

DCPL - 0078

DCPL - 0144

DCPLO-DT0237

C

C

C

C

C

C

C

C

C

C

C

C 16.2.2.13 Painting Scheme for Condenser LT-M0-03025 20-Sep-10 A DCPLO-DT0272

C 16.2.2.14 Painting Scheme for Deaerator LT-M0-03117 20-Sep-10 A DCPLO-DT0272

C 16.2.2.15 Painting Scheme for Feed Water Heaters LT-M0-03094 20-Sep-10 A DCPLO-DT0272

Act. 1-Feb-10 3-Apr-10 █ 2-Feb-10 3-Apr-10 █ 10-May-10 15-Jun-10 30-Aug-10 █

Sch. 30-Jan-10 1-Mar-10 █ █ 31-Mar-10 30-Apr-10 30-May-10 29-Jun-10 29-Jul-10 28-Aug-10 1Act. 10-May-10 9-Jul-10 █ █

GA drawing of Deaerator16.3.1.2 LT-M0-03100 30-Jan-10

DT0072

I

DT01390078 DT0074DCPLO-

DT0139-1

0131 DT02450078DCPL - 0146C

Page 09 of 12

Page 56: mrp

Early Start Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date-Unit 1 DTN No

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & T

FLAG

Last

Wk

Rcv

dTo

Rcv

d N

ext W

k

JNSTPP

4th Submission (Rev. D)

Release

Subm

. N

ext W

k

ReceiveJNSTPP

Subm

. N

ext W

k

ReleaseRec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Last

Wk

Subm

ited

Rec

d af

tr

Long

Tim

e

JNSTPP L & T

As Built

L & T

2nd Submission (Rev. B)

FLAG

Last

Wk

Rcv

d

Receive

FLAG

Last

Wk

Subm

ited

ReceiveReceive

1st Submission (Rev. A)

FLAG

Last

Wk

Rcv

d

FLAG

JNSTPP

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & TReleaseRelease ReleaseTo

Rcv

d N

ext W

k 3rd Submission (Rev. C)

FLAG FLAG

Rec

d af

tr

Long

Tim

e

Last

Wk

Rcv

d

FLAG

Receipt Date of Approval

Schedule First

Submission Date C

ateg

ory

(A/I/

N)

Uni

t No.

Sr. No. Description Drawing / Doc. No.

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

Sch. 12-Jan-10 11-Feb-10 █ █ 13-Mar-10 12-Apr-10 12-May-10 11-Jun-10 11-Jul-10 10-Aug-10 1Act. 2-Feb-10 3-Apr-10 █ █

Sch. 15-Oct-09 14-Nov-09 14-Dec-09 13-Jan-10 12-Feb-10 14-Mar-10 13-Apr-10 13-May-10 1 5-Dec-10Act. 15-Oct-09 6-Nov-09 23-Nov-09 5-Dec-09

17 VDR - Boiler Feed Pump (TD & MD) 399.717.1 Motor Driven Boiler Feed Pump

Sch. 1-Sep-10 1-Oct-10 █ 31-Oct-10 30-Nov-10 30-Dec-10 29-Jan-11 28-Feb-11 30-Mar-11 1Act. 23-Aug-10 █

Sch. 1-Sep-10 1-Oct-10 █ 31-Oct-10 30-Nov-10 30-Dec-10 29-Jan-11 28-Feb-11 30-Mar-11 1Act. 23-Aug-10 █

Sch. 1-Sep-10 1-Oct-10 31-Oct-10 30-Nov-10 30-Dec-10 29-Jan-11 28-Feb-11 30-Mar-11 1Act. 23-Aug-10 15-Sep-10Sch. 5-Sep-10 5-Oct-10 █ 4-Nov-10 4-Dec-10 3-Jan-11 2-Feb-11 4-Mar-11 3-Apr-11 1

C 17.1.15 Complete Group P&ID FPD-M0-03317 1-Sep-10 A DCPLO-DT0235

DCPL - 0180

C 17.1.9 Complete Group Pump Datasheet FPD-M0-03311 1-Sep-10 A DCPLO-DT0240

C 17.1.3 Complete Group General Arrnagment drawing FPD-C0-03305 1-Sep-10 I DCPLO-DT0235

C 17 1 76 Motor Sizing Calculation FPD-M0-03466 5-Sep-10 A DCPLO-

A

LT-M0-03101

QAP - Deaerator

Foundation Loading Data16.3.1.3

16.3.1.6 15-Oct-09LT-QO-03003

12-Jan-10 I DCPL - 0078

DCPL - 0003

DCPLO-DT0017

DCPL - 0009

DCPLO-DT0074DCPLO-DT0004

C

C

Act. 23-Aug-10 █

17.2 Turbine Driven Boiler Feed PumpSch. 1-Sep-10 1-Oct-10 █ 31-Oct-10 30-Nov-10 30-Dec-10 29-Jan-11 28-Feb-11 30-Mar-11 1Act. 23-Aug-10 █

Sch. 1-Sep-10 1-Oct-10 31-Oct-10 30-Nov-10 30-Dec-10 29-Jan-11 28-Feb-11 30-Mar-11 1Act. 23-Aug-10 15-Sep-10Sch. 1-Sep-10 1-Oct-10 █ 31-Oct-10 30-Nov-10 30-Dec-10 29-Jan-11 28-Feb-11 30-Mar-11 1Act. 23-Aug-10 █

18 VDR - Steam Turbine Drive 469.0

19 VDR - EOT Cranes 10.2VDR - EOT Crane for TG Building 18.4

Sch. 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 23-Oct-10 22-Nov-10 22-Dec-10 21-Jan-11 1Act. 16-Jul-10 10-Aug-10 17-Aug-10 15-Sep-10Sch. 25-Jun-10 25-Jul-10 24-Aug-10 23-Sep-10 █ 23-Oct-10 22-Nov-10 22-Dec-10 21-Jan-11 1Act. 16-Jul-10 15-Sep-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 24-Dec-10 23-Jan-11Act. 17-Jul-10 10-Aug-10 7-Sep-10Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 24-Dec-10 23-Jan-11Act. 17-Jul-10 10-Aug-10 7-Sep-10Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 18-Aug-10 15-Sep-10Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1

C 17.2.69 Complete Group Pump Datasheet FPD-M0-03311 1-Sep-10 A DCPLO-DT0240

C 17.2.14 Complete Group P&ID FPD-M0-03384 1-Sep-10 A DCPLO-DT0235

DCPL - 0180

C 17.2.3 Complete Group General Arrnagment drawing FPD-M0-03372 1-Sep-10 I DCPLO-DT0235

C 17.1.76 Motor Sizing Calculation FPD-M0-03466 5-Sep-10 A DT0240

Data sheet of 115/15 T TG Hall EOT Crane (Double Girder) AIL‐M0‐03201 25‐Jun‐10 A

Mechanism Sizing Calculation for 115/15 T TG Hall EOT cranes  AIL‐M0‐03203 25‐Jun‐10 I

Gantry Rail installation for 115/15 T TG Hall EOT cranes AIL‐M0‐03206 15‐Jul‐10 I

General arrangement for PVC shrouded conductor type DSL for 115/15T TG Hall EOT crane 

AIL‐M0‐03207 15‐Jul‐10 I

I

Crab sub assembly for 115/15T TG Hall EOT crane  AIL‐M0‐03205 27‐Jun‐10 I

General arrangement for 115/15 T TG Hall EOT crane             AIL‐M0‐03204 27‐Jun‐10

l

115T main hook block assembly   AIL‐M0‐03208 15‐Jul‐10 I

15 T Aux Hook Block Assembly   

19.4

19.8

19 10

19.9

19.1

19.3

19.6

DCPLO-DT0186

DCPLO-DT0247

DCPLO-DT0247

DCPLO-DT0247

DCPLO-DT0186

DCPL - 0182

DCPL - 0164

DCPLO-DT0231

DCPL - 0179

DCPLO-DT0190

DCPLO-DT0190

DCPL - 0164

DCPLO-DT0185

DCPLO - DT0234

DCPl - 0177

DCPLO-DT0251

19.7

19.5 DCPLO-DT0190

DCPLO-DT0190

DCPL - 0164

DCPLO-DT0251

C

C

C

C

C

C

C

C

C

DCPLO-

AIL‐M0‐03209 15‐Jul‐10 I

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 24-Dec-10 23-Jan-11 1 15-Sep-10Act. 18-Aug-10 15-Sep-10Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1

Schematic circuit diagram of Aux. hoist panel  for 115/15 T TGHall crane

AIL‐E0‐03218

LT Drive wheel assembly AIL‐M0‐03210 15‐Jul‐10 I

LT idle wheel assembly AIL‐M0‐03211 15‐Jul‐10 I

I

I

I

I

I

27‐Jun‐10

AIL‐E0‐03222

AIL‐E0‐03223

I

19.12

G.A. drawing of Protective panel & transformer enclosure for 115/15 T TGHall crane  

19.16

19.21

AIL‐E0‐03220

19.14

AIL‐E0‐03224

AIL‐E0‐03225

Schematic circuit diagram of Cross Traverse  and Micro Cross Traverse panel & BOM for 115/15 T TGHall crane

19.10

AIL‐E0‐03219

Schematic circuit diagram of protective panel and lighting circuit for 115/15 T TGHall crane 

AIL‐E0‐03216

Schematic circuit diagram of Main hoist panel  for 115/15 T TGHall crane

AIL‐E0‐03217

AIL‐E0‐03221

G.A. of Aux. hoist  panel  for 115/15 T TGHall crane  

19.23

19.17

19.18

19.20

19.22

19.24

19.25

19.19

27‐Jun‐10

27‐Jun‐10

27‐Jun‐10

27‐Jun‐10

27‐Jun‐10

27‐Jun‐10 I

27‐Jun‐10

19.11

19.13

19.15

G.A. of Cross Traverse panel for 115/15 T TGHall crane

27‐Jun‐10

27‐Jun‐10

G.A. of Main hoist  panel  for 115/15 T TGHall crane  

Schematic circuit diagram of Long Traverse   panel  for for 115/15 T TGHall craneBill of material   for Main, Aux. Hoist, CT circuit, LT circuit and main (Pro ) circuit  for 115/15 T TGHall        

DCPLO-DT0185

I

I

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0225

DCPl - 0165

DCPL - 0160

DCPLO-DT0225

DCPl - 0165

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0226

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0226

DCPl - 0165

DCPL - 0177

DCPL - 0165

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0226

DCPl - 0165

DCPl - 0165

DCPLO-DT0247

DCPLO-DT0247

DCPLO-DT0247

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0225

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

C

DCPLO-DT0234

DCPLO-DT0247DCPLO-DT0247

Long travel  Machinery  Assembly for 115/15 T TGHall EOT crane  AIL‐M0‐03214 15‐Jul‐10 I

 Electrical equpment layout in cabin for 115/15 T TGHall EOT crane

AIL‐M0‐03215 27‐Jun‐10 I

CT Drive wheel assembly AIL‐M0‐03212 15‐Jul‐10 I

CT idle wheel assembly AIL‐M0‐03213 15‐Jul‐10 I

I

DCPLO-DT0185

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0226

DCPl - 0165

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0226

DCPl - 0165

DCPLO-DT018

DCPLO-DT018

DCPL - 0160

DCPLO-DT0226

DCPl - 016

DCPLO-DT0185

DCPLO-DT0185

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0225

DCPl - 0165

Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 24-Dec-10 23-Jan-11 1 3-Aug-10Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1 3-Aug-10Act. 20-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 20-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 █ 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1Act. 30-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 █ 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11Act. 17-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 █ 11-Jan-11 10-Feb-11Act. 12-Aug-10 25-Aug-10 █

Sch. 27-Jun-10 27-Jul-10 26-Aug-10 25-Sep-10 25-Oct-10 24-Nov-10 █ 24-Dec-10 23-Jan-11 1Act. 16-Jul-10 3-Aug-10 12-Aug-10 25-Aug-10 █

Sch. 15-Jul-10 14-Aug-10 13-Sep-10 13-Oct-10 12-Nov-10 12-Dec-10 11-Jan-11 10-Feb-11 1 3-Aug-10Act. 20-Jul-10 3-Aug-10 12-Aug-10 26-Aug-10Sch. 13-Aug-10 12-Sep-10 12-Oct-10 11-Nov-10 █ 11-Dec-10 10-Jan-11 9-Feb-11 11-Mar-11 1Act. 12-Aug-10 █

VDR - EOT Crane for BFP 8.7Sch. 28-Jul-10 27-Aug-10 26-Sep-10 26-Oct-10 25-Nov-10 25-Dec-10 24-Jan-11 23-Feb-11Act. 17-Aug-10 15-Sep-10Sch. 28-Jul-10 27-Aug-10 █ 26-Sep-10 26-Oct-10 25-Nov-10 25-Dec-10 24-Jan-11 23-Feb-11Act. 13-Aug-10 █

Sch. 26-Jul-10 25-Aug-10 █ 24-Sep-10 24-Oct-10 23-Nov-10 23-Dec-10 22-Jan-11 21-Feb-11Act. 23-Aug-10 █

Sch. 26-Jul-10 25-Aug-10 █ 24-Sep-10 24-Oct-10 23-Nov-10 23-Dec-10 22-Jan-11 21-Feb-11Act. 23-Aug-10 █

Sch 9 Aug 10 8 Sep 10 8 Oct 10 7 Nov 10 7 Dec 10 6 Jan 11 5 Feb 11 7 Mar 11

AIL‐M0‐03253 28-Jul-10 I DCPLO-DT0228

G l t f PVC h d d d t t DSL f DCPLO DCPL

C 19.5 Crab sub assembly for 40/10T TG Hall EOT crane  AIL‐M0‐03255 26-Jul-10 I DCPLO-DT0234

C DCPLO-DT0234

I

I

Structural calculations for 115/15 T TGHall crane  

DCPLO-DT0231

DCPL - 0179

I

Make of Bought Out Item List  

AIL‐E0‐03226

27‐Jun‐10

15‐Jul‐10

19.29

19.31

19.36

19.34

19.4 General arrangement for 40/10 T TG Hall EOT crane            

AIL‐M0‐03231

AIL‐M0‐03234

AIL‐M0‐03235Electrical feeder diagram

Crane contrlol write up

AIL‐M0‐03236

AIL‐E0‐03227

AIL‐E0‐03225

AIL‐E0‐03228

Cable size calculation for 115/15 T TGHall crane  AIL‐E0‐03229

Earthing details 

Cable Schedule for 115/15 T TGHall crane

15‐Jul‐10

19.28

I

15‐Jul‐10 I

15‐Jul‐10 I

27‐Jun‐10 I

19.1 Data sheet of 40/10 T TG Hall EOT Crane (Double Girder) AIL‐M0‐03251 28-Jul-10

19.35

19.30

19.25

I

I

AIL‐M0‐03230

27‐Jun‐10

A

19.27

19.26

AIL‐M0‐03254

G.A. of Cross Traverse  panel  for 115/15 T TGHall crane  

Crane lubrication

27‐Jun‐10

27‐Jun‐10

15‐Jul‐10

G.A. of Long Traverse  panel  for 115/15 T TGHall crane  

I26-Jul-10

I

DCPLO-DT0203

DCPLO-DT0203

DCPL - 0162

DCPLO-DT0227

DCPLO-DT0186

DCPl - 0165

DCPLO-DT0227

DCPl - 0165

DCPLO-DT0203

DCPL - 0162

DCPLO-DT0226

DCPl - 0165

DCPLO-DT0226

DCPl - 0165

DCPLO-DT0186

DCPL - 0161

DCPLO-DT0227

DCPLO-DT0231

C

C

C

C

C

C

C

C

C

C

DT0185 DT0185 0160 DT0226 0165DCPLO-DT0185

DCPLO-DT0185

DCPL - 0160

DCPLO-DT0226

DCPl - 0165

DCPLO-DT0203

DCPL - 0160

DCPLO-DT0186

DCPLO-DT0186

DCPL - 0161

DCPL - 0165

DCPLO-DT0226

DCPl - 0165

DCPLO-DT0247

C 19.44 DSL Sizing Calculation for 115/15 T TG Hall EOT Crane AIL‐M0‐03243 13‐Aug‐10 IDCPLO-DT0227

C 19.3 Mechanism Sizing Calculation for 40/10 T TG Hall EOT cranes 

C

Sch. 9-Aug-10 8-Sep-10 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 27-Aug-10 6-Sep-10

C 19.7 General arrangement for PVC shrouded conductor type DSL for 40/10T TG Hall EOT crane 

AIL‐M0‐03257 9-Aug-10 I DCPLO-DT0242

DCPL - 0176

Page 10 of 12

Page 57: mrp

Early Start Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date-Unit 1 DTN No

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & T

FLAG

Last

Wk

Rcv

dTo

Rcv

d N

ext W

k

JNSTPP

4th Submission (Rev. D)

Release

Subm

. N

ext W

k

ReceiveJNSTPP

Subm

. N

ext W

k

ReleaseRec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Last

Wk

Subm

ited

Rec

d af

tr

Long

Tim

e

JNSTPP L & T

As Built

L & T

2nd Submission (Rev. B)

FLAG

Last

Wk

Rcv

d

Receive

FLAG

Last

Wk

Subm

ited

ReceiveReceive

1st Submission (Rev. A)

FLAG

Last

Wk

Rcv

d

FLAG

JNSTPP

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & TReleaseRelease ReleaseTo

Rcv

d N

ext W

k 3rd Submission (Rev. C)

FLAG FLAG

Rec

d af

tr

Long

Tim

e

Last

Wk

Rcv

d

FLAG

Receipt Date of Approval

Schedule First

Submission Date C

ateg

ory

(A/I/

N)

Uni

t No.

