mpf / jlots overview

40
MPF / JLOTS Overview

Upload: norina

Post on 01-Feb-2016

55 views

Category:

Documents


0 download

DESCRIPTION

MPF / JLOTS Overview. MPF org chart. SLRP (Survey Liaison Recon Party) O-9. Airfield. 4. 3. ACB2 SLRP could include the following reps : - S3, S3A, S4, S7A, A3, B6, B3, C3, EA1 SLRP responsibilities : Gather detailed info on conditions within the AAA - PowerPoint PPT Presentation

TRANSCRIPT

Page 1: MPF / JLOTS  Overview

MPF / JLOTS Overview

Page 2: MPF / JLOTS  Overview

MPF org chart

Page 3: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

SLRP (Survey Liaison Recon Party) O-9SLRP (Survey Liaison Recon Party) O-9

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

ACB2 SLRP could include the following reps:- S3, S3A, S4, S7A, A3, B6, B3, C3, EA1

SLRP responsibilities:Gather detailed info on conditions within the AAA- Hydrographic analysis of the beach- Location of HN sources for construction materials- Location of covered storage and hardstand- Designation of MSR and MHE requirements- Location of HN emergency medical facilities- HN public telephone/satellite communications- Analysis on effects of customs/traditions- HN translator- Location of HN military, police & intel agencies

Page 4: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

OPP (Off-load Preparation Party) O-4OPP (Off-load Preparation Party) O-4

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

OPP team includes reps from the MAGTF subordinateelements and NSE

OPP responsibilities:OPP is tasked with the preparation of the equipmentonboard the Maritime Prepositioning Ships (MPS) for debarkation at the AAA

Typical OPP team consists of ~100 personnel per MPS ~84 from MEF FWD~16 from NSE (~5 from ACB2)

Page 5: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

Advanced Party O-4Advanced Party O-4

Green Beach

Red Beach

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

- AP arranges the reception of the Main Body incoordination with the Tanker Airlift Control Element (TALCE) - Consists of AAOG, AAOE, LFSP, NSE and security elements to provide protection- AP team includes:

150 Security200 NCW210 NAVCHAPGRU18 (2 boat crews)110 Camp Support

688- Arrival Airfield Control Group is operational- Tanker Airlift Control Element operational- Beach/Port/Airfield security is established

CAMP

SECURITY

Page 6: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

Seaward Security (NCW) O-2Seaward Security (NCW) O-2

Green Beach

Red Beach

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

- MPSRON arrives in the AAA - Seaward security is established at Beach/Port- Arrival and Assembly organizations functional: AAOG (Arrival Assembly Operations Group) AAOE (Arrival Assembly Operations Element) LFSP (Landing Force Support Party) POG (Port Operations Group) BOG (Beach Operations Group) MCC(Movement Control Center) AACG(Arrival Airfield Control Group)

CAMP

SECURITYS

EC

SE

C

Page 7: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

Navy Day O-1Navy Day O-1

Green Beach

Red Beach

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

CAMP

SECURITY

- Splash lighterage at beach- Off-load systems ready- Voice and Data Communications established and tested

- MPS ready for off-load- Cargo Handling Systems prepared - Causeway ferries assembled- Connect RRDF

SE

CS

EC

RRDF

CF

CF

CF

CF

LCT (lighterage control team)

BPT (Beach Party Team)

Shore Party

Shore Party

Page 8: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Roll On Roll Off Discharge Facility (RRDF)

• Purpose: Used for In-Stream off-load. Allows for quick discharge of rolling stock and mobile loaded material onto lighterage for transport to shore.

• Capacity: 100 tons per section

• Operating Limits: Sea State 2

• Installation: Approx. 36 hrs.

• Crew: (Approx. 60 personnel)

– OPS: 2 shifts of 13 personnel (26 total)

– SLWT’s: 2 crews (16 personnel)

• Craft:

– (2) SLWT (Bring to the ship)

– (1) SLWT (support)

Page 9: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Roll On Roll Off Discharge Facility (RRDF)

• Equipment:– (6) CIN’s

– (1) COS (optional)

– (3) Tricons

– (3) ISO Containers

– RRDF kit (Lights, Zodiak, Easy, Dunnage, Flexors, Side Shear Connectors, 3 bumpers)

• Acronyms– PCO – Primary Control Officer

– OCO – Offload Control Officer

– LCO – Lighterage Control Officer

– LSO – Lighterage Supply Officer

– POG – Port Ops Group

– AAOG – Arrival Assembly Ops Group

• USNS Martin (6 CINs, 1 SLWT)

