  • L&T CONSTRUCTION B&F EDRC - CHENNAI

  • India Advantage

    Healthcare revenue in India is set to reach USD160 billion by 2017; expenditure is

    likely to expand at a CAGR of 15.2 per

    cent over 201117.

    Rising incomes, greater health awareness, lifestyle diseases and increasing access to

    insurance will contribute to growth.

    Investment in healthcare infrastructure is set to rise, benefiting both hard

    (hospitals) and soft (R&D, education)

    infrastructure.

    Medical tourism is emerging as one of the most lucrative investment areas in the

    country.

    Availability of a large pool of well-trained medical professionals in the country.

    India has an advantage over its peers in the West and Asia in terms of cost of high-

    quality medical services offered.

    L&T CONSTRUCTION B&F EDRC - CHENNAI

    The government aims to develop India as a global healthcare hub

    Policy support in the form of reduced excise and customs duty, and exemption in

    service tax

    Initiatives like NRHM would boost healthcare in rural areas

    2011

    Market

    value:

    USD

    68.4

    billion

    2017 Market

    value:

    USD

    160

    billion

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Hospitals Pharmaceutical

    Market Revenue Breakup

    Source: Hospital Market India by Research on India, Aranca Research

    Diagnostics Medical

    Equipment

    Medical

    Insurance

    Segments of Health Care Industry

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Inadequate for serving the needs of growing population. Efforts are made up to create Infrastructure and to provide Manpower. Build up Appropriate linkages between the various centers.

    Sub centers 137271 nos. Dispensaries 27400 nos. Primary health centers 22971 nos. Community health centers 2935 nos. Hospitals 15097 nos.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    HOSPITALS:

    Government Hospital 4475 nos. 375987 Beds Charitable Trusts Hospitals 335 nos. 19677 Beds Private / Corporate Hospitals 10289 nos. 228155 Beds

    TOTAL 15099 nos. 623819 Beds

    HOSPITAL BEDS TO POPULATION RATIO:

    DEVELOPED COUNTRIES

    USA - 3:1000 UK - 3:1000 GERMANY - 8.3:1000 FRANCE - 6.6:1000 ITALY - 3.5:1000 CANADA - 3.2:1000 CHINA - 3.8:1000 SWEDEN - 2.7:1000 JAPAN - 13.7:1000

    India - 0.9:1000

    Source: Central Intelligence Agency

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    DOCTORS TO PATIENT RATIO:

    DEVELOPED COUNTRIES

    USA - 2.42/1000 UK - 2.77/1000 GERMANY - 3.69/1000 FRANCE - 3.38/1000 ITALY - 3.8/1000 CANADA - 2.07/1000 CHINA -1.46/1000 SWEDEN - 3.8/1000 JAPAN - 2.14/1000

    India - 0.65/1000

    Source: Central Intelligence Agency

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Source: Central Intelligence Agency

    STRONG ECONOMY:

    $4.99 Trillion dollar economy. 4th largest economy in the world. 56.9% of GDP from service sector. 25.8% of GDP from industry sector.

    STRONG ENABLERS:

    Economy expected to grow at around 6% + annually. Young employable human resources. A market of 1,236,344,631(JULY 2014 EST.) Population.

    OVERVIEW:

    Indian healthcare market expected to touch USD 160 billion crores by 2017. Annual growth rate of 15% for the next 15 years.

    India needs to add 80000

    hospital beds each year for

    next five years

    India, emerging as a most

    favored destination in medical

    tourism

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    In a nut shell, it is clear evident that

    900 MW plus (approx.) is required to

    be generated every year to cater to the

    anticipated growing demand of

    4,00,000 plus beds 5 years down the

    line in India.

    Sector Total (in MW) % of total

    Central Govt. 66,997.94 28.64%

    Private 76,095.30 32.53%

    State Govt. 90,836.70 38.83%

    TOTAL 2,33,929.94 100.00%

    Actual power supply position in terms of peak demand met during the year

    2011-12 in India

    Peak demand in MW Peak met in MW Surplus / Deficit

    in MW in %

    1,36,006 1,16,191 -13,815 -10.6

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Given the backdrop of the power scenario, the way out to resolve the crisis is to reduce the demand to match with

    the available supply.

    As there remain a lot of social issues in bringing down the existing demand, the fresh demand that is being added

    into the system should be managed.