Sr. No. Description Drawing / Doc. No.

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

Sch. 9-Aug-10 8-Sep-10 █ 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 23-Aug-10 █

Sch. 9-Aug-10 8-Sep-10 █ 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 23-Aug-10 █

Sch. 9-Aug-10 8-Sep-10 █ 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 23-Aug-10 █

Sch. 9-Aug-10 8-Sep-10 █ 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 23-Aug-10 █

Sch. 9-Aug-10 8-Sep-10 █ 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 23-Aug-10 █

Sch. 9-Aug-10 8-Sep-10 █ 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 23-Aug-10 █

Sch. 9-Aug-10 8-Sep-10 █ 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 23-Aug-10 █

Sch 30-Jul-10 29-Aug-10 █ 28-Sep-10 28-Oct-10 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11Schematic circuit diagram of protective panel and lighting circuit DCPLO- DCPL -

C 19.13 CT idle wheel assembly AIL‐M0‐03263 9-Aug-10 I DCPLO-DT0241

19.14 Long travel  Machinery  Assembly for 40/10 T TGHall EOT crane  AIL‐M0‐03264 9-Aug-10 I DCPLO-DT0241

C 19.11 LT idle wheel assembly AIL‐M0‐03261 9-Aug-10 I DCPLO-DT0241

19.12 CT Drive wheel assembly AIL‐M0‐03262 9-Aug-10 I DCPLO-DT0241

C 19.9 15 T Aux Hook Block Assembly    AIL‐M0‐03259 9-Aug-10 I DCPLO-DT0241

19.10 LT Drive wheel assembly AIL‐M0‐03260 9-Aug-10 I DCPLO-DT0241

19.8 115T main hook block assembly   AIL‐M0‐03258 9-Aug-10 I DCPLO-DT0241C

C

C

C

Sch. 30-Jul-10 29-Aug-10 █ 28-Sep-10 28-Oct-10 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 30-Jul-10 29-Aug-10 █ 28-Sep-10 28-Oct-10 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 30-Jul-10 29-Aug-10 █ 28-Sep-10 28-Oct-10 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 30-Jul-10 29-Aug-10 █ 28-Sep-10 28-Oct-10 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 30-Jul-10 29-Aug-10 █ 28-Sep-10 28-Oct-10 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 30-Jul-10 29-Aug-10 █ 28-Sep-10 28-Oct-10 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 1-Aug-10 31-Aug-10 █ 30-Sep-10 30-Oct-10 29-Nov-10 29-Dec-10 28-Jan-11 27-Feb-11Act. 13-Aug-10 █

Sch. 1-Aug-10 31-Aug-10 30-Sep-10 30-Oct-10 29-Nov-10 29-Dec-10 28-Jan-11 27-Feb-11 15-Sep-10Act. 16-Aug-10 15-Sep-10Sch. 1-Aug-10 31-Aug-10 █ 30-Sep-10 30-Oct-10 29-Nov-10 29-Dec-10 28-Jan-11 27-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 1-Aug-10 31-Aug-10 █ 30-Sep-10 30-Oct-10 29-Nov-10 29-Dec-10 28-Jan-11 27-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 1-Aug-10 31-Aug-10 █ 30-Sep-10 30-Oct-10 29-Nov-10 29-Dec-10 28-Jan-11 27-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 9-Aug-10 8-Sep-10 █ 8-Oct-10 7-Nov-10 7-Dec-10 6-Jan-11 5-Feb-11 7-Mar-11Act. 23-Aug-10 █

Sch. 30-Jul-10 29-Aug-10 █ 28-Sep-10 28-Oct-10 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11Act. 30-Aug-10 █

Sch. 30-Jul-10 29-Aug-10 28-Sep-10 28-Oct-10 █ 27-Nov-10 27-Dec-10 26-Jan-11 25-Feb-11 1Act. 12-Aug-10 26-Aug-10 █

Sch. 1-Aug-10 31-Aug-10 █ 30-Sep-10 30-Oct-10 29-Nov-10 29-Dec-10 28-Jan-11 27-Feb-11Act. 13-Aug-10 26-Aug-10 █

Sch. 1-Aug-10 31-Aug-10 █ 30-Sep-10 30-Oct-10 29-Nov-10 29-Dec-10 28-Jan-11 27-Feb-11I DCPLO- DCPl - C 19 36 Earthing details AIL‐E0‐03286

C 19.35 Electrical feeder diagram AIL‐E0‐03285 1-Aug-10 I DCPLO-DT0228

DCPl - 0171

C 19.34 Make of Bought Out Item List   AIL‐M0‐03284 30-Jul-10 I DCPLO-DT0227

DCPL - 0171

C 19.30 Crane lubrication AIL‐M0‐03280 9-Aug-10 I DCPLO-DT0241

C 19.31 Structural calculations for 40/10 T TGHall crane   AIL‐M0‐03281 30-Jul-10 I DCPLO-DT0247

C 19.27 Cable Schedule for 40/10 T TGHall crane AIL‐E0‐03277 1-Aug-10 I DCPLO-DT0228

DCPL - 0171

C 19.28 Crane contrlol write up AIL‐E0‐03278 1-Aug-10 I DCPLO-DT0228

DCPL - 0171

C 19.29 Cable size calculation for 40/10 T TGHall crane  AIL‐E0‐03279 1-Aug-10 I DCPLO-DT0228

DCPL - 0171

C 19.26 G.A. of Long Traverse  panel  for 40/10 T TGHall crane   AIL‐E0‐03276 1-Aug-10 I DCPLO-DT0229

DC PL - 0183

C 19.21 Bill of material   for Main, Aux. Hoist, CT circuit, LT circuit and main (Pro ) circuit  for 40/10 T TGHall        

AIL‐E0‐03271 30-Jul-10 I DCPLO-DT0229

DCPL - 0171

C 19.22 G.A. drawing of Protective panel & transformer enclosure for 40/10 T TGHall crane  

AIL‐E0‐03272 1-Aug-10 I DCPLO-DT0229

C 19.19 Schematic circuit diagram of Cross Traverse  and Micro Cross Traverse panel & BOM for 40/10 T TGHall crane

AIL‐E0‐03269 30-Jul-10 I DCPLO-DT0229

DCPL - 0171

C 19.20 Schematic circuit diagram of Long Traverse   panel  for for 40/10 T TGHall crane

AIL‐E0‐03270 30-Jul-10 I DCPLO-DT0229

DCPL - 0171

C 19.17 Schematic circuit diagram of Main hoist panel  for 40/10 T TGHall crane

AIL‐E0‐03267 30-Jul-10 I DCPLO-DT0229

DCPL - 0171

19.18 Schematic circuit diagram of Aux. hoist panel  for 40/10 T TGHall crane

AIL‐E0‐03268 30-Jul-10 I DCPLO-DT0229

DCPL - 0171

19.16 Schematic circuit diagram of protective panel and lighting circuit for 40/10 T TGHall crane 

AIL‐E0‐03266 30-Jul-10 I DCPLO-DT0229

DCPL - 0171

1-Aug-10

C

C

g g pAct. 13-Aug-10 26-Aug-10 █

Sch. 25-Aug-10 24-Sep-10 █ 24-Oct-10 23-Nov-10 23-Dec-10 22-Jan-11 21-Feb-11 23-Mar-11Act. 13-Aug-10 26-Aug-10 █

20 VDR - Condensate Extraction Pump 392.8Sch. 8-Aug-10 7-Sep-10 █ █ 7-Oct-10 6-Nov-10 6-Dec-10 5-Jan-11 4-Feb-11 6-Mar-11 1Act. 23-Jul-10 █ █

Sch. 11-Aug-10 10-Sep-10 █ █ 10-Oct-10 9-Nov-10 9-Dec-10 8-Jan-11 7-Feb-11 9-Mar-11 1Act. 23-Jul-10 █ █

Sch. 11-Aug-10 10-Sep-10 █ █ 10-Oct-10 9-Nov-10 9-Dec-10 8-Jan-11 7-Feb-11 9-Mar-11 1Act. 23-Jul-10 █ █

21 VDR - Vacuum Pump 304.0

22 VDR - Condensate Polishing Units 532.0

23 VDR - DMCW Pumps 292.0

24 VDR - Plate Heat Exchangers 177.0

25 VDR - Butter Fly Valves 152.0

26 VDR - LP Bypass Valves 292.0

27 VDR - Shop Fabricated Tanks - Steel 152.0

28 VDR - AC & DC Distribution Board 127.0

29 VDR El t 190 0

C 20.5 CEP GA Drawing common for pump & motor & acces. (INSTA KSB-M0-03503 11-Aug-10 I DCPLO-DT0205

C 20.6 CEP P&I diagram with list of components KSB-M0-03504 11-Aug-10 A DCPLO-DT0205

C 20.1 Pump Data Sheet (Technical Schedule) KSB-M0-03533 8-Aug-10 A DCPLO-DT0205

I DT0228 0171C 19.36 Earthing details  AIL‐E0‐03286 1-Aug-10

C 19.44 DCPLO-DT0228

DCPl - 0171

DSL Selection & Voltage drop Calculation for 40/10 T BFP EOT Crane

AIL‐M0‐03294 25-Aug-10 I

29 VDR - Elevators 190.0

30 VDR - OLTCs & Debris Filter 330.0

31 VDR - HP Heaters 2/3 Way Bypass Valves 152.0

32 VDR - Misc. 152.0

33 VDR - Power Cycle Valves 469.0

34 VDR - Control Valves & Pneumetic ON / OFF Valves 228.0

35 VDR - Shop Fabricated Piping 583.0

Page 11 of 12

Page 58: mrp

Early Start Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date DTN No. Date I/W No. Date-Unit 1 DTN No

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & T

FLAG

Last

Wk

Rcv

dTo

Rcv

d N

ext W

k

JNSTPP

4th Submission (Rev. D)

Release

Subm

. N

ext W

k

ReceiveJNSTPP

Subm

. N

ext W

k

ReleaseRec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Last

Wk

Subm

ited

Rec

d af

tr

Long

Tim

e

JNSTPP L & T

As Built

L & T

2nd Submission (Rev. B)

FLAG

Last

Wk

Rcv

d

Receive

FLAG

Last

Wk

Subm

ited

ReceiveReceive

1st Submission (Rev. A)

FLAG

Last

Wk

Rcv

d

FLAG

JNSTPP

Rec

d af

tr

Long

Tim

e

To R

cvd

Nex

t Wk

Subm

. N

ext W

kLa

st W

k Su

bmite

d

L & TReleaseRelease ReleaseTo

Rcv

d N

ext W

k 3rd Submission (Rev. C)

FLAG FLAG

Rec

d af

tr

Long

Tim

e

Last

Wk

Rcv

d

FLAG

Receipt Date of Approval

Schedule First

Submission Date C

ateg

ory

(A/I/

N)

Uni

t No.

Sr. No. Description Drawing / Doc. No.

LARSEN & TOUBRO LIMITEDPOWER PROJECT MANAGEMENT SERVICES , VADODARAJOB No. T209001

DOCUMENT NO. :LT-P0-00003ANNEXURE - :4.2REV. NO: :A

36 VDR - Chain Pully Blocks, HOT, etc.. 152.0

37 VDR - Gas Cylinders 152.0

38 VDR - Strainers 203.0

39 VDR - Safety & Relief Valves 152.0

40 VDR - 24 V DC System 76.0

41 VDR - DCS 254.0

42 VDR - Flow Elements 228.0

43 VDR - Expansion Joints (Metallic & Rubber) 203.0

44 VDR - Vibration Monitoring System 114.0

45 VDR - Supports & Hangers 596.0

46 VDR - LP Valves 469.0

47 VDR - Extraction Steam Check Valves 165.0

48 VDR - LV power & Control Cables 76.0

49 VDR - C&I Cables 139.0

50 VDR - Insulation 139.0

51 GENERAL DOCUMENTS 0.0

Sch. 29-Dec-09 28-Jan-10 █ █ 1 ExtraAct. 29-Dec-09 █ █

Sch. 29-Dec-09 28-Jan-10 █ █ 1 ExtraAct. 29-Dec-09 █ █

Sch. 29-Dec-09 28-Jan-10 █ █ 1 ExtraAct. 29-Dec-09 █ █

Sch. 4-Jan-10 3-Feb-10 █ 1 ExtraAct. 4-Jan-10 15-Mar-10 █

I

17.2

LT-M0-03092

K6A24-009-DWG-M-002Plant Lay-Out

17.4

I DCPl - 0071GA Sketch & Load Data for Feed Water Heaters 4-Jan-1017.5

TXH1A-090XX1

DCPLO-DT0038

DCPLO-DT0037I

17.3C

Heat & Mass Balance Diagram for HP-LP Baypass

DCPLO-DT0038

C

C

C

29-Dec-09

29-Dec-09

DCPLO-DT0043

I

29-Dec-09

JPN-SK-M-006Sketch of Transformer & CW Pipe Interface

Sch. 18-Jan-10 17-Feb-10 1 ExtraAct. 19-Jan-10 15-Feb-10Sch. 19-Jan-10 18-Feb-10 █ █ 1 ExtraAct. 19-Jan-10 █ █

Sch. 19-Jan-10 18-Feb-10 █ █ 1 ExtraAct. 19-Jan-10 █ █

Sch. Mail Mail █ 1 ExtraAct. 10-Oct-09 2-Mar-10 █

Sch. Mail Mail █ 1 ExtraAct. 10-Oct-09 2-Mar-10 █

Sch. Mail Mail █ 1 ExtraAct. 10-Oct-09 2-Mar-10 █

Sch. 13-Apr-10 13-Apr-10 1 ExtraAct. 13-Apr-10 5-May-10

LMTG-M0-01207 Sch. 12-May-10 12-May-10 █ █ 1 ExtraLMTG-M0-01207 Act. 12-May-10 15-Jun-10 20-Jul-10 █ █

LMTG-M0-01206 Sch. 12-May-10 12-May-10 1 ExtraLMTG-M0-01206 Act. 12-May-10 15-Jun-10

LMTG-M0-01205 Sch. 12-May-10 11-Jun-10 1 ExtraLMTG-M0-01205 Act. 12-May-10 15-Jun-10

T3101PLPA101 Sch. 1-Feb-10 1-Feb-10 █ 1 ExtraLMTG-M0-01201 Act. 1-Feb-10 17-Jul-10 █

Sch. 2-Jul-10 2-Jul-10 █ █ 1 ExtraLMTG-P0-01036 Act. 2-Jul-10 █ █

Sch. 29-Apr-10 29-Apr-10 █ █ █ 1 ExtraLMTG-M0-01202 Act. 29-Apr-10 15-Jun-10 █ 20-Jul-10 █ █

Sch. 17-Jul-10 17-Jul-10 █ █ 1 Extra- Act. 17-Jul-10 █ █

Sch. 23-Jul-10 23-Jul-10 █ 1 ExtraLMTG-M0-02809 Act. 23-Jul-10 6-Aug-10 █ 17-Sep-10

Sch 23 Jul 10 23 Jul 10 █ 1 Extra

C 17.17 System Description of Steam Turbine 2-Jul-10 I DCPLO-DT0171

17.16 Oil Piping & Equipment Arrangement 1-Feb-10 I DCPLO_DT0069

DCPL - 0150

17.14 Details of Embedded Materials 12-May-10 I DCPLO-DT0141

DCPL - 0132

17.15 Foundation Embedded Materials for Piping 12-May-10 I DCPLO-DT0141

DCPL - 0132

DCPLO-DT0119

DCPL - 0106

17.11 Mail I By Mail DCPL - 0058DS-Gas Paremeters at Chimney Inlet-2 97140-01-DS-0002

17.13 Embedded Metal Plan Around Lube Oil Conditioner 12-May-10 I DCPLO-DT0141

DCPL - 0132

DCPLO-DT0202

17.12 Note on Surge Capacitor Value Recommendation from MELCO

GAE-KN-T001 13-Apr-10 I

17.7

17.8

17.9

17.6

JPN-SK-E-001

I19-Jan-10 DCPLO-DT0058

I

DCPl - 0046

DCPLO-DT0058

DS-ESP 97140-08-DS-0001 Mail I

DCPL - 005817.10 DS-Gas Paremeters at Chimney Inlet-1 97140-01-DS-0001 Mail I By Mail

JPN-SK-E-003 I

Sketch Showing Cable Tray Exit Along Grid 12 & Electrical Equipment Erection

JPN-SK-E-002

Sketch showing IPBD Run Arrangement for YND1 Scheme DCPLO-DT0053

C

C

C

C

C

C 17.18 Foundation of Lubrication Oil Equipment 29-Apr-10 I DCPLO-DT0137

DCPl - 0132

DCPLO-DT0202

C

C

DCPLO

C

C

C

C

C 17.17 Observation on Sketch of Crane Span - AB bay 17-Jul-10 I DCPLO-DT0188

C 17.18 Outline Dimention of AC Motor EH Oil Pump (A) 23-Jul-10 A DCPLO-DT0204

DCPL - 0163

DCPLO-DT0267

DCPL DCPLO

By Mail DCPL - 0058

19-Jan-10

18-Jan-10

Sketch Showing Cable Tray Exit Along Grid C & Electrical Equipment Erection

Sch. 23-Jul-10 23-Jul-10 █ 1 ExtraLMTG-M0-02810 Act. 23-Jul-10 6-Aug-10 █ 17-Sep-10

- Sch. 11-Aug-10 11-Aug-10 █ 1 Extra- Act. 11-Aug-10 █

Abbreviation: Total:A - Approval I/W No. - Inward No. Unit type: C - Common for both Units Sch. - Schedule Date for SubmissionI - Information DTN No. - Document Transmittal No. 1 - For Unit No. 1 only Act. - Actual Date of SubmissionN - Not For Submission

- Weightage Point not considered 2 - For Unit No. 2 onlyx x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x x

17.17 Outline Dimention of AC Motor EH Oil Pump (B) 23-Jul-10 A DCPLO-DT0204C

C 17.18 Grout Material for TG Foundation 11-Aug-10 I DCPLO-DT0220

DCPL - 0163

DCPLO-DT0267

Page 12 of 12

Page 59: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 59 of 103

  

4.2 PROCUREMENT STATUS

Page 60: mrp

JOB NO: - T209001

Enq. Float

Rcpt Quote

LOI/PO Issue Sch. Act.