• CPF (Causeway Platform Facility)

Page 10: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

O - DayO - Day

Green Beach

Red Beach

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

CAMP

SECURITY

- Rolling stock, container and fuel off-load begins- Main Body begins arriving ~315 - 80 ACB - 60 BMU - 100 NCW - 10 CNBG - 65 ACU

- Splash AAVs- Offload NSE equipment- Instream off-load begins

Staging orMarshalling

Area

Causeway Ferry

Causeway Ferry

SE

C

SE

C

Causeway Ferry

RRDF

LCT (lighterage control team)

BPT (Beach Party Team)

Shore Party

Shore Party

Page 11: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

O +1O +1

Green Beach

Red Beach

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

CAMP

SECURITY - Initial water capability- Main Body continues to arrive

Staging orMarshalling

Area

Causeway Ferry

Causeway Ferry

SE

C

SE

C

Causeway Ferry

LCM-8

LCM-8

RRDF

LCT (lighterage control team)

BPT (Beach Party Team)

Shore Party

Shore Party

Page 12: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

O +2O +2

Green Beach

Red Beach

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

CAMP

SECURITY - Issue habitability/capability sets- MRE issue point established- Install AABWS/AABFS

Staging orMarshalling

Area

Causeway Ferry

Causeway Ferry

SE

C

SE

C

Causeway Ferry

LCM-8

LCM-8

AABFS

RRDF

LCT (lighterage control team)

BPT (Beach Party Team)

Shore Party

Shore Party

Page 13: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Amphibious Assault Bulk Fuel System (AABFS)

• Crew Size: 12 (Including BIU Crew and Boat Crew)

• Length: 10,000 ft Capability (5,000 ft per hosereel)

• Hose: 6 in. diameter

• Install: 10 hrs – 10,000 ft

• Rate of delivery: 700 gal/min @ 5,000 ft hose length (700,000 gal/day)

• Craft: SLWT/CSP/BF+1/LCU/LCM8

• Operating Limits: install – sea state 2, operate – sea state 3 Intended for 30 days or less 600 GPM pump (in-line booster pump) Hose comes in 100 ft sections 2 zodiacs standing by for operations and maintenance Make sure hose has not been used for fuel or non-potable water

Page 14: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Amphibious Assault Bulk Fuel System (AABFS)

• BIU – Beach Interface Unit (Place 150 ft above high water mark)

• Installation:

1. Place BIU at beach

2. Place 2 sections (200 ft) on beach

3. Install riding saddle approx. 100 ft from beach

4. Pay out hose from shore

5. Anchor every 150 ft.

6. Light buoy every 100 ft

Page 15: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Amphibious Assault Bulk Water System (AABWS)

• Crew Size: 12 (Including BIU Crew and Boat Crew)

• Length: 10,000 Per Hosereel

• Hose: 4 in. diameter

• Install: 10 hrs – 10,000 ft

• Rate of delivery: 300 gal/min @ 10,000 ft hose length (700,000 gal/day)

• Craft: SLWT/CSP/BF+1/LCU/LCM8 Hose comes in 150 ft sections 2 zodiacs standing by for operations and maintenance Make sure hose has not been used for fuel or non-potable

water

Page 16: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

O +4O +4

Green Beach

Red Beach

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

CAMP

SECURITY - Main Body FIE complete- MAGTF self-deploying aircraft begins arriving- Instream rolling stock off-load complete

Staging orMarshalling

Area

Causeway Ferry

Causeway Ferry

SE

CS

EC

Causeway Ferry

LCM-8

LCM-8

AABFS

RRDF

LCT (lighterage control team)

BPT (Beach Party Team)

Shore Party

Shore Party

Page 17: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

O +6 through O+9O +6 through O+9

Green Beach

Red Beach

-10 -9 -8 -7 -6 -5 -4 -3 -2 -1 O +1 +2 +3 +4 +5 +6 +7 +8 +9 +10 +11 +12 +13 +14 +15 +16 +17 +18 +19 +20 +21 +22

0

1

2

3

4SU

PPORT

K

CAMP

SECURITY - Container off-load complete O+6- MAGTF operationally ready O+9

Staging orMarshalling

Area

Causeway Ferry

Causeway Ferry

SE

C

SE

C

Causeway Ferry

LCM-8

LCM-8

AABFS

LCT (lighterage control team)