    Rational use requires that we obtain maximum efficiency from the energy consumption and from the facilities

    required for the generation and distribution of such energy.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    It has put onus on the companies developing the countrys infrastructure to bring down

    the carbon footprint of the new immovable assets coming up in the country.

    Power saving is equal to Power generation.

    Necessity & Effective Implementation of energy conservation

    measures to reduce the energy demand.

    Exploring utilization of same materials for various purposes to the

    maximum extent and Usage of extra/new materials will be

    greatly reduced.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Power requirement for different electrical

    appliances and installations for a typical

    Health care building as stipulated by

    National Electrical Code (NEC).

    Re-arrangement of these loads by altering

    the loading factors explained down the line

    and witnessed the power savings possible.

    Proportions of various loads & Power requirement in Health care buildings

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    DG SET -1

    SECTION - 1 SECTION - 2

    AMF CUM SYNCHRONIZING PANEL

    i. LIGHTING

    ii. SMALL POWER

    iii. AHU PUMPS

    iv. VENTILATION FANS

    v. MONOBLOC, SOLAR HOT WATER

    SYSTEM,DRINKING WATER COOLER ,OWC

    vi. STP,WTP & RO PLANT

    vii. SWIMMING POOL TREATMENT UNIT

    viii. SEWAGE PUMPS

    ix. SERVICE BUILDING LOADS LIGHTING &

    SMALL POWER

    x. KITCHEN LOADS

    xi. CHILLERS

    xii. FACILITIES LIGHTING

    i. LIFTS

    ii. PRIMARY PUMP , SECONDARY PUMP, CONDENSER

    PUMP & COOLING TOWER LOADS

    iii. HYDROPNEUMATIC & BOREWELL PUMPS

    iv. FIRE PROTECTION SYSTEM

    v. EXTERNAL LIGHTING

    vi. CHILLERS

    CBS UPS

    B/C

    CBS - CENTRAL BATTERY SYSTEM

    ELV - EXTRA LOW VOLTAGE

    UPS - UNINTERRUPTABLE POWER SUPLLY

    EMERGENCY LIGHTING

    i. BUILDING UPS LOADS

    ii. IT & ELV SERVER

    B/C SECTION - 3

    ELECTROMEDICAL

    EQUIPMENTS

    DG SET -2 DG SET -3 DG SET -4

    B/C AMF CUM SYNCHRONIZING PANEL

    Transformer -1

    GRID SUPPLY

    Transformer -2 GRID SUPPLY

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    DG SET -1

    SECTION - 1 SECTION - 2

    AMF CUM SYNCHRONIZING PANEL

    i. LIGHTING

    ii. SMALL POWER

    iii. AHU PUMPS

    iv. VENTILATION FANS

    v. MONOBLOC, SOLAR HOT WATER

    SYSTEM,DRINKING WATER COOLER ,OWC

    vi. STP,WTP & RO PLANT

    vii. SWIMMING POOL TREATMENT UNIT

    viii. SEWAGE PUMPS

    ix. SERVICE BUILDING LOADS LIGHTING &

    SMALL POWER

    x. KITCHEN LOADS

    xi. CHILLERS

    xii. FACILITIES LIGHTING

    i. LIFTS

    ii. PRIMARY PUMP , SECONDARY PUMP,

    CONDENSER PUMP & COOLING TOWER LOADS

    iii. HYDROPNEUMATIC & BOREWELL PUMPS

    iv. FIRE PROTECTION SYSTEM

    v. EXTERNAL LIGHTING

    vi. CHILLERS

    CBS UPS

    B/C

    CBS - CENTRAL BATTERY SYSTEM

    ELV - EXTRA LOW VOLTAGE

    UPS - UNINTERRUPTABLE POWER

    SUPLLY

    EMERGENCY

    LIGHTING

    (90 MINUTES)

    i. BUILDING UPS LOADS

    (30 MINUTES)

    ii. IT & ELV SERVER

    (30 MINUTES)

    B/C SECTION - 3

    DG SET -2 DG SET -3 DG SET -4

    B/C AMF CUM SYNCHRONIZING PANEL

    Transformer -1

    GRID

    SUPPLY

    Transformer -2 GRID

    SUPPLY

    ELECTROMEDICAL

    EQUIPMENTS

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Lighting system

    Elevators

    Electro-medical and its allied systems

    Exploring same materials for multi use

    and using of new materials are greatly

    reduced.