(LOI Date)

A COMMON SYSTEM

1 EOT Crane for Tg Building 100.00% 100.00% 100.00% Anupam Cranes,India 12-May-10 27-May-10 17-Jun-10 12-May-10 0.00% 100.00%

2 EOT Crane for BFP 100.00% 100.00% 100.00% Anupam Cranes,India 17-May-10 2-Sep-10 17-May-10 0.00% 100.00%

3 Elevator for Main & Service Building 100.00% 100.00% 0.00% - 25-Apr-11 - 0.00% 30.00%

4 Insulation 0.00% 0.00% 0.00% - 18-Feb-12 - 0.00% 0.00%

5 Paints 0.00% 0.00% 0.00% - 13-Apr-12 - 0.00% 0.00%

6 Misccellaneous Items for Commom System 0.00% 0.00% 0.00% - 14-Jun-11 - 0.00% 0.00%

% Cum. Progress Remarks

4.2.1 ORDERING ( 10% )

SR. NO. System Description

% Progress for the Month

Vendor LOI Date PO Date

Release Date of Orders %

Progress for Month

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda.

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO. :- 60 of 103

B STG SYSTEM

1 Steam Turbine 100.00% 100.00% 100.00% L&T-MHI 25-Aug-09 19-Jan-10 25-Aug-09 0.00% 100.00%

2 Generator 100.00% 100.00% 100.00% L&T-MHI 25-Aug-09 19-Jan-10 25-Aug-09 0.00% 100.00%

3 Turbine Preservation System 0.00% 0.00% 0.00% - 24-Aug-11 - 0.00% 0.00%

4 Miscellaneous Items for STG System 0.00% 0.00% 0.00% - 14-Jun-11 - 0.00% 0.00%

C FEED WATER SYSTEM

1 Deaerator 100.00% 100.00% 100.00% L&T-HED 21-Sep-09 19-Jan-10 21-Sep-09 0.00% 100.00%

2 MDBFP 100.00% 100.00% 100.00% Flowserve, India/Spain 14-Jun-10 - 22-Feb-10 14-Jun-10 0.00% 100.00%

3 TDBFP 100.00% 100.00% 100.00% Flowserve, India/Spain 14-Jun-10 - 22-Feb-10 14-Jun-10 0.00% 100.00%

4 Drive Turbine for BFP 100.00% 100.00% 100.00% Siemens, Germany/India - - 21-Apr-10 - 0.00% 100.00%

5 HPH 100.00% 100.00% 100.00% L&T-HED 21-Sep-09 19-Jan-10 21-Sep-09 0.00% 100.00%

6 HP valve of Feed Water System 100.00% 100.00% 0.00% - - 14-Jun-11 - 0.00% 30.00%

7 LP Piping & Fitting of Feed Water System 0.00% 0.00% 0.00% - - 23-Aug-11 - 0.00% 0.00%

8 LP Valve of Feed Water System 100.00% 0.00% 0.00% - - 23-Aug-11 - 20.00% 20.00%

9 Hangers & Support of Feed Water System 0.00% 0.00% 0.00% - - 23-Aug-11 - 0.00% 0.00%

10 Miscellaneous Items for Feed Water System 0.00% 0.00% 0.00% - - 23-Aug-11 - 0.00% 0.00%

Page 61: mrp

JOB NO: - T209001

Enq. Float

Rcpt Quote

LOI/PO Issue Sch. Act.

(LOI Date)

% Cum. Progress Remarks

4.2.1 ORDERING ( 10% )

SR. NO. System Description

% Progress for the Month

Vendor LOI Date PO Date

Release Date of Orders %

Progress for Month

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda.

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO. :- 61 of 103

11 Hp piping & Fittings of Feedwater System 0.00% 0.00% 0.00% - - 14-Jun-11 - 0.00% 0.00%

12 Expansion Joints of Feed Water System 0.00% 0.00% 0.00% - - 14-Jul-11 - 0.00% 0.00%

12 Butterfly Valve for Feed Water System 100.00% 100.00% 0.00% - - 11-Dec-10 - 10.00% 30.00%

13 2/3 Way Valve for Feed Water System 0.00% 0.00% 0.00% - - 30-May-11 - 0.00% 0.00%

D CONDENSATE SYSTEM

1 Condenser 100.00% 100.00% 100.00% L&T-HED 21-Sep-09 19-Jan-10 21-Sep-09 0.00% 100.00%

2 Condensate Extraction Pump 100.00% 100.00% 100.00% KSB,India 7-Jun-10 - 15-Jun-10 7-Jun-10 0.00% 100.00%

3 Condensate Polishing Unit 100.00% 100.00% 0.00% Siemens, India - - 24-Aug-10 - 100.00% 100.00%

4 LPH 100.00% 100.00% 100.00% L&T-HED 21-Sep-09 19-Jan-10 21-Sep-09 0.00% 100.00%

5 Gland Steam Condenser 100.00% 100.00% 100.00% L&T-MHI 25-Aug-09 19-Jan-10 25-Aug-09 0.00% 100.00%

6 LP Valve of Condensate System 100.00% 0.00% 0.00% - - 23-Aug-11 - 20.00% 20.00%

7 Hangers & Support of Condesate System 0.00% 0.00% 0.00% - - 23-Aug-11 - 0.00% 0.00%

8 Miscellaneous Items of Condensate System 0.00% 0.00% 0.00% - - 23-Aug-11 - 0.00% 0.00%

9 LP piping & Fittings of Condensate System 0.00% 0.00% 0.00% - - 23-Aug-11 - 0.00% 0.00%

E VACUUM SYSTEM

1 Vacuum Pump 100.00% 100.00% 0.00% - - 6-Aug-10 - 0.00% 30.00%

2 LP Valves of Vacuum System 100.00% 0.00% 0.00% - - 7-Sep-11 - 20.00% 20.00%

3 Hangers & Supports of Vacuum Ssytem 0.00% 0.00% 0.00% - - 7-Sep-11 - 0.00% 0.00%

4 Miscellaneous Items of Vacuum System 0.00% 0.00% 0.00% - - 7-Sep-11 - 0.00% 0.00%

5 LP Piping & Fittings of Vacuum System 0.00% 0.00% 0.00% - - 7-Sep-11 - 0.00% 0.00%

F CLOSED COOLING WATER SYSTEM

1 DMCW Pump 100.00% 100.00% 0.00% - - 4-Nov-10 - 0.00% 30.00%

2 Plate Heat Exchanger 100.00% 100.00% 0.00% - - 4-Nov-10 - 0.00% 30.00%

Page 62: mrp

JOB NO: - T209001

Enq. Float

Rcpt Quote

LOI/PO Issue Sch. Act.

(LOI Date)

% Cum. Progress Remarks

4.2.1 ORDERING ( 10% )

SR. NO. System Description

% Progress for the Month

Vendor LOI Date PO Date

Release Date of Orders %

Progress for Month

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda.

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO. :- 62 of 103

3 DMCW Expansion Tanks 100.00% 100.00% 0.00% - - 31-Jan-11 - 10.00% 30.00%

4 LP Valves of Closed Cooling Water System 100.00% 0.00% 0.00% - - 1-Sep-11 - 20.00% 20.00%

5 Hangers & Supports of Closed Cooling Water Syst 0.00% 0.00% 0.00% - - 1-Sep-11 - 0.00% 0.00%

6 Miscellaneous Items of Closed Cooling Water Sys 100.00% 0.00% 0.00% - - 1-Sep-11 - 0.00% 20.00%

7 LP Piping & Fittings of Closed Cooling Water Syste 0.00% 0.00% 0.00% - - 1-Sep-11 - 0.00% 0.00%

G DRAIN SYSTEM

1 HP & LP Flash Tanks 100.00% 100.00% 100.00% L&T-HED 21-Sep-09 - 21-Sep-09 0.00% 100.00%

2 HP valves of Drain System 100.00% 100.00% 0.00% - - 28-Jul-11 - 0.00% 30.00%

3 LP Piping & Fittings of Drain System 0.00% 0.00% 0.00% - - 1-Sep-11 - 0.00% 0.00%

4 LP Valves of Drain System 100.00% 0.00% 0.00% - - 1-Sep-11 - 20.00% 20.00%

5 Hangers & Supports of Drain System 0.00% 0.00% 0.00% - - 1-Sep-11 - 0.00% 0.00%

6 Miscellaneous Items of Drain System 0.00% 0.00% 0.00% - - 1-Sep-11 - 0.00% 0.00%

7 HP Piping & Fittings of Drain System 0.00% 0.00% 0.00% - - 28-Jul-11 - 0.00% 0.00%

H EXTRACTION STEAM SYSTEM

1 FCNRV 100.00% 100.00% 100.00% L&T-MHI 25-Aug-09 19-Jan-10 25-Aug-09 0.00% 100.00%

2 HP valves of Extraction System 100.00% 100.00% 0.00% - - 1-Aug-11 - 0.00% 30.00%

3 LP Piping & Fittings of Extraction System 0.00% 0.00% 0.00% - - 5-Sep-11 - 0.00% 0.00%

4 LP Valves of Extraction System 100.00% 0.00% 0.00% - - 5-Sep-11 - 20.00% 20.00%

5 Hangers & Supports of Extraction System 0.00% 0.00% 0.00% - - 5-Sep-11 - 0.00% 0.00%

6 Miscellaneous Items of Extraction System 0.00% 0.00% 0.00% - - 5-Sep-11 - 0.00% 0.00%

7 HP Piping & Fittings of Extraction System 0.00% 0.00% 0.00% - - 1-Aug-11 - 0.00% 0.00%

I LP BYPASS STEAM SYSTEM

1 LP Bypass Valve 0.00% 0.00% 0.00% - - 28-Jan-11 - 0.00% 0.00%

Page 63: mrp

JOB NO: - T209001

Enq. Float

Rcpt Quote

LOI/PO Issue Sch. Act.

(LOI Date)

% Cum. Progress Remarks

4.2.1 ORDERING ( 10% )

SR. NO. System Description

% Progress for the Month

Vendor LOI Date PO Date

Release Date of Orders %

Progress for Month

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda.

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO. :- 63 of 103

2 HP valves of LP Bypass Steam System 100.00% 100.00% 0.00% - - 1-Aug-11 - 0.00% 30.00%

3 LP Piping & Fittings of LP Bypass Steam System 0.00% 0.00% 0.00% - - 5-Sep-11 - 0.00% 0.00%

4 Hangers & Supports of LP Bypass Steam System 0.00% 0.00% 0.00% - - 5-Sep-11 - 0.00% 0.00%

5 Miscellaneous Items of LP Bypass Steam System 0.00% 0.00% 0.00% - - 5-Sep-11 - 0.00% 0.00%

6 HP Piping & Fittings of LP Bypass Steam System 0.00% 0.00% 0.00% - - 1-Aug-11 - 0.00% 0.00%

J CIRCULATING WATER SYSTEM

1 Rubber Expansion Joints 0.00% 0.00% 0.00% - - 6-Aug-11 - 0.00% 0.00%

2 Butterfly Valve for Circulating Water System 100.00% 100.00% 0.00% - - 11-Jun-11 - 10.00% 30.00%

3 OLTCs 100.00% 100.00% 0.00% - - 11-Jun-11 - 0.00% 30.00%

4 LP Valves of Circulating Water System 100.00% 0.00% 0.00% - - 8-Sep-11 - 20.00% 20.00%

5 Hangers & Supports of Circulating Water System 0.00% 0.00% 0.00% - - 8-Sep-11 - 0.00% 0.00%

6 Miscellaneous Items of Circulating Water System 0.00% 0.00% 0.00% - - 8-Sep-11 - 0.00% 0.00%

7 LP Piping & Fittings of Circulating Water System 0.00% 0.00% 0.00% - - 8-Sep-11 - 0.00% 0.00%

K ELECTRICAL SYSTEM

1 AC, DC, UPS Distribution Board 0.00% 0.00% 0.00% - - 7-Apr-11 - 0.00% 0.00%

2 Battery Bank & Chargers 0.00% 0.00% 0.00% - - 12-Jul-11 - 0.00% 0.00%

3 Power Cables 0.00% 0.00% 0.00% - - 16-Sep-11 - 0.00% 0.00%

4 Miscellaneous Items of Electrical System 0.00% 0.00% 0.00% - - 16-Sep-11 - 0.00% 0.00%

L C&I SYSTEM

1 Vibration Monitoring System 100.00% 100.00% 0.00% - - 24-Aug-11 - 0.00% 30.00%

2 DCS System & Panel 100.00% 100.00% 0.00% - - 20-Jul-11 - 0.00% 30.00%

3 C&I Cables 0.00% 0.00% 0.00% - - 2-Dec-11 - 0.00% 0.00%

4 Field Instruments 0.00% 0.00% 0.00% - - 20-Jul-11 - 0.00% 0.00%

Page 64: mrp

JOB NO: - T209001

Enq. Float

Rcpt Quote

LOI/PO Issue Sch. Act.

(LOI Date)

% Cum. Progress Remarks

4.2.1 ORDERING ( 10% )

SR. NO. System Description

% Progress for the Month

Vendor LOI Date PO Date

Release Date of Orders %

Progress for Month

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda.

