mpf / jlots overview
DESCRIPTION
MPF / JLOTS Overview. MPF org chart. SLRP (Survey Liaison Recon Party) O-9. Airfield. 4. 3. ACB2 SLRP could include the following reps : - S3, S3A, S4, S7A, A3, B6, B3, C3, EA1 SLRP responsibilities : Gather detailed info on conditions within the AAA - PowerPoint PPT PresentationTRANSCRIPT
MPF / JLOTS Overview
MPF org chart
FORCES
DAYS
Major Events:
Airfiel
d
SLRP (Survey Liaison Recon Party) O-9SLRP (Survey Liaison Recon Party) O-9
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
ACB2 SLRP could include the following reps:- S3, S3A, S4, S7A, A3, B6, B3, C3, EA1
SLRP responsibilities:Gather detailed info on conditions within the AAA- Hydrographic analysis of the beach- Location of HN sources for construction materials- Location of covered storage and hardstand- Designation of MSR and MHE requirements- Location of HN emergency medical facilities- HN public telephone/satellite communications- Analysis on effects of customs/traditions- HN translator- Location of HN military, police & intel agencies
FORCES
DAYS
Major Events:
Airfiel
d
OPP (Off-load Preparation Party) O-4OPP (Off-load Preparation Party) O-4
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
OPP team includes reps from the MAGTF subordinateelements and NSE
OPP responsibilities:OPP is tasked with the preparation of the equipmentonboard the Maritime Prepositioning Ships (MPS) for debarkation at the AAA
Typical OPP team consists of ~100 personnel per MPS ~84 from MEF FWD~16 from NSE (~5 from ACB2)
FORCES
DAYS
Major Events:
Airfiel
d
Advanced Party O-4Advanced Party O-4
Green Beach
Red Beach
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
- AP arranges the reception of the Main Body incoordination with the Tanker Airlift Control Element (TALCE) - Consists of AAOG, AAOE, LFSP, NSE and security elements to provide protection- AP team includes:
150 Security200 NCW210 NAVCHAPGRU18 (2 boat crews)110 Camp Support
688- Arrival Airfield Control Group is operational- Tanker Airlift Control Element operational- Beach/Port/Airfield security is established
CAMP
SECURITY
FORCES
DAYS
Major Events:
Airfiel
d
Seaward Security (NCW) O-2Seaward Security (NCW) O-2
Green Beach
Red Beach
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
- MPSRON arrives in the AAA - Seaward security is established at Beach/Port- Arrival and Assembly organizations functional: AAOG (Arrival Assembly Operations Group) AAOE (Arrival Assembly Operations Element) LFSP (Landing Force Support Party) POG (Port Operations Group) BOG (Beach Operations Group) MCC(Movement Control Center) AACG(Arrival Airfield Control Group)
CAMP
SECURITYS
EC
SE
C
FORCES
DAYS
Major Events:
Airfiel
d
Navy Day O-1Navy Day O-1
Green Beach
Red Beach
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
CAMP
SECURITY
- Splash lighterage at beach- Off-load systems ready- Voice and Data Communications established and tested
- MPS ready for off-load- Cargo Handling Systems prepared - Causeway ferries assembled- Connect RRDF
SE
CS
EC
RRDF
CF
CF
CF
CF
LCT (lighterage control team)
BPT (Beach Party Team)
Shore Party
Shore Party
FORCES
DAYS
Major Events:
Roll On Roll Off Discharge Facility (RRDF)
• Purpose: Used for In-Stream off-load. Allows for quick discharge of rolling stock and mobile loaded material onto lighterage for transport to shore.
• Capacity: 100 tons per section
• Operating Limits: Sea State 2
• Installation: Approx. 36 hrs.