    Building Management Systems (BMS)

    ELV systems

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Designed to automatically manage a daily rhythm of light, promoting sleep-wake rhythm.

    For better look out and healing environment, a colour rendering property and light reflectance values (LRV) shall

    be ensured.

    High Energy efficient light fixtures such as CFL, FTL (T5 lamps) and LED type pendant light fixtures in operation

    theatre (replacement of Metal halide light fixtures) are

    mostly used across these buildings,

    The luminous efficacy i.e., Lumens per watts is increased without compromising the Illumination requirement in a

    particular location.

    SPECIAL CONSIDERATIONS:

    Sustainable Lighting Solutions for a Healing Environment in patient

    rooms

    CONCEPT:

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    A Centralized lighting control system is used to control the

    light fixtures in common

    areas like corridor, Lobby,

    etc. across various floors in

    the multi-storey hospital

    building.

    The centralized lighting control panel can be

    integrated with centralized

    BMS system interfaced via

    Programmable Logic

    Controller..

    Remote operation via BMS provides an integrated

    approach to control and

    energy management.

    LPD of 0.8 to 0.9 and total power load percentage of 6.5

    to 7.5% is achieved against

    the requirement of 25% for

    lighting load from the total

    power requirement.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Elevator is a mechanical device which is used for vertical

    transporting of people or goods from one level to another.

    This is treated as one of the lifesaving element.

    Gearless types elevators are emerged as effective one and control drive with VFD working in closed loop system.

    This paves a way to reduce the energy requirement much appreciable value due to the advantage of requiring a less

    powerful motor to turn the sheave.

    This type of Elevators is proved to be efficient in terms of operating speed as well.

    This way, the power requirement has been brought down to 4% from the total power requirement against 15%.

    Passenger lifts. Bed lifts. Service lifts. Dumb waiters

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Public Health Engineering (PHE) system, as a part of waste management system and infection control, an

    amount of power is required to carry out certain

    activities like Sewage treatment plant, Water treatment

    plant and other treatment plant for radioactive wastes,

    Infectious waste, etc.

    This contributes to 10% of the total power load.

    It is necessary to explore Energy efficient equipments such as selecting maximum efficiency between 70% to

    80% for pumps/motors and Solar geysers/heaters for hot

    water supply network with Electrical power back up.

    Sewage treatment plant

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Water &

    landscape pumps

    hot water boiler

    ro plant

    Solar geyser

    Power requirement

    has been brought

    down to 4% from the

    total power

    requirement against

    10%.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Medical equipment also known as Life support is

    designed to aid in the diagnosis and is used greatly to

    maintain a patient's bodily function.

    Monitors to measure patient vital signs and other parameters.

    Most of them of Electro medical installations are of sensitive electronic equipments.

    In a hospital building, Electro medical & its related installations contribute to 20% approx. of the total power

    requirement in that building.

    This Power electronic equipments are susceptible to mis-operation caused by harmonic distortion.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    The degree to which harmonics is determined by the susceptibility of the load (or power source) to them. The most susceptible type of equipment is that whose design or constitution assumes (nearly) perfect sinusoidal

    fundamental input. CASE STUDY

    Voltage variation Current variation

    At Transformer Incomer Feeder,

    Observed 230 volts to 236 volts which is normal as per

    the standards variation. Observed1147amps to a max. of 1485 amps, Neutral

    current 1068 amps to 1550 amps & led to system

    unstable.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Power Factor Total Harmonic Distortion

    The power factor is read between 0.84 to 0.89 against

    the desirable value of 0.95 & more.

    THD (I) is 5 to 6% and THD (V) is about 1.6% which

    is quite normal as per the IEEE 519.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Voltage variation Current variation

    At Medical equipment feeder,

    Observed 234 volts to 238 volts which is normal as per

    the standards variation. The phase current is about 40 amps in all the three

    phases and the neutral current is about 230 amps which

    is not advisable as it leads to unstable of the power

    system.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Voltage variation Current variation

    At Medical equipment feeder,

    Observed 234 volts to 238 volts which is normal as per

    the standards variation. The phase current is about 40 amps in all the three

    phases and the neutral current is about 230 amps which

    is not advisable as it leads to unstable of the power

    system.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Power Factor Total Harmonic Distortion

    The power factor is read between 0.84 to 0.96 against

    the desirable value of 0.95 & more.