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO. :- 64 of 103

5 Miscellaneous Items of C&I System 0.00% 0.00% 0.00% - - 2-Dec-11 - 0.00% 0.00%

Page 65: mrp

JOB NO: - T209001

% Progress for Month

% Cum. Progress

A COMMON SYSTEM

1 EOT Crane for Tg Building Anupam Cranes,India 12-May-10 27-May-10 0.00% 18.00%

2 EOT Crane for BFP Anupam Cranes,India 17-May-10 - 0.00% 18.00%

3 Elevator for Main & Service Building - - 0.00% 0.00%

4 Insulation - - 0.00% 0.00%

5 Paints - - 0.00% 0.00%

6 Misccellaneous Items for Commom System - - 0.00% 0.00%

B STG SYSTEM

LOI / PO Date

Manufacturing / Delivery Progress Qty

DespatchedSite Rcpt

DateDelivery Details Remarks

4.2.2 MANUFACTURING ( 90% )

SR. NO. System Description Vendor LOI Date

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO :- 65 of 103

B STG SYSTEM

1 Steam Turbine L&T-MHI 25-Aug-09 19-Jan-10 4.93% 52.95%

2 Generator L&T-MHI 25-Aug-09 19-Jan-10 4.99% 55.32%

3 Turbine Preservation System - - 0.00% 0.00%

4 Miscellaneous Items for STG System - - 0.00% 0.00%

C FEED WATER SYSTEM

1 Deaerator L&T-HED 21-Sep-09 19-Jan-10 0.50% 9.00%

2 MDBFP Flowserve, India/Spain 14-Jun-10 - 4.00% 18.00%

3 TDBFP Flowserve, India/Spain 14-Jun-10 - 4.00% 18.00%

4 Drive Turbine for BFP Siemens, Germany/India - - 0.00% 0.00%

5 HPH L&T-HED 21-Sep-09 19-Jan-10 2.00% 19.00%

6 HP valve of Feed Water System - - 0.00% 0.00%

7 LP Piping & Fitting of Feed Water System - - 0.00% 0.00%

8 LP Valve of Feed Water System - - 0.00% 0.00%

9 Hangers & Support of Feed Water System - - 0.00% 0.00%

10 Miscellaneous Items for Feed Water System - - 0.00% 0.00%

11 Hp piping & Fittings of Feedwater System - - 0.00% 0.00%

Page 66: mrp

JOB NO: - T209001

% Progress for Month

% Cum. Progress

LOI / PO Date

Manufacturing / Delivery Progress Qty

DespatchedSite Rcpt

DateDelivery Details Remarks

4.2.2 MANUFACTURING ( 90% )

SR. NO. System Description Vendor LOI Date

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO :- 66 of 103

12 Expansion Joints of Feed Water System - - 0.00% 0.00%

12 Butterfly Valve for Feed Water System - - 0.00% 0.00%

13 2/3 Way Valve for Feed Water System - - 0.00% 0.00%

D CONDENSATE SYSTEM

1 Condenser L&T-HED 21-Sep-09 19-Jan-10 3.00% 32.00%

2 Condensate Extraction Pump KSB,India 7-Jun-10 - 14.00% 20.00%

3 Condensate Polishing Unit Siemens, India - - 0.00% 0.00%

4 LPH L&T-HED 21-Sep-09 19-Jan-10 2.00% 19.00%4 LPH L&T-HED 21-Sep-09 19-Jan-10 2.00% 19.00%

5 Gland Steam Condenser L&T-MHI 25-Aug-09 19-Jan-10 0.00% 0.00%

6 LP Valve of Condensate System - - 0.00% 0.00%

7 Hangers & Support of Condesate System - - 0.00% 0.00%

8 Miscellaneous Items of Condensate System - - 0.00% 0.00%

9 LP piping & Fittings of Condensate System - - 0.00% 0.00%

E VACUUM SYSTEM

1 Vacuum Pump - - 0.00% 0.00%

2 LP Valves of Vacuum System - - 0.00% 0.00%

3 Hangers & Supports of Vacuum Ssytem - - 0.00% 0.00%

4 Miscellaneous Items of Vacuum System - - 0.00% 0.00%

5 LP Piping & Fittings of Vacuum System - - 0.00% 0.00%

F CLOSED COOLING WATER SYSTEM

1 DMCW Pump - - 0.00% 0.00%

2 Plate Heat Exchanger - - 0.00% 0.00%

3 DMCW Expansion Tanks - - 0.00% 0.00%

4 LP Valves of Closed Cooling Water System - - 0.00% 0.00%

Page 67: mrp

JOB NO: - T209001

% Progress for Month

% Cum. Progress

LOI / PO Date

Manufacturing / Delivery Progress Qty

DespatchedSite Rcpt

DateDelivery Details Remarks

4.2.2 MANUFACTURING ( 90% )

SR. NO. System Description Vendor LOI Date

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO :- 67 of 103

5 Hangers & Supports of Closed Cooling Water System - - 0.00% 0.00%

6 Miscellaneous Items of Closed Cooling Water Syste - - 0.00% 0.00%

7 LP Piping & Fittings of Closed Cooling Water System - - 0.00% 0.00%

G DRAIN SYSTEM

1 HP & LP Flash Tanks L&T-HED 21-Sep-09 - 1.00% 7.00%

2 HP valves of Drain System - - 0.00% 0.00%

3 LP Piping & Fittings of Drain System - - 0.00% 0.00%

4 LP Valves of Drain System - - 0.00% 0.00%4 LP Valves of Drain System - - 0.00% 0.00%

5 Hangers & Supports of Drain System - - 0.00% 0.00%

6 Miscellaneous Items of Drain System - - 0.00% 0.00%

7 HP Piping & Fittings of Drain System - - 0.00% 0.00%

H EXTRACTION STEAM SYSTEM

1 FCNRV L&T-MHI 25-Aug-09 19-Jan-10 0.00% 0.00%

2 HP valves of Extraction System - - 0.00% 0.00%

3 LP Piping & Fittings of Extraction System - - 0.00% 0.00%

4 LP Valves of Extraction System - - 0.00% 0.00%

5 Hangers & Supports of Extraction System - - 0.00% 0.00%

6 Miscellaneous Items of Extraction System - - 0.00% 0.00%

7 HP Piping & Fittings of Extraction System - - 0.00% 0.00%

I LP BYPASS STEAM SYSTEM

1 LP Bypass Valve - - 0.00% 0.00%

2 HP valves of LP Bypass Steam System - - 0.00% 0.00%

3 LP Piping & Fittings of LP Bypass Steam System - - 0.00% 0.00%

4 Hangers & Supports of LP Bypass Steam System - - 0.00% 0.00%

Page 68: mrp

JOB NO: - T209001

% Progress for Month

% Cum. Progress

LOI / PO Date

Manufacturing / Delivery Progress Qty

DespatchedSite Rcpt

DateDelivery Details Remarks

4.2.2 MANUFACTURING ( 90% )

SR. NO. System Description Vendor LOI Date

LARSEN & TOUBRO LIMITEDPower Project Management Services,Baroda

JAIPRAKASH POWER VENTURESLIMITED

DOCUMENT NO.: - LT:JNSTPP:CON:PPM:003PROGRESS REPORT NO.: - 11ANNEXURE NO.: -

2 X 660 MW STEAM TURBINE GENERATOR & AUXILIARIES PAGE NO :- 68 of 103

5 Miscellaneous Items of LP Bypass Steam System - - 0.00% 0.00%

6 HP Piping & Fittings of LP Bypass Steam System - - 0.00% 0.00%

J CIRCULATING WATER SYSTEM

1 Rubber Expansion Joints - - 0.00% 0.00%

2 Butterfly Valve for Circulating Water System - - 0.00% 0.00%

3 OLTCs - - 0.00% 0.00%

4 LP Valves of Circulating Water System - - 0.00% 0.00%

5 Hangers & Suuports of Circulating Water System - - 0.00% 0.00%5 Hangers & Suuports of Circulating Water System - - 0.00% 0.00%

6 Miscellaneous Items of Circulating Water System - - 0.00% 0.00%

7 LP Piping & Fittings of Circulating Water System - - 0.00% 0.00%

K ELECTRICAL SYSTEM

1 AC, DC, UPS Distribution Board - - 0.00% 0.00%

2 Battery Bank & Chargers - - 0.00% 0.00%

3 Power Cables - - 0.00% 0.00%

4 Miscellaneous Items of Electrical System - - 0.00% 0.00%

L C&I SYSTEM

1 Vibration Monitoring System - - 0.00% 0.00%

2 DCS System & Panel - - 0.00% 0.00%

3 C&I Cables - - 0.00% 0.00%

4 Field Instruments - - 0.00% 0.00%

5 Miscellaneous Items of C&I System - - 0.00% 0.00%

Page 69: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 69 of 103

  

4.3 PROJECT WBS STURCTURE, WEIGHTAGE PRINCIPLE AND BASIS OF

PROGRESS MEASUREMENT

Page 70: mrp

LEVEL : I

DOCUMENT NO :

PROGRESS REPORT NO :

REV. NO :

JOB NO :- T209001

JAIPRAKASH POWER VENTURE LIMITED (2 X 660 MW JAYPEE NIGRIE SUPER THERMAL POWER PROJECT)

LARSEN & TOUBRO LIMITED, PPMS,

BARODA

WORK BREAK - DOWN STRUCTURE, WEIGHTAGE PRINCIPLE AND BASIS OF PROGRESS MEASUREMENT

STG PACKAGE - 2 X 660 MW JAYPEE NIGRIE SUPER THERMAL POWER PROJECT WTG PT 1000000

10% 75%

ENGINEERING WTG PT 100000 PROCUREMENT WTG PT 750000 CONSTRUCTION WTG PT 150000

35% 65% 10% 90% 2% 3% 80% 15%

BASIC ENGINEERING DETAIL ENGINEERING ORDERING MANUFACTURING / DELIVERY COMMISSIONING

WTG PT 35000 WTG PT 65000 WTG PT 75000 WTG PT 675000 WTG PT 3000 WTG PT 4500 WTG PT 120000 WTG PT 22500

DESIGN CRITERIA DOCUMENTS 20% ROTATING EQUIPMENTS 25% ROTATING EQUIPMENTS 35% ORDER ON ERECTION OPENING OF SITE STG SYSTEM 45% PRE COMM. 90%

DCD POWER SYSTEM - 75% STATIC EQUIPMENTS 20% STATIC EQUIPMENTS 20% CONTRACTOR 100% OFFICE 100% FEED WATER SYSTEM 13% UNIT COMM. 10%

DCD BOP SYSTEM - 25% VENDOR DRGs REVIEW 20% BOP / MISCELLANEOUS ITEMS 17% BOP / MISCELLANEOUS ITEMS 15% CONDENSATE SYSTEM 21% TOTAL 100%

CALCULATION 10% PIPING STRESS ANALYSIS, ISOMETRIC & LISTS 30% PIPES 10% PIPES 10% VACUUM SYSTEM 1.00%

CALC. POWER SYSTEMS - 75% PIPE SUPPORT DRGs 15% VALVES 10% VALVES 10% CLOSED CW SYSTEM 3.00%

LEVEL : III

LEVEL :II

ERECTION / SITE WORKS

15%

LEVEL : IV

TENDERING ENABLING WORKS

TG BUILDING GA, PIPING LAYOUT &

COMPOSITE DRGS 20%

CALC. POWER SYSTEMS - 75% PIPE SUPPORT DRGs 15% VALVES 10% VALVES 10% CLOSED CW SYSTEM 3.00%

CALC. BOP SYSTEMS - 25% O & M MANUALS, PG TEST PROCEDURE 2.5% ELECTRICAL ITEMS 8% ELECTRICAL ITEMS 5% DRAIN SYSTEM 2.00%

P & IDs 30% ELECTRICAL SCHEMATICS, FEEDER, INSTRUMENTATION ITEMS 10% INSTRUMENTATION ITEMS 5% EXTRACTION SYSTEM 2.00%

UPTO REL FOR CONSTRUCTION - 97.5% CABLE SCHEDULE & TERMINATIONS ETC… 2.5% TOTAL 100% TOTAL 100% LP BYPASS SYSTEM 1.00%

AS BUILT - 2.5% C & I CONTROL SCHEMES, INSTAL DRGs CONDENSER CW SYSTEM 2.00%

PROCUREMENT ASSISTANCE 40% CABLE SCHEDULE & TERMINATIONS ETC… 10% C & I SYSTEM 3.00%

MECHANICAL - 90% TOTAL 100% ELECTRICAL SYSTEM 3.00%

ELECTRICAL - 5% COMMON SYSTEM 1.00%

C & I - 5% NOTE : INSULATION 2.00%

TOTAL 100% Rotating Equipment Includes :- Turbine & Auxillieries, Generator & Auxillieries, GSC, BFP, Drive Turbine, Motor for MDBFP, CEP, Vacuum pump, DMCW pump. PAINTING 1.00%

Static Equipment lncludes :- Deaerator, HPH, LPH, Condenser, PHE, DMCW Expansion Tank, HP Flash Tank, LP Flash Tank TOTAL 100.00%

BOP/Miscellaneous items :- Turbine Preservation System, CPU, OLTC & Debris filter, EOT cranes, Elevators, Expansion Joints, Insulation,Paints etc…

BASIS OF WEIGHTAGE :

BASIS OF PROGRESS MEASUREMENT :

ORDERING- EFFORTS MANUFACTURING / DELIVERY

LEVEL : V FURTHER EACH DISCIPLINE / GROUP TO BE BROKEN DOWN INTO ACTIVITIES IN THE DETAILED PROJECT SCHEDULE WITH WEIGHTAGES.

CONSTRUCTION - COST/ WORK VOLUME/RESOURSE & MANPOWER UTILISATIONENGINEERING - MANHOUR / EFFORTS

BASIS OF PROGRESS MEASUREMENT :

Standard Milestones for Progress Standard Milestones for Progress

80% 70% measurement of ITEMs / MRs measurement of ITEMs / MRs

15% 15% RCPT / Approval of MFG DRGs 10%

5% 12.5% Enquiry 20% Sub order of Major Material 10%

As built 2.5% RCPT of Quote 10% Prorata RCPT of Major Material 20%

70% LOI / Order 70% Prorata Manufacturing 40%

15% 85% Inspection 5%

12.5% 12.5% Despatch 5%

As built 2.5% As built 2.5% Receipt at site 10%

Bulk Material

45% MFG / Testing 90%

45% Despatch 5%

10% Receipt at site 5%

2nd Submission Incorporating Comments

DRGS/DOCS to be submitted for Approval

1st Submission to Jaypee / DCPL1st Submission to Jaypee / DCPL

Purchase Specification

Bid Evaluation

APPROVED BY :

DOC NO :

Procurement AssistancePREP BY : CHKD BY :

P & IDs

DCD

DRGS/DOCS to be submitted for Information

ISSUED FORDATE :Specification

1st Submission to Jaypee / DCPL

BASIC & DETAIL ENGINEERING

BASIC ENGINEERING

PROCUREMENT

ORDERING / TENDERING

1st Submission to Jaypee / DCPL

Approval

2nd Submission Incorporating Comments

MANUFACTURING / DELIVERY

2nd Submission Incorporating Comments

Released for Construction

For all items

CONSTRUCTION

PROGRESS WILL BE MEASURED PRORATA BY WORK ACHIEVED

AGAINST TOTAL WORK VOLUME. THE PROGRESS SHALL

Released for ConstructionPGINFORMATION VP

BE CALCULATED AT SITE AS THE WORK COMMENCES ON SITE

DETAIL ENGINEERING

ApprovalVL

Page 71: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No- 71 of 103

  

4.4 PRIMAVERA SCHEDULE

Page 72: mrp

Activity ID Activity Name OriginalDuration

Start Finish

MILESTONMILESTONE 1475 23-Jul-09 A 05-Aug-13

L&T MILEL&T MILESTONE 1475 23-Jul-09 A 05-Aug-13

ML100 Date of "Notice To Proceed" 0 23-Jul-09 A

ML101 Opening of Site office & Mobilization 0 03-Jan-11*

ML102 Unit-1 Supply of Embedded parts for TG 0 03-Jan-11*

ML104 Unit-1 Commencement of EOT erection 0 23-May-11*

ML106 Unit-1 Commencement of insitu Condenser erection 0 12-Oct-11*

ML107 Unit-1 MDBFP receipt at site 0 20-Dec-11*

ML110 ***Unit-1 Commencement of TG erection 0 26-Dec-11

ML109 Unit-1 Receipt of LP Turbine at site 0 24-Jan-12*

ML111 Unit-1 Receipt of Generator at site 0 22-Mar-12*

ML108 Unit-1 Receipt of Deaerator at site 0 27-Mar-12*

ML113 Unit-1 TG oil flushing completion 0 06-Nov-12*

ML112 Unit-1 Readiness of TG/C&I system 0 24-Jan-13*ML118 Unit-1 Completion of Governing system 0 09-Feb-13*ML115 Unit-1 TG boxing up 0 09-Feb-13*ML116 Unit-1 Boiler Light up readiness 0 26-Mar-13*ML114 Unit-1 Commissioning of MDBFP 0 26-Mar-13*ML119 Unit-1 TG on Barring Gear 0 12-Apr-13*ML117 Unit-1 Steam Blowing completion 0 25-Apr-13*ML121 Unit-1 TG Synchronization on Coal 0 24-Jun-13*ML120 Unit-1 TG Synchronization on Oil 0 24-Jun-13*ML123 Unit-1 Completion of Trial operation 0 05-Aug-13*

CLIENT INCLIENT INPUTS 821 24-Sep-10 22-Dec-12

CONSTRUCONSTRUCTION PHASE 576 24-Sep-10 21-Apr-12ML200 Availability of leveled & graded land,water & electri... 0 24-Sep-10*

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 1 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 73: mrp