• Crew: (Approx. 60 personnel)
– OPS: 2 shifts of 13 personnel (26 total)
– SLWT’s: 2 crews (16 personnel)
• Craft:
– (2) SLWT (Bring to the ship)
– (1) SLWT (support)
FORCES
DAYS
Major Events:
Roll On Roll Off Discharge Facility (RRDF)
• Equipment:– (6) CIN’s
– (1) COS (optional)
– (3) Tricons
– (3) ISO Containers
– RRDF kit (Lights, Zodiak, Easy, Dunnage, Flexors, Side Shear Connectors, 3 bumpers)
• Acronyms– PCO – Primary Control Officer
– OCO – Offload Control Officer
– LCO – Lighterage Control Officer
– LSO – Lighterage Supply Officer
– POG – Port Ops Group
– AAOG – Arrival Assembly Ops Group
• USNS Martin (6 CINs, 1 SLWT)
• CPF (Causeway Platform Facility)
FORCES
DAYS
Major Events:
Airfiel
d
O - DayO - Day
Green Beach
Red Beach
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
CAMP
SECURITY
- Rolling stock, container and fuel off-load begins- Main Body begins arriving ~315 - 80 ACB - 60 BMU - 100 NCW - 10 CNBG - 65 ACU
- Splash AAVs- Offload NSE equipment- Instream off-load begins
Staging orMarshalling
Area
Causeway Ferry
Causeway Ferry
SE
C
SE
C
Causeway Ferry
RRDF
LCT (lighterage control team)
BPT (Beach Party Team)
Shore Party
Shore Party
FORCES
DAYS
Major Events:
Airfiel
d
O +1O +1
Green Beach
Red Beach
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
CAMP
SECURITY - Initial water capability- Main Body continues to arrive
Staging orMarshalling
Area
Causeway Ferry
Causeway Ferry
SE
C
SE
C
Causeway Ferry
LCM-8
LCM-8
RRDF
LCT (lighterage control team)
BPT (Beach Party Team)
Shore Party
Shore Party
FORCES
DAYS
Major Events:
Airfiel
d
O +2O +2
Green Beach
Red Beach
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
CAMP
SECURITY - Issue habitability/capability sets- MRE issue point established- Install AABWS/AABFS
Staging orMarshalling
Area
Causeway Ferry
Causeway Ferry
SE
C
SE
C
Causeway Ferry
LCM-8
LCM-8
AABFS
RRDF
LCT (lighterage control team)
BPT (Beach Party Team)
Shore Party
Shore Party
FORCES
DAYS
Major Events:
Amphibious Assault Bulk Fuel System (AABFS)
• Crew Size: 12 (Including BIU Crew and Boat Crew)
• Length: 10,000 ft Capability (5,000 ft per hosereel)
• Hose: 6 in. diameter
• Install: 10 hrs – 10,000 ft
• Rate of delivery: 700 gal/min @ 5,000 ft hose length (700,000 gal/day)
• Craft: SLWT/CSP/BF+1/LCU/LCM8
• Operating Limits: install – sea state 2, operate – sea state 3 Intended for 30 days or less 600 GPM pump (in-line booster pump) Hose comes in 100 ft sections 2 zodiacs standing by for operations and maintenance Make sure hose has not been used for fuel or non-potable water
FORCES
DAYS
Major Events:
Amphibious Assault Bulk Fuel System (AABFS)
• BIU – Beach Interface Unit (Place 150 ft above high water mark)
• Installation:
1. Place BIU at beach
2. Place 2 sections (200 ft) on beach
3. Install riding saddle approx. 100 ft from beach
4. Pay out hose from shore
5. Anchor every 150 ft.
6. Light buoy every 100 ft
FORCES
DAYS
Major Events:
Amphibious Assault Bulk Water System (AABWS)
• Crew Size: 12 (Including BIU Crew and Boat Crew)
• Length: 10,000 Per Hosereel
• Hose: 4 in. diameter
• Install: 10 hrs – 10,000 ft
• Rate of delivery: 300 gal/min @ 10,000 ft hose length (700,000 gal/day)
• Craft: SLWT/CSP/BF+1/LCU/LCM8 Hose comes in 150 ft sections 2 zodiacs standing by for operations and maintenance Make sure hose has not been used for fuel or non-potable
water
FORCES
DAYS
Major Events:
Airfiel
d
O +4O +4
Green Beach
Red Beach
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
CAMP
SECURITY - Main Body FIE complete- MAGTF self-deploying aircraft begins arriving- Instream rolling stock off-load complete
Staging orMarshalling
Area
Causeway Ferry
Causeway Ferry
SE
CS
EC
Causeway Ferry
LCM-8
LCM-8
AABFS
RRDF
LCT (lighterage control team)
BPT (Beach Party Team)
Shore Party
Shore Party
FORCES
DAYS
Major Events:
Airfiel
d
O +6 through O+9O +6 through O+9
Green Beach
Red Beach
-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22
0
1
2
3
4SU
PPORT
K
CAMP
SECURITY - Container off-load complete O+6- MAGTF operationally ready O+9
Staging orMarshalling
Area
Causeway Ferry
Causeway Ferry
SE
C
SE
C
Causeway Ferry
LCM-8
LCM-8
AABFS
LCT (lighterage control team)
BPT (Beach Party Team)
Shore Party
Shore Party
Joint Logistics Over The Shore (JLOTS)
SLCP(ship literagecontrol point)
MPS
MPS
MPS
MPS
MPS
Green Beach
Red Beach
AABFS
BLCP (Beach literage Cont Pt)
BCU (BeachClearance Unit)
BCU
Staging orMarshalling
Area
Staging orMarshalling
Area
CAMP
Causeway Ferry
Causeway Ferry
LCM-8
LCM-8
LCM-8
Airfiel
d
APOD
SE
CSECURITY
Pre-JLOTSPre-JLOTS
Crane ship
HLPS
HLPS
ABN BDE ClosesPREPO Ashore BDE Closes
Prepo Afloat ADVON arrives
APS 3P.O.P. Arrives
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
K
MPS Discharge
SE
C
SUPPO
RTCO
MBAT
SLCP(ship literagecontrol point)
MPS
MPS
MPS
MPS
MPS MPS
CAMP
Green Beach
Red Beach
ABLTS
Causeway Ferry
Causeway Ferry
BLCP (Beach literage Cont Pt)
BCU (BeachClearance Unit)
BCU
Staging orMarshalling
Area
LCM-8
LCM-8Staging or
MarshallingArea
P. O. P.
Airfiel
d
APOD SE
C
SECURITY
Pre-JLOTSPre-JLOTS
DischargeP.O.P.
Assemble RRDFFloating pier
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
SUPPO
RTCO
MBAT
K
MPS Discharge
SLCP(ship literagecontrol point)
MPS
MPS
MPS
Crane ship
HLPS
HLPS
Green Beach
Red Beach
ABLTS
Causeway Ferry
Causeway Ferry
BLCP (Beach literage Cont Pt)
BCU (BeachClearance Unit)
BCU
Staging orMarshalling
Area
LCM-8
LCM-8Staging or
MarshallingArea
CAMP
MPS
MPS
MPS
MPS
Airfiel
d
APOD SE
C
SECURITY
Establish port/beachfor APS Discharge
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
SUPPO
RTCO
MBAT
K
MPS Discharge
Pre-JLOTSPre-JLOTS
SLCP(ship literagecontrol point)
MPS
MPS
MPS
AABFS
MPS MPS
Green Beach
Red Beach
Floating Pier
BLCP (Beach literage Cont Pt)
BCU (BeachClearance Unit)
BCU
CAMP
Crane ship
Airfiel
d
APOD
JLCC (Joint literagecontrol center)
SE
C
SECURITY
JLOTS PrepJLOTS Prep
LMSR
LMSR
LMSR
LMSR
LMSR
LMSR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
APS 3 Arrives
SUPPO
RTCO
MBAT
K
MPS Discharge
Staging orMarshalling
Area
Staging orMarshalling
Area
JLCC
SLCP(ship literagecontrol point)
MPS MPS
Floating Pier
MPS
MPS
MPS
MPS MPS
Green Beach
Red Beach
AABFS
Causeway Ferry
Causeway Ferry
BLCP (Beach literage Cont Pt)
BCU (BeachClearance Unit)
BCU
Staging orMarshalling
Area
LCM-8
LCM-8Staging or
MarshallingArea
CAMP
Crane ship
Airfiel
d
APOD SE
C
SECURITY
Container Ship
Container Ship
AMMO
AMMO
AMMO
LMSR
LMSR
LMSR
LMSR
LMSR
LMSR
Remaining APS 3 ArrivesAdditional Trans Gp. Arr
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
SUPPO
RTCO
MBAT
LSV
K
LSV ArrivesMPS Discharge
JLOTS PrepJLOTS Prep
SLCP(ship literagecontrol point)
Staging orMarshalling
Area
MPS MPS
AABFS
MPS
MPS
MPS
LSV
Floating Pier
LMSR
LMSR
LMSR
LMSR
LMSR
LMSR
Green Beach
Red Beach
OPDS
BLCP (Beach literage Cont Pt)
BCU (BeachClearance Unit)
BCU
CAMP
Crane ship
Container Ship
Container Ship
Airfiel
d
APOD
JLCC (Joint literagecontrol center)
SE
C
SECURITY
OPDS Arr.