BPT (Beach Party Team)

Shore Party

Shore Party

Page 18: MPF / JLOTS  Overview

Joint Logistics Over The Shore (JLOTS)

Page 19: MPF / JLOTS  Overview

SLCP(ship literagecontrol point)

MPS

MPS

MPS

MPS

MPS

Green Beach

Red Beach

AABFS

BLCP (Beach literage Cont Pt)

BCU (BeachClearance Unit)

BCU

Staging orMarshalling

Area

Staging orMarshalling

Area

CAMP

Causeway Ferry

Causeway Ferry

LCM-8

LCM-8

LCM-8

Airfiel

d

APOD

SE

CSECURITY

Pre-JLOTSPre-JLOTS

Crane ship

HLPS

HLPS

ABN BDE ClosesPREPO Ashore BDE Closes

Prepo Afloat ADVON arrives

APS 3P.O.P. Arrives

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

K

MPS Discharge

SE

C

SUPPO

RTCO

MBAT

Page 20: MPF / JLOTS  Overview

SLCP(ship literagecontrol point)

MPS

MPS

MPS

MPS

MPS MPS

CAMP

Green Beach

Red Beach

ABLTS

Causeway Ferry

Causeway Ferry

BLCP (Beach literage Cont Pt)

BCU (BeachClearance Unit)

BCU

Staging orMarshalling

Area

LCM-8

LCM-8Staging or

MarshallingArea

P. O. P.

Airfiel

d

APOD SE

C

SECURITY

Pre-JLOTSPre-JLOTS

DischargeP.O.P.

Assemble RRDFFloating pier

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

SUPPO

RTCO

MBAT

K

MPS Discharge

Page 21: MPF / JLOTS  Overview

SLCP(ship literagecontrol point)

MPS

MPS

MPS

Crane ship

HLPS

HLPS

Green Beach

Red Beach

ABLTS

Causeway Ferry

Causeway Ferry

BLCP (Beach literage Cont Pt)

BCU (BeachClearance Unit)

BCU

Staging orMarshalling

Area

LCM-8

LCM-8Staging or

MarshallingArea

CAMP

MPS

MPS

MPS

MPS

Airfiel

d

APOD SE

C

SECURITY

Establish port/beachfor APS Discharge

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

SUPPO

RTCO

MBAT

K

MPS Discharge

Pre-JLOTSPre-JLOTS

Page 22: MPF / JLOTS  Overview

SLCP(ship literagecontrol point)

MPS

MPS

MPS

AABFS

MPS MPS

Green Beach

Red Beach

Floating Pier

BLCP (Beach literage Cont Pt)

BCU (BeachClearance Unit)

BCU

CAMP

Crane ship

Airfiel

d

APOD

JLCC (Joint literagecontrol center)

SE

C

SECURITY

JLOTS PrepJLOTS Prep

LMSR

LMSR

LMSR

LMSR

LMSR

LMSR

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

APS 3 Arrives

SUPPO

RTCO

MBAT

K

MPS Discharge

Staging orMarshalling

Area

Staging orMarshalling

Area

JLCC

Page 23: MPF / JLOTS  Overview

SLCP(ship literagecontrol point)

MPS MPS

Floating Pier

MPS

MPS

MPS

MPS MPS

Green Beach

Red Beach

AABFS

Causeway Ferry

Causeway Ferry

BLCP (Beach literage Cont Pt)

BCU (BeachClearance Unit)

BCU

Staging orMarshalling

Area

LCM-8

LCM-8Staging or

MarshallingArea

CAMP

Crane ship

Airfiel

d

APOD SE

C

SECURITY

Container Ship

Container Ship

AMMO

AMMO

AMMO

LMSR

LMSR

LMSR

LMSR

LMSR

LMSR

Remaining APS 3 ArrivesAdditional Trans Gp. Arr

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

SUPPO

RTCO

MBAT

LSV

K

LSV ArrivesMPS Discharge

JLOTS PrepJLOTS Prep

Page 24: MPF / JLOTS  Overview

SLCP(ship literagecontrol point)

Staging orMarshalling

Area

MPS MPS

AABFS

MPS

MPS

MPS

LSV

Floating Pier

LMSR

LMSR

LMSR

LMSR

LMSR

LMSR

Green Beach

Red Beach

OPDS

BLCP (Beach literage Cont Pt)

BCU (BeachClearance Unit)

BCU

CAMP

Crane ship

Container Ship

Container Ship

Airfiel

d

APOD

JLCC (Joint literagecontrol center)

SE

C

SECURITY

OPDS Arr.