Activity ID Activity Name OriginalDuration

Start Finish

ML201 Unit-1 Readiness of site access road for transporta... 0 22-Nov-10*ML202 Unit-1 Service (AB) bay readiness for erection of E... 0 21-May-11*ML215 ***Unit-1 Service (BC) bay readiness for erection o... 0 11-Jul-11*ML216 ***Unit-1 Readiness of GSC structural foundation (... 0 22-Aug-11*ML204 Unit-1 Readiness of '9' mtrs floor 0 22-Aug-11*ML225 ***Unit-1 Readiness of BFP foundations (at '0' mtr ... 0 22-Sep-11*ML207 Unit-1 TG bldg readiness for STG erection 0 22-Sep-11*ML205 Unit-1 Clearance for insitu Condenser erection 0 22-Sep-11*ML219 ***Unit-1 Readiness of Vacuum pump foundations(... 0 22-Sep-11*ML206 Unit-1 Readiness of '0' mtr floor 0 22-Sep-11*ML224 ***Unit-1 Readiness of CEP foundations (at '(-)5' m... 0 22-Sep-11*ML221 ***Unit-1 Readiness of PHE foundations (at '0' mtr ... 0 22-Sep-11*ML222 ***Unit-1 Readiness of DMCW Pump foundations (... 0 22-Sep-11*ML223 ***Unit-1 Readiness of CPU foundations (at '0' mtr ... 0 22-Sep-11*ML220 ***Unit-1 Readiness of HP/LP Flash tank foundatio... 0 22-Sep-11*ML227 ***Unit-1 Readiness of Turbine Preservation sys fd... 0 22-Nov-11*ML228 ***Unit-1 Readiness of HPH 6A & 6B structural fou... 0 22-Nov-11*ML209 Unit-1 Readiness of Strand Jack foundation for Ge... 0 22-Nov-11*ML226 ***Unit-1 Readiness of LPH 3 & 4 structural founda... 0 22-Nov-11*ML208 Unit-1 Readiness of '17' mtrs floor 0 22-Nov-11*ML218 ***Unit-1 Readiness of CW BF v/vs & Pipe support... 0 22-Dec-11*ML231 ***Unit-1 Readiness of DMCW Expansion tank fou... 0 21-Jan-12*ML210 Unit-1 Readiness of '31' mtrs floor 0 21-Jan-12*ML230 ***Unit-1 Readiness of Deaerator foundation (at '3... 0 21-Jan-12*ML229 ***Unit-1 Readiness of HPH 7A,7B,8A & 8B struct... 0 21-Jan-12*ML213 Unit-1 Readiness of electrical & instrumentation ea... 0 22-Mar-12*ML211 Unit-1 Readiness of AC/DC/UPS Panel & Battery b... 0 22-Mar-12*ML212 Unit-1 Main & Service building readiness for Elevat... 0 22-Mar-12*ML214 Unit-1 Readiness of Control room for DCS & Mars... 0 21-Apr-12*

COMMISSCOMMISSIONING PHASE 488 22-Aug-11 22-Dec-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 2 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 74: mrp

Activity ID Activity Name OriginalDuration

Start Finish

ML300 Unit-1 Readiness of 415V supply for EOT & Elevator 0 22-Aug-11*ML301 Unit-1 Availability of trained O&M manpower for co... 0 22-May-12*ML302 Unit-1 Availability of DM water at terminal points at... 0 22-May-12*ML308 Unit-1 Availibility of Auxillary cooling water at termi... 0 21-Jul-12*ML304 Unit-1 Readiness of 415V,3.3KV,11KV & Emergen... 0 21-Jul-12*ML303 Unit-1 Readiness of HVAC system for DCS commi... 0 21-Jul-12*ML305 Unit-1 Readiness of 220V & 24V DC power supply ... 0 21-Jul-12*ML306 Unit-1 Readiness of Fire protection, detection & al... 0 21-Jul-12*ML307 Unit-1 Availability of Instru & Service air at terminal... 0 21-Jul-12*ML309 Unit-1 Availability of Condenser cooling water at te... 0 22-Sep-12*ML310 Unit-1 Readiness of GT, UAT, GCB & Switchyards 0 22-Dec-12*

LAYOUT &LAYOUT & LOADING SUBMISSION 487 23-Sep-09 A 22-Jan-10 A

EN200 TG hall Main & Aux. Column 105 23-Sep-09 A 22-Jan-10 AEN204 Other equipments, Floors & Control room 236 23-Dec-09 A 22-Jan-10 AEN201 TG Foundation including deck 104 23-Dec-09 A 19-Jan-10 AEN202 Condenser Pit 104 23-Dec-09 A 19-Jan-10 AEN203 BFP & CEP 130 23-Dec-09 A 19-Jan-10 A

COMMON COMMON SYSTEM 1389 23-Jul-09 A 11-May-13

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

EN100 Major Engineering 324 23-Jul-09 A 26-Nov-10EN101 Balance Engineering 575 15-Dec-09 A 02-Jan-12

EOT CRAEOT CRANE FOR TG BUILDING 587 25-Jan-10 A 12-Oct-11

CMN10 Ordering 75 25-Jan-10 A 24-May-10 ACMN20 Product Engineering 48 01-Jun-10 A 29-Sep-10CMN30 Manufacturing 160 01-Jul-10 A 07-Mar-11CMN70 Supply of Main Girder for Crane-2 52 07-Mar-11 06-May-11CMN80 Supply of Trolley for Crane-2 52 07-Mar-11 06-May-11CMN90 Supply of Balance & Misc items for Crane-2 52 07-Mar-11 06-May-11CMN60 Supply of Balance & Misc items for Crane-1 52 07-Mar-11 06-May-11

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 3 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 75: mrp

Activity ID Activity Name OriginalDuration

Start Finish

CMN40 Supply of Main Girder for Crane-1 52 07-Mar-11 06-May-11CMN50 Supply of Trolley for Crane-1 52 07-Mar-11 06-May-11CMN100 Mounting of L T. wheels with the individual Girders 30 06-May-11 10-Jun-11CMN110 Lifting and placement of Girders,End carriage on t... 50 10-Jun-11 08-Aug-11CMN120 Erection of Electrical panels and completing other ... 41 08-Aug-11 24-Sep-11CMN130 Assembling Wire Rope with Hooks and weaving o... 41 08-Aug-11 24-Sep-11CMN140 Commissioning of Crane No 1 & 2 15 24-Sep-11 12-Oct-11

EOT FOREOT FOR BFP 490 25-Jan-10 A 05-Sep-11

CMN150 Ordering 90 25-Jan-10 A 24-May-10 ACMN160 Product Engineering 45 01-Jul-10 A 29-Sep-10CMN170 Manufacturing 145 02-Aug-10 A 19-Feb-11CMN190 Supply of Trolley 60 19-Feb-11 30-Apr-11CMN200 Supply of Balance & Misc items 60 19-Feb-11 30-Apr-11CMN180 Supply of Main Girder 60 19-Feb-11 30-Apr-11CMN210 Mounting of L T. wheels with the individual Girders 15 12-Jul-11 28-Jul-11CMN220 Lifting and placement of Girders, End carriage on t... 16 29-Jul-11 16-Aug-11CMN230 Erection of Electrical panels and completing other ... 10 17-Aug-11 27-Aug-11CMN240 Assembling Wire Rope with Hooks and weaving o... 10 17-Aug-11 27-Aug-11CMN250 Commissioning of Crane 7 29-Aug-11 05-Sep-11

ELEVATOELEVATOR FOR MAIN & SERVICE BUILDING 756 24-Mar-10 A 31-Dec-12

CMN260 Ordering 90 24-Mar-10 A 06-Dec-10CMN270 Product Engineering 60 07-Dec-10 14-Feb-11CMN280 Manufacturing 172 15-Feb-11 02-Sep-11CMN290 Supply of Counterweights 60 03-Sep-11 11-Nov-11CMN300 Supply of Lift Cars 60 03-Sep-11 11-Nov-11CMN310 Supply of Winding units 60 03-Sep-11 11-Nov-11CMN320 Supply of Electrical Motors & accessories 60 03-Sep-11 11-Nov-11CMN330 Supply of Balance & Misc items 60 03-Sep-11 11-Nov-11CMN340 Installation of Steel guides for Elevator car 45 08-Jun-12 31-Jul-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 4 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 76: mrp

Activity ID Activity Name OriginalDuration

Start Finish

CMN350 Installation of Counterweight guard, Cocounterwei... 30 31-Jul-12 04-Sep-12CMN360 Installation of Elevator car alongwith doors and oth... 55 04-Sep-12 07-Nov-12CMN370 Installation of Electrical and Control equipments 45 15-Sep-12 07-Nov-12CMN380 Commissioning of Main & Service Building Elevators 70 10-Oct-12 31-Dec-12

INSULATINSULATION 454 05-Jan-12 03-Apr-13

CMN390 Ordering 90 05-Jan-12 19-Apr-12CMN400 Manufacturing 100 19-Apr-12 14-Aug-12CMN410 Supply 90 10-Jul-12 23-Oct-12CMN420 Application 139 23-Oct-12 03-Apr-13

PAINTSPAINTS 437 29-Feb-12 11-May-13

CMN430 Ordering 90 29-Feb-12 13-Jun-12CMN440 Manufacturing 60 13-Jun-12 22-Aug-12CMN450 Supply 100 22-Aug-12 17-Dec-12CMN460 Application 92 25-Jan-13 11-May-13

MISC ITEMISC ITEM FOR COMMON SYSTEM 500 10-May-11 21-Sep-12

CMN470 Ordering 90 10-May-11 23-Aug-11CMN480 Product Engineering 60 23-Aug-11 01-Nov-11CMN490 Manufacturing 189 01-Nov-11 08-Jun-12CMN500 Supply for Unit-1 & 2 180 24-Feb-12 21-Sep-12

STG SYSTSTG SYSTEM 1475 23-Jul-09 A 05-Aug-13

TURBINETURBINE 1398 23-Jul-09 A 20-May-13

MANUFACMANUFACTURING & SUPPLY 1050 23-Jul-09 A 06-Jun-12

MANUFMANUFACTURING 856 23-Jul-09 A 25-Nov-11STG8 Ordering 29 23-Jul-09 A 25-Aug-09 ASTG1 Product Engineering 500 26-Aug-09 A 06-May-11STG2 Procurement of Raw Material, Forgings & Castings... 260 13-Jan-10 A 09-Oct-10STG3 Machining of Rotors 337 01-Mar-10 A 11-Dec-10STG4 Stationary/Rotating Blades & Blade rings 334 26-Apr-10 A 19-Jan-11STG5 Diaphragms 311 26-Apr-10 A 24-Mar-11

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 5 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 77: mrp

Activity ID Activity Name OriginalDuration

Start Finish

STG6 Machining of Castings 287 26-Jul-10 A 24-Mar-11STG8 HIPT Pedestal 217 24-Sep-10 03-Jun-11STG7 Balance & Misc items including Electrical & C&I ite... 237 24-Sep-10 27-Jun-11STG9 Assembly & Testing of Turbine 130 28-Jun-11 25-Nov-11

SUPPLYSUPPLY 535 20-Dec-10 06-Jun-12STG1 Embedded parts for HIPT, LPT-1 and LPT-2 26 20-Dec-10 18-Jan-11STG1 LPT-1 & 2 Casings 59 17-Nov-11 24-Jan-12STG1 Bearing Pedestal for HIPT 33 17-Nov-11 24-Dec-11STG1 LPT-1 & 2 Rotors 55 22-Nov-11 24-Jan-12STG1 HIPT Rotor 53 24-Nov-11 24-Jan-12STG1 HIPT Casings 57 24-Nov-11 28-Jan-12STG1 LPT-1 & 2 other miscellaneous items 95 26-Nov-11 15-Mar-12STG1 HIPT other miscellaneous items 85 26-Nov-11 03-Mar-12STG1 Other auxiliaries & systems like Lube oil system, Pi... 122 26-Nov-11 16-Apr-12STG1 Balance & Misc items including Electrical & C&I ite... 106 04-Feb-12 06-Jun-12

ERECTIONERECTION 590 23-Sep-11 04-May-13STG200 HIPT Brg Pedestal and LPT 1&2- Chipping of fdn ... 52 23-Sep-11 22-Nov-11STG210 HIPT Brg Pedestal and LPT 1&2- Fixing of Seatin... 30 26-Dec-11 28-Jan-12STG220 HIPT- Placement of bottom half, internals and leve... 60 30-Jan-12 07-Apr-12STG230 LPT 1- Placement of bottom half, internals and lev... 60 10-Feb-12 19-Apr-12STG240 LPT 2- Placement of bottom half, internals and lev... 60 22-Feb-12 01-May-12STG250 HIPT- Placement of Rotor in Position and its cente... 80 09-Apr-12 10-Jul-12STG280 Erection of Lube, Jacking, EH Oil System 105 16-Apr-12 15-Aug-12STG260 LPT 1- Placement of Rotor in Position and its cent... 70 20-Apr-12 10-Jul-12STG270 LPT 2- Placement of Rotor in Position and its cent... 60 02-May-12 10-Jul-12STG290 Erection of MSV/GVs & RSV/ICVs 92 14-May-12 28-Aug-12STG300 Alignment of HIPT, LPT-1 & LPT-2 Rotors 39 11-Jul-12 24-Aug-12STG310 Coupling of Turbine Rotors 30 25-Aug-12 28-Sep-12STG320 Setting of Steam path clearances and boxing up 48 29-Sep-12 23-Nov-12STG330 Erection of Turning gear motor 33 09-Feb-13 20-Mar-13

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 6 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 78: mrp

Activity ID Activity Name OriginalDuration

Start Finish

STG340 Erection of Turbine enclosure 19 12-Apr-13 04-May-13

COMMISSCOMMISSIONING 265 29-Aug-12 20-May-13STG350 Lube oil flushing and normalisation 60 29-Aug-12 06-Nov-12STG360 Turning gear operation 5 06-Apr-13 12-Apr-13STG370 Steam rolling & overspeed testing 6 13-May-13 20-May-13

GENERAGENERATOR 1475 23-Jul-09 A 05-Aug-13

MANUFACMANUFACTURING & SUPPLY 971 23-Jul-09 A 19-Mar-12

MANUFMANUFACTURING 820 23-Jul-09 A 20-Oct-11STG8 Ordering 29 23-Jul-09 A 25-Aug-09 ASTG3 Product Engineering 500 26-Aug-09 A 12-May-11STG3 Procurement of Raw Material, Forgings & Castings... 260 13-Jan-10 A 03-Nov-10STG4 Stator Machining & Winding 200 20-Feb-10 A 18-Nov-10STG4 Rotor Machining & Winding 185 20-Feb-10 A 20-Nov-10STG4 Manufacturing of Other Auxiliries 140 01-Sep-10 A 09-Feb-11STG4 Manufacturing of Balance & Miscellaneous items 217 09-Feb-11 20-Oct-11

SUPPLYSUPPLY 456 20-Dec-10 19-Mar-12STG4 Embedded parts for Generator 26 20-Dec-10 18-Jan-11STG4 Stator 129 20-Oct-11 19-Mar-12STG4 Rotor 114 20-Oct-11 01-Mar-12STG4 Bearing Pedestal 99 20-Oct-11 13-Feb-12STG4 Exciter 84 24-Nov-11 01-Mar-12STG4 Control panels 84 24-Nov-11 01-Mar-12STG5 Balance & Misc items including Electrical & C&I ite... 84 24-Nov-11 01-Mar-12

ERECTIONERECTION 367 23-Nov-11 23-Nov-12STG510 Erection of Strand Jack lifting arrangement 50 23-Nov-11 19-Jan-12STG520 Lifting of Stator and its placement in position 10 23-Mar-12 03-Apr-12STG770 Preparation for Rotor threading and electrical testi... 30 04-Apr-12 08-May-12STG530 Rotor threading 10 09-May-12 19-May-12STG780 Lowering of Generator Rotor on Bearings 15 21-May-12 06-Jun-12STG790 Mounting of Fan blades on Rotor 10 07-Jun-12 18-Jun-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 7 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 79: mrp

Activity ID Activity Name OriginalDuration

Start Finish

STG550 Erection of Seal oil System 25 14-Jun-12 13-Jul-12STG800 Runout of Coupling half of Generator rotor at both ... 10 19-Jun-12 29-Jun-12STG560 Erection of Generator Gas (H2, CO2) system 25 13-Jul-12 11-Aug-12STG540 Erection of Stator Cooling water System 25 11-Aug-12 10-Sep-12STG570 Alignment of Generator Rotor with Turbine Rotor 26 25-Aug-12 24-Sep-12STG580 Coupling of Gen. Rotor with Turbine Rotor 14 25-Sep-12 10-Oct-12STG590 Erection of Exciter 15 11-Oct-12 27-Oct-12STG600 Boxing up of Bearing Pedestal of Generator 23 29-Oct-12 23-Nov-12

COMMISSCOMMISSIONING 329 10-Sep-12 05-Aug-13STG610 Flushing of Stator water cooling system 10 10-Sep-12 21-Sep-12STG620 Tightness test of Generator (Air & H2) 20 12-Apr-13 06-May-13STG650 STG full loading & Stabilisation 36 07-Jun-13 19-Jul-13STG630 Synchronization on Oil 0 07-Jun-13*STG640 Synchronization on Coal 0 07-Jun-13*STG660 Trial run 14 19-Jul-13 05-Aug-13