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
AMMO
AMMO
AMMO
SUPPO
RTCO
MBAT
K
MPS Discharge
Staging orMarshalling
Area
JLOTS PrepJLOTS Prep OPDS arrives- delivers up to 1.2M gal of product
OPDS (Offshore Petroleum Distribution System)
• Crew: ( approx. 50 per shift)– ACB2 – 100 personnel– Other – 76 personnel– Total: 176 personnel
• Equipment:– Modified Medium Tanker– 4 nautical miles of hose (6” diameter)– Single Anchor Leg Moor System (SALM) (30o list to drop)– OPDS Jewelry for SLWT conversion– 4 modified SLWTs or 5 OUBs (OPDS Utility Boats)– UCT support for installation and maintenance
• Length: 4 nautical miles – 1 product 2 nautical miles – 2 products
• Capacity: 1.2 Million Gallons/ 20 hour Day
OPDS (Offshore Petroleum Distribution System)
• Operating Limits:– water depths of 35 – 200 ft
– 1.5 knot currents, 16 knot winds
– sea bottom made up of sand, mud, coral (not rock)
• Planning Factors:– 48 hrs to convert craft
– 48 hrs after tanker arrival, deliver 1.2 MG/20 hr day using 4 point mooring
– 7 days after tanker arrival to have SALM system operational intended for 180 day installation
– 5 OUB’s on each tanker (1 repair barge, 3 tow tugs, 1 dive boat)
– BTU (Beach Termination Unit) each tanker carries 2 (crew size 4)
– SALM will survive 55 knot winds
SLCP(ship literagecontrol point)
Staging orMarshalling
Area
Staging orMarshalling
Area MPS MPS
AABFS
MPS
MPS
MPS
LSV
Floating Pier
LMSR
LMSR
LMSR
LMSR
LMSR
LMSR
Green Beach
Red Beach
OPDS
BLCP (Beach literage Cont Pt)
BCU (BeachClearance Unit)
BCU
OUB OUB
OUB
OUBOUB
CAMP
Crane ship
Container Ship
Container Ship
Airfiel
d
APOD
JLCC (Joint literagecontrol center)
SE
C
SECURITY
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
AMMO
AMMO
AMMO
SUPPO
RTCO
MBAT
K
Establish OPDS MPS Discharge
JLOTS PrepJLOTS Prep
Green Beach
Red Beach
IPDS
BLCP (Beach literage Cont Pt)
BCU (BeachClearance Unit)
BCU
Floating Pier
CAMP
Airfiel
d
APOD
JLCC (Joint literagecontrol center)
SE
C
SECURITY
OPDS
OUB OUB
OUB
OUBOUB
Crane ship
Container Ship
Container Ship
LMSR
LMSR
LMSR
LMSR
LMSR
LMSR
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Begin APS 3Discharge at SPOD
AMMO
AMMO
AMMO
SUPPO
RTCO
MBAT
Staging orMarshalling
Area
LSV
K
MPS
MPS
Est. IPDS/MPS Discharge
Staging orMarshalling
Area SLCP(ship literagecontrol point)
JLOTS PrepJLOTS Prep
Green Beach
Red Beach
IPDS
BCU
BCU
SLCP
BLCP
BLCP
Floating Pier
Airfiel
d
APOD
JLCC (Joint literagecontrol center)
SE
C
SECURITY
OPDS
OUB OUB
OUB
OUBOUB
CAMP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
Crane ship
Container Ship
Container Ship
LMSR
LMSR
LMSR
LMSR
LMSR
LMSR
MPS Complete Transfer Responsibility
PREPO AfloatMain Body Arriving
AMMO
AMMO
AMMO
SUPPO
RTCO
MBAT
Staging orMarshalling
Area
LSV
K
Staging orMarshalling
Area
JLOTSJLOTS
IPDS
Red Beach
BCU
BLCP
Green Beach
BCU
BLCP
RRDF
Floating Pier
LMSR
LMSR
RRDF
Staging orMarshalling
Area
Crane ship
Container Ship
Container Ship
LMSR
Airfiel
d
APOD
JLCC (Joint literagecontrol center)
SE
C
SECURITY
OPDS
OUB OUB
OUB
OUBOUB
CAMP
SLCP