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

AMMO

AMMO

AMMO

SUPPO

RTCO

MBAT

K

MPS Discharge

Staging orMarshalling

Area

JLOTS PrepJLOTS Prep OPDS arrives- delivers up to 1.2M gal of product

Page 25: MPF / JLOTS  Overview

OPDS (Offshore Petroleum Distribution System)

• Crew: ( approx. 50 per shift)– ACB2 – 100 personnel– Other – 76 personnel– Total: 176 personnel

• Equipment:– Modified Medium Tanker– 4 nautical miles of hose (6” diameter)– Single Anchor Leg Moor System (SALM) (30o list to drop)– OPDS Jewelry for SLWT conversion– 4 modified SLWTs or 5 OUBs (OPDS Utility Boats)– UCT support for installation and maintenance

• Length: 4 nautical miles – 1 product 2 nautical miles – 2 products

• Capacity: 1.2 Million Gallons/ 20 hour Day

Page 26: MPF / JLOTS  Overview

OPDS (Offshore Petroleum Distribution System)

• Operating Limits:– water depths of 35 – 200 ft

– 1.5 knot currents, 16 knot winds

– sea bottom made up of sand, mud, coral (not rock)

• Planning Factors:– 48 hrs to convert craft

– 48 hrs after tanker arrival, deliver 1.2 MG/20 hr day using 4 point mooring

– 7 days after tanker arrival to have SALM system operational intended for 180 day installation

– 5 OUB’s on each tanker (1 repair barge, 3 tow tugs, 1 dive boat)

– BTU (Beach Termination Unit) each tanker carries 2 (crew size 4)

– SALM will survive 55 knot winds

Page 27: MPF / JLOTS  Overview

SLCP(ship literagecontrol point)

Staging orMarshalling

Area

Staging orMarshalling

Area MPS MPS

AABFS

MPS

MPS

MPS

LSV

Floating Pier

LMSR

LMSR

LMSR

LMSR

LMSR

LMSR

Green Beach

Red Beach

OPDS

BLCP (Beach literage Cont Pt)

BCU (BeachClearance Unit)

BCU

OUB OUB

OUB

OUBOUB

CAMP

Crane ship

Container Ship

Container Ship

Airfiel

d

APOD

JLCC (Joint literagecontrol center)

SE

C

SECURITY

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

AMMO

AMMO

AMMO

SUPPO

RTCO

MBAT

K

Establish OPDS MPS Discharge

JLOTS PrepJLOTS Prep

Page 28: MPF / JLOTS  Overview

Green Beach

Red Beach

IPDS

BLCP (Beach literage Cont Pt)

BCU (BeachClearance Unit)

BCU

Floating Pier

CAMP

Airfiel

d

APOD

JLCC (Joint literagecontrol center)

SE

C

SECURITY

OPDS

OUB OUB

OUB

OUBOUB

Crane ship

Container Ship

Container Ship

LMSR

LMSR

LMSR

LMSR

LMSR

LMSR

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Begin APS 3Discharge at SPOD

AMMO

AMMO

AMMO

SUPPO

RTCO

MBAT

Staging orMarshalling

Area

LSV

K

MPS

MPS

Est. IPDS/MPS Discharge

Staging orMarshalling

Area SLCP(ship literagecontrol point)

JLOTS PrepJLOTS Prep

Page 29: MPF / JLOTS  Overview

Green Beach

Red Beach

IPDS

BCU

BCU

SLCP

BLCP

BLCP

Floating Pier

Airfiel

d

APOD

JLCC (Joint literagecontrol center)

SE

C

SECURITY

OPDS

OUB OUB

OUB

OUBOUB

CAMP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

Crane ship

Container Ship

Container Ship

LMSR

LMSR

LMSR

LMSR

LMSR

LMSR

MPS Complete Transfer Responsibility

PREPO AfloatMain Body Arriving

AMMO

AMMO

AMMO

SUPPO

RTCO

MBAT

Staging orMarshalling

Area

LSV

K

Staging orMarshalling

Area

JLOTSJLOTS

Page 30: MPF / JLOTS  Overview

IPDS

Red Beach

BCU

BLCP

Green Beach

BCU

BLCP

RRDF

Floating Pier

LMSR

LMSR

RRDF

Staging orMarshalling

Area

Crane ship

Container Ship

Container Ship

LMSR

Airfiel

d

APOD

JLCC (Joint literagecontrol center)