TURBINETURBINE PRESERVATION SYSTEM 581 31-May-11 31-Dec-12

STG670 Ordering 90 31-May-11 12-Sep-11STG680 Product Engineering 60 13-Sep-11 21-Nov-11STG690 Manufacturing 189 22-Nov-11 28-Jun-12STG700 Supply of Turbine Preservation system & its acces... 150 25-May-12 15-Nov-12STG710 Erection 75 22-Sep-12 19-Dec-12STG720 Commissioning 10 19-Dec-12 31-Dec-12

MISC ITEMISC ITEM FOR STG SYSTEM 500 10-May-11 21-Sep-12

STG730 Ordering 90 10-May-11 23-Aug-11STG740 Product Engineering 60 23-Aug-11 01-Nov-11STG750 Manufacturing 189 01-Nov-11 08-Jun-12STG760 Supply for Unit-1 & 2 180 24-Feb-12 21-Sep-12

FEED WATFEED WATER SYSTEM 1400 23-Jul-09 A 22-May-13

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 8 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 80: mrp

Activity ID Activity Name OriginalDuration

Start Finish

EN102 Major Engineering 339 23-Jul-09 A 29-Nov-10EN103 Balance Engineering 575 15-Dec-09 A 02-Jan-12

DEAERATDEAERATOR 1270 23-Jul-09 A 12-Jan-13

FW100 Ordering 52 23-Jul-09 A 21-Sep-09 AFW10 Product Engineering 208 22-Sep-09 A 16-Feb-11FW20 Procurement of Raw Material, Nozzles, Flanges etc 276 01-Jun-10 A 18-Jun-11FW40 Fabrication of Shells 136 12-Mar-11 18-Aug-11FW30 Forming of Dish ends 136 12-Mar-11 18-Aug-11

FW50 Assembly of Deaerator 100 18-Aug-11 13-Dec-11FW1050 Readiness of Strand Jack foundation for Deaerator... 0 30-Sep-11*FW70 Supply of Balance & Miscellaneous items 166 13-Dec-11 23-Jun-12FW60 Supply of Deaerator & its accessories 166 13-Dec-11 23-Jun-12

FW80 Erection of Strand Jack lifting arrangement 50 13-Mar-12 10-May-12

FW90 Placement, Leveling, Centering, Preassembly & A... 70 23-Jun-12 13-Sep-12FW110 Hydraulic test of Deaerator 10 13-Sep-12 25-Sep-12

FW120 Commissioning of Deaerator 25 15-Dec-12 12-Jan-13

MDBFPMDBFP 1181 29-Dec-09 A 26-Mar-13

FW130 Ordering 45 29-Dec-09 A 24-May-10 AFW140 Product Engineering 120 26-Jul-10 A 07-Oct-10FW150 Manufacturing 338 09-Aug-10 A 06-Sep-11FW160 Supply of MDBFP-1 & its accessories 90 06-Sep-11 20-Dec-11FW170 Supply of MDBFP-2 & its accessories 90 06-Sep-11 20-Dec-11FW180 Erection of MDBFP-1 including all its accessories 80 20-Dec-11 22-Mar-12FW200 Erection of MDBFP-2 including all its accessories 80 22-Mar-12 23-Jun-12FW210 Erection of Oil system 30 23-Jun-12 28-Jul-12FW220 Erection of Cooling water system for Motor 30 28-Jul-12 01-Sep-12FW230 Cleaning of Oil pipes & Normalization 15 01-Sep-12 19-Sep-12FW240 Trial run of Motors 15 24-Sep-12 11-Oct-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 9 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 81: mrp

Activity ID Activity Name OriginalDuration

Start Finish

FW250 Commissioning of MDBFPs 45 02-Feb-13 26-Mar-13

TDBFPTDBFP 1238 29-Dec-09 A 22-May-13

FW260 Ordering 45 29-Dec-09 A 24-May-10 AFW270 Product Engineering 120 26-Jul-10 A 07-Oct-10FW280 Manufacturing 338 09-Aug-10 A 06-Sep-11FW300 Supply of TDBFP-1 & Accessories 90 06-Sep-11 20-Dec-11FW290 Supply of TDBFP-2 & Accessories 90 06-Sep-11 20-Dec-11FW310 Erection of TDBFP-1 including all its accessories 80 20-Dec-11 22-Mar-12FW330 Erection of TDBFP-2 including all its accessories 80 22-Mar-12 23-Jun-12FW340 Erection of Oil System 30 07-Sep-12 11-Oct-12FW350 Cleaning of Oil pipes & Normalization 15 12-Oct-12 29-Oct-12FW360 Commissioning of TDBFP 49 27-Mar-13 22-May-13

DRIVE TUDRIVE TURBINE (FOR TDBFP) 1185 14-Apr-10 A 22-May-13

FW370 Ordering 50 14-Apr-10 A 23-Aug-10 AFW380 Product Engineering 120 24-Sep-10 10-Feb-11FW390 Manufacturing 395 03-Dec-10 07-Mar-12FW400 Supply of Drive Turbine-1 & Accessories 142 08-Mar-12 20-Aug-12FW410 Supply of Drive Turbine-2 & Accessories 142 08-Mar-12 20-Aug-12FW420 Chipping of Foundation and fixing of packers and ... 20 21-Jun-12 13-Jul-12FW430 Placement, levelling and centering of Turbine module 22 14-Jul-12 08-Aug-12FW440 Alignment of Turbine with BFP & Gear box 25 09-Aug-12 06-Sep-12FW450 Erection of Oil System 30 07-Sep-12 11-Oct-12FW1080 Cleaning of Oil pipes & Normalization 15 12-Oct-12 29-Oct-12FW460 Turning Gear operation of Drive turbines 10 30-Oct-12 09-Nov-12FW470 Commissioning of Drive Turbines 49 27-Mar-13 22-May-13

HPHHPH 1282 23-Jul-09 A 24-Jan-13

MANUFACMANUFACTURING & SUPPLY 1053 23-Jul-09 A 09-Jun-12FW1090 Ordering 52 23-Jul-09 A 21-Sep-09 AFW480 Product Engineering 200 22-Sep-09 A 16-Oct-10

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 10 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 82: mrp

Activity ID Activity Name OriginalDuration

Start Finish

FW490 Procurement of Raw Material, Tubes, Forgings etc 186 03-Feb-10 A 15-Feb-11FW500 Fabrication of Shells 199 16-Dec-10 05-Aug-11FW510 Machining and Drilling of Tube sheets 120 15-Feb-11 05-Jul-11FW520 Forming of Dish ends 147 15-Feb-11 05-Aug-11FW530 Tubing 50 05-Jul-11 01-Sep-11FW540 Assembly 152 01-Sep-11 25-Feb-12FW550 Supply of HPH 6A & 6B with accessories 90 27-Dec-11 10-Apr-12FW570 Supply of HPH 8A & 8B with accessories 90 25-Feb-12 09-Jun-12FW560 Supply of HPH 7A & 7B with accessories 90 25-Feb-12 09-Jun-12

ERECTIOERECTION & COMMISSIONING 289 10-Apr-12 24-Jan-13FW580 Erection of HPH 6A 45 10-Apr-12 01-Jun-12FW1060 Erection of HPH 6B 45 01-Jun-12 24-Jul-12FW590 Erection of HPH 7A & 7B 45 09-Jun-12 01-Aug-12FW1070 Erection of HPH 8A & 8B 45 01-Aug-12 22-Sep-12FW600 Mounting of Acessories (safety valves,vents and d... 50 22-Sep-12 20-Nov-12FW610 Commissioning of HPHs 35 15-Dec-12 24-Jan-13

HP VALVHP VALVE OF FEED WATER SYSTEM 400 17-May-10 A 10-Jan-12

FW680 Ordering 90 17-May-10 A 06-Dec-10FW690 Product Engineering 60 07-Dec-10 14-Feb-11FW700 Manufacturing 193 15-Feb-11 27-Sep-11FW710 Supply for Unit-1 & 2 180 15-Jun-11 10-Jan-12

LP PIPINGLP PIPING & FITTING OF FEED WATER SYST... 435 19-Jul-11 26-Sep-12

FW720 Ordering 90 19-Jul-11 01-Nov-11FW730 Product Engineering 53 01-Nov-11 02-Jan-12FW740 Manufacturing 140 02-Jan-12 13-Jun-12FW750 Supply for Unit-1 & 2 180 29-Feb-12 26-Sep-12

LP VALVLP VALVE OF FEED WATER SYSTEM 330 21-Sep-10 A 11-Nov-11

FW760 Ordering 90 21-Sep-10 A 16-Dec-10FW770 Product Engineering 53 17-Dec-10 16-Feb-11

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 11 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 83: mrp

Activity ID Activity Name OriginalDuration

Start Finish

FW780 Manufacturing 140 17-Feb-11 29-Jul-11FW790 Supply for Unit-1 & 2 180 16-Apr-11 11-Nov-11

H&S OF FH&S OF FEED WATER SYSTEM 435 19-Jul-11 26-Sep-12

FW800 Ordering 90 19-Jul-11 01-Nov-11FW810 Product Engineering 53 01-Nov-11 02-Jan-12FW820 Manufacturing 140 02-Jan-12 13-Jun-12FW830 Supply for Unit-1 & 2 180 29-Feb-12 26-Sep-12

MISC ITEMISC ITEM OF FEED WATER SYSTEM 435 19-Jul-11 26-Sep-12

FW1010 Ordering 90 19-Jul-11 01-Nov-11FW1020 Product Engineering 53 01-Nov-11 02-Jan-12FW1030 Manufacturing 140 02-Jan-12 13-Jun-12FW1040 Supply for Unit-1 & 2 180 29-Feb-12 26-Sep-12

HP PIPINHP PIPING & FITTING OF FEED WATER SYS... 633 10-May-11 01-Feb-13

FW620 Ordering 90 10-May-11 23-Aug-11FW630 Product Engineering 60 23-Aug-11 01-Nov-11FW640 Manufacturing 193 01-Nov-11 13-Jun-12FW650 Supply for Unit-1 & 2 210 25-Jan-12 26-Sep-12FW660 Erection of FW System piping (along with LP Pipin... 85 07-Sep-12 14-Dec-12FW670 Commissioning of FW System piping (Hydro test,C... 42 15-Dec-12 01-Feb-13

EXPANSIEXPANSION JOINT (DRIVE TURBINE EXHAU... 490 09-Jun-11 11-Oct-12

FW840 Ordering 90 09-Jun-11 22-Sep-11FW850 Product Engineering 60 22-Sep-11 01-Dec-11FW860 Manufacturing 174 01-Dec-11 21-Jun-12FW870 Supply for Unit-1 & 2 150 12-Apr-12 04-Oct-12FW880 Erection 30 07-Sep-12 11-Oct-12

BUTTERFBUTTERFLY VALVE (DRIVE TURBINE EXHA... 742 25-Jun-10 A 30-Oct-12

FW890 Ordering 90 25-Jun-10 A 06-Dec-10FW900 Product Engineering 60 07-Dec-10 14-Feb-11FW910 Manufacturing 344 15-Feb-11 21-Mar-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 12 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 84: mrp

Activity ID Activity Name OriginalDuration

Start Finish

FW920 Supply for Unit-1 & 2 180 12-Jan-12 08-Aug-12FW930 Erection 20 26-Sep-12 18-Oct-12FW940 Commissioning 10 19-Oct-12 30-Oct-12

2/3 WAY 2/3 WAY VALVES (FOR HPH ISOLATION IN F... 592 25-Apr-11 07-Dec-12

FW950 Ordering 90 25-Apr-11 08-Aug-11FW960 Product Engineering 60 08-Aug-11 17-Oct-11FW970 Manufacturing 225 17-Oct-11 05-Jul-12FW980 Supply for Unit-1 & 2 180 17-Apr-12 13-Nov-12FW990 Erection 34 18-Oct-12 26-Nov-12FW1000 Commissioning 10 27-Nov-12 07-Dec-12

CONDENSCONDENSATE SYSTEM 1319 23-Jul-09 A 02-Mar-13

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

EN104 Major Engineering 324 23-Jul-09 A 26-Nov-10EN105 Balance Engineering 575 15-Dec-09 A 02-Jan-12

CONDENCONDENSER 1115 23-Jul-09 A 10-Aug-12

MANUFACMANUFACTURING & SUPPLY 1000 23-Jul-09 A 17-Apr-12

MANUFMANUFACTURING 822 23-Jul-09 A 22-Oct-11CND1 Ordering 52 23-Jul-09 A 21-Sep-09 ACND1 Product Engineering 200 22-Sep-09 A 02-Dec-10CND2 Procurement of Raw Material,Tubes etc 226 10-May-10 A 06-Nov-10CND3 Machining & Drilling Tube Sheets & Tube Support ... 162 02-Oct-10 09-Apr-11CND4 Fabrication & Machining of Water Boxes at Shop 300 06-Nov-10 22-Oct-11

SUPPLYSUPPLY 496 08-Dec-10 17-Apr-12CND5 Hotwell parts & Shell panels 90 08-Dec-10 23-Mar-11CND8 Tubes 114 09-Apr-11 20-Aug-11CND7 Tube sheets & Tube Support plates 67 09-Apr-11 27-Jun-11CND6 Lower exhaust neck parts 86 30-Apr-11 09-Aug-11CND1 Expansion bellows 86 30-Apr-11 09-Aug-11CND1 Balance & Miscellaneous items 190 22-Jul-11 29-Feb-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 13 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 85: mrp

Activity ID Activity Name OriginalDuration

Start Finish

CND9 Water boxes & accessories 152 22-Oct-11 17-Apr-12

ASSEMBLASSEMBLY,ERECTION & COMMISSIONING 541 16-Feb-11 10-Aug-12CND120 Assembly of Shell panels & Hotwell parts 90 16-Feb-11 01-Jun-11CND130 Tube sheets & Tube support plates assembly 97 01-Jun-11 22-Sep-11CND140 Tubebundles assembly 110 06-Jun-11 12-Oct-11CND830 Preassembly of Lower exhaust necks & Expansion... 30 09-Aug-11 13-Sep-11CND145 Condenser insitu erection start 0 12-Oct-11CND820 Hanging of Condesnser neck & Expansion bellow ... 10 12-Oct-11 24-Oct-11CND160 Shell Panels, Hotwell & Tubebundles erection 106 24-Oct-11 24-Feb-12CND190 Piping & Miscellaneous work 66 29-Feb-12 16-May-12CND170 Erection of LPH 1A/2A & 1B/2B 20 10-Apr-12 03-May-12CND180 Expansion bellows & Lower Exhaust neck erection... 60 03-May-12 12-Jul-12CND200 Water box assembly 15 12-Jul-12 30-Jul-12CND210 Hydro test of Steam and Waterside 10 30-Jul-12 10-Aug-12

CEPCEP 1078 13-Jan-10 A 04-Feb-13

CND220 Ordering 90 13-Jan-10 A 24-May-10 ACND230 Product Engineering 120 26-Jul-10 A 24-Sep-10 ACND240 Manufacturing 308 16-Aug-10 A 02-Aug-11CND250 Supply of CEP-1and its accessories 60 28-Jun-11 06-Sep-11CND270 Supply of CEP-3 and its accessories 60 28-Jun-11 06-Sep-11CND260 Supply of CEP-2 and its accessories 60 28-Jun-11 06-Sep-11CND280 Erection CEP-1and its accessories 45 23-Sep-11 14-Nov-11CND790 Erection CEP-2 and its accessories 45 15-Nov-11 05-Jan-12CND290 Erection CEP-3 and its accessories 45 06-Jan-12 27-Feb-12CND300 Trial run of Motors 15 23-Aug-12 10-Sep-12CND310 Commissioning of CEPs 17 15-Jan-13 04-Feb-13

CPU (3 X CPU (3 X 50%) 1034 15-Apr-10 A 02-Mar-13

CND320 Ordering 90 15-Apr-10 A 24-Sep-10 ACND330 Product Engineering 120 24-Sep-10 10-Feb-11

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 14 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 86: mrp

Activity ID Activity Name OriginalDuration

Start Finish

CND340 Manufacturing 218 07-Jan-11 17-Sep-11CND350 Supply of Skid with Pumps & its accessories 90 15-Aug-11 26-Nov-11CND360 Supply of Vessels & Tanks with its accessories 90 15-Aug-11 26-Nov-11CND370 Supply of Balance & Miscellaneous items 120 19-Sep-11 04-Feb-12CND380 Erection of CPU-1 & its accessories including Elec... 45 24-Oct-11 14-Dec-11CND800 Erection of CPU-2 & its accessories including Elec... 45 15-Dec-11 04-Feb-12CND810 Erection of CPU-3 & its accessories including Elec... 45 06-Feb-12 28-Mar-12CND390 Commissioning 23 04-Feb-13 02-Mar-13