    THD (I) is 40% and THD (V) is about 1.4% which is

    quite normal as per the IEEE 519.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Non-linear medical equipment's and sensitive loads like CATH lab, MRI CT scan, LINAC, PET

    CT, etc. loads should be designed such that to have

    separate impedance.

    Using a separate feeding circuit for separate loads can reduce shared impedance and minimize load to

    load interference.

    Load balancing should be achieved for better and efficient operation such that life cycle of the

    equipment's installed can be ensured very high.

    Shared impedance circuit

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Focusing on higher percentage of

    84% towards Electricity calls for

    Automation, wherein Energy

    conservation is possible.

    Proportions of Overall Energy

    Consumption in a Typical

    building

    Monitor consumption

    Control usage Save money

    Lower risk of illness

    (sick building syndrome)

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Alarms for faulty equipment High Efficiency in operation Reduction in maintenance

    staff

    Lower emissions Reduced green house gas Usage of lesser fossil fuel

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    A Building Management System,

    which is PC, based Management

    system used in a building with /

    without graphic interface for various

    utilities for,

    Central control & monitoring of various

    Parameters.

    Energy data management. Alarm management. Data management. Scheduling Preventative

    maintenance.

    Energy optimization. Minimum downtime.

    Optimized man power, Control usage, Improved comfort. Flexibility in information availability via web link/Internet/Intranet. The health care buildings are designed by integrating other ELV systems like Nurse call system,

    Hospital Management System, CCTV, Public Address system, CATV system, Data/LAN network

    system, Telephone and EPABX system to make the operation & facilities much more user friendly and

    for operational excellence.

    BMS architecture

    10/100/1000 Mbps

    LAN

    Printer

    IBM

    S

    Serve

    r

    ACS

    Workstat

    ion

    IBMS

    Workstat

    ion

    CCTV Monitoring CCTV

    Storage PA

    Control

    ler

    Modbus BACnet LON

    Building Manager

    ACCESS

    Controller

    (Typ.)

    Security System Manager

    Cameras

    (Typ.)

    Life Safety Manager

    Fire

    Alarm

    Control

    Panel

    Remote

    Call

    Station

    Amplifier

    LOC: HOSPITAL

    COMMAND CENTER

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Chillers Fans

    PHE Pumps Fire Pumps

    BTU

    Meter,

    Water

    Meter

    Unitary

    Controller -

    Integrator

    (Typ.)

    LOC: CONTROL ROOM

    Third Party

    Integration

    1. Lift

    2. VFD

    3. CPM AHUs

    General

    Purpose

    Controller -

    DDC (Typ.)

    Field

    devices

    Security System Network (10/100 Mpbs LAN)

    BMS Workstation

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Building Management system is provided for

    Automated Control & Monitoring of HVAC Systems

    Automated Control & Monitoring of PHE Systems

    Monitoring of Fire Fighting Systems

    Monitoring of Electrical Panels

    Energy Billing (Yearly/Monthly/Daily)

    Proposed Building Management System

    will have following components;

    IP Master DDC

    Integrators

    Felid Equipments

    BMS Workstation

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    PCMS System has been designed for the Control and Monitoring of all main electrical panels(HT Panel,LT panel, Main

    distribution panels.)exclusively;

    Dedicated system for Electrical systems control & monitoring apart from BMS

    Electrical Panels

    DG

    Lighting control

    UPS

    The system will have dedicated monitor for Control & Monitoring.

    This system will integrate with IBMS software for Critical alarm monitoring through IBMS Screen.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    BMS

    Control & Monitoring of HVAC & PHE

    Monitoring of Fire fighting systems

    People count through Turnstile integration

    PCMS (POWER CONTROL MONITORING SYSTEM)

    Critical alarms from PCMS

    Energy Management systems

    Monitoring of Various Resources like Power, Water & Gas

    Security systems

    Critical alarms from CCTV & Access control systems

    Safety systems

    Monitoring of the healthiness of Fire Alarm & PA systems

    IBMS Software is considered to integrate between various subsystems software's.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Hospital Management System Nurse Call system

    Telephone & EPABX system Public Address system

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Structure Earthing System and Equipotential Bonding A Structural steel bar is identified (among various existing rods) in the column and slab to make the required Grid /

    Mat to achieve the step and touch potential.