SE

C

SECURITY

OPDS

OUB OUB

OUB

OUBOUB

CAMP

SLCP

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

SUPPO

RTCO

MBAT

K

AMMO

AMMO

AMMO

LMSR

LMSR

LMSR

LCM-8

LCU-2000

LCU-2000

LCM-8

LSV

Staging orMarshalling

Area

Begin Instream Discharge of APS 3

JLOTSJLOTS

Page 31: MPF / JLOTS  Overview

AMMO

AMMO

AMMO

LMSR

LMSR

LMSR

LMSR

Staging orMarshalling

Area

IPDS

Floating Pier

FuelFarm

Red Beach

BCU

BLCP

Green Beach

BCU

BLCPSLCP

ELCAS (Elevated Causeway)

RRDF

LMSR

LMSR

RRDFJLCC (Joint literage

control center)

CAMP

Crane ship

Container Ship

Container Ship

Airfiel

d

APOD SE

C

SECURITY

OPDS

OUB OUB

OUB

OUBOUB

1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30

OPDS In Operation LT Division Closes PREPO BDE Closes

SUPPO

RTCO

MBAT

K

Staging orMarshalling

Area

ELCAS Arrives

JLOTSJLOTS ELCAS(M) arrives- critical to throughput across the beach

Page 32: MPF / JLOTS  Overview

Elevated Causeway System (ELCAS(M) )

• Crew Size:– Erection: 120 (2-60 man crews)

– Operation: 54 (2-27 man crews)

– SLWT: 32 (4-8 man crews)

• Length: Goal: Pier Head outside of surf zone with at least 20 ft. depth of water.

• Description: 8’x 40’x 5’ (pontoon) modular sections cantilevered over the water

• Operational Requirements: (Erect 3000 ft. in 7 days) handle cargo from both sides of pier head erect from shore using cantilever erection with 175 ton cranes operate in sea state 3 (5ft waves) , survive sea state 5 (12 ft

waves) beach gradient (not less than 1:24 or greater than 1:300)

Page 33: MPF / JLOTS  Overview

Elevated Causeway System (ELCAS(M) )

• Planning Factors: 20 ft at pier head prefer soft bottom (sand/clay) need shore side area for staging, marshalling, logistics bottom of roadway pontoon 7 ft above mean high water

• Modular BF: 3 pontoons wide x 3 pontoons long (24 x 120 w/o powered

section, carry up to 298,000 lbs) 5 pontoons wide x 3 pontoons long (40 x 120 w/o powered

section, carry up to 498,000 lbs)

• Used to carry cranes, pontoons, pile bins

Page 34: MPF / JLOTS  Overview

Elevated Causeway System (ELCAS(M) )

Equipment:

(2) 175 Ton Cranes

(2) Tractor trailer turntables (48,000 lbs)

(1) 30T Rough Terrain Mobile Crane

(2) 25 Ton RTCH

(3) Welding Machines

(1) 15,000 lb RT Forklift

(2) Diesel hammers

(1) 6,000 lb RT extended boom forklift

(2) Portable floodlight trailers

(1) Hydraulic vibratory extractor

• Various Slings

• Beveling Machines

• Pile Welding Fixture

• Matting

• Beach Ramp (6 pontoons)

• Roadway (201 pontoons)

• Pierhead (66 pontoons)

Page 35: MPF / JLOTS  Overview

Elevated Causeway System (ELCAS(M) )

• Marshalling Yard (7 areas): (Crew: 44, 22 man shifts at 12 hrs each)

• Receiving staging, used for inspecting pontoons

• Storage for 20’ ISO’s containing ELCAS(M) components

• Equipment Storage/Maintenance

• Staging Pontoons and Piles (Beach Ramp Location)

• Welded Pile Stowage, Pile Welding Stations

• Pile bin stowage

• Pontoon Stowage

• Pile Size: 24” OD (1/2” thickness) steel piles in 38 ft length ( fits in ISO containers)

Page 36: MPF / JLOTS  Overview

Elevated Causeway System (ELCAS(M) )

• Installation:– Bring ELCAS (M) materials ashore using 3 or 5 wide MCWF or other lighterage

– Prepare marshalling areas and beach ramp site. Beach ramp hole is 79 ft back from high-water mark and 7 ft above above high water mark.