LPHLPH 1273 23-Jul-09 A 15-Jan-13

MANUFACMANUFACTURING & SUPPLY 993 23-Jul-09 A 10-Apr-12CND840 Ordering 52 23-Jul-09 A 21-Sep-09 ACND400 Product Engineering 200 22-Sep-09 A 16-Oct-10CND410 Procurement of Raw Material,Tubes,Forgings etc 186 03-Feb-10 A 15-Feb-11CND420 Fabrication of Shells 199 16-Dec-10 05-Aug-11CND440 Forming of Dish ends 147 15-Feb-11 05-Aug-11CND430 Machining and Drilling of Tube sheets 120 15-Feb-11 05-Jul-11CND450 Tubing 50 05-Jul-11 01-Sep-11CND460 Assembly 100 01-Sep-11 27-Dec-11CND480 Supply of LPH-4 and its accessories 90 27-Dec-11 10-Apr-12CND490 Supply of LPH-1A/2A and its accessories 90 27-Dec-11 10-Apr-12CND500 Supply of LPH-1B/2B and its accessories 90 27-Dec-11 10-Apr-12CND470 Supply of LPH-3 and its accessories 90 27-Dec-11 10-Apr-12

ERECTIOERECTION & COMMISSIOING 280 10-Apr-12 15-Jan-13CND510 Erection of LPH-3 & 4 110 10-Apr-12 16-Aug-12CND520 Erection of Drains, Vents and safety Valves 60 16-Aug-12 25-Oct-12CND530 Commissioning of LPHs 30 11-Dec-12 15-Jan-13

GSC (L&TGSC (L&T-MHI SCOPE) 1319 23-Jul-09 A 02-Mar-13

CND850 Ordering 27 23-Jul-09 A 22-Aug-09 ACND540 Product Engineering 90 22-Dec-10 05-Apr-11

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 15 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 87: mrp

Activity ID Activity Name OriginalDuration

Start Finish

CND550 Manufacturing 188 06-Apr-11 10-Nov-11CND570 Supply of Exhauster and its accessories 60 11-Nov-11 19-Jan-12CND560 Supply of Gland Steam Cooler and its accessories 60 11-Nov-11 19-Jan-12CND580 Erection of Gland Steam Cooler & Exhausters 60 20-Jan-12 29-Mar-12CND590 Erection of seal steam regulating valve & Piping 60 30-Mar-12 07-Jun-12CND600 Commissioning of GSC 23 04-Feb-13 02-Mar-13

LP VALVLP VALVES OF CONDENSATE SYSTEM 333 21-Sep-10 A 14-Nov-11

CND670 Ordering 90 21-Sep-10 A 16-Dec-10CND680 Product Engineering 53 17-Dec-10 16-Feb-11CND690 Manufacturing 142 17-Feb-11 01-Aug-11CND700 Supply for Unit-1 & 2 150 24-May-11 14-Nov-11

H&S OF CH&S OF CONDENSATE SYSTEM 437 19-Jul-11 28-Sep-12

CND710 Ordering 90 19-Jul-11 01-Nov-11CND720 Product Engineering 53 01-Nov-11 02-Jan-12CND730 Manufacturing 142 02-Jan-12 15-Jun-12CND740 Supply for Unit-1 & 2 150 06-Apr-12 28-Sep-12

MISC ITEMISC ITEMS OF CONDENSATE SYSTEM 437 19-Jul-11 28-Sep-12

CND750 Ordering 90 19-Jul-11 01-Nov-11CND760 Product Engineering 53 01-Nov-11 02-Jan-12CND770 Manufacturing 142 02-Jan-12 15-Jun-12CND780 Supply for Unit-1 & 2 150 06-Apr-12 28-Sep-12

LP PIPINGLP PIPING & FITTING OF CONDENSATE SYS... 546 19-Jul-11 15-Jan-13

CND610 Ordering 90 19-Jul-11 01-Nov-11CND620 Product engineering 53 01-Nov-11 02-Jan-12CND630 Manufacturing 142 02-Jan-12 15-Jun-12CND640 Supply for Unit-1 & 2 180 02-Mar-12 28-Sep-12CND650 Erection of Condensate System piping (along with ... 100 16-Aug-12 11-Dec-12CND660 Commissioning of Condensate Sys piping (Hydro t... 30 11-Dec-12 15-Jan-13

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 16 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 88: mrp

Activity ID Activity Name OriginalDuration

Start Finish

VACUUM SVACUUM SYSTEM 1287 23-Jul-09 A 29-Jan-13

ENGINEEENGINEERING 815 23-Jul-09 A 03-Jan-12

EN106 Major Engineering 332 23-Jul-09 A 27-Nov-10EN107 Balance Engineering 576 14-Dec-09 A 03-Jan-12

VACUUMVACUUM PUMP 1020 25-Feb-10 A 29-Jan-13

VAC10 Ordering 90 25-Feb-10 A 06-Dec-10VAC20 Product Engineering 120 07-Dec-10 25-Apr-11VAC30 Manufacturing 203 15-Feb-11 08-Oct-11VAC70 Supply of Vacuum pump-4 & its accessories 90 10-Oct-11 21-Jan-12VAC60 Supply of Vacuum pump-3 & its accessories 90 10-Oct-11 21-Jan-12VAC50 Supply of Vacuum pump-2 & its accessories 90 10-Oct-11 21-Jan-12VAC40 Supply of Vacuum pump-1 & its accessories 90 10-Oct-11 21-Jan-12VAC80 Erection of Vacuum pump-1 45 23-Jan-12 14-Mar-12VAC90 Erection of Vacuum pump-2 45 22-Feb-12 13-Apr-12VAC100 Erection of Vacuum pump-3 45 22-Mar-12 12-May-12VAC110 Erection of Vacuum pump-4 45 14-May-12 04-Jul-12VAC120 Trial run of Motors 19 23-Aug-12 14-Sep-12VAC130 Commissioning of Vacuum pumps 60 21-Nov-12 29-Jan-13

LP VALVLP VALVE OF VACUUM SYSTEM 378 21-Sep-10 A 29-Dec-11

VAC190 Ordering 90 21-Sep-10 A 16-Dec-10VAC200 Product engineering 53 17-Dec-10 16-Feb-11VAC210 Manufacturing 151 17-Feb-11 11-Aug-11VAC220 Supply for Unit-1 & 2 180 03-Jun-11 29-Dec-11

H&S OF VH&S OF VACUUM SYSTEM 483 20-Jul-11 14-Nov-12

VAC230 Ordering 90 20-Jul-11 02-Nov-11VAC240 Product engineering 53 02-Nov-11 03-Jan-12VAC250 Manufacturing 151 03-Jan-12 27-Jun-12VAC260 Supply for Unit-1 & 2 180 18-Apr-12 14-Nov-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 17 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 89: mrp

Activity ID Activity Name OriginalDuration

Start Finish

MISC ITEMISC ITEM OF VACUUM SYSTEM 483 20-Jul-11 14-Nov-12

VAC270 Ordering 90 20-Jul-11 02-Nov-11VAC280 Product Engineering 53 02-Nov-11 03-Jan-12VAC290 Manufacturing 151 03-Jan-12 27-Jun-12VAC300 Supply for Unit-1 & 2 180 18-Apr-12 14-Nov-12

LP PIPINGLP PIPING & FITTING OF VACUUM SYSTEM 483 20-Jul-11 14-Nov-12

VAC140 Ordering 90 20-Jul-11 02-Nov-11VAC150 Product engineering 53 02-Nov-11 03-Jan-12VAC160 Manufacturing 151 03-Jan-12 27-Jun-12VAC170 Supply for Unit-1 & 2 180 18-Apr-12 14-Nov-12VAC180 Erection of Vacuum System piping (along with LP ... 60 01-Sep-12 09-Nov-12

CLOSE COCLOSE COOLING WATER SYSTEM 1196 23-Jul-09 A 30-Oct-12

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

EN108 Major Engineering 324 23-Jul-09 A 26-Nov-10EN109 Balance Engineering 575 15-Dec-09 A 02-Jan-12

DMCW PUDMCW PUMP 860 18-Feb-10 A 30-Oct-12

CCW10 Ordering 100 18-Feb-10 A 14-Dec-10CCW20 Product Engineering 90 15-Dec-10 29-Mar-11CCW30 Manufacturing 156 23-Feb-11 23-Aug-11CCW50 Supply of DMCW Pump-2 & its accessories 60 24-Aug-11 01-Nov-11CCW60 Supply of DMCW Pump-3 & its accessories 60 24-Aug-11 01-Nov-11CCW40 Supply of DMCW Pump-1 & its accessories 60 24-Aug-11 01-Nov-11CCW70 Erection of DMCW Pump-1 45 02-Nov-11 23-Dec-11CCW80 Erection of DMCW Pump-2 45 24-Dec-11 14-Feb-12CCW90 Erection of DMCW Pump-3 45 15-Feb-12 06-Apr-12CCW100 Trial run of Motors 5 23-Aug-12 29-Aug-12CCW110 Commissioning of DMCW Pumps 18 09-Oct-12 30-Oct-12

PHEPHE 860 12-Feb-10 A 30-Oct-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 18 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 90: mrp

Activity ID Activity Name OriginalDuration

Start Finish

CCW120 Ordering 100 12-Feb-10 A 14-Dec-10CCW130 Product Engineering 75 15-Dec-10 11-Mar-11CCW140 Manufacturing 141 12-Mar-11 23-Aug-11CCW150 Supply of PHE-1 & its accessories 60 24-Aug-11 01-Nov-11CCW160 Supply of PHE-2 & its accessories 60 24-Aug-11 01-Nov-11CCW170 Supply of PHE-3 & its accessories 60 24-Aug-11 01-Nov-11CCW180 Erection of PHE-1 30 02-Nov-11 06-Dec-11CCW190 Erection of PHE-2 30 07-Dec-11 10-Jan-12CCW200 Erection of PHE-3 30 11-Jan-12 14-Feb-12CCW210 Commissioning of PHEs 18 09-Oct-12 30-Oct-12

DMCW EXDMCW EXPANSION TANK 761 10-May-10 A 30-Oct-12

CCW220 Ordering 90 10-May-10 A 06-Dec-10CCW230 Product Engineering 75 07-Dec-10 03-Mar-11CCW240 Manufacturing 170 04-Mar-11 17-Sep-11CCW250 Supply of DMCW Expansion tank & its accessories 60 19-Sep-11 26-Nov-11CCW260 Erection of DMCW Expansion tank 30 23-Jan-12 25-Feb-12CCW270 Commissioning of DMCW Expansion tank 18 09-Oct-12 30-Oct-12

LP VALVLP VALVES OF CLOSE CW SYSTEM 337 21-Sep-10 A 18-Nov-11

CCW340 Ordering 90 21-Sep-10 A 16-Dec-10CCW350 Product engineering 52 17-Dec-10 15-Feb-11CCW360 Manufacturing 147 16-Feb-11 05-Aug-11CCW370 Supply for Unit-1 & 2 180 23-Apr-11 18-Nov-11

H&S OF CH&S OF CLOSE CW SYSTEM 442 19-Jul-11 03-Oct-12

CCW380 Ordering 90 19-Jul-11 01-Nov-11CCW390 Product engineering 52 01-Nov-11 31-Dec-11CCW400 Manufacturing 147 31-Dec-11 20-Jun-12CCW410 Supply for Unit-1 & 2 180 07-Mar-12 03-Oct-12

MISC ITEMISC ITEMS OF CLOSE CW SYSTEM 337 10-May-10 A 18-Nov-11

CCW420 Ordering of Chemical Pot Feeder Tank 90 10-May-10 A 16-Dec-10

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 19 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 91: mrp

Activity ID Activity Name OriginalDuration

Start Finish

CCW430 Product engineering 52 17-Dec-10 15-Feb-11CCW440 Manufacturing 147 16-Feb-11 05-Aug-11CCW450 Supply for Unit-1 & 2 180 23-Apr-11 18-Nov-11

LP PIPINGLP PIPING & FITTING OF CLOSE CW SYSTEM 469 19-Jul-11 30-Oct-12

CCW280 Ordering 90 19-Jul-11 01-Nov-11CCW290 Product engineering 52 01-Nov-11 31-Dec-11CCW300 Manufacturing 147 31-Dec-11 20-Jun-12CCW310 Supply for Unit-1 & 2 180 07-Mar-12 03-Oct-12CCW320 Erection of CCW piping (along with LP Valves and ... 95 20-Jun-12 09-Oct-12CCW330 Commissioning of CCW piping (Hydro testing & Fl... 18 09-Oct-12 30-Oct-12

DRAIN SYSDRAIN SYSTEM 1241 23-Jul-09 A 14-Dec-12

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

EN110 Major Engineering 324 23-Jul-09 A 26-Nov-10EN111 Balance Engineering 575 15-Dec-09 A 02-Jan-12

HP & LP HP & LP FLASH TANK (L&T-HED SCOPE) 1241 23-Jul-09 A 14-Dec-12

DRN320 Ordering 52 23-Jul-09 A 21-Sep-09 ADRN10 Product Engineering 120 28-Jan-10 A 04-Nov-10DRN20 Fabrication 180 15-Oct-11 11-May-12DRN30 Supply HP & LP Flash tanks & its accessories 60 07-Apr-12 15-Jun-12DRN40 Erection of HP & LP Flash tanks & its accessories 60 16-Jun-12 24-Aug-12DRN50 Commissioning 19 23-Nov-12 14-Dec-12

HP VALVHP VALVES OF DRAIN SYSTEM 392 17-May-10 A 02-Jan-12

DRN120 Ordering 90 17-May-10 A 06-Dec-10DRN130 Product Engineering 60 07-Dec-10 14-Feb-11DRN140 Manufacturing 171 15-Feb-11 01-Sep-11DRN150 Supply for Unit-1 & 2 180 07-Jun-11 02-Jan-12

LP PIPINGLP PIPING & FITTING OF DRAIN SYSTEM 462 19-Jul-11 23-Oct-12

DRN160 Ordering 90 19-Jul-11 01-Nov-11

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 20 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 92: mrp

Activity ID Activity Name OriginalDuration

Start Finish

DRN170 Product Engineering 52 01-Nov-11 31-Dec-11DRN180 Manufacturing 149 31-Dec-11 22-Jun-12DRN190 Supply for Unit-1 & 2 180 27-Mar-12 23-Oct-12

LP VALVLP VALVES OF DRAIN SYSTEM 357 21-Sep-10 A 08-Dec-11

DRN200 Ordering 90 21-Sep-10 A 16-Dec-10DRN210 Product Engineering 52 17-Dec-10 15-Feb-11DRN220 Manufacturing 149 16-Feb-11 08-Aug-11DRN230 Supply for Unit-1 & 2 180 13-May-11 08-Dec-11

H&S OF DH&S OF DRAINS SYSTEM 462 19-Jul-11 23-Oct-12

DRN240 Ordering 90 19-Jul-11 01-Nov-11DRN250 Product Engineering 52 01-Nov-11 31-Dec-11DRN260 Manufacturing 149 31-Dec-11 22-Jun-12DRN270 Supply for Unit-1 & 2 180 27-Mar-12 23-Oct-12

MISC ITEMISC ITEMS OF DRAINS SYSTEM 462 19-Jul-11 23-Oct-12

DRN280 Ordering 90 19-Jul-11 01-Nov-11DRN290 Product Engineering 52 01-Nov-11 31-Dec-11DRN300 Manufacturing 149 31-Dec-11 22-Jun-12DRN310 Supply for Unit-1 & 2 180 27-Mar-12 23-Oct-12

HP PIPINHP PIPING & FITTING OF DRAINS SYSTEM 549 14-Jun-11 14-Dec-12

DRN60 Ordering 90 14-Jun-11 27-Sep-11DRN70 Product Engineering 60 27-Sep-11 06-Dec-11DRN80 Manufacturing 171 06-Dec-11 22-Jun-12DRN90 Supply for Unit-1 & 2 180 27-Mar-12 23-Oct-12DRN100 Erection of Drain piping (along with LP Piping & Fit... 77 25-Aug-12 22-Nov-12DRN110 Commissioning of Drain piping (Hydro testing, Che... 19 23-Nov-12 14-Dec-12

EXTRACTIEXTRACTION SYSTEM 1298 23-Jul-09 A 09-Feb-13

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

EN112 Major Engineering 324 23-Jul-09 A 26-Nov-10

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 21 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 93: mrp

Activity ID Activity Name OriginalDuration

Start Finish

EN113 Balance Engineering 575 15-Dec-09 A 02-Jan-12

FCNRV ( FCNRV ( L&T - MHI SCOPE) 1295 23-Jul-09 A 06-Feb-13

EXT580 Ordering 29 23-Jul-09 A 25-Aug-09 AEXT10 Product Engineering 90 24-Sep-10 06-Jan-11EXT20 Manufacturing 200 01-Jul-11 18-Feb-12EXT30 Supply 90 16-Jan-12 28-Apr-12EXT40 Erection of all FCNRVs in Extraction lines 30 01-Dec-12 05-Jan-13EXT50 Commissioning 27 05-Jan-13 06-Feb-13