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
SUPPO
RTCO
MBAT
K
AMMO
AMMO
AMMO
LMSR
LMSR
LMSR
LCM-8
LCU-2000
LCU-2000
LCM-8
LSV
Staging orMarshalling
Area
Begin Instream Discharge of APS 3
JLOTSJLOTS
AMMO
AMMO
AMMO
LMSR
LMSR
LMSR
LMSR
Staging orMarshalling
Area
IPDS
Floating Pier
FuelFarm
Red Beach
BCU
BLCP
Green Beach
BCU
BLCPSLCP
ELCAS (Elevated Causeway)
RRDF
LMSR
LMSR
RRDFJLCC (Joint literage
control center)
CAMP
Crane ship
Container Ship
Container Ship
Airfiel
d
APOD SE
C
SECURITY
OPDS
OUB OUB
OUB
OUBOUB
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30
OPDS In Operation LT Division Closes PREPO BDE Closes
SUPPO
RTCO
MBAT
K
Staging orMarshalling
Area
ELCAS Arrives
JLOTSJLOTS ELCAS(M) arrives- critical to throughput across the beach
Elevated Causeway System (ELCAS(M) )
• Crew Size:– Erection: 120 (2-60 man crews)
– Operation: 54 (2-27 man crews)
– SLWT: 32 (4-8 man crews)
• Length: Goal: Pier Head outside of surf zone with at least 20 ft. depth of water.
• Description: 8’x 40’x 5’ (pontoon) modular sections cantilevered over the water
• Operational Requirements: (Erect 3000 ft. in 7 days) handle cargo from both sides of pier head erect from shore using cantilever erection with 175 ton cranes operate in sea state 3 (5ft waves) , survive sea state 5 (12 ft
waves) beach gradient (not less than 1:24 or greater than 1:300)
Elevated Causeway System (ELCAS(M) )
• Planning Factors: 20 ft at pier head prefer soft bottom (sand/clay) need shore side area for staging, marshalling, logistics bottom of roadway pontoon 7 ft above mean high water
• Modular BF: 3 pontoons wide x 3 pontoons long (24 x 120 w/o powered
section, carry up to 298,000 lbs) 5 pontoons wide x 3 pontoons long (40 x 120 w/o powered
section, carry up to 498,000 lbs)
• Used to carry cranes, pontoons, pile bins
Elevated Causeway System (ELCAS(M) )
Equipment:
(2) 175 Ton Cranes
(2) Tractor trailer turntables (48,000 lbs)
(1) 30T Rough Terrain Mobile Crane
(2) 25 Ton RTCH
(3) Welding Machines
(1) 15,000 lb RT Forklift
(2) Diesel hammers
(1) 6,000 lb RT extended boom forklift
(2) Portable floodlight trailers
(1) Hydraulic vibratory extractor
• Various Slings
• Beveling Machines
• Pile Welding Fixture
• Matting
• Beach Ramp (6 pontoons)
• Roadway (201 pontoons)
• Pierhead (66 pontoons)
Elevated Causeway System (ELCAS(M) )
• Marshalling Yard (7 areas): (Crew: 44, 22 man shifts at 12 hrs each)
• Receiving staging, used for inspecting pontoons
• Storage for 20’ ISO’s containing ELCAS(M) components
• Equipment Storage/Maintenance
• Staging Pontoons and Piles (Beach Ramp Location)
• Welded Pile Stowage, Pile Welding Stations
• Pile bin stowage
• Pontoon Stowage
• Pile Size: 24” OD (1/2” thickness) steel piles in 38 ft length ( fits in ISO containers)
Elevated Causeway System (ELCAS(M) )
• Installation:– Bring ELCAS (M) materials ashore using 3 or 5 wide MCWF or other lighterage
– Prepare marshalling areas and beach ramp site. Beach ramp hole is 79 ft back from high-water mark and 7 ft above above high water mark.