    Structure Earthing forms the faradays cage for the Entire building.

    To be continued

    TOUCH POTENTIAL STEP POTENTIAL

  • Precautionary measures to be taken:

    Re-bar steel at beam/column/pile/pile cap level identified as part of structural earthing shall be maintained completely dry and clean.

    In order to prevent rust/corrosion of that steel, it shall be painted with non-rusting primer and finished with not less than two stove enamel coating (finish can be with light grey with RAL standard color) throughout

    the length.

    EARTHING & BONDING OF SUBSTATION EARTHING & BONDING OF TECHNICAL

    ROOMS

    L&T CONSTRUCTION B&F EDRC - CHENNAI

  • Interconnecting arrangement of structure rebar at piles & Columns.

    DETAIL 1-1

    L&T CONSTRUCTION B&F EDRC - CHENNAI

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    DETAIL-2

    For single sided welding, minimum

    length of 100mm

    shall be

    maintained.

    For double sided welding, minimum

    length of 55mm

    shall be

    maintained.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Continuity

    maintained

    by welding

    of

    reinforceme

    nt rods

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Reinforcement steel is used for forming Grid/Mat as per the Calculation in order to meet the required Step and Touch Potential.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Earth strips laid below plinth

    level to create low impedance

    path

    Earth grid formed as

    per calculation

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Interconnecting strips

    are being joined using

    DC welding to make

    Grid formation

    Earth rod of 3 mtrs being

    driven at the junctions/

    interconnecting strips

    Earth rod is being joined

    together with grids to enhance

    the low impedance path to

    meet out the required Step &

    Touch potential as per design

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    STEP-1 Identified rod in on

    Pile for structural

    Earthing marked

    using green colour

    tape.

    STEP-2

    16mm non

    reinforcing

    rods used for

    linking

    linking the adjacent piles using non

    reinforcing rod (16mm)

    STEP-3 STEP-4

    Distance between the two

    identified pile rods is

    measured

    Identified

    Pile rod for

    Structural

    Earthing

    The length of

    welding seam min

    100mm (for single

    side welding) and

    min 55mm

    (Double side

    welding).

    MAKE WELDING ON THE

    CONNECTIONS

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    STEP-5 Link from

    pile rods to

    column.

    Link

    between

    two

    column

    rods

    Linking of column and pile rods

    using 16mm reinforcing rods and

    make welding at that points Green colour marking on

    column rods used for

    Structural Earthing

    After the completion of concreting the particular column

    rods are marked using green color tape for easy

    identification.

    STEP-6

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Tangible benefits:

    Equipment's operating within the building is highly protected against damage due to lightning protection as

    well (Faradays cage).

    Reliability is very high. Savings in materials usage. Since the requirement of Cu. Earth strip and Earth

    Electrode is greatly reduced, cost incurring for the same

    will be avoided.

    Capital cost and Running cost is significantly reduced. No. of Activities involved for the system during

    execution is very less.

    To be continued.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Intangible benefits:

    No. of Activities involved for the system during execution is very less.

    Reduction in significant time is possible.

    No additional external space is required for laying Earth pits.

    Aesthetically the external environment can be maintained with high profile.

    Clash free coordination with other services are easily possible which in turn saves design time significantly.

    Possibility of theft is averted during construction.

    Maintenance of Earth mat is not required to be done at regular intervals as like conventional Earth Electrodes.

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Fire responder station at main Security

    cabin at entry

    Fire Alarm panel at

    control room Repeater panel at

    Reception

    Fire Alarm panel at

    Reception

    Fire Alarm

    panel for partial

    Zone

    Repeater panel at Partial Zone

    Repeater station located

    for Partial Zone

    To BMS

    Fire Alarm panel for

    Service building

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    In a Nut shell, Re-arrangement of these loads by altering the loading factors is demonstrated.

    Re-arrangement Proportions of various loads & Power requirement in

    Health care buildings

  • L&T CONSTRUCTION B&F EDRC - CHENNAI

    Efforts are being taken for a further reduction in the power demand without compromising the energy

    requirements by adopting innovative techniques.

    Mammoth Targets Ahead

    Its all about Imagineering L&T CONSTRUCTION

  • L&T CONSTRUCTION B&F EDRC - CHENNAI