HP VALVHP VALVES OF EXTRACTION SYSTEM 413 17-May-10 A 23-Jan-12

EXT110 Ordering 90 17-May-10 A 06-Dec-10EXT120 Product Engineering 60 07-Dec-10 14-Feb-11EXT130 Manufacturing 182 15-Feb-11 14-Sep-11EXT140 Supply for Unit-1 & 2 180 28-Jun-11 23-Jan-12

LP PIPINGLP PIPING & FITTING OF EXTRACTION SYST... 483 19-Jul-11 13-Nov-12

EXT150 Ordering 90 19-Jul-11 01-Nov-11EXT160 Product Engineering 53 01-Nov-11 02-Jan-12EXT170 Manufacturing 159 02-Jan-12 05-Jul-12EXT180 Supply for Unit-1 & 2 180 17-Apr-12 13-Nov-12

LP VALVLP VALVES OF EXTRACTION SYSTEM 378 21-Sep-10 A 29-Dec-11

EXT190 Ordering 90 21-Sep-10 A 16-Dec-10EXT200 Product Engineering 53 17-Dec-10 16-Feb-11EXT210 Manufacturing 159 17-Feb-11 20-Aug-11EXT220 Supply for Unit-1 & 2 180 03-Jun-11 29-Dec-11

H&S OF EH&S OF EXTRACTION SYSTEM 483 19-Jul-11 13-Nov-12

EXT230 Ordering 90 19-Jul-11 01-Nov-11EXT240 Product Engineering 53 01-Nov-11 02-Jan-12EXT250 Manufacturing 159 02-Jan-12 05-Jul-12EXT260 Supply for Unit-1 & 2 180 17-Apr-12 13-Nov-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 22 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 94: mrp

Activity ID Activity Name OriginalDuration

Start Finish

MISC ITEMISC ITEM OF EXTRACTION SYSTEM 483 19-Jul-11 13-Nov-12

EXT270 Ordering 90 19-Jul-11 01-Nov-11EXT280 Product Engineering 53 01-Nov-11 02-Jan-12EXT290 Manufacturing 159 02-Jan-12 05-Jul-12EXT300 Supply for Unit-1 & 2 180 17-Apr-12 13-Nov-12

HP PIPINHP PIPING & FITTING OF EXTRACTION SYST... 606 14-Jun-11 09-Feb-13

EXT60 Ordering 90 14-Jun-11 27-Sep-11EXT70 Product Engineering 60 27-Sep-11 06-Dec-11EXT80 Manufacturing 182 06-Dec-11 05-Jul-12EXT90 Supply for Unit-1 & 2 180 17-Apr-12 13-Nov-12EXT100 Erection of Extraction piping (along with LP Piping ... 120 22-Sep-12 09-Feb-13

LP BYPASLP BYPASS SYSTEM 1200 23-Jul-09 A 03-Nov-12

ENGINEEENGINEERING 825 23-Jul-09 A 02-Jan-12

EN114 Major Engineering 332 23-Jul-09 A 27-Nov-10EN115 Balance Engineering 575 24-Dec-09 A 02-Jan-12

LP BYPALP BYPASS VALVES 597 02-Dec-10 21-Jul-12

EXT310 Ordering 90 02-Dec-10 17-Mar-11EXT320 Product Engineering 60 17-Mar-11 26-May-11EXT330 Manufacturing 238 21-Apr-11 24-Jan-12EXT340 Supply 90 24-Jan-12 08-May-12EXT350 Erection 60 08-May-12 17-Jul-12EXT360 Commissioning 4 17-Jul-12 21-Jul-12

HP VALVHP VALVES OF LP BYPASS SYSTEM 413 17-May-10 A 23-Jan-12

EXT420 Ordering 90 17-May-10 A 06-Dec-10EXT430 Product Engineering 60 07-Dec-10 14-Feb-11EXT440 Manufacturing 182 15-Feb-11 14-Sep-11EXT450 Supply for Unit-1 & 2 180 28-Jun-11 23-Jan-12

LP PIPINGLP PIPING & FITTING OF LP BYPASS SYSTEM 483 09-Jul-11 03-Nov-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 23 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 95: mrp

Activity ID Activity Name OriginalDuration

Start Finish

EXT460 Ordering 90 09-Jul-11 22-Oct-11EXT470 Product Engineering 60 22-Oct-11 31-Dec-11EXT480 Manufacturing 152 31-Dec-11 26-Jun-12EXT490 Supply for Unit-1 & 2 180 07-Apr-12 03-Nov-12

H&S OF LH&S OF LP BYPASS SYSTEM 483 09-Jul-11 03-Nov-12

EXT500 Ordering 90 09-Jul-11 22-Oct-11EXT510 Product Engineering 60 22-Oct-11 31-Dec-11EXT520 Manufacturing 152 31-Dec-11 26-Jun-12EXT530 Supply for Unit-1 & 2 180 07-Apr-12 03-Nov-12

MISC ITEMISC ITEM OF LP BYPASS SYSTEM 483 09-Jul-11 03-Nov-12

EXT540 Ordering 90 09-Jul-11 22-Oct-11EXT550 Product Engineering 60 22-Oct-11 31-Dec-11EXT560 Manufacturing 152 31-Dec-11 26-Jun-12EXT570 Supply for Unit-1 & 2 180 07-Apr-12 03-Nov-12

HP PIPINHP PIPING & FITTING OF LP BYPASS SYSTEM 518 04-Jun-11 03-Nov-12

EXT370 Ordering 90 04-Jun-11 17-Sep-11EXT380 Product Engineering 60 17-Sep-11 26-Nov-11EXT390 Manufacturing 182 26-Nov-11 26-Jun-12EXT400 Supply for Unit-1 & 2 180 07-Apr-12 03-Nov-12EXT410 Erection of LP Bypass piping (along with LP Piping... 75 21-Jul-12 17-Oct-12

CONDENSCONDENSER COOLING WATER SYSTEM 1309 23-Jul-09 A 20-Feb-13

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

EN116 Major Engineering 324 23-Jul-09 A 26-Nov-10EN117 Balance Engineering 575 15-Dec-09 A 02-Jan-12

RUBBERRUBBER EXPANSION JOINT OF CONDENSE... 571 06-Jun-11 28-Dec-12

CWS10 Ordering 90 06-Jun-11 19-Sep-11CWS20 Product Engineering 60 19-Sep-11 28-Nov-11CWS30 Manufacturing 180 28-Nov-11 25-Jun-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 24 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 96: mrp

Activity ID Activity Name OriginalDuration

Start Finish

CWS40 Supply for Unit-1 & 2 180 16-Apr-12 12-Nov-12CWS50 Erection of Rubber expansion bellows for Condnse... 60 10-Aug-12 19-Oct-12CWS360 Erection of Rubber expansion bellows for Condnse... 60 19-Oct-12 28-Dec-12

BUTTERFBUTTERFLY VALVE OF CONDENSER CW SY... 807 25-Jun-10 A 20-Feb-13

CWS60 Ordering 90 25-Jun-10 A 06-Dec-10CWS70 Product Engineering 90 07-Dec-10 21-Mar-11CWS80 Manufacturing 198 22-Mar-11 07-Nov-11CWS90 Supply for Unit-1 & 2 180 30-Aug-11 26-Mar-12CWS100 Erection of Butterfly valves for Condenser-1 60 10-Aug-12 19-Oct-12CWS370 Erection of Butterfly valves for Condenser-2 60 19-Oct-12 28-Dec-12CWS110 Commissioning 16 01-Feb-13 20-Feb-13

OLTCOLTC 807 26-Apr-10 A 20-Feb-13

CWS120 Ordering 90 26-Apr-10 A 06-Dec-10CWS130 Product Engineering 90 07-Dec-10 21-Mar-11CWS140 Manufacturing 159 22-Mar-11 22-Sep-11CWS150 Supply OLTC & its accessories 90 19-Aug-11 01-Dec-11CWS160 Erection of OLTC-1 75 10-Aug-12 06-Nov-12CWS380 Erection of OLTC-2 75 06-Nov-12 01-Feb-13CWS170 Commissioning 16 01-Feb-13 20-Feb-13

LP VALVLP VALVES OF CONDENSER SW SYSTEM 377 21-Sep-10 A 28-Dec-11

CWS240 Ordering 90 21-Sep-10 A 16-Dec-10CWS250 Product Engineering 53 17-Dec-10 16-Feb-11CWS260 Manufacturing 159 17-Feb-11 20-Aug-11CWS270 Supply for Unit-1 & 2 180 02-Jun-11 28-Dec-11

H&S OF CH&S OF CONDENSER CW SYSTEM 482 19-Jul-11 12-Nov-12

CWS280 Ordering 90 19-Jul-11 01-Nov-11CWS290 Product Engineering 53 01-Nov-11 02-Jan-12CWS300 Manufacturing 159 02-Jan-12 05-Jul-12CWS310 Supply for Unit-1 & 2 180 16-Apr-12 12-Nov-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 25 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 97: mrp

Activity ID Activity Name OriginalDuration

Start Finish

MISC ITEMISC ITEMS OF CONDENSER CW SYSTEM 482 19-Jul-11 12-Nov-12

CWS320 Ordering 90 19-Jul-11 01-Nov-11CWS330 Product Engineering 53 01-Nov-11 02-Jan-12CWS340 Manufacturing 159 02-Jan-12 05-Jul-12CWS350 Supply for Unit-1 & 2 180 16-Apr-12 12-Nov-12

LP PIPINGLP PIPING & FITTING OF CONDENSER CW S... 582 19-Jul-11 20-Feb-13

CWS180 Ordering 90 19-Jul-11 01-Nov-11CWS190 Product Engineering 53 01-Nov-11 02-Jan-12CWS200 Manufacturing 159 02-Jan-12 05-Jul-12CWS210 Supply for Unit-1 & 2 180 16-Apr-12 12-Nov-12CWS220 Erection of Condenser CW piping (along with LP V... 105 10-Aug-12 11-Dec-12CWS230 Water circulation in Condenser CW line 16 01-Feb-13 20-Feb-13

ELECTRICELECTRICAL SYSTEM 1245 23-Jul-09 A 18-Dec-12

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

EN118 Major Engineering 324 23-Jul-09 A 26-Nov-10EN119 Balance Engineering 575 15-Dec-09 A 02-Jan-12

AC,DC,UPAC,DC,UPS DIST. PANELS 560 22-Feb-11 04-Sep-12

ELE10 Ordering 90 22-Feb-11 07-Jun-11ELE20 Product Engineering 90 07-Jun-11 20-Sep-11ELE30 Manufacturing 180 20-Sep-11 17-Apr-12ELE40 Supply of AC,DC,UPS Dist Panels & its accessorie... 180 07-Feb-12 04-Sep-12ELE50 Erection 53 22-May-12 23-Jul-12ELE60 Panels Charging 4 23-Jul-12 27-Jul-12

BATTERYBATTERY BANK & CHARGER 482 28-May-11 21-Sep-12

ELE70 Ordering 90 28-May-11 10-Sep-11ELE80 Product Engineering 90 10-Sep-11 24-Dec-11ELE90 Manufacturing 128 24-Dec-11 22-May-12ELE100 Supply of Battery bank, Charger & its accessories f... 150 13-Mar-12 04-Sep-12

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 26 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 98: mrp

Activity ID Activity Name OriginalDuration

Start Finish

ELE110 Erection of Battery bank, Charger & its accessories 45 22-May-12 13-Jul-12ELE200 Cabling work of Battery bank, Charger & its access... 30 13-Jul-12 17-Aug-12ELE120 Commissioning 30 17-Aug-12 21-Sep-12

POWER CPOWER CABLE 503 03-Aug-11 18-Dec-12

ELE130 Ordering 90 03-Aug-11 16-Nov-11ELE140 Manufacturing 191 16-Nov-11 26-Jun-12ELE150 Supply of Power Cable & its accessories for Unit-1... 210 13-Mar-12 13-Nov-12ELE160 Cabling work (Power cables) 120 31-Jul-12 18-Dec-12

MISC ITEMISC ITEMS OF ELECTRICAL SYSTEM 468 03-Aug-11 13-Nov-12

ELE170 Ordering 90 03-Aug-11 16-Nov-11ELE180 Manufacturing 191 16-Nov-11 26-Jun-12ELE190 Supply for Unit-1 & 2 210 13-Mar-12 13-Nov-12

C&I SYSTEC&I SYSTEM 1433 23-Jul-09 A 24-Jun-13

ENGINEEENGINEERING 815 23-Jul-09 A 02-Jan-12

EN120 Major Engineering 324 23-Jul-09 A 26-Nov-10EN121 Balance Engineering 575 15-Dec-09 A 02-Jan-12

VIBRATIOVIBRATION MONITORING SYSTEM 821 26-Apr-10 A 06-Mar-13

C&I10 Ordering 90 26-Apr-10 A 06-Dec-10C&I20 Product Engineering 75 07-Dec-10 03-Mar-11C&I30 Manufacturing 226 04-Mar-11 22-Nov-11C&I40 Supply of Vib Monitoring system & its accessories ... 150 14-Sep-11 06-Mar-12C&I50 Erection 30 07-Sep-12 11-Oct-12C&I60 Commissioning 28 02-Feb-13 06-Mar-13

DCS SYSDCS SYSTEM & PANEL 931 26-Apr-10 A 24-Jun-13

C&I70 Ordering 90 26-Apr-10 A 06-Dec-10C&I80 Product Engineering 90 07-Dec-10 21-Mar-11C&I90 Manufacturing 147 22-Mar-11 08-Sep-11C&I100 Supply DCS System, Panel & its accessories for U... 150 01-Jul-11 22-Dec-11

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 27 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 99: mrp

Activity ID Activity Name OriginalDuration

Start Finish

C&I110 Erection 40 23-Apr-12 07-Jun-12C&I120 Checking and Setting of Interlocks and Protection 129 25-Jan-13 24-Jun-13

C&I CABLC&I CABLE 449 19-Oct-11 10-Jan-13

C&I130 Ordering 90 19-Oct-11 01-Feb-12C&I140 Manufacturing 176 01-Feb-12 24-Aug-12C&I150 Supply of C&I Cables & its accessories for Unit-1 & 2 180 11-May-12 07-Dec-12C&I160 Laying & Termination of Control Cables 119 24-Aug-12 10-Jan-13

FIELD INSFIELD INSTRUMENTS 598 06-Jun-11 24-Jan-13

C&I170 Ordering 90 06-Jun-11 19-Sep-11C&I180 Product Engineering 90 19-Sep-11 02-Jan-12C&I190 Manufacturing 203 02-Jan-12 25-Aug-12C&I200 Supply of Various Field instruments & its accessori... 240 07-Apr-12 12-Jan-13C&I210 Installation/Mounting 43 06-Dec-12 24-Jan-13

MISC ITEMISC ITEMS OF C&I SYSTEM 415 19-Oct-11 07-Dec-12

C&I220 Ordering 90 19-Oct-11 01-Feb-12C&I230 Manufacturing 176 01-Feb-12 24-Aug-12C&I240 Supply for Unit-1 & 2 180 11-May-12 07-Dec-12

TENDERINTENDERING & ENABLING 133 04-Sep-10 A 03-Jan-11

TENDERITENDERING 105 04-Sep-10 A 16-Dec-10

TND100 Order on Erection Contractor 90 04-Sep-10 A 16-Dec-10

ENABLINENABLING 18 17-Dec-10 03-Jan-11

ENB100 Opening of Site Office 15 17-Dec-10 03-Jan-11

SPARESSPARES 547 23-Oct-12 22-Apr-14

SPR20 Supply of Mandatory Spares for Unit-2 469 23-Oct-12* 22-Apr-14SPR10 Supply of Mandatory Spares for Unit-1 313 23-Oct-12* 22-Oct-13

Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q232009 2010 2011 2012 2013 2014

2x660 MW JPVL NIGRIE STPP - UNIT#1 L2 SCHEDULE

Project Baseline BarActual WorkRemaining WorkCritical Remaining WorkMilestone

Page 28 of 28

Date Particulars

28-SEP-10 UNIT 1 STG PACKAGE - L2 SCHEDULE

Page 100: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No-100 of 103

  

4.5 PROJECT PHOTOGRAPHS

Page 101: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No-101 of 103

  

Page 102: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No-102 of 103

  

Page 103: mrp

  LARSEN & TOUBRO LIMITED Power Project Management Services, Vadodara

JAIPRAKASH POWER VENTURES LIMITED

Document No: LT-P0-00003 Progress Report No-11

JOB NO: T209001 2x660 MW Steam Turbine Generators and Auxiliaries Page No-103 of 103