– (6) P40G Pontoon sections (3 wide x 2 long) are placed for beach ramp. Maintain 7.5o angle. 6 piles are used to secure ramp. Piles are cut 3 ft above deck.
– Roadway consists of 3 wide P40G pontoons (201 for 3000 ft). Transition from beach ramp to roadway is via 9 angled connectors. Fasten 2 pontoons side by side, lift them into place, cantilevered out, add third section.
– Construct pier head once the proper distance is obtained. Pier head piles are cut 2 inches below the deck level. Pierhead crane piles cut 1 inch above deck level. (Specific pontoons in certain locations)
– The turntables, lights, throughput cranes. (installation of 175 ton cranes), navigation lights, life lines, nets, life ring buoys (every 80 ft opposite sides)
– OPS: The turned tractor trailer is loaded on the turntable. Vehicle traffic is on the left hand side.
Airfiel
d
APOD
Staging orMarshalling
Area
SPOD
Floating Pier
Red Beach
BCU
BLCP
Green Beach
BCU
BLCP
LCM-8
LCU-2000
LCU-2000
LSV
LCM-8
JLCC (Joint literagecontrol center)Staging or
MarshallingArea ELCAS (Elevated Causeway)
SURGE SURGE
SURGE
SURGE
Crane ship
Container Ship
Crane ship
Container Ship
Container ShipEnd User
End User
End UserFuelFarm
SE
C
SECURITY
End User
CAMP
OPDS
SLCP
IPDS
11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 35 40 45 50 55 60 65 70 75 80
SUPPO
RTCO
MBAT
K
Staging orMarshalling
Area
1st Hvy Div 2nd Hvy Div 3rd Hvy Div 5 1/3rd Hvy Div
JLOTSJLOTS
Airfiel
d
APOD
Staging orMarshalling
Area
Floating Pier
Red Beach
BCU
BLCP
Green Beach
BCU
BLCP
LCM-8
LCU-2000
LCU-2000
LSV
LCM-8
JLCC (Joint literagecontrol center)Staging or
MarshallingArea ELCAS (Elevated Causeway)
End User
End User
End UserFuelFarm
SE
C
SECURITY
End User
CAMP
OPDS
SLCP
IPDS
25 26 27 28 29 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140
SUPPO
RTCO
MBAT
K
Staging orMarshalling
Area
Resupply / Regeneration
Crane ship
Container Ship
Crane ship
Container Ship
Container Ship
Container Ship
Container Ship
Container Ship
Container Ship
Container Ship
JLOTS SustainmentJLOTS Sustainment
MSCO
JLOTS CDR**
FSO
LSOSSO
APSRONNSE
BSCNAVYLIGHTERAGE
CREWS
BSWOOtherSupport
MTMCTiger tm
MSCLNO
OPDSTANKER
TRANSGROUP
TERM BNJLCC
ARMYLIGHTERAGE
CREWS
SDO
BLCP
OPDSOIC
MUAET
IPDSBN
TSC
PHASE 4
START: MPF complete
TRANSITION: Army Corps has closed
AACG
BCU
TRUCK BNCDR
SLCP
TACON TACON DURING PUMPING
TACON DURING OPDS OPS
*
*
*
LNO
FSOLNO
OPDSCDR
BPT *
ELCASOIC
ELCASCDR*
* DebarkTMs
CAMP
TACON
APS
NAVFOR
Support
WHEN U|W
NSE LNO
ARFOR
JTF CDR ***
MARFORAFFOR Support
FORCES
DAYS
Major Events:
Airfiel
d
RegenerationRegeneration
Green Beach
Red Beach
+20 +21 +22+23+24+25+26+27+28+29+30+31+32+33+34+35+36+37+38+39+40+41+42+43+44+45+46+47+48+49
0
1
2
3
4SU
PPORT
K
CAMP
SECURITY - Retrograde, washdown and backload operations commence- Navy backloads lighterage- MPSRON deploys- Redeployment
Staging orMarshalling
Area
Causeway Ferry
Causeway Ferry
SE
C
SE
C
Causeway Ferry
LCM-8
LCM-8
AABFS
LCT (lighterage control team)
BPT (Beach Party Team)
Shore Party
Shore Party