– (6) P40G Pontoon sections (3 wide x 2 long) are placed for beach ramp. Maintain 7.5o angle. 6 piles are used to secure ramp. Piles are cut 3 ft above deck.

– Roadway consists of 3 wide P40G pontoons (201 for 3000 ft). Transition from beach ramp to roadway is via 9 angled connectors. Fasten 2 pontoons side by side, lift them into place, cantilevered out, add third section.

– Construct pier head once the proper distance is obtained. Pier head piles are cut 2 inches below the deck level. Pierhead crane piles cut 1 inch above deck level. (Specific pontoons in certain locations)

– The turntables, lights, throughput cranes. (installation of 175 ton cranes), navigation lights, life lines, nets, life ring buoys (every 80 ft opposite sides)

– OPS: The turned tractor trailer is loaded on the turntable. Vehicle traffic is on the left hand side.

Page 37: MPF / JLOTS  Overview

Airfiel

d

APOD

Staging orMarshalling

Area

SPOD

Floating Pier

Red Beach

BCU

BLCP

Green Beach

BCU

BLCP

LCM-8

LCU-2000

LCU-2000

LSV

LCM-8

JLCC (Joint literagecontrol center)Staging or

MarshallingArea ELCAS (Elevated Causeway)

SURGE SURGE

SURGE

SURGE

Crane ship

Container Ship

Crane ship

Container Ship

Container ShipEnd User

End User

End UserFuelFarm

SE

C

SECURITY

End User

CAMP

OPDS

SLCP

IPDS

11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 35 40 45 50 55 60 65 70 75 80

SUPPO

RTCO

MBAT

K

Staging orMarshalling

Area

1st Hvy Div 2nd Hvy Div 3rd Hvy Div 5 1/3rd Hvy Div

JLOTSJLOTS

Page 38: MPF / JLOTS  Overview

Airfiel

d

APOD

Staging orMarshalling

Area

Floating Pier

Red Beach

BCU

BLCP

Green Beach

BCU

BLCP

LCM-8

LCU-2000

LCU-2000

LSV

LCM-8

JLCC (Joint literagecontrol center)Staging or

MarshallingArea ELCAS (Elevated Causeway)

End User

End User

End UserFuelFarm

SE

C

SECURITY

End User

CAMP

OPDS

SLCP

IPDS

25 26 27 28 29 30 35 40 45 50 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140

SUPPO

RTCO

MBAT

K

Staging orMarshalling

Area

Resupply / Regeneration

Crane ship

Container Ship

Crane ship

Container Ship

Container Ship

Container Ship

Container Ship

Container Ship

Container Ship

Container Ship

JLOTS SustainmentJLOTS Sustainment

Page 39: MPF / JLOTS  Overview

MSCO

JLOTS CDR**

FSO

LSOSSO

APSRONNSE

BSCNAVYLIGHTERAGE

CREWS

BSWOOtherSupport

MTMCTiger tm

MSCLNO

OPDSTANKER

TRANSGROUP

TERM BNJLCC

ARMYLIGHTERAGE

CREWS

SDO

BLCP

OPDSOIC

MUAET

IPDSBN

TSC

PHASE 4

START: MPF complete

TRANSITION: Army Corps has closed

AACG

BCU

TRUCK BNCDR

SLCP

TACON TACON DURING PUMPING

TACON DURING OPDS OPS

*

*

*

LNO

FSOLNO

OPDSCDR

BPT *

ELCASOIC

ELCASCDR*

* DebarkTMs

CAMP

TACON

APS

NAVFOR

Support

WHEN U|W

NSE LNO

ARFOR

JTF CDR ***

MARFORAFFOR Support

Page 40: MPF / JLOTS  Overview

FORCES

DAYS

Major Events:

Airfiel

d

RegenerationRegeneration

Green Beach

Red Beach

+20 +21 +22+23+24+25+26+27+28+29+30+31+32+33+34+35+36+37+38+39+40+41+42+43+44+45+46+47+48+49

0

1

2

3

4SU

PPORT

K

CAMP

SECURITY - Retrograde, washdown and backload operations commence- Navy backloads lighterage- MPSRON deploys- Redeployment

Staging orMarshalling

Area

Causeway Ferry

Causeway Ferry

SE

C

SE

C

Causeway Ferry

LCM-8

LCM-8

AABFS

LCT (lighterage control team)

BPT (Beach Party Team)

Shore Party

Shore Party