mr. philip s. weech gef operational focal point gef council member

10
Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

Upload: melanie-bradford

Post on 08-Jan-2018

219 views

Category:

Documents


1 download

DESCRIPTION

 SCCF For Water Resource Management  SCCF For Sanitation

TRANSCRIPT

Page 1: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

Mr. Philip S. WeechGEF Operational Focal Point

GEF Council Member

Page 2: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

SLOSH/PRECIS Archipelagic Climate Change Modeling

Tandem Green Energy Pilot Project National Carbon Sink Inventory Forest Legislation

Page 3: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

SCCF For Water Resource Management SCCF For Sanitation

Page 4: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

National Energy Policy Committee (NEPC) Wind, Wave, Tidal, Solar, Reverse

GeoThermal Building Energy Efficiency Tourism Sector, HVAC Systems

Page 5: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

National Capacity Building for Environmental Management

Caribbean Challenge for MPAs and Terrestrial Pas

Page 6: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

Removal of Invasive (Casuarinas, Scaevola) from dune areas & replanting with native species

Page 7: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

Preventing exploitation of coastal and marine resources in the Banks of The Bahamas.

Research of the Continental Shelf of The Bahamas

Restoration of Wetlands and Creeks

Page 8: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

Forestry Legislative Framework (CC, CBD,UNCCD)

Sound Chemical Management (SAICM, PIC, POPS)

Page 9: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

Current status of preparation◦ Concept

GEF Focal Area◦ International Waters: SO2

Proposed GEF Agency for the proposed project◦ UNEP/FAO

Page 10: Mr. Philip S. Weech GEF Operational Focal Point GEF Council Member

All Projects are at the PIF Stage except the Caribbean Challenge National/Regional

Preliminary Identification of Agencies Costing to be done To be submitted in GEF-4 pipeline Lion Fish Project to be accessed under

Emergency Facility? National/Regional